CN209723296U CN201920417944.7U CN201920417944U CN209723296U CN 209723296 U CN209723296 U CN 209723296U CN 201920417944 U CN201920417944 U CN 201920417944U CN 209723296 U CN209723296 U CN 209723296U
Authority
CN
China
Prior art keywords
wall
steel cable
blockwork
building block
flexible connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920417944.7U
Other languages
Chinese (zh)
Inventor
邓兴贵
蔡安谷
左金涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Quick Construction Technology Co ltd
Original Assignee
Guizhou Xinggui Hengyuan New Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Xinggui Hengyuan New Building Materials Co Ltd filed Critical Guizhou Xinggui Hengyuan New Building Materials Co Ltd
Priority to CN201920417944.7U priority Critical patent/CN209723296U/en
Application granted granted Critical
Publication of CN209723296U publication Critical patent/CN209723296U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of assembled building block wall steel cable flexible connecting structures, it include the first blockwork wall, second blockwork wall, first steel cable, second steel cable and tension rib, there are gaps between first blockwork wall and the second blockwork wall, the embedded bar for connection is embedded in the first blockwork wall and the second blockwork wall, and the first steel cable is equipped in the pre-buried embedded bar of the first blockwork wall, the second steel cable is equipped in the pre-buried embedded bar of the second blockwork wall simultaneously, it is connected between first steel cable and the second steel cable by tension rib.Using flexible connecting structure described in the utility model, solves the connection type between traditional architecture wall, not only make the gap between wall smaller, construction is more convenient when filling wall pours, material is saved, and but also the production of assembled building block wall and installation process are more convenient, has structure simple, the advantages that construction is simple is quick, safe and practical.

Description

A kind of assembled building block wall steel cable flexible connecting structure
Technical field
The utility model relates to building structure technology field, specifically a kind of assembled building block wall steel cable is flexible Connection structure.
Background technique
Fabricated construction is the abbreviation of prefabricated concrete structure, be using prefabricated components as main bearing member through assembly and The concrete structure being formed by connecting.With the development of modern industrial technology, build house can as machine production, in batch at The manufacture of set ground.As long as prefabricated house component, transport to assemble in site got up at.Due to the construction speed of assembled architecture Degree is fast, and lower production costs, promotes come all over the world rapidly.In China, according to propulsion supply side structural reform With the requirement of novel Urbanization Progress, the assembled architectures such as steel construction, concrete are greatly developed.Therefore, assembled steel reinforced coagulation Soil structure is one of the important directions of China's building structure development, it is conducive to the development of China's building industrialization, improves production Efficiency is energy saving, develops Green environmental-protection building, and is conducive to improve and guarantee construction engineering quality.It is built using assembled The major advantage built has: a large amount of building subassembly is completed the process by Workshop Production, and only needs largely to be assembled at the scene Operation greatly reduces than original cast-in-place operation;Using building, finishing integrated design, construction, component gets over standard, production efficiency Higher, corresponding component cost will decline, and cooperate the digital management of factory, the cost performance of entire assembled architecture can be more next It is higher, while also being compliant with the requirement of green building.Therefore, developing assembled architecture has the larger advantage for saving resource and market Prospect.
Filling wall is a kind of building structure, and wall is different according to structure stress situation, there is load bearing wall, non-load bearing wall. Using building block in house building course, gap can be generated between blocks, so that filling wall construction is formed, it is main at present to use It disengages the connection type not disengaged either to be attached, when using the method disengaged, fills and reserved between the building block of wall both ends Gap not less than 20mm, the Out-Plane Stability Problems of filling wall are more prominent when using disengagement mode in this way.And use does not take off There is also certain problems for the connection method opened, and at present mainly based on bar planting method, bar planting method is problem appear to is that the steel being implanted into Muscle is insecure, and stability is poor.These problems seriously affect structure safety, so that the whole shock resistance of structure can be reduced Can, security-hidden trouble is left to engineering.The drawbacks of to overcome rigid connection, " the masonry filler wall detail of construction " 10SG64-2 In propose flexible connection scheme between filling wall and main structure, " seismic design provision in building code " (GB50011-2011) the 13.2.1 item provides: to the building element of flexible connection, can be not counted in rigidity, masonry filler wall can not be considered to main structure Stiffness contribution.Therefore, reduction coefficient natural vibration period for considering main structure can not be had in main structure seismic resistance calculation, it is convenient The design application of concrete structure.However, effective flexible connection forms there is no to can solve masonry filler wall pair at present The problems such as influence to tension rib of the stiffness contribution of main structure, masonry filler wall sedimentation and deformation.
Utility model content
The problem of the technical problems to be solved in the utility model is for background technique provides a kind of structure letter Single, easy for construction flexible connecting device, breaks the connection type between traditional architecture wall, and filling wall is cast-in-place concrete structure Part, two sides and assembled building block wall are flexibly connected, and filling wall can construct after the completion of assembled building block, so that assembled building block The production of wall and installation process are more convenient, specifically a kind of assembled building block wall steel cable flexible connecting structure.
In order to solve the above technical problems, the technology employed by the present utility model is a kind of assembled building block wall steel cable Flexible connecting structure includes the first blockwork wall, the second blockwork wall, the first steel cable, the second steel cable and tension rib, institute State between the first blockwork wall and the second blockwork wall that there are gaps, in the first blockwork wall and the second prefabricated block It is embedded with the embedded bar for connection in block wall, and is equipped in the pre-buried embedded bar of the first blockwork wall First steel cable, while the second steel cable, first steel cable are equipped in the pre-buried embedded bar of the second blockwork wall And second be connected between steel cable by tension rib.
Further, a kind of assembled building block wall steel cable flexible connecting structure described in the utility model, wherein described pre- It buries reinforcing bar and is embedded in corresponding first blockwork wall the second blockwork coping, first steel cable and the second steel in advance respectively Removably set is hung in corresponding embedded bar rope respectively, wherein first steel cable and the second steel cable are all made of diameter is 4mm, the steel cable that length is 400mm form enclosed construction, and the embedded bar uses diameter for the spiral of 12mm.
Using a kind of assembled building block wall steel cable flexible connecting structure described in the utility model, compared with prior art, Its effective effect is: due to being embedded in the first blockwork wall and the second blockwork wall for connection Embedded bar, and the first steel cable is equipped in the pre-buried embedded bar of the first blockwork wall, while described second It is equipped with the second steel cable in the pre-buried embedded bar of blockwork wall, passes through tension rib between first steel cable and the second steel cable It is connected.After assembled building block main structure construction, the first steel cable and the second steel cable is set to be connected by tension rib, just It can be carried out poured in place concrete, the construction of filling wall can be realized, construction can be reduced and interfered with each other, main structure is not influenced Construction speed, can effectively shorten the construction period, while also ensure the antidetonation compatibility of deformation with main structure, can also Built-in fitting is installed at gap, higher bearing capacity can be provided in this way.Using flexible connecting structure described in the utility model, solve Connection type between traditional architecture wall not only makes the gap between wall smaller, and construction is more convenient when filling wall pours, and saves Material, and but also the production of assembled building block wall and installation process are more convenient, have structure simple, construction is simple is fast Victory, it is safe and practical the advantages that.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawing.
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is structural schematic diagram when the utility model is constructed.
It is as shown in the figure: the first building block of 1- partition wall, the second building block of 2- partition wall, the first steel cable of 3-, the second steel cable of 4-, 5- drawknot Muscle, 6- embedded bar, 7- reinforcing bar.
Specific embodiment
For the design for further illustrating the utility model, below with reference to attached drawing to specific embodiment of the present utility model It is described further:
As depicted in figs. 1 and 2, a kind of assembled building block wall steel cable flexible connecting structure described in the utility model, including There are the first blockwork wall 1, the second blockwork wall 2, the first steel cable 3, the second steel cable 4 and tension rib 5, the first prefabricated block There are gaps between block wall 1 and the second blockwork wall 2, in the first blockwork wall 1 and the second blockwork wall 2 It is embedded with the embedded bar 6 for connection, and is equipped with the in the pre-buried embedded bar 6 of the first blockwork wall 1 One steel cable 3, while the second steel cable 4, first steel are equipped in the pre-buried embedded bar 6 of the second blockwork wall 2 It is connected between rope 3 and the second steel cable 4 by tension rib 5.Wherein it is prefabricated to be embedded in corresponding first in advance respectively for the embedded bar 6 Removably set is hung on relatively respectively for the top of blockwork 1 and the second blockwork wall 2, first steel cable 3 and the second steel cable 4 In the embedded bar 6 answered, wherein it is 4mm that first steel cable 3 and the second steel cable 4, which are all made of diameter, length is the steel cable of 400mm Enclosed construction is formed, the embedded bar 4 uses diameter for the spiral of 12mm.
In actual application, using flexible connecting structure described in the utility model, it is not only suitable for assembled block In "-" type, the wall of T-type and L-type structure between block wall, it is also suitable for other abnormally-structured walls.When for building filling When wall, specific construction method the following steps are included:
Step 1: shifting to an earlier date prefabricated first blockwork wall 1 and the second blockwork wall 2 in factory, and respectively described The top surface of one blockwork wall 1 and the second blockwork wall 2 is embedded with the embedded bar 6 for connection;
Step 2: the prefabricated first blockwork wall 1 and the second blockwork wall 2 being lifted in place at the scene, and mentioned Preceding prefabricated first steel cable 3 and the second steel cable 4, the good matched tension rib 5 of simultaneous selection are ready for building in addition, also to match Reinforcing bar 7 required for filling wall and the steel form and concrete material for pouring needs;
Step 3: prefabricated first steel cable 3 and the second steel cable 4 are socketed on respectively in corresponding embedded bar 6, then Reinforcing bar 7 passes through from gap to first steel cable 3 and from the second steel cable 4 intersects from top to bottom, and makes the reinforcing bar 7 in hanging down Straight state is located in gap, while being carried out at the first connector 3, the second connector 4 and 7 place of intersecting of reinforcing bar by tension rib 5 It is connected and fixed, is allowed to form the reinforced mesh of filling wall;
Step 4: first by selected steel form be fixed on the first blockwork wall 1 and the second blockwork wall 2 it Between be formed by gap two sides, then at the gap of the two sides of steel form and bottom install sealing material, finally in gap Middle casting concrete;Wherein the sealing material is flexible sealing material;
Step 5: when the concrete when be poured in step 4 reaches design strength, removing steel form to get cast-in-place coagulation is arrived The masonry of soil fills wall.
In conclusion can not only carry out poured in place concrete, i.e., using flexible connecting structure described in the utility model The construction that filling wall can be achieved, can reduce construction and interfere with each other, not influence the construction speed of main structure, can effectively shorten and apply The work duration, while also ensuring the antidetonation compatibility of deformation with main structure, built-in fitting can also be installed in gap location, can mention in this way For higher bearing capacity.The connection type between traditional architecture wall is also solved, not only makes the gap between wall smaller, is filled It constructs when wall pours more convenient, saves material, and but also the production of assembled building block wall and installation process are more convenient, have Have structure simple, construction is simple is quick, it is safe and practical the advantages that.
Above description is merely a prefered embodiment of the utility model, is not intended to limit the utility model, for ability For the technical staff in domain, there can be various modifications and variations, it is all to utilize any modification made by the utility model, equally replace It changes, improve, should be included within the scope of protection of this utility model.

Claims (2)

1. a kind of assembled building block wall steel cable flexible connecting structure, it is characterised in that: include the first blockwork wall (1), Two blockwork walls (2), the first steel cable (3), the second steel cable (4) and tension rib (5), the first blockwork wall (1) and There are gaps between two blockwork walls (2), pre- in the first blockwork wall (1) and the second blockwork wall (2) It is embedded with the embedded bar (6) for connection, and is set in the pre-buried embedded bar (6) of the first blockwork wall (1) Have the first steel cable (3), while being equipped with the second steel cable in the pre-buried embedded bar (6) of the second blockwork wall (2) (4), it is connected between first steel cable (3) and the second steel cable (4) by tension rib (5).
2. a kind of assembled building block wall steel cable flexible connecting structure according to claim 1, it is characterised in that: described pre-buried Reinforcing bar (6) is embedded in the top of corresponding first blockwork wall (1) and the second blockwork wall (2), first steel in advance respectively Removably set is hung in corresponding embedded bar (6) respectively for rope (3) and the second steel cable (4), wherein first steel cable (3) Being all made of diameter with the second steel cable (4) is 4mm, and the steel cable that length is 400mm forms enclosed construction, and the embedded bar is using straight Diameter is the spiral of 12mm.
CN201920417944.7U 2019-03-29 2019-03-29 A kind of assembled building block wall steel cable flexible connecting structure Expired - Fee Related CN209723296U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920417944.7U CN209723296U (en) 2019-03-29 2019-03-29 A kind of assembled building block wall steel cable flexible connecting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920417944.7U CN209723296U (en) 2019-03-29 2019-03-29 A kind of assembled building block wall steel cable flexible connecting structure

Publications (1)

Publication Number Publication Date
CN209723296U true CN209723296U (en) 2019-12-03

Family

ID=68689408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920417944.7U Expired - Fee Related CN209723296U (en) 2019-03-29 2019-03-29 A kind of assembled building block wall steel cable flexible connecting structure

Country Status (1)

Country Link
CN (1) CN209723296U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826337A (en) * 2019-03-29 2019-05-31 贵州兴贵恒远新型建材有限公司 A kind of assembled building block wall steel cable flexible connecting structure and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826337A (en) * 2019-03-29 2019-05-31 贵州兴贵恒远新型建材有限公司 A kind of assembled building block wall steel cable flexible connecting structure and its construction method

Similar Documents

Publication Publication Date Title
CN201217847Y (en) Plug-in type preformed hole grouting reinforcement lapping connection component
CN103510639B (en) A kind of can the overlaid plate type shear wall of restore funcitons and implementation method thereof
CN208441231U (en) A kind of beam column built from concrete dry method connecting node
CN106120542B (en) It can be applied to the assembled pier and its construction technology of seismic fortification intensity upper zone
CN106638486B (en) High-tech zones cut-pff wall and gallery stage construction method
CN204626707U (en) A kind of wall-wall horizontal connecting node of exempting from the connection of formwork erection steel plate with stem stem
CN204311614U (en) The fabricated shear wall of prestressing force splicing
CN109826337A (en) A kind of assembled building block wall steel cable flexible connecting structure and its construction method
CN206570955U (en) A kind of prefabricated post single hole provisions for grouting
CN209723296U (en) A kind of assembled building block wall steel cable flexible connecting structure
KR101458434B1 (en) Half precast concrete column manufacturing method using prefabricated PC panels and constructing method using the same
CN204356996U (en) The U-shaped beam of prefabricated reinforced concrete with horizontal steel diaphragm
CN209040349U (en) A kind of ring muscle fastening shear wall structure being easily installed
CN206752693U (en) A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node
CN203296203U (en) Reinforced-concrete-fitted seismic isolation node and fitted seismic isolation structure with reinforced-concrete-fitted seismic isolation node
CN205742550U (en) Novel fabricated building connects node
CN104746434B (en) Closure segment formwork system without dismantling outer formwork
CN109838012A (en) A kind of flexible connecting device and its construction method of the assembled building block wall with aluminium set
CN209293197U (en) Wall and floor connection structure and assembled arthitecutral structure system
CN207727762U (en) Assembled beam-column connecting node
CN205557839U (en) Brickwork infilled wall and main body frame's flexible connection mean
CN213062683U (en) Anti-seismic concrete prefabricated staircase
CN204098220U (en) The bottom reinforcement bars syndeton that a kind of keyway node prefabricated frame is set a roof beam in place
CN211286164U (en) Self-compaction regeneration block concrete superimposed shear wall
CN209227784U (en) Wall and Liangping face external link structure and assembled arthitecutral structure system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191226

Address after: No. 8, building 5-8, future Fangzhou E3 group, yu'an'jing District, Yunyan District, Guiyang City, Guizhou Province 550001

Patentee after: Guizhou Quick Construction Technology Co.,Ltd.

Address before: 561000 Guizhou province Xixiu Xixiu District of Anshun City Economic Development Zone

Patentee before: GUIZHOU XINGGUI HENGYUAN NEW BUILDING MATERIAL CO.,LTD.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191203

CF01 Termination of patent right due to non-payment of annual fee