CN207727762U - Assembled beam-column connecting node - Google Patents

Assembled beam-column connecting node Download PDF

Info

Publication number
CN207727762U
CN207727762U CN201721850902.XU CN201721850902U CN207727762U CN 207727762 U CN207727762 U CN 207727762U CN 201721850902 U CN201721850902 U CN 201721850902U CN 207727762 U CN207727762 U CN 207727762U
Authority
CN
China
Prior art keywords
buried
reinforced concrete
steel
column
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201721850902.XU
Other languages
Chinese (zh)
Inventor
张延年
刘海军
秦桂娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201721850902.XU priority Critical patent/CN207727762U/en
Application granted granted Critical
Publication of CN207727762U publication Critical patent/CN207727762U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to prefabricated construction field in civil engineering, more particularly, to a kind of assembled beam-column connecting node.Including:Prefabricated reinforced concrete column, precast reinforced concrete beam, pre-embedded steel slab, bracket, upper end fix angle steel, screed, pre-buried prick post reinforcing bar, pre-buried wear beam steel, nuts, longitudinal reinforcement in beam, reinforced bar sleeve, reserved wear beam steel hole;It is respectively equipped with four pre-buried prick post reinforcing bars in prefabricated reinforced concrete column and in bracket and four pre-buried are worn beam steel, left and right reserves two respectively and wears beam steel hole in precast reinforced concrete beam, and prefabricated mixed reinforcing bar, which coagulates, is all provided with that there are one brackets and a upper end to fix angle steel on the side wall of earth pillar.The utility model has the advantages of simple structure effectively improves beam column construction construction efficiency, simplifies construction technology, while ensureing node bending resistance, shear-carrying capacity, avoids the problems such as beam column node area reinforcement constitution is complicated.

Description

Assembled beam-column connecting node
Technical field
The utility model belongs to prefabricated construction field in civil engineering, connects more particularly, to a kind of assembled beam-column Connect node.
Background technology
Fabricated construction greatly reduces compared with cast-in-place concrete structure than original cast-in-place operation, and largely building portion Product are machined by Workshop Production, and component type mainly has:Side fascia, lining, superimposed sheet, balcony, air-conditioning plate, stair, in advance Beam processed, prefabricated post etc..Simultaneously using building, finishing integrated design, construction, it can synchronize and carry out with main body construction, shorten Duration, the advantages that reducing cost, contribute to building industrialization, economy and environmental benefit good.
Although prefabricated integral frame structure there are many benefits, exist at connecting node during practice of construction Many technical barriers, lifting components are not easy to carry out construction positioning, and then reduce construction quality and efficiency of assembling;It is whole to assembly For formula frame structure, beam-column connection is construction key place again, and the bar connecting of beam-column connection mostly uses machinery at present Sleeve connection, be welded to connect or wet type connection etc. forms;And there is the constructions complicated, power transmission of these connecting nodes not directly, The problems such as working procedure is more.This prefabricated assembling type reinforced concrete frame beam column connection convenient for connection for just needing exploitation new Node, the advantages of to give full play to fabricated construction, it appears particularly significant.
Utility model content
In order to solve the above-mentioned technical problem, the utility model provides a kind of assembled beam-column connecting node, is mainly Exploitation one kind can effectively improve beam column construction construction efficiency, simplify construction technology, ensure node bending resistance, shear-carrying capacity While, the problems such as avoiding beam column node area reinforcement constitution complicated.
The technical solution adopted in the utility model is as follows:
A kind of assembled beam-column connecting node, including prefabricated reinforced concrete column(1), precast reinforced concrete beam(2), it is pre- Bury steel plate(3), bracket(4), upper end fix angle steel(5), screed(6), pre-buried prick post reinforcing bar(7), pre-buried wear beam steel(8)、 Nuts(9), longitudinal reinforcement in beam(10), reinforced bar sleeve(11), reserved wear beam steel hole(12);Described is precast reinforced mixed Solidifying earth pillar(1)And bracket(4)In be respectively equipped with four pre-buried prick post reinforcing bars(7)Pre-buried beam steel is worn with four(8), the steel Muscle sleeve(11)It is arranged in pre-buried prick post reinforcing bar(7)On, by pre-buried prick post reinforcing bar(7)With longitudinal reinforcement in beam(10)It is connected to one It rises, prefabricated reinforced concrete column(1)The precast reinforced concrete beam of the right and left(2)In be respectively set two and reserved wear beam steel Hole(12), reserve for two per side and wear beam steel hole(12)It is separately positioned on away from short side precast reinforced concrete beam(2)End At the 10cm and 20cm at portion midpoint, and bracket can be aligned in(4)The pre-buried of middle setting wears beam steel(8), precast reinforced mixed Solidifying earth pillar(1)Side wall on be all provided with there are one bracket(4)Angle steel is fixed with a upper end(5), angle steel is fixed in upper end(5)One end It is fixed in prefabricated reinforced concrete column(1)Side wall on, angle steel is fixed in each upper end(5)The other end be fixed in it is precast reinforced mixed Solidifying Tu Liang(2)Upper surface;In precast reinforced concrete beam(2)Upper and lower ends be arranged pre-embedded steel slab(3), make upper end fixed angles Steel(5)And bracket(4)It is respectively acting on pre-embedded steel slab(3)On, use nuts(9)Pre-buried prick post reinforcing bar(7)It is fixed on prefabricated Reinforced column(1)Angle steel is fixed in the upper end of side wall(5)On, while using nuts(9)Beam steel is worn pre-buried(8)It is fixed on Precast reinforced concrete beam(2)Angle steel is fixed in the upper end of upper surface(5)On.
Further, the pre-buried prick post reinforcing bar(7)Beam steel is worn with pre-buried(8)Respectively along horizontal and vertical direction Setting.
The installation method of assembled beam-column connecting node, includes the following steps:
A. by prefabricated reinforced concrete column(1)Installation is in place, and by precast reinforced concrete beam(2)It hangs and is raised to position to be installed It sets, waits until precast reinforced concrete beam(2)Reserved wears beam steel hole(12)It is aligned in bracket(4)The pre-buried of middle setting wears beam Reinforcing bar(8)Afterwards, just make precast reinforced concrete beam(2)Balance landing;
B. after falling completely, precast reinforced concrete beam is slightly adjusted(2)Position so that pre-buried prick post reinforcing bar(7)With Longitudinal reinforcement in beam(10)On a horizontal line, in order to use reinforced bar sleeve(11)Pre-buried prick post reinforcing bar(7)In beam Longitudinal reinforcement(10)It links together;
C. screed is used(6)By prefabricated reinforced concrete column(1)And precast reinforced concrete beam(2)Between gap fill out It is full;
D. screed(6)In concrete reach some strength after, in precast reinforced concrete beam(2)Upper surface it is pre-buried Steel plate(3)Upper end is installed by upper end fixed angles steel(5);
E. nuts is used(9)Pre-buried prick post reinforcing bar(7)It is fixed on prefabricated reinforced concrete column(1)The upper end of side wall is fixed Angle steel(5)On;
F. nuts is used(9)Beam steel is worn pre-buried(8)It is fixed on precast reinforced concrete beam(2)The upper end of upper surface is solid Determine angle steel(5)On;
G. to nuts(9)It twists eventually, you can complete the installation of assembled beam-column connecting node.
The beneficial effects of the utility model:
The advantages of the utility model and advantageous effect are:The utility model can effectively improve beam column construction construction efficiency, letter Construction technology is changed, while ensureing node bending resistance, shear-carrying capacity, has avoided beam column node area reinforcement constitution complexity etc. and ask Topic, while saving a large amount of templates, support and labour, obvious economic.The utility model has efficient, applicable, durable The features such as property, it can be ensured that prefabricated beam column construction quality.
Description of the drawings
Fig. 1 is assembled beam-column connecting node front elevation view.
Fig. 2 is the front elevation view of prefabricated reinforced concrete column.
Fig. 3 is the sectional view of prefabricated reinforced concrete column.
Fig. 4 is the sectional view of precast reinforced concrete beam.
Fig. 5 is the sectional view of precast reinforced concrete beam.
Fig. 6 is the vertical view of precast reinforced concrete beam.
In figure:1 is prefabricated reinforced concrete column, and 2 be precast reinforced concrete beam, and 3 be pre-embedded steel slab, and 4 be bracket, and 5 are Angle steel is fixed in upper end, and 6 be screed, and 7 be pre-buried prick post reinforcing bar, and 8 wear beam steel to be pre-buried, and 9 be nuts, and 10 be longitudinal in beam Reinforcing bar, 11 be reinforced bar sleeve, and 12 wear beam steel hole to be reserved.
Specific implementation mode
In order to further illustrate the utility model, the utility model is retouched in detail with reference to the accompanying drawings and embodiments It states, but they cannot be interpreted as to the restriction to scope of protection of the utility model.
Embodiment:As shown in figs. 1 to 6, a kind of assembled beam-column connecting node, including it is prefabricated reinforced concrete column 1, prefabricated Reinforced beam 2, pre-embedded steel slab 3, bracket 4, upper end fix angle steel 5, screed 6, pre-buried prick post reinforcing bar 7, pre-buried wear joist steel Muscle 8, nuts 9, reinforced bar sleeve 11, reserved wear beam steel hole 12 at longitudinal reinforcement 10 in beam;The prefabricated reinforced concrete It is respectively equipped with four pre-buried prick post reinforcing bars 7 in column 1 and bracket 4 and four pre-buried are worn beam steel 8, the pre-buried prick post reinforcing bar 7 It is arranged respectively along horizontal and vertical direction with pre-buried beam steel 8 of wearing;The reinforced bar sleeve 11 is arranged in pre-buried prick post reinforcing bar 7 On, longitudinal reinforcement 10 in pre-buried prick post reinforcing bar 7 and beam is linked together, 1 the right and left of prefabricated reinforced concrete column it is prefabricated Be respectively set in reinforced beam 2 two it is reserved wear beam steel hole 12, two per side are reserved to wear beam steel hole 12 and divides It is not arranged at 10cm and 20cm away from 2 end midpoint of short side precast reinforced concrete beam, and can be aligned in bracket 4 and set Set it is pre-buried wear beam steel 8, be all provided with that there are one brackets 4 and upper end to fix angle steel on the side wall of prefabricated reinforced concrete column 1 5, one end that angle steel 5 is fixed in upper end is fixed on the side wall of prefabricated reinforced concrete column 1, and the another of angle steel 5 is fixed in each upper end End is fixed in the upper surface of precast reinforced concrete beam 2;In the upper and lower ends of precast reinforced concrete beam 2, pre-embedded steel slab 3 is set, Upper end fixation angle steel 5 and bracket 4 is set to be respectively acting on pre-embedded steel slab 3, it is broken to prevent 2 stress of precast reinforced concrete beam from occurring It is bad, enhance integral strength;The upper end for pre-buried prick post reinforcing bar 7 being fixed on 1 side wall of prefabricated reinforced concrete column with nuts 9 is fixed On angle steel 5, while with nuts 9 the pre-buried upper end fixed angles worn beam steel 8 and be fixed on 2 upper surface of precast reinforced concrete beam On steel 5, to realize to drawing, by pressure transmission to the side of prefabricated reinforced concrete column 1.
The installation method of assembled beam-column connecting node, includes the following steps:
A. prefabricated reinforced concrete column 1 is installed in place, and precast reinforced concrete beam 2 is hung and is raised to position to be installed, Until the beam steel hole 12 of wearing that precast reinforced concrete beam 2 is reserved is aligned in after be arranged in bracket 4 pre-buried wear beam steel 8, Just make the balance landing of precast reinforced concrete beam 2;
B. after falling completely, the position of precast reinforced concrete beam 2 is slightly adjusted so that in pre-buried prick post reinforcing bar 7 and beam Longitudinal reinforcement 10 is on horizontal line, in order to reinforced bar sleeve 11 longitudinal reinforcement 10 in pre-buried prick post reinforcing bar 7 and beam It links together;
C. the gap between prefabricated reinforced concrete column 1 and precast reinforced concrete beam 2 is filled up with screed 6;
D. after the concrete in screed 6 reaches some strength, the pre-embedded steel slab in 2 upper surface of precast reinforced concrete beam 3 upper ends are installed by upper end fixed angles steel 5;
E. angle steel 5 is fixed in the upper end for pre-buried prick post reinforcing bar 7 being fixed on nuts 91 side wall of prefabricated reinforced concrete column On;
F. with nuts 9 it is pre-buried wear beam steel 8 and be fixed on the upper end of 2 upper surface of precast reinforced concrete beam fix angle steel On 5;
G. nuts 9 is twisted eventually, you can complete the installation of assembled beam-column connecting node.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and Retouching also should be regarded as the scope of protection of the utility model.

Claims (2)

1. a kind of assembled beam-column connecting node, it is characterised in that:Including prefabricated reinforced concrete column(1), precast reinforced coagulation Tu Liang(2), pre-embedded steel slab(3), bracket(4), upper end fix angle steel(5), screed(6), pre-buried prick post reinforcing bar(7), pre-buried wear Beam steel(8), nuts(9), longitudinal reinforcement in beam(10), reinforced bar sleeve(11), reserved wear beam steel hole(12);Described Prefabricated reinforced concrete column(1)And bracket(4)In be respectively equipped with four pre-buried prick post reinforcing bars(7)Pre-buried beam steel is worn with four (8), the reinforced bar sleeve(11)It is arranged in pre-buried prick post reinforcing bar(7)On, by pre-buried prick post reinforcing bar(7)With longitudinal reinforcement in beam (10)It links together, prefabricated reinforced concrete column(1)The precast reinforced concrete beam of the right and left(2)In be respectively set two It is reserved to wear beam steel hole(12), reserve for two per side and wear beam steel hole(12)It is separately positioned on precast reinforced mixed away from short side Solidifying Tu Liang(2)At the 10cm and 20cm at end midpoint, and bracket can be aligned in(4)The pre-buried of middle setting wears beam steel(8), Prefabricated reinforced concrete column(1)Side wall on be all provided with there are one bracket(4)Angle steel is fixed with a upper end(5), upper end fixed angles Steel(5)One end be fixed in prefabricated reinforced concrete column(1)Side wall on, angle steel is fixed in each upper end(5)The other end it is affixed In precast reinforced concrete beam(2)Upper surface;In precast reinforced concrete beam(2)Upper and lower ends be arranged pre-embedded steel slab(3), Upper end is set to fix angle steel(5)And bracket(4)It is respectively acting on pre-embedded steel slab(3)On, use nuts(9)Pre-buried prick post reinforcing bar (7)It is fixed on prefabricated reinforced concrete column(1)Angle steel is fixed in the upper end of side wall(5)On, while using nuts(9)Beam is worn pre-buried Reinforcing bar(8)It is fixed on precast reinforced concrete beam(2)Angle steel is fixed in the upper end of upper surface(5)On.
2. assembled beam-column connecting node according to claim 1, it is characterised in that:The pre-buried prick post reinforcing bar(7) Beam steel is worn with pre-buried(8)It is arranged respectively along horizontal and vertical direction.
CN201721850902.XU 2017-12-26 2017-12-26 Assembled beam-column connecting node Withdrawn - After Issue CN207727762U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721850902.XU CN207727762U (en) 2017-12-26 2017-12-26 Assembled beam-column connecting node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721850902.XU CN207727762U (en) 2017-12-26 2017-12-26 Assembled beam-column connecting node

Publications (1)

Publication Number Publication Date
CN207727762U true CN207727762U (en) 2018-08-14

Family

ID=63086572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721850902.XU Withdrawn - After Issue CN207727762U (en) 2017-12-26 2017-12-26 Assembled beam-column connecting node

Country Status (1)

Country Link
CN (1) CN207727762U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978861A (en) * 2018-10-09 2018-12-11 安徽建筑大学 A kind of antidetonation pre-embedded steel slab and hidden bracket formula beam-to-column joint structure
CN109811657A (en) * 2019-01-23 2019-05-28 南昌大学 A kind of precast concrete is wet to connect a section prestressed pipe pipeline construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978861A (en) * 2018-10-09 2018-12-11 安徽建筑大学 A kind of antidetonation pre-embedded steel slab and hidden bracket formula beam-to-column joint structure
CN109811657A (en) * 2019-01-23 2019-05-28 南昌大学 A kind of precast concrete is wet to connect a section prestressed pipe pipeline construction method
CN109811657B (en) * 2019-01-23 2021-11-19 南昌大学 Construction method of prestressed pipeline at wet joint section of precast concrete member

Similar Documents

Publication Publication Date Title
CN103243817B (en) A kind of assembled beam-column attachment means
CN108978859A (en) Assembled beam-column connecting node
CN107905363B (en) A kind of full assembled concrete nodal point connecting and connection method based on energy consumption with shearing resistance
CN202809834U (en) Semi-rigid whole bolt connection node for grinder-concrete wall
CN106049691A (en) Fully-prefabricated assembling type steel tube constraint frame node
CN107152104B (en) Assembled cavity shear wall horizontal joint tooth socket rotating vane type connection structure
CN208441231U (en) A kind of beam column built from concrete dry method connecting node
CN109372129A (en) The novel full assembly concrete frame joint of one kind and its construction method
CN109779012A (en) A kind of reinforced beam and concrete filled steel tube column connected node
CN207727762U (en) Assembled beam-column connecting node
CN101906754A (en) Rigid connection method for steel beam and concrete pier
CN208685438U (en) A kind of wet seam type of attachment of sectional type floorings
CN106480983A (en) A kind of assembled beam-column hinged joint and its assembling mode
CN108018944A (en) Assembled beam-column connecting node and its installation method
CN105275087A (en) A prefabricated assembled type concrete beam-column connecting structure
CN108086471A (en) Detachable prefabricated assembled concrete-filled steel square tubular column and girder steel combined joint
CN106120542B (en) It can be applied to the assembled pier and its construction technology of seismic fortification intensity upper zone
CN205976215U (en) Compound box roof beam of assembled concrete
CN105220792B (en) A kind of prefabricated concealed bracings energy-consuming shear wall and its assemble method
CN204753575U (en) A pile extension mechanism for concrete pile
CN105735470A (en) Precast concrete frame system using high-performance materials differentially
CN202520017U (en) Construction structure of variable cross-section prestress overhanging type folding beam for stand
CN102418400B (en) Pretensioning prestressed reinforced concrete precast beam
CN207934185U (en) A kind of detachably prefabricated assembled concrete-filled steel square tubular column and girder steel combined joint
CN208718077U (en) A kind of assembled beam-column construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20180814

Effective date of abandoning: 20190102

AV01 Patent right actively abandoned