CN209720616U - A kind of rubbish van - Google Patents
A kind of rubbish van Download PDFInfo
- Publication number
- CN209720616U CN209720616U CN201920023056.7U CN201920023056U CN209720616U CN 209720616 U CN209720616 U CN 209720616U CN 201920023056 U CN201920023056 U CN 201920023056U CN 209720616 U CN209720616 U CN 209720616U
- Authority
- CN
- China
- Prior art keywords
- cabinet
- compartment
- hinged
- rubbish van
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Refuse Receptacles (AREA)
Abstract
Rubbish van disclosed in the utility model, including chassis, the vehicle frame being fixed on the chassis, the driver's cabin and lifting handling device being connect with the vehicle frame, it is removable on the vehicle frame to be connected with compartment, the compartment includes the cabinet and the top cover and end cap hinged with the cabinet being tightly connected by plate, and the end cap is hinged with the top of the box and its medial surface is provided with sealing joint strip to close lid sealing.It is arranged by above structure, the compartment of rubbish van is detachably placed directly in garbage collection points and does dustbin use, and when compartment is smaller with respect to rubbish van, a rubbish van can load two or more compartments.
Description
Technical field
The utility model relates to means of transport field, especially a kind of cram packer.
Background technique
Currently, many places garbage collection points are usually arranged in treatment of urban garbage, then pass through waste transportation vehicle for rubbish
The garbage transporting of rubbish bleeding point is buried into processing point set or degradation treatment.Existing some garbage collection points are right in order to prevent
The pollution of surrounding enviroment and be provided with dustbin to seal splendid attire rubbish, without being transformed to bleeding point;Other rubbish
Bleeding point is provided with melt pit, and dustbin is buried in melt pit without influencing environmental surfaces appearance.Waste transportation vehicle is at these
It is to topple over the dustbin lifting of bleeding point, and the rubbish in dustbin is poured into rubbish van when garbage collection points are collected
Compartment in, and to form secondary environmental pollution due to be easy to causeing rubbish to fall when toppling over, be not easy to garbage collection transhipment.
Utility model content
The utility model is intended to solve one of above-mentioned technical problem in the related technology at least to a certain extent.For this purpose,
The utility model proposes a kind of dismountable rubbish vans in compartment.
The technical scheme adopted by the utility model to solve the technical problem is as follows:
A kind of rubbish van, including chassis, the vehicle frame being fixed on the chassis, the driver's cabin being connect with the vehicle frame
It is removable on the vehicle frame to be connected with compartment with lifting handling device, the compartment include the cabinet being tightly connected by plate and
The top cover and end cap hinged with the cabinet, the end cap and the top of the box are hinged and its medial surface is provided with sealing joint strip
To close lid sealing;The compartment two sides are symmetrically arranged with the first hoisting column, the lifting handling device include driving device and with
First lifting part of the driving device connection, the driving device drive the first lifting part relative frame space mobile,
First lifting part and first hoisting column can be cooperatively connected to lift the compartment, the driving device connection control mould
Block is to be controlled electronically.It is arranged by above structure, the compartment of rubbish van is detachably placed directly in garbage collection points and does rubbish
Rubbish case uses, and when compartment is smaller with respect to rubbish van, a rubbish van can load two or more compartments,
And compartment is directly mobile from bleeding point by the lifting handling device on rubbish van in the utility model, can save existing receipts
The setting of hydraulic lift device, simplifies structure in collection point melt pit;It avoids and topples in bleeding point simultaneously, prevent the secondary dirt of environment
Dye.
As an improvement of the above technical solution, the second hoisting column is set on the compartment, and the second hoisting column setting exists
One end opposite with the end cap, the lifting handling device include the second lifting part, second lifting part and described second
Hoisting column can be cooperatively connected, and the driving device connects second lifting part, and can drive its relatively described first lifting
Part lifting;I.e. when rubbish van conveying carriage is moved to the place of rubbish centralized processing by the first, second lifting part
Cooperate with the first, second hoisting column and lift, compartment is lifted in the promotion of the second lifting part pours out rubbish from port.
As a further improvement of the above technical scheme, the compartment two sides are provided with locking device close to the end cap,
It includes the rotating arm that one end is hinged on the cabinet, one end and the hinged connecting rod of the rotating arm other end, one end and institute
The hinged locking hook of the other end of connecting rod is stated, is hinged on cabinet in the middle part of the locking hook, the other end is the tight lock part of hook, institute
It states tight lock part and extends box opening plane, and the plane of movement of the rotating arm, connecting rod, locking hook and the body side are flat
Row;The end cap two sides are provided with the locking post for extending respectively to locking hook rotational plane, are clamped so that locking hook rotates;It is described
Rotating arm is connected with motor, and to be rotated by the motor driven, the motor and the control module are electrically connected, and the control
Molding block is electrically connected with detection device, and the opening of the cabinet is arranged in the detection device, to detect end cap folding, keeps away
When exempting from end cap opening, locking device turns to locked position.
Further, the bottom of box two sides are provided with channel steel, and the channel steel notch of two sides is opposite, turn between the channel steel
It is dynamic to be connected with shaft, the both ends of the shaft extended spot channel steel, and the rotating arm with two sides locking device is connected and fixed respectively.
Further, the cabinet is set as rectangular parallelepiped structure, and the top of the box center is arranged in parallel with cross along its long side
Beam, there are six top cover settings, is successively symmetrically hinged on the crossbeam, and the top cover includes frame body and door-plate, described
Frame body includes that the quadrilateral frame formed is connected by four flat logical head and the tail, and the door-plate surrounding stretches out in the frame body formation and takes
Socket part is provided with adhesive tape pressing plate on the clinch lower end surface, and the top of the box is provided with two stringers, matches with cabinet edge
It closes and forms the second clinch for the clinch lap hermetically.That is, compartment upper top cover piecemeal is arranged, can individually open therein
One, prevent bulk gas in cabinet from volatilizing.
Further, the bottom of box is provided with polywater groove, and the polywater groove is communicated with water outlet, the water outlet
Setting is connected with capping on wall box, and on the water outlet to block water outlet, and the capping is connected with second
To be driven by it closure or open water outlet, second driving device and the control module are electrically connected driving device,
When needing sewage discharge in case, i.e., controllable capping, which is opened, flows out sewage from water outlet.
Further, the top cover and the crossbeam are by hinged axis connection, and top cover includes connector, and the connector is
U-shaped board part, one end are rotatably sleeved on articulated shaft, and the other end is fixedly connected with the frame body bottom, the U-shaped board part
Setting improve its physical property in structure, enhancing bending strength etc..
Further, setting stores the storage box of deodorant, the spray head being connected to the storage box in the cabinet, described
Solenoid valve is provided with and communicated between storage box and spray head, the control module and the solenoid valve are electrically connected, so that in cabinet
Portion's deodorization is controllable.
Further, it is provided with push plate in the cabinet, the pushing meanss connecting with the push plate, the push plate setting is being pushed up
Cover the lower section on opposite hinged place one side, and push plate is parallel with the inner sidewall of cabinet is affixed setting, the pushing meanss be arranged with
In the side wall that push plate is affixed, to increase the waste deposit amount in compartment from the inside pressing waste of opening.
Further, the pushing meanss and the control module are electrically connected, and are provided with lock tongue, the case on the top cover
Electronic lock body is provided on body, the lock tongue and electronic lock body cooperation lock, the electronic lock body and the control module
It is electrically connected, i.e., when push plate compressed garbage, control module controls the electronic lock body and locks, and prevents top cover from opening and launches rubbish
Rubbish influences push plate rollback.
The beneficial effects of the utility model are: a kind of rubbish van of the utility model, including chassis, it is fixed on described
Vehicle frame on chassis, the driver's cabin being connect with the vehicle frame and lifting handling device, it is removable on the vehicle frame to be connected with compartment,
The compartment includes the cabinet and the top cover and end cap hinged with the cabinet being tightly connected by plate, the end cap and the case
Hinged and its medial surface is provided with sealing joint strip to close lid sealing at the top of body;The compartment two sides are symmetrically arranged with the first lifting
Column, the first lifting part that the lifting handling device includes driving device and connect with the driving device, the driving device
Drive the first lifting part relative frame space mobile, first lifting part and first hoisting column can be cooperatively connected with
The compartment is lifted, the driving device link control module is to be controlled electronically.It is arranged by above structure, rubbish van
Compartment is detachably placed directly in garbage collection points and does dustbin use, and when compartment is smaller with respect to rubbish van, a rubbish
Rubbish transfer car(buggy) can load two or more compartments, and in the utility model compartment directly by the lift on rubbish van
It is mobile from bleeding point to rise handling device, the setting of hydraulic lift device in existing bleeding point melt pit can be saved, simplified structure;Together
When avoid and topple in bleeding point, prevent secondary environmental pollution.
Detailed description of the invention
The present invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is compartment partial sectional view in the present embodiment;
Fig. 2 is compartment top view;
Fig. 3 is compartment bottom view;
Fig. 4 is the top cover opening state partial sectional view in compartment;
Fig. 5 is top cover bottom view.
Specific embodiment
Referring to figs. 1 to Fig. 5, a kind of rubbish van of the utility model, including chassis, the vehicle being fixed on the chassis
Frame, the driver's cabin being connect with the vehicle frame and lifting handling device, it is removable on the vehicle frame to be connected with compartment 1, the compartment 1
Hinged top cover 12 and end cap 13 including the cabinet 11 being tightly connected by plate and with the cabinet 11, the end cap 13 with it is described
11 top of cabinet is hinged and its medial surface is provided with sealing joint strip to close lid sealing;1 two sides of compartment are symmetrically arranged with first
Hoisting column 14, the first lifting part that the lifting handling device includes driving device and connect with the driving device, the drive
Dynamic device drives the first lifting part relative frame space mobile, and first lifting part can match with first hoisting column 14
Connection is closed to lift the compartment 1, the driving device link control module is to be controlled electronically.It is arranged by above structure, rubbish
The compartment 1 of rubbish transfer car(buggy) is detachably placed directly in garbage collection points and does dustbin use, and compartment 1 with respect to rubbish van compared with
Hour, a rubbish van can load two or more compartments 1, and in the utility model compartment 1 directly by rubbish
Lifting handling device on rubbish transfer car(buggy) is mobile from bleeding point, can save setting for hydraulic lift device in existing bleeding point melt pit
It sets, simplifies structure;It avoids and topples in bleeding point simultaneously, prevent secondary environmental pollution.
In the present embodiment, the second hoisting column 15 is set on the compartment 1, the setting of the second hoisting column 15 with it is described
The opposite one end of end cap 13, the lifting handling device include the second lifting part, second lifting part and second lifting
Column 15 can be cooperatively connected, and the driving device connects second lifting part, and can drive its relatively described first lifting part
Lifting;I.e. when rubbish van conveying carriage 1 is moved to the place of rubbish centralized processing by first, second lifting part with
The cooperation lifting of first, second hoisting column 15, compartment 1 is lifted in the promotion of the second lifting part pours out rubbish from port.
In one embodiment, 1 two sides of compartment are provided with locking device close to the end cap 13 comprising one end hinge
Meet the rotating arm 31 on the cabinet 11, one end and the hinged connecting rod 32 of 31 other end of rotating arm, one end and the company
The other end of bar 32 hinged locking hook 33 is hinged on cabinet 11 in the middle part of the locking hook 33, and the other end is the locking of hook
Portion, the tight lock part extend 11 plane of the opening of cabinet, and the plane of movement of the rotating arm 31, connecting rod 32, locking hook 33 with
11 side of cabinet is parallel;13 two sides of end cap are provided with the locking post 34 for extending respectively to 33 rotational plane of locking hook,
It is clamped so that locking hook 33 rotates;The rotating arm 31 is connected with motor, to be rotated by the motor driven, the motor and institute
Control module electric connection is stated, and the control module is electrically connected with detection device, the detection device is arranged in the case
The opening of body 11, to detect the folding of end cap 13, when end cap 13 being avoided to open, locking device turns to locked position.
Specifically, 11 two sides of the bottom of cabinet are provided with channel steel 16, and 16 notch of channel steel of two sides is opposite, the slot
Shaft 17, the 17 both ends extended spot channel steel 16 of shaft, and the rotation with two sides locking device respectively are rotatably connected between steel 16
Arm 31 is connected and fixed.
In one embodiment, the cabinet 11 is set as rectangular parallelepiped structure, and 11 top center of cabinet is along its long side
It is arranged in parallel with crossbeam 18, there are six the settings of top cover 12, is successively symmetrically hinged on the crossbeam 18, the top cover 12 wraps
Frame body 121 and door-plate 122 are included, the frame body 121 includes connecting the quadrilateral frame formed, the door by four flat logical head and the tail
122 surrounding of plate stretches out in the frame body 121 and forms clinch, is provided with adhesive tape pressing plate on the clinch lower end surface, described
It is provided with two stringers at the top of cabinet 11, forms the second clinch with 11 edge mate of cabinet so that clinch sealing is taken
It connects.That is, 1 upper top cover of compartment, 12 piecemeal is arranged, one of those can be individually opened, prevents bulk gas in cabinet 11 from volatilizing.
Further, 11 bottom of cabinet is provided with polywater groove 110, and the polywater groove 110 is communicated with water outlet
111, the setting of water outlet 111 is connected with capping on 11 side wall of cabinet, and on the water outlet 111 to block water outlet
Mouth 111, the capping are connected with the second driving device to be driven by it closure or open water outlet 111, and described second drives
Device and the control module are electrically connected, when needing sewage discharge in case, i.e., controllable capping open make sewage from
Water outlet 111 flows out.
Specifically, the top cover 12 is connect with the crossbeam 18 by articulated shaft 123, and top cover 12 includes connector 124,
The connector 124 is U-shaped board part, and one end is rotatably sleeved on articulated shaft 123, the other end and 121 bottom of frame body
Portion is fixedly connected, and the setting of the U-shaped board part improves its physical property, enhancing bending strength etc. in structure.
Specifically, setting stores the storage box of deodorant, the spray head being connected to the storage box, institute in the cabinet 11
It states and is provided with and communicated with solenoid valve between storage box and spray head, the control module and the solenoid valve are electrically connected, so that cabinet
11 inside deodorizations are controllable.
Further, it is provided with push plate in the cabinet 11, the pushing meanss being connect with the push plate, the push plate setting
In lower section of the top cover 12 with respect to hinged place one side, and push plate is parallel with the inner sidewall of cabinet 11 is affixed setting, the pushing meanss
It is arranged in the side wall being affixed with push plate, to increase the waste deposit amount in compartment 1 from the inside pressing waste of opening.It is described to push away
Dynamic device and the control module are electrically connected, and are provided with lock tongue on the top cover 12, are provided with electronic lock on the cabinet 11
Body, the lock tongue and electronic lock body cooperation lock, and the electronic lock body and the control module are electrically connected, that is, work as push plate
When compressed garbage, control module controls the electronic lock body and locks, and prevents top cover 12 from opening garbage throwing, influences push plate rollback.
The above specific structure and dimension data are illustrated to the preferred embodiment of the utility model, but this reality
It is not limited to the specific embodiments with novel creation, those skilled in the art are in the premise without prejudice to the spirit of the present invention
Various equivalent deformation or replacement can be also made down, these equivalent deformations or replacement are all contained in the claim of this application and are limited
In fixed range.
Claims (10)
1. a kind of rubbish van, including chassis, the vehicle frame being fixed on the chassis, the driver's cabin being connect with the vehicle frame and
It is lifted handling device, it is characterised in that: removable on the vehicle frame to be connected with compartment (1), the compartment (1) includes close by plate
Seal the cabinet (11) and the top cover (12) and end cap (13) hinged with the cabinet (11) of connection, the end cap (13) and the case
Hinged and its medial surface is provided with sealing joint strip to close lid sealing at the top of body (11);Compartment (1) two sides are symmetrically arranged with
One hoisting column (14), the first lifting part that the lifting handling device includes driving device and connect with the driving device, institute
Stating driving device drives the first lifting part relative frame space mobile, first lifting part and first hoisting column
(14) it can be cooperatively connected to lift the compartment (1), the driving device link control module is to be controlled electronically.
2. a kind of rubbish van according to claim 1, it is characterised in that: the second lifting is arranged on the compartment (1)
Column (15), second hoisting column (15) are arranged in one end opposite with the end cap (13), and the lifting handling device includes
Second lifting part, second lifting part can be cooperatively connected with second hoisting column (15), and the driving device connects institute
The second lifting part is stated, and its relatively described first lifting part lifting can be driven.
3. a kind of rubbish van according to claim 1, it is characterised in that: compartment (1) two sides are close to the end
Lid (13) is provided with locking device comprising one end is hinged on the rotating arm (31) on the cabinet (11), one end and the rotation
The hinged connecting rod (32) of pivoted arm (31) other end, one end locking hook (33) hinged with the other end of the connecting rod (32) are described
It is hinged on cabinet (11) in the middle part of locking hook (33), the other end is the tight lock part of hook, and the tight lock part extends cabinet (11)
Plane of the opening, and the plane of movement of the rotating arm (31), connecting rod (32), locking hook (33) and the cabinet (11) side are flat
Row;
End cap (13) two sides are provided with the locking post (34) for extending respectively to locking hook (33) rotational plane, for locking hook
(33) rotation clamping;The rotating arm (31) is connected with motor, to be rotated by the motor driven, the motor and the control
Module is electrically connected, and the control module is electrically connected with detection device, and the detection device is arranged in the cabinet (11)
Opening, with detect end cap (13) folding, avoid end cap (13) open when, locking device turns to locked position.
4. a kind of rubbish van according to claim 3, it is characterised in that: cabinet (11) two sides of the bottom are respectively provided with
Have channel steel (16), and channel steel (16) notch of two sides is opposite, is rotatably connected to shaft (17), the shaft between the channel steel (16)
(17) channel steel (16) surface is extended at both ends, and is connected and fixed respectively with the rotating arm of two sides locking device (31).
5. a kind of rubbish van according to claim 1, it is characterised in that: the cabinet (11) is set as cuboid knot
Structure, cabinet (11) top center are arranged in parallel with crossbeam (18) along its long side, and there are six top cover (12) settings, successively
It is symmetrically hinged on the crossbeam (18), the top cover (12) includes frame body (121) and door-plate (122), the frame body
It (121) include that the quadrilateral frame formed is connected by four flat logical head and the tail, door-plate (122) surrounding stretches out in the frame body
(121) clinch is formed, adhesive tape pressing plate is provided on the clinch lower end surface, two are provided at the top of the cabinet (11) and is indulged
Beam, the stringer cooperatively form the second clinch with the open edge at the top of cabinet (11) for the clinch lap hermetically.
6. a kind of rubbish van according to claim 5, it is characterised in that: the top cover (12) and the crossbeam (18)
It is connected by articulated shaft (123), and top cover (12) includes connector (124), the connector (124) is U-shaped board part, one end
It is rotatably sleeved on articulated shaft (123), the other end is fixedly connected with the frame body (121) bottom.
7. a kind of rubbish van according to claim 1, it is characterised in that: cabinet (11) bottom is provided with polywater
Groove (110), the polywater groove (110) are communicated with water outlet (111), and the water outlet (111) is arranged in cabinet (11) side
Capping is connected on wall, and on the water outlet (111) to block water outlet (111), the capping is connected with the second drive
To be driven by it closure or open water outlet (111), second driving device electrically connects dynamic device with the control module
It connects.
8. a kind of rubbish van according to claim 1, it is characterised in that: setting, which stores, in the cabinet (11) removes
Smelly dose of storage box, the spray head being connected to the storage box are provided with and communicated with solenoid valve between the storage box and spray head, described
Control module and the solenoid valve are electrically connected.
9. a kind of rubbish van according to claim 1, it is characterised in that: it is provided with push plate in the cabinet (11),
The pushing meanss being connect with the push plate, push plate setting in the lower section of top cover (12) with respect to hinged place one side, and push plate with
The inner sidewall of cabinet (11) is affixed setting in parallel, and the pushing meanss are arranged in the side wall being affixed with push plate, with from opening
Inside pressing waste.
10. a kind of rubbish van according to claim 9, it is characterised in that: the pushing meanss and the control mould
Block is electrically connected, and is provided with lock tongue on the top cover (12), is provided with electronic lock body, the lock tongue and institute on the cabinet (11)
Electronic lock body cooperation locking is stated, the electronic lock body and the control module are electrically connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920023056.7U CN209720616U (en) | 2019-01-04 | 2019-01-04 | A kind of rubbish van |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920023056.7U CN209720616U (en) | 2019-01-04 | 2019-01-04 | A kind of rubbish van |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209720616U true CN209720616U (en) | 2019-12-03 |
Family
ID=68679259
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920023056.7U Active CN209720616U (en) | 2019-01-04 | 2019-01-04 | A kind of rubbish van |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209720616U (en) |
-
2019
- 2019-01-04 CN CN201920023056.7U patent/CN209720616U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207404275U (en) | A kind of upward-acting door railway transportation container | |
US7997852B1 (en) | Side loader garbage truck | |
CN209720616U (en) | A kind of rubbish van | |
CN2547690Y (en) | Self-discharging garbage vehicle | |
CN214609561U (en) | Bucket-throwing-preventing mechanism of self-loading and unloading type garbage truck | |
CN201023537Y (en) | Wing-opening compartment for truck | |
CN201343283Y (en) | Garbage transportation truck | |
CN203485806U (en) | Novel airtight dump truck | |
CN211732683U (en) | Self-loading and unloading garbage truck with hydraulic rear door opening function | |
CN201512234U (en) | Container | |
CN2818228Y (en) | Opening and closing device of sealed top of vehicle carriage | |
CN201367213Y (en) | Container | |
CN2437561Y (en) | Convertible box car | |
CN219406656U (en) | Full trailer carriage with openable top cover | |
CN107720022B (en) | Railway transportation container with upper door | |
CN112593515A (en) | Automatic garbage dumping mechanism of road sweeper | |
CN201268257Y (en) | Car hopper cover for dump truck | |
CN205891711U (en) | Half fluid material transportation container | |
CN106005801B (en) | A kind of lateral plug-type transport container of chamber door | |
CN1966366B (en) | Inclined-pull type horizontal wholly-closed garbage transfer device | |
CN213801387U (en) | Garbage truck | |
CN2714476Y (en) | Arm drawing vehicle coupling device of separated type garbage station | |
CN211844192U (en) | Material transfer vehicle | |
CN2787504Y (en) | Integrated side cover-flipping car body | |
CN206939601U (en) | More opening doors are electric four-wheeled to turn over ladle car |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |