CN209341178U - The prefabricated dedicated wire box of superimposed sheet - Google Patents
The prefabricated dedicated wire box of superimposed sheet Download PDFInfo
- Publication number
- CN209341178U CN209341178U CN201920361574.XU CN201920361574U CN209341178U CN 209341178 U CN209341178 U CN 209341178U CN 201920361574 U CN201920361574 U CN 201920361574U CN 209341178 U CN209341178 U CN 209341178U
- Authority
- CN
- China
- Prior art keywords
- box
- prefabricated
- wire
- height
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本实用新型提供一种预制叠合板专用线盒,它包括底盒、顶盒,所述底盒由贯通管形状的盒壁和固接在盒壁上的两个钢筋穿接块组成,钢筋穿接块上设有钢筋孔;底盒上部设有内螺纹,下部设有螺丝固定槽;顶盒由顶板和盒身组成,顶板和盒身上都设有穿管孔,盒身下部设有外螺纹,此结构用于预埋的部分和线管安装的部分分体设置,实现分别施工,有效避免在叠合板预制生产过程中线盒预埋时造成线管弯曲的问题,避免施工吊装过程中对线盒的破坏,从而提高了工作效率,节约了工程成本。
The utility model provides a special wire box for prefabricated laminated boards, which includes a bottom box and a top box. There are reinforcement holes on the connecting block; the upper part of the bottom box is provided with internal threads, and the lower part is provided with screw fixing grooves; the top box is composed of a top plate and a box body, both of which are provided with pipe holes, and the lower part of the box body is provided with external threads , this structure is used to separate the pre-embedded part and the line pipe installation part to achieve separate construction, effectively avoiding the problem of wire pipe bending when the line box is pre-embedded in the prefabricated production process of the laminated board, and avoiding the line alignment during the construction and hoisting process The destruction of the box, thereby improving work efficiency and saving engineering costs.
Description
技术领域technical field
本实用新型属于叠合板预制技术领域,具体涉及一种预制叠合板专用线盒。The utility model belongs to the technical field of prefabricated laminated panels, in particular to a special line box for prefabricated laminated panels.
背景技术Background technique
在建筑施工中,顶板灯盒是不可或缺重要组成部分,它确保屋顶照明设备的正常使用,而现有技术中在预制叠合板施工过程中使用的线盒为成品PVC八角盒,其的高度不能满足施工要求。In building construction, the roof light box is an indispensable and important part, which ensures the normal use of roof lighting equipment, while the wire box used in the construction process of prefabricated laminated panels in the prior art is a finished PVC octagonal box, and its height Can not meet the construction requirements.
灯具接线盒一般采用86系列PVC八角盒留置,这种线盒是分86h70,86h50系列,即线盒高度为70mm和50mm,然而由于一般叠合板浇筑厚度为60mm,常用的线管为直径20mm,这就使得在接线盒处的出管口部分或者全部浸入混凝土中,在叠合板制作过程中必须采用弯曲线管呈“乙”字形,使得管线裸露在60mm以上才行。这种方法使得在制作到施工过程中可能对线管及线管与线盒的连接处造成破坏。一旦破坏了就需要人工剃凿管线,这就产生了不必要的人工费用。86 series PVC octagonal box is generally used for the junction box of lamps and lanterns. This kind of junction box is divided into 86h70 and 86h50 series, that is, the height of the junction box is 70mm and 50mm. This makes part or all of the pipe outlet at the junction box immersed in the concrete. In the process of making the laminated board, it is necessary to use a curved wire pipe in the shape of "B" so that the pipe is exposed to more than 60mm. This method may cause damage to the wire pipe and the connection between the wire pipe and the wire box during the process of manufacture and construction. Once damaged, the pipeline needs to be manually shaved, which creates unnecessary labor costs.
实用新型内容Utility model content
为了避免生产与施工过程中线管的破坏,达到节省人工成本的目的。本实用新型提供一种预制叠合板专用线盒,其具体技术方案是:In order to avoid damage to the line pipe during production and construction, and achieve the purpose of saving labor costs. The utility model provides a special wire box for prefabricated laminated boards, and its specific technical scheme is:
一种预制叠合板专用线盒,它包括底盒、顶盒,所述底盒由贯通管形状的盒壁和固接在盒壁上的两个钢筋穿接块组成,钢筋穿接块上设有钢筋孔;底盒上部设有内螺纹,下部设有螺丝固定槽;顶盒由顶板和盒身组成,顶板和盒身上都设有穿管孔,盒身下部设有外螺纹。A special line box for prefabricated laminated boards, which includes a bottom box and a top box. There are reinforcement holes; the upper part of the bottom box is provided with internal threads, and the lower part is provided with screw fixing grooves; the top box is composed of a top plate and a box body, both of which are provided with pipe holes, and the lower part of the box body is provided with external threads.
此结构用于预埋的部分和线管安装的部分分体设置,实现分别施工,有效避免在叠合板预制生产过程中线盒预埋时造成线管弯曲的问题,避免施工吊装过程中对线盒的破坏,从而提高了工作效率,节约了工程成本。This structure is used to separate the pre-embedded part and the wire pipe installation part to achieve separate construction, effectively avoiding the problem of wire pipe bending when the wire box is pre-embedded in the prefabricated production process of the laminated board, and avoiding the alignment of the wire box during construction and hoisting damage, thereby improving work efficiency and saving engineering costs.
附图说明Description of drawings
图1为本专用线盒应用参考图;Figure 1 is a reference diagram for the application of this dedicated wire box;
图2为底盒主视图;Figure 2 is a front view of the bottom box;
图3为底盒俯视结构图;Figure 3 is a top view structural diagram of the bottom box;
图4为顶盒主视图;Figure 4 is a front view of the top box;
图5为顶盒俯视结构图;Fig. 5 is a top view structure diagram of the top box;
图6为施工完成状态示意图。Figure 6 is a schematic diagram of the construction completion state.
具体实施方式Detailed ways
下面对本实用新型进一步说明:The utility model is further described below:
如图1-5所示,一种预制叠合板专用线盒,它包括底盒1、顶盒2,所述底盒1由贯通管形状的盒壁11和固接在盒壁11上的两个钢筋穿接块13组成,钢筋穿接块13上设有钢筋孔;底盒上部设有内螺纹12,下部设有螺丝固定槽14;顶盒2由顶板22和盒身21组成,顶板22和盒身21上都设有穿管孔23,盒身下部设有外螺纹24。As shown in Fig. 1-5, a special line box for prefabricated laminated boards includes a bottom box 1 and a top box 2. The bottom box 1 consists of a box wall 11 in the shape of a through tube and two A steel bar piercing block 13 is formed, and a steel bar hole is provided on the steel bar piercing block 13; the bottom box is provided with an internal thread 12, and the bottom is provided with a screw fixing groove 14; the top box 2 is composed of a top plate 22 and a box body 21, and the top plate 22 All be provided with pipe hole 23 on the box body 21, and box body bottom is provided with external screw thread 24.
采用上述预制叠合板专用线盒的施工方法,按下列步骤进行:Using the construction method of the above-mentioned special line box for prefabricated laminated panels, proceed as follows:
1)在底盒1两侧的钢筋孔中穿上钢筋4。1) Put steel bars 4 in the steel bar holes on both sides of the bottom box 1.
2)底盒螺丝固定槽侧(即底盒下侧)用胶带封口,盒内填充泡沫,再用胶带封住螺纹侧开口(即底盒上侧)。2) The screw fixing groove side of the bottom box (that is, the lower side of the bottom box) is sealed with tape, the box is filled with foam, and then the opening of the threaded side (that is, the upper side of the bottom box) is sealed with tape.
3)在叠合板钢筋5安装时,将底盒绑扎到叠合板钢筋5上,使底盒的螺丝固定槽侧与模板紧贴。此步完成图参考图1。3) When installing the reinforcement 5 of the laminated plate, bind the bottom box to the reinforcement 5 of the laminated plate, so that the side of the screw fixing groove of the bottom box is closely attached to the template. Refer to Figure 1 for the complete picture of this step.
4)进行混凝土浇筑,底盒1整体盒壁浇筑于混凝土内,底盒螺丝固定槽侧与叠合板下表面齐平,螺纹侧露于叠合板上表面。具体的,螺纹侧可以是与叠合板上表面齐平,也可以稍高于叠合板。4) Concrete pouring, the whole box wall of the bottom box 1 is poured in the concrete, the screw fixing groove side of the bottom box is flush with the lower surface of the laminated plate, and the threaded side is exposed on the upper surface of the laminated plate. Specifically, the threaded side can be flush with the upper surface of the laminated board, or slightly higher than the laminated board.
5)将叠合板运输到现场后,取顶盒2,根据线管设计选择在顶盒上的一个或多个穿管孔23上安装线盒锁母3。5) After the laminated board is transported to the site, take the top box 2, and install the wire box lock nut 3 on one or more pipe holes 23 on the top box according to the design of the wire pipe.
6)最后将顶盒2旋入底盒1中。此步骤完成图见图6。6) Finally screw the top box 2 into the bottom box 1. The complete picture of this step is shown in Figure 6.
本实用新型提供的预制叠合板专用线盒,底盒1要预埋在叠合板中,它的尺寸应当适应于叠合板厚度而设置。具体的,本实用新型提供的底盒1高60mm-70mm,而顶盒2高度为50mm。In the special wire box for prefabricated laminated boards provided by the utility model, the bottom box 1 should be pre-buried in the laminated boards, and its size should be adapted to the thickness of the laminated boards. Specifically, the height of the bottom box 1 provided by the utility model is 60mm-70mm, and the height of the top box 2 is 50mm.
所述钢筋穿接块13的位置可以是在底盒1的下部、中部或者上部。优选设置在与盒底齐平的位置。The position of the steel bar piercing block 13 may be at the lower part, the middle part or the upper part of the bottom box 1 . It is preferably set in a position flush with the bottom of the box.
优选的,底盒的内螺纹12高度占盒壁11总高的三分一。顶盒2的外螺纹24高度占顶盒盒身21高度的五分之一。但螺纹并不限于此范围,螺纹很大范围以能够满足顶盒能固定到底盒中,不会晃动,不易脱出为准。理论上说螺纹越大,底盒和顶盒固定越稳固。Preferably, the height of the inner thread 12 of the bottom box accounts for one-third of the total height of the box wall 11 . The height of the external thread 24 of the top box 2 accounts for 1/5th of the height of the top box body 21 . But the screw thread is not limited to this range, and the screw thread has a wide range to meet the requirement that the top box can be fixed in the bottom box without shaking and not easy to come out. Theoretically, the larger the thread, the more secure the bottom box and top box are fixed.
顶盒顶板上设有三个穿管孔,顶盒盒身上均匀设有四个穿管孔。穿管孔上设有挡片,所述挡片在顶盒未使用时都具有与顶盒本身相连的小连接点,这些小连接点在挡片经敲打时容易断掉。按照线管设计,仅需要敲掉需要使用的穿管孔上的挡片。Three pipe holes are arranged on the top plate of the top box, and four pipe holes are uniformly arranged on the body of the top box. The through-pipe hole is provided with a baffle, and the baffle has small connection points connected with the top box itself when the top box is not in use, and these small connection points are easily broken when the baffle is knocked. According to the design of the conduit, it is only necessary to knock off the baffles on the conduit holes that need to be used.
本方案将设计了预埋盒体部分和线管安装部分,线盒预埋与线管安装分别进行,有效避免在预制生产过程中线盒预埋时线管弯曲及施工吊装过程中对线盒的破坏,从而提高了工作效率,节约了工程成本。This plan will design the pre-embedded box body part and the wire pipe installation part. The wire box pre-embedded and the wire pipe installation are carried out separately, which can effectively avoid the bending of the wire pipe when the wire box is pre-embedded in the prefabricated production process and the damage to the wire box during the construction and hoisting process. Destruction, thereby improving work efficiency and saving engineering costs.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920361574.XU CN209341178U (en) | 2019-03-21 | 2019-03-21 | The prefabricated dedicated wire box of superimposed sheet |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920361574.XU CN209341178U (en) | 2019-03-21 | 2019-03-21 | The prefabricated dedicated wire box of superimposed sheet |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209341178U true CN209341178U (en) | 2019-09-03 |
Family
ID=67763158
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920361574.XU Active CN209341178U (en) | 2019-03-21 | 2019-03-21 | The prefabricated dedicated wire box of superimposed sheet |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209341178U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109827155A (en) * | 2019-03-21 | 2019-05-31 | 中国二十二冶集团有限公司 | The dedicated wire box of prefabricated superimposed sheet and its construction method |
-
2019
- 2019-03-21 CN CN201920361574.XU patent/CN209341178U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109827155A (en) * | 2019-03-21 | 2019-05-31 | 中国二十二冶集团有限公司 | The dedicated wire box of prefabricated superimposed sheet and its construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102979304B (en) | Construction method of double shear wall formworks at deformation joint of high-rise building | |
| CN103061504B (en) | Concrete slab Pipe installing hole to be provided construction mould and construction method | |
| CN202125073U (en) | Turnover bottom clip bolt for combined beam column template | |
| CN206616862U (en) | Formwork root bracing means | |
| CN207582956U (en) | A kind of one-time formed constructing device of concrete window tongue and groove | |
| CN208441314U (en) | A kind of prefabricated superimposed sheet and the superimposed sheet and Cast-in-situ Beam quick assembling connection structure | |
| CN209341178U (en) | The prefabricated dedicated wire box of superimposed sheet | |
| CN207314829U (en) | A kind of wooden model early tears support device open | |
| CN215168004U (en) | Wall form for housing construction engineering | |
| CN203334661U (en) | Scaffold-hole-free formwork construction device for brick-concrete structure construction column | |
| CN110761553A (en) | Constructional column formwork unit, constructional column formwork structure and constructional column construction method | |
| CN110258864A (en) | A kind of basement shear wall exempts from punching template construction method | |
| CN113668849A (en) | Post-cast strip pouring equipment and construction method thereof | |
| CN209737913U (en) | A composite floor mold that is easy to demould | |
| CN109577498B (en) | A sealing device suitable for small-area floor openings | |
| CN218375202U (en) | Brickwork constructional column reentrant corner reinforcing tool | |
| CN205742988U (en) | The explosion-proof membrane module of template one word piece | |
| CN111677268A (en) | A fair-faced concrete single-side support formwork system suitable for side walls of underground engineering | |
| CN207376661U (en) | A kind of plugging structure of poured band of outer wall of basement | |
| CN206902768U (en) | A kind of post-cast strip adjustable supporting | |
| CN208167766U (en) | A kind of simple and fast connection precast concrete plate fetal membrane | |
| CN206539019U (en) | The trapezoidal reserved cartridge of aluminum alloy pattern plate tool-type | |
| CN208633518U (en) | Prestressed concrete laminated floor slab hangs mould pouring construction structure | |
| CN205777520U (en) | The whole lifting steel mold device that a kind of deformation joint position processes | |
| CN207063524U (en) | The detachable sealing beam framework fixer of architectural engineering |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |