CN209723620U - A section template reinforcing bolt is poured after sandwich thermal insulation board precast facade - Google Patents

A section template reinforcing bolt is poured after sandwich thermal insulation board precast facade Download PDF

Info

Publication number
CN209723620U
CN209723620U CN201920343542.7U CN201920343542U CN209723620U CN 209723620 U CN209723620 U CN 209723620U CN 201920343542 U CN201920343542 U CN 201920343542U CN 209723620 U CN209723620 U CN 209723620U
Authority
CN
China
Prior art keywords
section
bar
sections
bars
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920343542.7U
Other languages
Chinese (zh)
Inventor
赵春梅
王雪峰
刘威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201920343542.7U priority Critical patent/CN209723620U/en
Application granted granted Critical
Publication of CN209723620U publication Critical patent/CN209723620U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model pours a section template reinforcing bolt after providing a kind of sandwich thermal insulation board precast facade, it is two-period form composite structure, wherein, one section of bar is embedded in outer impeller when outer impeller is prefabricated, it is welded with pre-embedded steel slab in outer impeller, two sections of bars are connected as one with one section of bar by nut, template is passed through on the outside of two sections of bars and is exposed to a part on the outside of template, it is locked by fastener exposed portion, it is easy for installation that this reinforces bolt, construction rear pattern plate does not need manually gas welding to be used to cut off exposed parts screw rod when removing, but directly disassembly is used in turn, and reduces use cost.

Description

A section template reinforcing bolt is poured after sandwich thermal insulation board precast facade
Technical field
The utility model is applied in the assembly of shear wall structure construction of sandwich thermal insulation board precast facade, specifically a kind of Template fixes construction equipment.
Background technique
As country widelys popularize assembled architecture, assembly of shear wall structure system is used widely.For this knot The connecting portion of structure system, prefabricated components and Cast-in-Situ Segment becomes Construction control emphasis, prefabricated outer in particular by sandwich thermal insulation board Wall Cast-in-Situ Segment template construction, even more control stress point.For assembly of shear wall structure, exterior wall Cast-in-Situ Segment wall inner side template and outer Leaf is reinforced, and harness cord screw rod is generallyd use.The harness cord screw rod one end is outside sandwiched heat insulation board precast facade Cast-in-Situ Segment on impeller Pre-buried, the other end is connect with Cast-in-Situ Segment wall inner side template with fastener, and operation, harness cord spiral shell are installed on the screw rod on the outside of template The length of bar should be enough to be greater than Cast-in-Situ Segment width and county can also stretch out the outer segment length of template.It is artificial to use when form removable Gas welding cuts off exposed parts screw rod, and is repaired, and constructs comparatively laborious, and wastes after screw rod excision.
Utility model content
Problem to be solved in the utility model is: fabricated shear wall construction split bolt fixed structure is deposited in the prior art It needs to repair cast-in-place concrete metope in waste of material, and after constructing, not only wastes material, patch work is also comparatively laborious to be lacked It falls into.
In order to solve the above technical problems, technical solution provided by the utility model is:
A section template reinforcing bolt is poured after a kind of sandwich thermal insulation board precast facade, it is two-period form composite structure, wherein one section Bar is embedded in outer impeller when outer impeller is prefabricated, it is welded with pre-embedded steel slab in outer impeller, and two sections of bars and one section of bar pass through spiral shell Mother is connected as one, and template is passed through on the outside of two sections of bars and is exposed to a part on the outside of template, exposed portion is locked by fastener.
This reinforcing bolt is easy for installation, and construction rear pattern plate does not need manually gas welding to be used to cut exposed parts screw rod when removing It removes, but directly disassembly is used in turn, and reduces use cost.
The docking structure of one section of bar and two sections of bars is: one section of bar outer end is equipped with screw thread, and two sections of bar inner ends are equipped with screw thread, and one section Bar and two sections of bars access a nut jointly, are linked together the two by the nut.
The docking structure of one section of bar and two sections of bars is also possible to: two sections of affixed nuts in bar inner end, and one section of bar outer end is equipped with silk Button, the nut of two sections of bars are attached on one section of bar, realize that two sections of bars are docked with one section of bar.
Specifically, two sections of bars are exposed to a length of 100mm of template exterior portion;The overall length of one section of bar and two sections of bars is siphonal lobe Concrete cover+heat preservation plate thickness+outer wall thick+inner side template and the stupefied thickness+100mm of primary and secondary.
Preferably, on the inside of template one section of bar and two sections of bars to being set with taper PVC casing, taper PVC set on connected nut Pipe range 40mm, nut are retracted taper 2mm.
Detailed description of the invention
Fig. 1 is the utility model overall structure installation diagram;
Fig. 2 is one section of bar, schematic enlarged-scale view at two sections of bar docking;
Fig. 3 is that independent nut docks schematic diagram;
Fig. 4 is structural exploded view at independent nut docking;
Fig. 5 is two sections of bar welded nut structural exploded views.
In figure: outer impeller 1, insulation board 2, interior impeller 3, Cast-in-Situ Segment 4, template 5, pre-embedded steel slab 6, one sections of bars 7, taper PVC Casing 8, nut 9, two sections of bars 10, fasteners 11.
Specific embodiment
The utility model is illustrated with reference to the accompanying drawing:
Split bolt provided by the utility model is cast-in-place for the progress wall installation of assembled sandwich heat preserving wall body Cast-in-Situ Segment Section construction, for fixing Cast-in-Situ Segment template.The structure to be contacted of split bolt as shown in Figure 1, include outer impeller 1, insulation board 2, The Cast-in-Situ Segment 4 and template 5 opposite with interior impeller 3.
As shown in Figure 1-3, pouring a section template reinforcing bolt after sandwich thermal insulation board precast facade provided by the utility model, it is used In assembling type outer wall Cast-in-Situ Segment formwork reinforcement.The reinforcing bolt is two-period form composite structure, wherein one section of bar 7 is pre- in outer impeller It is embedded in when processed in outer impeller, it is welded with pre-embedded steel slab 6 in outer impeller, and two sections of bars 10 are connected as with one section of bar 7 by nut 9 Integrally, template 5 being passed through on the outside of two sections of bars 10 and being exposed to 5 outside a part of template, exposed portion is locked by fastener 11.
The utility model is described in detail below by one embodiment:
The reinforcing bolt of two-period form composite structure, one section of bar 7 are that a diameter 14mm, end are formed with screw thread and are equipped with spiral shell The rod piece of mother 9, one section of bar 7 is pre-buried preceding i.e. in nut 9.
Two sections of bars 10 are diameter 14mm, rod piece of the surface with screw thread.Screw thread can be made in two sections of bar overall surfaces.It can also be with Only in end system a part for connecting with nut, then in the middle part of two sections of bars 10 need to fill position system a part of fastener 11.
Two sections of bar screw thread ends and pre-buried rod piece (i.e. one section of bar) nut thread are affixed.Specific structure is as shown in Fig. 2, one section of bar 7 screw thread is screwed on the left of nut 9, and the screw thread end of two sections of bars 10 is screwed on the right side of nut 5, and two bars dock in nut 9, is passed through Two bars are combined as a whole by nut 9.Two sections of 10 other ends of bar pass through pattern hole, and screw rod is exposed to 5 outside 100mm of template, with button Part 11 is locked.It is also possible to nut is screwed on one section of bar, by nut-welding in two sections of rod end heads, installation such as Fig. 4.
The length described in the utility model for reinforcing bolt is the length after one section of bar, 7, two sections of bars 10 dock, its length is Siphonal lobe concrete cover+heat preservation plate thickness+outer wall thick+inner side template and the stupefied thickness+100mm of primary and secondary.As shown in Figure 1, one section of bar 7 is located completely In 5 inside of Cast-in-Situ Segment template, two sections of bars 10 pass through template 5 and are threadedly coupled with one section of bar 7.That is the docking of one section of bar, 7, two sections of bars 10 It is in 5 inside of template.
In the utility model design, two sections of bars 10 are expected to remove after 4 concrete initial set of Cast-in-Situ Segment, therefore are It avoids concrete from building nut 9, taper PVC casing 8 has also been devised outside the nut 9 of one section of bar 7, two sections of bars 10 docking.Knot Closing is the straight pipe being adapted to nut diameter inside 3,4 taper PVC casing 8 of attached drawing, the taper sheath being integrated outside straight pipe, cone Shape set can be by nut cover among inner cavity, 8 overall length 40mm of this taper PVC casing.
It when taper PVC casing is installed, is buckled on nut, and be close to template-setup, nut is retracted 2mm in taper.
When form removable, the fastener 11 in 5 outside of template is unscrewed, unloads two sections of bars 10, form removal 5 is unloaded with special spanner Inferior pyramidal PVC casing 8 and nut 9 while being the structure with two sections of bar one (by nut, remove two sections of bars and remove nut), by spiral shell Mother 9 cleans out with two sections of bars 10, is used in turn to lower layer.
This construction method is easy to operate, and it is fast that peace tears speed open, and hinged bolt is used in turn, i.e. guarantee concrete metope appearance matter Amount, and reduce construction cost.

Claims (5)

1. pouring a section template reinforcing bolt after a kind of sandwich thermal insulation board precast facade, it is two-period form composite structure, wherein one section of bar It is embedded in when outer impeller is prefabricated in outer impeller, it is welded with pre-embedded steel slab in outer impeller, and two sections of bars and one section of bar pass through nut It is connected as one, template is passed through on the outside of two sections of bars and is exposed to a part on the outside of template, exposed portion is locked by fastener.
2. pour a section template reinforcing bolt after sandwich thermal insulation board precast facade according to claim 1, it is characterized in that: one section of bar and The docking structure of two sections of bars is: one section of bar outer end is equipped with screw thread, and two sections of bar inner ends are equipped with screw thread, and one section of bar and two sections of bars connect jointly Enter a nut, is linked together the two by the nut.
3. pour a section template reinforcing bolt after sandwich thermal insulation board precast facade according to claim 1, it is characterized in that: one section of bar and The docking structure of two sections of bars is: two sections of affixed nuts in bar inner end, and one section of bar outer end is equipped with screw thread, and the nut of two sections of bars is attached to one section On bar, realize that two sections of bars are docked with one section of bar.
4. a section template reinforcing bolt is poured after sandwich thermal insulation board precast facade according to claim 1, it is characterized in that: described two sections Bar is exposed to a length of 100mm of template exterior portion;The overall length of one section of bar and two sections of bars is siphonal lobe concrete cover+heat preservation plate thickness+exterior wall Thickness+inner side template and the stupefied thickness+100mm of primary and secondary.
5. a section template reinforcing bolt is poured after sandwich thermal insulation board precast facade according to claim 1, it is characterized in that: on the inside of template One section of bar and two sections of bars to taper PVC casing is set on connected nut, taper PVC covers pipe range 40mm, and nut is retracted taper sheath Pipe 2mm.
CN201920343542.7U 2019-03-18 2019-03-18 A section template reinforcing bolt is poured after sandwich thermal insulation board precast facade Active CN209723620U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920343542.7U CN209723620U (en) 2019-03-18 2019-03-18 A section template reinforcing bolt is poured after sandwich thermal insulation board precast facade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920343542.7U CN209723620U (en) 2019-03-18 2019-03-18 A section template reinforcing bolt is poured after sandwich thermal insulation board precast facade

Publications (1)

Publication Number Publication Date
CN209723620U true CN209723620U (en) 2019-12-03

Family

ID=68687113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920343542.7U Active CN209723620U (en) 2019-03-18 2019-03-18 A section template reinforcing bolt is poured after sandwich thermal insulation board precast facade

Country Status (1)

Country Link
CN (1) CN209723620U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021713A (en) * 2019-12-13 2020-04-17 中冶天工集团有限公司 Novel concrete embedded bolt mechanism and use method thereof
CN112609961A (en) * 2020-12-13 2021-04-06 福州市第三建筑工程公司 Integral horizontal pull rod assembly in concrete wall formwork
CN114197742A (en) * 2021-12-31 2022-03-18 三一筑工科技股份有限公司 PCF board connecting device, construction method of PCF board connecting device and prefabricated part

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021713A (en) * 2019-12-13 2020-04-17 中冶天工集团有限公司 Novel concrete embedded bolt mechanism and use method thereof
CN112609961A (en) * 2020-12-13 2021-04-06 福州市第三建筑工程公司 Integral horizontal pull rod assembly in concrete wall formwork
CN114197742A (en) * 2021-12-31 2022-03-18 三一筑工科技股份有限公司 PCF board connecting device, construction method of PCF board connecting device and prefabricated part

Similar Documents

Publication Publication Date Title
CN209723620U (en) A section template reinforcing bolt is poured after sandwich thermal insulation board precast facade
CN208534047U (en) Sealing up screw can be recycled in combined type
CN110359601A (en) A kind of one-time formed energy saving form walls of one-piece casting and construction method
CN110984562B (en) Double-shear wall long and narrow deformation joint and construction method
CN103422674A (en) Cast-in-place section concrete construction method of assembling-type concrete structure
CN101864836B (en) Construction method for supporting template at construction joint of frame structure
JP2008127897A (en) Mold holder, construction method of concrete structure using mold holder, and concrete structure constructed by the method
CN102296812A (en) Building template molding structure, fastening piece and building template construction method
CN205875736U (en) Sectional type shear force wall is to drawing sealing screw
CN109853953A (en) Controllable wall pours the outer wall template split bolt of thickness and its peace tears method open
CN206706844U (en) A kind of alter-pouring strips mould plate installs construction
CN201581640U (en) Efficient waterproof opposite-pulling screw
JP2001214534A (en) Anchor structure and its work execution method
CN208235942U (en) One kind being used for shear wall interlayer joint part three-stage moldboard reinforcing tool
CN106639099B (en) Plant-fibre type heat preservation dismounting-free formwork formwork system surface smoothness control method
CN114753630A (en) Cast-in-place side formwork reinforcing structure and method for top of prefabricated outer wall
CN113445767B (en) Post-cast strip protective structure is built in room
CN210315625U (en) Anti reinforcement structure that floats of sump pit template
CN211869633U (en) Assembled double-bottom water floating building structure with heat insulation function
CN201162350Y (en) Water stop screw in underground shearing force wall
CN211114417U (en) Novel steel-concrete composite beam structure of tensile shear
CN208763396U (en) A kind of horizontal construction joint reinforcing bolt
CN209341178U (en) The prefabricated dedicated wire box of superimposed sheet
KR101372899B1 (en) Deck plate spacer
CN208219912U (en) A kind of precast shear wall L shape Joint's connection fabrication

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant