CN209699426U - A kind of prefabricated beam mould of mortar leakage prevention - Google Patents

A kind of prefabricated beam mould of mortar leakage prevention Download PDF

Info

Publication number
CN209699426U
CN209699426U CN201920327756.5U CN201920327756U CN209699426U CN 209699426 U CN209699426 U CN 209699426U CN 201920327756 U CN201920327756 U CN 201920327756U CN 209699426 U CN209699426 U CN 209699426U
Authority
CN
China
Prior art keywords
template
detachable
mould
fixed form
leakage prevention
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920327756.5U
Other languages
Chinese (zh)
Inventor
金勇�
刘德伟
吴晓春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Jinsui New Energy Technology Co Ltd
Original Assignee
Anhui Jinsui New Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jinsui New Energy Technology Co Ltd filed Critical Anhui Jinsui New Energy Technology Co Ltd
Priority to CN201920327756.5U priority Critical patent/CN209699426U/en
Application granted granted Critical
Publication of CN209699426U publication Critical patent/CN209699426U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The utility model relates to a kind of prefabricated beam moulds of mortar leakage prevention, including unitary mould, the unitary mould includes fixed form, detachable template and the side template between fixed form and detachable template, it is connected by bindiny mechanism between the fixed form, detachable template and side template, embedded bar structural member is equipped in the unitary mould;The detachable template includes lower template, cope plate and the oblique fracture between lower template and cope plate.The prefabricated beam mould of the mortar leakage prevention, junction and mold lower end sealing part between mold are provided with mud leakproof blocking piece, certain effect for preventing mud from leaking can be played but also have the effect of certain buffering, and the template of the irregular face contact of product is easily removed when carrying out product stripping, frictional force when can reduce product stripping between product and template.

Description

A kind of prefabricated beam mould of mortar leakage prevention
Technical field
The utility model belongs to building mould field, and in particular to a kind of prefabricated beam mould of mortar leakage prevention.
Background technique
Mold be in industrial production to be molded, be blow molded, squeeze out, die casting or the methods of forging and forming, smelting, punching press obtain The various moulds and tool of required product, mold are the tools for making formed article, and this tool is made of various parts, Different molds is made of different parts, it mainly realizes article shape by the change of physical state of the formed material Processing.
And the precast beam production mould used now in building trade, when reproduction product, will appear a large amount of spillages Situation, and spillage not only will result only in production cost and greatly increase, also resulting in can not be by template when carrying out product stripping It removes, and needs to carry out some external force and carry out assisted demoulding, and when producing the product of different shaping, some local meetings of product With wedge angle either irregular shape, and lead to the bad progress of product stripping, and deal with improperly, will lead to mold often With product being damaged in various degree, unnecessary loss is increased, and waste the time of product stripping significantly, so that factory produces Product processing efficiency reduces, and reduces the income of factory.
Utility model content
The purpose of this utility model is that solve the above-mentioned problems and simple, the design reasonable one that provides a kind of structure The prefabricated beam mould of kind mortar leakage prevention.
The utility model achieves the above object through the following technical schemes:
A kind of prefabricated beam mould of mortar leakage prevention, including unitary mould, the unitary mould includes fixed form, detachable Template and the side template between fixed form and detachable template, the fixed form, detachable template and side template Between connected by bindiny mechanism, embedded bar structural member is equipped in the unitary mould;
The detachable template includes lower template, cope plate and the oblique fracture between lower template and cope plate, tiltedly The bevel inclination angle of fracture can be modified according to the shape of actual product with size, convenient so that detachable template and production It is separated between product.
As the scheme that advanced optimizes of the utility model, the lower end of the cope plate is equipped with oblique section, the lower template Upper end be equipped with oblique section, the oblique section tilt angle having the same on oblique section and lower template on the cope plate, tiltedly Oblique fracture is constituted after section fitting, can be exited lower template directly down along the inclined surface of oblique fracture when being split, Reduce the frictional force between template and product.
As the scheme that advanced optimizes of the utility model, close to the position of oblique fracture on the cope plate and lower template side wall It sets and is welded with fixed connecting plate, fixed connecting plate is equipped with screw hole, and connector is equipped in screw hole, and the form of connector has more Kind, using bolt and nut but it can be not limited only to this, connector meets national machinery standard.
As the scheme that advanced optimizes of the utility model, strap, the fixation are welded on the fixed form Mudding part is equipped between template and strap, the material of mudding part is plastic material, can be plastic cement but not only It is limited to this, there is certain deformability and buffer capacity, the effect of sealing can be played in the gap of junction.
As the scheme that advanced optimizes of the utility model, the quantity of the mudding part and strap is multiple groups, The mudding part and strap are located at the lower end of detachable template, the lower end of side template, side template and stent Between plate, between side template and detachable template, being respectively provided with mudding part in unitary mould many places can prevent mud from leaking, The leakage rate for reducing mud, reduces production cost.
As the scheme that advanced optimizes of the utility model, the bindiny mechanism includes the fixation set on side template upper end Bar, the connection sheet being socketed in fixed link and the connecting hole in connection sheet, the fixed form and detachable template Upper end is equipped with screw hole, facilitates carry out installation and removal.
The utility model has the beneficial effects that:
1) the utility model is provided with mudding part in the plurality of positions of unitary mould, because the material of mudding part is Plastic material, will not installation to mold and fractionation have any impact, and there is the effect of certain barrier mud leakage Fruit, and the template-setup that the irregular face of product is contacted is set at cope plate and lower template, and by junction between the two It is set to inclined-plane, can be exited lower template along the inclined-plane at oblique fracture when demolished, it is possible to reduce conventional demoulding When frictional force, can template easily be dismantled, facilitate by product be removed from the molds and will not to product and Mold causes any damage;
2) connection type between each template of the utility model is more convenient, can carry out convenient and fast installation and removal, greatly The time of mold installation is shortened greatly and reduces the time of product stripping;
3) the utility model structure is simple, and stability is high, and design rationally, is easy to implement.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the top view of the utility model unitary mould;
Fig. 3, which is the utility model unitary mould, matches view with embedded bar structural member;
Fig. 4 is the enlarged view of the utility model A.
In figure: 1, unitary mould;11, detachable template;111, cope plate;112, lower template;113, oblique fracture;12, side Template;13, bindiny mechanism;14, fixed form;141, mudding part;2, embedded bar structural member.
Specific embodiment
The application is described in further detail with reference to the accompanying drawing, it is necessary to it is indicated herein to be, implement in detail below Mode is served only for that the application is further detailed, and should not be understood as the limitation to the application protection scope, the field Technical staff can make some nonessential modifications and adaptations to the application according to above-mentioned application content.
Embodiment 1
As shown in Figs 1-4, the prefabricated beam mould of a kind of mortar leakage prevention, including unitary mould 1, unitary mould 1 include fixing Template 14, detachable template 11 and the side template 12 between fixed form 14 and detachable template 11, fixed form 14, It is connected by bindiny mechanism 13 between detachable template 11 and side template 12, embedded bar structural member is equipped in unitary mould 1 2;
Detachable template 11 is including lower template 112, cope plate 111 and between lower template 112 and cope plate 111 Oblique fracture 113, the lower end of cope plate 111 are equipped with oblique section, and the upper end of lower template 112 is equipped with oblique section, oblique on cope plate 111 Close to tiltedly on oblique section tilt angle having the same on section and lower template 112, cope plate 111 and 112 side wall of lower template The position of fracture 113 is welded with fixed connecting plate, and fixed connecting plate is equipped with screw hole, is equipped with connector, stent in screw hole It is welded with strap on plate 14, mudding part 141, mudding part 141 are equipped between fixed form 14 and strap Quantity with strap is multiple groups, and mudding part 141 and strap are located at the lower end of detachable template 11, side form Between the lower end of plate 12, side template 12 and fixed form 14, between side template 12 and detachable template 11, bindiny mechanism 13 includes Fixed link, the connection sheet that is socketed in fixed link and the connecting hole in connection sheet set on 12 upper end of side template, it is fixed The upper end of template 14 and detachable template 11 is equipped with screw hole.
It should be noted that fixed form 14, side template 12 and detachable template 11 are both placed in when being produced Fixed form 14, side template 12 and detachable template 11 are connected by unitary mould using bindiny mechanism 13 behind new corresponding position 1, it should be noted that need that embedded bar structural member 2 is first placed on unitary mould 1 when connecting detachable template 11 In, it can then start progress mud and pour into, and wait formed product, because each junction in unitary mould 1 is provided with Mudding part 141, the amount that mud can be leaked is reduced, after formed product, by connection sheet after bindiny mechanism 13 is opened Rotation will not extremely interfere the position of demoulding, then remove the connector on oblique fracture 113, so that cope plate 111 and lower template It separates, then lower template 112 can directly be exited from oblique fracture 113 along the tilt angle of oblique section, then between 112 Cope plate 111 is removed, and will be separated between each template and product gradually, facilitate the demoulding for carrying out product, reduced The time of product stripping and it will not cause any damage to product and mold.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to guarantor of the invention Protect range.

Claims (6)

1. a kind of prefabricated beam mould of mortar leakage prevention, including unitary mould (1), it is characterised in that: the unitary mould (1) includes Fixed form (14), detachable template (11) and the side template being set between fixed form (14) and detachable template (11) (12), it is connect by bindiny mechanism (13) between the fixed form (14), detachable template (11) and side template (12), institute It states in unitary mould (1) and is equipped with embedded bar structural member (2);
The detachable template (11) include lower template (112), cope plate (111) and be set to lower template (112) and cope plate (111) oblique fracture (113) between.
2. a kind of prefabricated beam mould of mortar leakage prevention according to claim 1, it is characterised in that: the cope plate (111) Lower end be equipped with oblique section, the upper end of the lower template (112) is equipped with oblique section, the oblique section on the cope plate (111) with Oblique section tilt angle having the same in lower template (112).
3. a kind of prefabricated beam mould of mortar leakage prevention according to claim 1, it is characterised in that: the cope plate (111) It is welded with fixed connecting plate with the position on lower template (112) side wall close to oblique fracture (113), fixed connecting plate is equipped with spiral shell Hole, screw hole is interior to be equipped with connector.
4. a kind of prefabricated beam mould of mortar leakage prevention according to claim 1, it is characterised in that: the fixed form (14) On be welded with strap, between the fixed form (14) and strap be equipped with mudding part (141).
5. a kind of prefabricated beam mould of mortar leakage prevention according to claim 4, it is characterised in that: the mudding part It (141) is multiple groups with the quantity of strap, the mudding part (141) and strap are located at detachable template (11) between the lower end of lower end, side template (12), side template (12) and fixed form (14), side template (12) and detachable mould Between plate (11).
6. a kind of prefabricated beam mould of mortar leakage prevention according to claim 1, it is characterised in that: the bindiny mechanism (13) Fixed link, the connection sheet being socketed in fixed link and the connection in connection sheet including being set to side template (12) upper end Hole, the fixed form (14) and the upper end of detachable template (11) are equipped with screw hole.
CN201920327756.5U 2019-03-15 2019-03-15 A kind of prefabricated beam mould of mortar leakage prevention Active CN209699426U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920327756.5U CN209699426U (en) 2019-03-15 2019-03-15 A kind of prefabricated beam mould of mortar leakage prevention

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920327756.5U CN209699426U (en) 2019-03-15 2019-03-15 A kind of prefabricated beam mould of mortar leakage prevention

Publications (1)

Publication Number Publication Date
CN209699426U true CN209699426U (en) 2019-11-29

Family

ID=68644238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920327756.5U Active CN209699426U (en) 2019-03-15 2019-03-15 A kind of prefabricated beam mould of mortar leakage prevention

Country Status (1)

Country Link
CN (1) CN209699426U (en)

Similar Documents

Publication Publication Date Title
CN207535058U (en) For producing the assembly line of plaster mould box
CN209699426U (en) A kind of prefabricated beam mould of mortar leakage prevention
CN102145375A (en) Vacuum auxiliary impression-taking method and equipment for lost foam casting and lost foam pattern molding
CN202052861U (en) U-iron drawing die
CN209699427U (en) A kind of easily demoulding prefabricated balcony mold
CN209407346U (en) A kind of lower flange slab type mold
CN210791412U (en) Mould of concrete prefabricated member
CN206765036U (en) It is a kind of applied to cement brick production from mold
CN202683986U (en) Aluminium ingot mould convenient to demould
CN208303799U (en) A kind of piston type product mold
CN203305348U (en) Novel limestone powder cement brick combined mould
CN201998321U (en) PCCP (prestressed concrete cylinder pipe) armored bell mouth forming die
CN215702719U (en) Vertical stripper for suspension roller with A-shaped interface
CN2784162Y (en) Mould for concrete interlocking patch
CN207105469U (en) A kind of injection mold
CN1363437A (en) Technology for casting grooved side wall of shovel plate
CN210026077U (en) Injection mold suitable for electronic components switches on bottom plate
CN211682690U (en) U-shaped brick mold
CN211191877U (en) Mold for producing screw pump
CN207273485U (en) A kind of supporting block stamping die
CN209699431U (en) A kind of lower turning type is counter to play prefabricated panel mold
CN214321660U (en) Double-lug connector die structure
CN215100465U (en) Contact lens mould rotating transfer mechanism
CN210877400U (en) Die with quick mounting pouring gate
CN216151069U (en) Special-shaped wrench for demoulding inner circle of single panel of furnace bottom plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 231300 workshop 7, Nanju Industrial Park, Hangbu Town, Shucheng County, Lu'an City, Anhui Province

Patentee after: Anhui Jinsui New Energy Technology Co., Ltd

Address before: Duan Zhen Zhen Tang'an community, Feidong County, Hefei City, Anhui Province, 230000

Patentee before: Anhui Jinsui New Energy Technology Co., Ltd