CN209722946U - CFG Compound Foundation builds base reinforced structure - Google Patents

CFG Compound Foundation builds base reinforced structure Download PDF

Info

Publication number
CN209722946U
CN209722946U CN201920293151.9U CN201920293151U CN209722946U CN 209722946 U CN209722946 U CN 209722946U CN 201920293151 U CN201920293151 U CN 201920293151U CN 209722946 U CN209722946 U CN 209722946U
Authority
CN
China
Prior art keywords
cfg
broken stone
stone pile
reinforced structure
drain tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920293151.9U
Other languages
Chinese (zh)
Inventor
张慧荣
常淼
郑亚伟
卓雪超
高成昆
常跃州
陈广彦
岳文峰
程传雪
张二国
常小丽
张付香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN KEXING CONSTRUCTIONG GROUP CO Ltd
Original Assignee
HENAN KEXING CONSTRUCTIONG GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN KEXING CONSTRUCTIONG GROUP CO Ltd filed Critical HENAN KEXING CONSTRUCTIONG GROUP CO Ltd
Priority to CN201920293151.9U priority Critical patent/CN209722946U/en
Application granted granted Critical
Publication of CN209722946U publication Critical patent/CN209722946U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of CFG Compound Foundations to build base reinforced structure, its key points of the technical solution are that including CFG, broken stone pile and basal layer, the basal layer is sandstone packing layer, described CFG and broken stone pile composition support array, the sandstone packing layer is laid on above support array, CFG and broken stone pile are in the support array to arrange interval dislocation array arrangement, the central part of the broken stone pile is equipped with the seamless steel pipe concentric with broken stone pile, multiple tracks drain tank is offered on CFG of the side wall, the utility model has the advantage of easy for construction, seamless steel pipe cooperates broken stone pile and the bearing capacity of CFG acquisitions strong, CFG stake is equipped with drain tank, the drainability that the CFG Compound Foundation builds base reinforced structure can be greatly improved, therefore it can be widely applied to house Building lot.

Description

CFG Compound Foundation builds base reinforced structure
Technical field
The utility model relates to a kind of foundation structures, more specifically, it relates to which a kind of cement fly ash gravel pile is compound Ground capital construction base reinforced structure.
Background technique
The mode for mostly using high pressure water soil digging in building inclination rectification at present is exactly outer on the lesser basis of building settlement The soil layer drilling of side is placed into pvc pipe or steel pipe, then uses high pressure pump priming, and high pressure water is overflowed from nose end, and will be neighbouring Soil layer becomes mud and is extruded ground, is controlled by the mud amount and mud balance of outflow and takes native amount, to reach to building The purpose of object rectification righting.Although this method is simple, rectification speed is slow, it is not easy to control expected correction amount, and have Biggish construction risk.And over time, building basis deep foundation base will continue gradually to produce after being weakened by water Change shape, existing building i.e. can this run-off the straight again, also just need again to building carry out rectification righting, increase work Amount, also to the inconvenience of the work and life band of nearby residents, therefore this form of construction work does not have the safety used.
In engineering practice, people have invented composite foundation, by basement process, improve the stress performance of subsoil, Reach design requirement.Composite foundation refers to that subsoil part soil body during basement process is enhanced, or is set to Reinforcement material is changed or is arranged in subsoil, under load action, the effect of matrix and reinforcement shared load.In work Journey in practice, for high sensitivity silt, loosening sand Liquefaction Ground, solve soil liquefaction, ground weakness etc. simultaneously and ask Expected effect is often not achieved in topic, traditional, single method for processing foundation.Cement fly ash gravel pile (i.e. CFG) is Important component part in a kind of common ground capital construction base reinforcement composite construction.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of cement fly ash gravel pile to answer Close ground capital construction base reinforced structure.
To achieve the above objectives, the present invention adopts the following technical solutions: a kind of cement fly ash gravel pile is compoundly Capital construction base reinforced structure, including CFG, broken stone pile and basal layer, the basal layer be sandstone packing layer, described CFG with it is broken Stone mar composition support array, the sandstone packing layer are laid on above support array, CFG and broken stone pile in the support array To arrange interval dislocation array arrangement, the central part of the broken stone pile is equipped with the seamless steel pipe concentric with broken stone pile, described CFG Multiple tracks drain tank is offered on side wall.
Preferably, the side wall of the seamless steel pipe is equipped with the reinforcing rib of multiple tracks and seamless steel pipe axis parallel, The surface of the reinforcing rib is equipped with spiral lamination.
Preferably, the drain tank is metal drain tank, the downward V in multiple tips is equipped in the metal drain tank Type guide groove.
The utility model compare compared with the prior art have the advantage that it is easy for construction, seamless steel pipe cooperate broken stone pile and The bearing capacity of CFG acquisitions is strong, and CFG stake is equipped with drain tank, can greatly improve the CFG Compound Foundation The drainability of base reinforced structure is built, therefore can be widely applied to the building lot in house.
Detailed description of the invention
Fig. 1 is the structural representation that the utility model CFG Compound Foundation builds base reinforced structure embodiment Figure.
In figure: 1, broken stone pile;2, CFG;3, sandstone packing layer;4, seamless steel pipe;5, drain tank.
Specific embodiment
Base reinforced structure embodiment is built to the utility model CFG Compound Foundation with reference to the accompanying drawing to do It further illustrates.
A kind of CFG Compound Foundation builds base reinforced structure, including CFG stake 2, broken stone pile 1 and basal layer, Basal layer is sandstone packing layer 3, and CFG stake 2 and the composition support array of broken stone pile 1, sandstone packing layer 3 are laid on support array Square, CFG stake 2 and broken stone pile 1 are in support array to arrange interval dislocation array arrangement, and the central part of broken stone pile 1 is equipped with and broken stone pile 1 Concentric seamless steel pipe 4 offers multiple tracks drain tank 5 on the side wall of CFG stake 2.Easy for construction, seamless steel pipe 4 cooperates broken stone pile 1 The bearing capacity obtained with CFG stake 2 is strong, and CFG stake 2 and the composition support array of broken stone pile 1 support CFG stake 2 and broken stone pile 1 in array To arrange interval dislocation array arrangement, CFG stake 2 is equipped with drain tank 5, it is compound can to greatly improve the cement fly ash gravel pile 1 The drainability of ground capital construction base reinforced structure, therefore can be widely applied to the building lot in house.
The side wall of seamless steel pipe 4 is equipped with the reinforcing rib of multiple tracks and 4 axis parallel of seamless steel pipe, and the surface of reinforcing rib is set There is spiral lamination.Reinforcing rib, which is arranged, can be improved the structural strength of the broken stone pile 1 with seamless steel pipe 4, be arranged on reinforcing rib surface Spiral lamination can be improved the conjugation of broken stone pile 1 Yu seamless steel pipe 4, makes not allowing to be also easy to produce gap therebetween, improves entirety The compactness of structure.
Drain tank 5 is metal drain tank, and the downward V-type guide groove in multiple tips is equipped in metal drain tank.By drain tank 5 Be set as improving structural strength with the metal drain tank one of V-type guide groove, two come also contribute to improve sluicing efficiency.
The above is only the preferred embodiment of the utility model, and the protection scope of the utility model is not limited merely to Above-described embodiment, technical solution belonging to the idea of the present invention belong to the protection scope of the utility model, should refer to Out, for those skilled in the art, it is without departing from the principle of the utility model it is several improvement and Retouching, these improvements and modifications also should be regarded as the protection scope of the utility model.

Claims (3)

1. a kind of CFG Compound Foundation builds base reinforced structure, including CFG, broken stone pile and basal layer, special Sign is: the basal layer is sandstone packing layer, described CFG and broken stone pile composition support array, the sandstone packing layer paving It is located above support array, CFG and broken stone pile are misplaced array arrangement with arranging interval in the support array, the broken stone pile Central part is equipped with the seamless steel pipe concentric with broken stone pile, offers multiple tracks drain tank on CFG of the side wall.
2. CFG Compound Foundation according to claim 1 builds base reinforced structure, it is characterised in that: described The side wall of seamless steel pipe is equipped with the reinforcing rib of multiple tracks and seamless steel pipe axis parallel, and the surface of the reinforcing rib is equipped with spiral Line.
3. CFG Compound Foundation according to claim 1 builds base reinforced structure, it is characterised in that: described Drain tank is metal drain tank, and the downward V-type guide groove in multiple tips is equipped in the metal drain tank.
CN201920293151.9U 2019-03-08 2019-03-08 CFG Compound Foundation builds base reinforced structure Expired - Fee Related CN209722946U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920293151.9U CN209722946U (en) 2019-03-08 2019-03-08 CFG Compound Foundation builds base reinforced structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920293151.9U CN209722946U (en) 2019-03-08 2019-03-08 CFG Compound Foundation builds base reinforced structure

Publications (1)

Publication Number Publication Date
CN209722946U true CN209722946U (en) 2019-12-03

Family

ID=68685592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920293151.9U Expired - Fee Related CN209722946U (en) 2019-03-08 2019-03-08 CFG Compound Foundation builds base reinforced structure

Country Status (1)

Country Link
CN (1) CN209722946U (en)

Similar Documents

Publication Publication Date Title
CN102635124B (en) Construction method aiming to large open caisson in weak soil area
CN107246005A (en) Super-large diameter bores and buries steel pipe hollow foundation pile and its construction method
CN211646449U (en) Combined single-pile foundation of offshore wind turbine
CN106245643A (en) A kind of compound pile-type structure being applicable to the process of coastal deep reclaimed ground and construction method
CN110984212A (en) Offshore wind turbine combined single-pile foundation and construction method
CN206503157U (en) The embedding rock mixing pile foundation of offshore wind farm
CN202124863U (en) Screw anchor excavated composite foundation
CN101285302B (en) Method for reinforcing caisson of concrete dam
CN209722946U (en) CFG Compound Foundation builds base reinforced structure
CN209066518U (en) A kind of constructing structure of section of stake forced-landing tilt correcting structure and miniature steel pipe pile
CN209538173U (en) Eliminate the prefabricated pile of breathing soil layer frictional force
CN207959202U (en) A kind of CFG bracing means
CN205778943U (en) A kind of duct pieces of shield tunnel that is applicable to settles the lifting system transfinited
CN206157726U (en) Composite pile type structure suitable for coast deep dredger fill soil foundation handle
CN202194127U (en) Reducing high-pressure jet-grouting rigid pile
CN204570676U (en) A kind of convex tooth pile tube
CN108505531A (en) The embedding rock of offshore wind farm mixes pile foundation
CN105908773A (en) Two-stage socketed pile wind turbine foundation for shallow covering stratum foundation of offshore wind plant and construction method
CN207121898U (en) Super-large diameter bores and buries steel pipe hollow foundation pile
CN102828504A (en) Precast reinforced concrete hollow lateral-force resisting pile and pile embedding method
CN207419371U (en) A kind of yacht wharf pontoon bridge pile holding structure
CN202530450U (en) Combination pile with flexible pile and rigid pile arranged up and down consubstantially
CN110158547A (en) A kind of cement sand and gravel buttress dam
CN1195132C (en) Pipeline sinking process for use in tunnel foundation construction
CN204510861U (en) Whole building mobile route ground anti-settling structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191203

CF01 Termination of patent right due to non-payment of annual fee