CN207535058U - For producing the assembly line of plaster mould box - Google Patents
For producing the assembly line of plaster mould box Download PDFInfo
- Publication number
- CN207535058U CN207535058U CN201721645416.4U CN201721645416U CN207535058U CN 207535058 U CN207535058 U CN 207535058U CN 201721645416 U CN201721645416 U CN 201721645416U CN 207535058 U CN207535058 U CN 207535058U
- Authority
- CN
- China
- Prior art keywords
- operating platform
- mould box
- mold
- plaster mould
- assembly line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Moulds, Cores, Or Mandrels (AREA)
Abstract
The utility model discloses a kind of for producing the assembly line of plaster mould box, including:Level operating platform such as is equipped at the mold of gap distributions thereon;Hopper is located at the horizontal top for operating platform;Material scraping plate is located at the horizontal top for operating platform, and its lower edge flushes in the vertical direction with the upper edge of the mold;Material jacking mechanism, is located at the lower section of the horizontal operating platform, and can demould molding plaster mould box;Unloading manipulator is located at the horizontal side for operating platform, and for discharging.The advantages of assembly line is:It can realize the continuous production of plaster mould box, and molding, demoulding and the discharging of plaster mould box can realize that automatic integratedization is completed.
Description
Technical field
The utility model is related to construction material manufacturing technology fields, and in particular to a kind of flowing water for being used to produce plaster mould box
Line.
Background technology
Plaster mould box is made using industrial by-product ardealite or desulfurated plaster.Pre-production, in " cast-in-place concrete gypsum
In cavity arch without beam " construction, used as filling.After construction without dismounting, which synthesizes one with waffle beam superstructure
Body forms gypsum cavity arch without beam.The technology has many advantages, such as that sound insulation and noise reduction, insulation, saving floor height and shock resistance are good.
And plaster mould box is during fabrication, the overwhelming majority is realized using traditional cast means, manufacturing process
There are shortcomings, need to build sealing plate before pouring, and need to dismantle side plate after pouring, demoulding is also very laborious, needs to use
Power, which tramples thimble, could realize demoulding, and side plate is not tight seal, and be easy to cause a large amount of material leakage.At the same time, by
Certain cooling time is needed in in-mold molding in plaster mould box, it is continuous so as to cause that can not be realized when producing plaster mould box
Production, drastically influences manufacture efficiency.
Utility model content
For solution more than technical problem, the utility model provides a kind of assembly line for being used to produce plaster mould box, Neng Goushi
The continuous production of existing plaster mould box, and molding, demoulding and the discharging of plaster mould box can realize that automatic integratedization is completed.
To achieve the above object, technical solutions of the utility model are as follows:
A kind of assembly line for being used to produce plaster mould box, is characterized by, including:
Level operating platform such as is equipped at the mold of gap distributions thereon;
Hopper is located at the horizontal top for operating platform;
Material scraping plate, is located at the horizontal top for operating platform, and the upper edge of its lower edge and the mold is vertical
It is flushed on direction;
Material jacking mechanism, is located at the lower section of the horizontal operating platform, and can demould molding plaster mould box;
Unloading manipulator is located at the horizontal side for operating platform, and for discharging.
Using the above structure, the calcium plaster in it can be put by a certain amount to mold by hopper, and mold is transported in level
It is moved on turntable, so as to fulfill continuous production, material scraping plate can scrape calcium plaster extra in mold, and can guarantee after molding
Diaphragm capsule end face is smooth.With movement of the mold on horizontal operating platform, material is gradually molded solidification, passes through top again after its solidification
Expect the thrust of mechanism, plaster mould box finished product will be detached out of mold, the unloader positioned at horizontal operating platform side
Tool hand then can directly remove finished product.
As preferred:Be equipped with the centre bore extended downwardly in the mold, the material jacking mechanism include stripper, mandril,
Guide sleeve and drive component, stripper are covered on one end that the centre bore is located in mold, and the stripper be equipped with to
The cylindrical projection of lower extension, the cylindrical projection are slidably mounted in the centre bore, and its one end far from stripper is worn
The horizontal operating platform is crossed, is oriented to the lower section for being set on horizontal operating platform, mandril is slidably mounted in the guide sleeve, and its end
Portion is right against the end of the cylindrical projection, and the driving component is arranged on the one end of mandril far from cylindrical projection, and for driving
Dynamic mandril slides up and down in guide sleeve.Using the above structure, it is easily installed, and the plaster mould box that finished product can be effectively ensured takes off
Mould.
As preferred:The mandril is equipped with cambered surface close to one end of drive component, and the driving component includes and the arc
The cam that face slides against and the motor that the cam is driven to rotate.Using the above structure, convenient for driving mandril in guide sleeve
It slides up and down.
As preferred:The unloading manipulator includes the installing matrix fixed on the ground and first mechanical arm, second
Mechanical arm, third mechanical arm, the first mechanical arm is vertical to be mounted in installing matrix, and can be in the installing matrix upper edge
Horizontal direction rotates, and one end of second mechanical arm is hinged in perpendicular with the top of first mechanical arm, and the other end is also perpendicular
It is hinged in straight plane with the third mechanical arm, and the end of the third mechanical arm is equipped with cramping body, is used to capture recessed
Finished product in mould.Using the above structure, can be used in capturing the plaster mould box finished product in in-mold molding.
As preferred:The hopper is internally provided with blender, and the upside of hopper is equipped with feed-tank, and the discharge port of hopper is set
There is flow controller.Using the above structure, the blender being arranged in hopper can be stirred the calcium plaster in hopper, setting
Feed-tank on hopper also can timing water filling in hopper, to prevent calcium plaster from solidifying.
As preferred:The lower section of the horizontal operating platform is equipped with recycling bins, which is right against the material scraping plate, and water
Flat operating platform is equipped with material spilling hole in the side of mold.Using the above structure, it is extra on mold with the movement of horizontal operating platform
Calcium plaster can scrape backward, and can be fallen in recycling bins by material spilling hole.
As preferred:The both sides of the mold are arranged with drainage plate, which dips down close to one end of material spilling hole
Tiltedly, and the outlet of drainage plate is right against the material spilling hole.Using the above structure, convenient for recycling extra calcium plaster, material is improved
Utilization rate, it is cost-effective.
As preferred:The both sides of the horizontal operating platform are equipped with the rib upwardly extended.Using the above structure, mould can be prevented
Tool is fallen from level operating platform.
Compared with prior art, the beneficial effects of the utility model are:
Using provided by the utility model for producing the assembly line of plaster mould box, the continuous life of plaster mould box can be realized
Production, and molding, demoulding and the discharging of plaster mould box can realize that automatic integratedization is completed.Calcium plaster in it can be pressed one by hopper
Fixed amount is put into mold, and mold moves on level operating platform, and so as to fulfill continuous production, material scraping plate can will be more in mold
Remaining calcium plaster scrapes, and can guarantee that diaphragm capsule end face after molding is smooth.With movement of the mold on horizontal operating platform, material
Gradually molding solidification, again by the thrust of material jacking mechanism after its solidification, plaster mould box finished product will be detached from out of mold
Out, the unloading manipulator positioned at horizontal operating platform side then can directly be removed finished product.
Description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the sectional view of the utility model;
Fig. 3 is the partial view of material jacking mechanism;
Fig. 4 is another structure diagram of the utility model;
Fig. 5 is the structure diagram of mold.
Specific embodiment
The utility model is described in further detail with attached drawing with reference to embodiments.
As illustrated in fig. 1 and 2, it is a kind of for producing the assembly line of plaster mould box, using the mode of production of assembly line, Neng Goushi
The continuous production of existing plaster mould box, and molding, demoulding and the discharging of plaster mould box can realize that automatic integratedization is completed.It is specific
Structure includes:Level operating platform 1, level operate the mold 2 that gap distributions are equipped with etc. on platform 1;Hopper 4 is located at described
The top of level operating platform 1;Material scraping plate 7 is located at the horizontal top for operating platform 1, and its lower edge and the mold 2
Upper edge flushes in the vertical direction;Calcium plaster in it can be put by a certain amount to mold 2 by above-mentioned hopper 4, mold 2
It is moved on level operating platform 1, so as to fulfill continuous production, material scraping plate 7 can scrape calcium plaster extra in mold 2, and energy
Ensure that diaphragm capsule end face after molding is smooth.The assembly line further includes the material jacking mechanism 3 positioned at horizontal 1 lower section of operating platform, with
And the unloading manipulator 5 positioned at 1 side of the horizontal operating platform, with movement of the mold 2 on horizontal operating platform 1, material by
Gradually molding solidification, again by the thrust of material jacking mechanism 3 after its solidification, plaster mould box finished product will be detached from out of mold 2
Out, the unloading manipulator 5 positioned at 1 side of horizontal operating platform then can directly be removed finished product.
Again as shown in Figures 2 and 3, the concrete structure for realizing above-mentioned liftout function is:The center extended downwardly is equipped in mold 2
Hole 2b, the material jacking mechanism 3 include stripper 3a, mandril 3b, guide sleeve 3d and drive component 3c, and stripper 3a is covered in described
Centre bore 2b is located on one end in mold 2, and stripper 3a is equipped with the cylindrical projection 3a2 extended downwardly, and the cylinder is convex
It plays 3a2 to be slidably mounted in the centre bore 2b, and its one end far from stripper 3a passes through the horizontal operating platform 1,
Guide sleeve 3d is arranged on the lower section of horizontal operating platform 1, and mandril 3b is slidably mounted in guide sleeve 3d, and its end is right against institute
The end of cylindrical projection 3a2 is stated, the driving component 3c is arranged on the one end of mandril 3b far from cylindrical projection 3a2, and for driving
Dynamic mandril 3b is slided up and down in guide sleeve 3d.
Further, the mandril 3b is equipped with cambered surface 3b1 close to one end of drive component 3c, and the driving component 3c includes
With the cambered surface 3b1 cam 3c1 slid against the and motor 3c2 that cam 3c1 is driven to rotate.
Again as shown in Fig. 2, the concrete structure of above-mentioned unloading manipulator 5 includes:The installing matrix 5a fixed on the ground, with
And first mechanical arm 5b, second mechanical arm 5c, third mechanical arm 5d, the first mechanical arm 5b it is vertical be mounted on installing matrix
It on 5a, and can in the horizontal direction be rotated on installing matrix 5a, one end of second mechanical arm 5c is in perpendicular with
The top of one mechanical arm 5b is hinged, and the other end is also hinged, and the third machine in perpendicular with the third mechanical arm 5d
The end of tool arm 5d is equipped with cramping body 6, is used to capture the finished product in mold 2.
As shown in figure 4, the calcium plaster solidification in hopper 4, hopper 4 are internally provided with blender 4a in order to prevent, hopper 4
Upside is equipped with feed-tank 4b, and the discharge port of hopper 4 is equipped with flow controller 4c.Above-mentioned blender 4a can be to the gypsum in hopper 4
Slurry is stirred, and the feed-tank 4b being arranged on hopper 4 also can timing water filling in hopper 4.
Cost-effective again as shown in figure 4, in order to improve stock utilization, the lower section of level operating platform 1 is equipped with recycling bins 8,
The recycling bins 8 are right against the material scraping plate 7, and horizontal operating platform 1 is equipped with material spilling hole in mold 2 away from the side of its rotation direction
1b.With the movement of horizontal operating platform 1, extra calcium plaster can scrape, and can be fallen by material spilling hole 1b backward on mold 2
To recycling bins 8.
As shown in Figure 4,5, it is recycled to ensure that calcium plaster extra on mold 2 as far as possible more, the both sides of mold 2 are symmetrically set
There is drainage plate 2a, drainage plate 2a is tilted down close to one end of material spilling hole 1b, and the outlet of drainage plate 2a is right against the leakage
Expect hole 1b.
As shown in figure 4, the both sides of the horizontal operating platform 1 are equipped with the rib 1c upwardly extended.Using the above structure, can prevent
Only mold 2 is fallen from level operating platform.
Finally it should be noted that foregoing description is only the preferred embodiment of the utility model, the common skill of this field
Art personnel under the premise of without prejudice to the utility model aims and claim, can make under the enlightenment of the utility model
Expression, such transformation are each fallen within the scope of protection of the utility model as multiple types.
Claims (8)
1. a kind of assembly line for being used to produce plaster mould box, which is characterized in that including:
Level operating platform (1) such as is equipped at the mold (2) of gap distributions thereon;
Hopper (4) is located at the horizontal top for operating platform (1);
Material scraping plate (7) is located at the horizontal top for operating platform (1), and its lower edge and the upper edge of the mold (2) exist
It is flushed on vertical direction;
Material jacking mechanism (3), is located at the lower section of the horizontal operating platform (1), and can demould molding plaster mould box;
Unloading manipulator (5) is located at the horizontal side for operating platform (1), and for discharging.
2. the assembly line according to claim 1 for being used to produce plaster mould box, it is characterised in that:It is set in the mold (2)
There is the centre bore (2b) extended downwardly, the material jacking mechanism (3) is including stripper (3a), mandril (3b), guide sleeve (3d) and drives
Dynamic component (3c), stripper (3a) is covered in the centre bore (2b) on one end in mold (2), and the stripper (3a)
The cylindrical projection (3a2) extended downwardly is equipped with, which is slidably mounted in the centre bore (2b),
And its one end far from stripper (3a) passes through the horizontal operating platform (1), guide sleeve (3d) is arranged on horizontal operating platform (1)
Lower section, mandril (3b) is slidably mounted in the guide sleeve (3d), and its end is right against the end of the cylindrical projection (3a2),
The driving component (3c) is arranged on the one end of mandril (3b) far from cylindrical projection (3a2), and for mandril (3b) to be driven to lead
It is slided up and down into set (3d).
3. the assembly line according to claim 2 for being used to produce plaster mould box, it is characterised in that:The mandril (3b) is close
One end of drive component (3c) is equipped with cambered surface (3b1), and the driving component (3c) is including sliding against with the cambered surface (3b1)
Cam (3c1) and the motor (3c2) that the cam (3c1) is driven to rotate.
4. the assembly line for being used to produce plaster mould box according to claim 1 or 3, it is characterised in that:The discharging machinery
Hand (5) includes the installing matrix (5a) fixed on the ground and first mechanical arm (5b), second mechanical arm (5c), third machine
Tool arm (5d), the first mechanical arm (5b) is vertical to be mounted in installing matrix (5a), and can be in the installing matrix (5a)
On rotate in the horizontal direction, the top of one end of second mechanical arm (5c) with first mechanical arm (5b) in perpendicular is hinged,
The other end is also hinged with the third mechanical arm (5d) in perpendicular, and the end of the third mechanical arm (5d) is equipped with
Cramping body (6) is used to capture the finished product in mold (2).
5. the assembly line according to claim 4 for being used to produce plaster mould box, it is characterised in that:The hopper (4) it is interior
Portion is equipped with blender (4a), and the upside of hopper (4) is equipped with feed-tank (4b), and the discharge port of hopper (4) is equipped with flow controller
(4c)。
6. the assembly line according to claim 5 for being used to produce plaster mould box, it is characterised in that:The horizontal operating platform
(1) lower section is equipped with recycling bins (8), which is right against the material scraping plate (7), and horizontal operating platform (1) is in mold
(2) side is equipped with material spilling hole (1b).
7. the assembly line according to claim 6 for being used to produce plaster mould box, it is characterised in that:The two of the mold (2)
Side is arranged with drainage plate (2a), which tilts down close to one end of material spilling hole (1b), and drainage plate (2a)
Outlet is right against the material spilling hole (1b).
8. the assembly line according to claim 1 for being used to produce plaster mould box, it is characterised in that:The horizontal operating platform
(1) both sides are equipped with the rib (1c) upwardly extended.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721645416.4U CN207535058U (en) | 2017-11-30 | 2017-11-30 | For producing the assembly line of plaster mould box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721645416.4U CN207535058U (en) | 2017-11-30 | 2017-11-30 | For producing the assembly line of plaster mould box |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207535058U true CN207535058U (en) | 2018-06-26 |
Family
ID=62616249
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721645416.4U Active CN207535058U (en) | 2017-11-30 | 2017-11-30 | For producing the assembly line of plaster mould box |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207535058U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110625814A (en) * | 2019-09-30 | 2019-12-31 | 广州胜帆建材有限公司 | Rapid forming device and method for producing arc-shaped GRG (glass-fiber-reinforced glass) plate |
CN111113639A (en) * | 2020-02-17 | 2020-05-08 | 河北绿洲机械制造集团有限公司 | Gypsum mould box production line and production process |
CN111958810A (en) * | 2020-08-18 | 2020-11-20 | 广东联星瑞业水泥制品有限公司 | Flat lantern ring interface cement pipe manufacture equipment |
CN112092171A (en) * | 2020-09-27 | 2020-12-18 | 峨眉山市万晟新材料科技有限公司 | Automatic demoulding device for gypsum line |
CN113532072A (en) * | 2021-07-21 | 2021-10-22 | 醴陵市湘科花炮机械有限公司 | Drying device for ceramic blank making |
CN116901222A (en) * | 2023-06-27 | 2023-10-20 | 安徽省恒泰新材料有限公司 | Gypsum foaming production equipment |
-
2017
- 2017-11-30 CN CN201721645416.4U patent/CN207535058U/en active Active
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110625814A (en) * | 2019-09-30 | 2019-12-31 | 广州胜帆建材有限公司 | Rapid forming device and method for producing arc-shaped GRG (glass-fiber-reinforced glass) plate |
CN110625814B (en) * | 2019-09-30 | 2021-02-02 | 广州胜帆新材料科技有限公司 | Rapid forming device and method for producing arc-shaped GRG (glass-fiber-reinforced glass) plate |
CN111113639A (en) * | 2020-02-17 | 2020-05-08 | 河北绿洲机械制造集团有限公司 | Gypsum mould box production line and production process |
CN111958810A (en) * | 2020-08-18 | 2020-11-20 | 广东联星瑞业水泥制品有限公司 | Flat lantern ring interface cement pipe manufacture equipment |
CN112092171A (en) * | 2020-09-27 | 2020-12-18 | 峨眉山市万晟新材料科技有限公司 | Automatic demoulding device for gypsum line |
CN112092171B (en) * | 2020-09-27 | 2021-07-20 | 峨眉山市万晟新材料科技有限公司 | Automatic demoulding device for gypsum line |
CN113532072A (en) * | 2021-07-21 | 2021-10-22 | 醴陵市湘科花炮机械有限公司 | Drying device for ceramic blank making |
CN113532072B (en) * | 2021-07-21 | 2022-08-09 | 醴陵市湘科花炮机械有限公司 | Drying device for ceramic blank making |
CN116901222A (en) * | 2023-06-27 | 2023-10-20 | 安徽省恒泰新材料有限公司 | Gypsum foaming production equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207535058U (en) | For producing the assembly line of plaster mould box | |
CN111186000B (en) | Heat-insulating concrete block and manufacturing mold thereof | |
CN109435060B (en) | Tool for brick making | |
CN105500515A (en) | Improved concrete building block forming device | |
CN103507153B (en) | Gypsum block unresisted-jacking and forming machine | |
CN207549033U (en) | Plaster mould box molding machine | |
CN110682419A (en) | Concrete block forming die | |
CN207620811U (en) | A kind of anti-turned-down edge stripper apparatus on cable duct trolley | |
CN203725717U (en) | Sand moldforming mechanism for static pressure molding machine | |
CN207549261U (en) | A kind of rubber production pours device | |
CN211194333U (en) | Casting die utensil for building engineering | |
CN201778822U (en) | Hydraulic formwork trolley | |
CN211709604U (en) | Expansion-proof concrete mould | |
CN202292996U (en) | Die for manufacturing combined cavity member by using machine | |
CN209954937U (en) | Movable baking-free brick making device | |
CN218429111U (en) | A mixing arrangement for cement is energy-concerving and environment-protective | |
CN207127215U (en) | Sand mold device and mo(u)lding equipment | |
CN102294740B (en) | Die for making combined cavity member in machine | |
CN205201774U (en) | Cloth machine that production recess board was used | |
CN109012426A (en) | A kind of battery production mixing plant that maintenance cost is low | |
CN209381066U (en) | Cement electric pole centrifugation production mold retaining device | |
CN214238785U (en) | Cement pipe production pouring mold | |
CN214464236U (en) | Tunnel secondary lining trolley | |
CN212598729U (en) | Automatic sand supply device for precoated sand warehouse | |
CN209578052U (en) | A kind of mold being used to form casting sand type pouring basin |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |