CN209639541U - A kind of tunnel oven high temperature preheating band structure - Google Patents

A kind of tunnel oven high temperature preheating band structure Download PDF

Info

Publication number
CN209639541U
CN209639541U CN201920175119.0U CN201920175119U CN209639541U CN 209639541 U CN209639541 U CN 209639541U CN 201920175119 U CN201920175119 U CN 201920175119U CN 209639541 U CN209639541 U CN 209639541U
Authority
CN
China
Prior art keywords
exhaust smoke
tunnel oven
gas pass
vertical gas
preheating zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920175119.0U
Other languages
Chinese (zh)
Inventor
姚文博
张国富
辛茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gaoyi Northern Kiln Engineering Co Ltd
Original Assignee
Gaoyi Northern Kiln Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gaoyi Northern Kiln Engineering Co Ltd filed Critical Gaoyi Northern Kiln Engineering Co Ltd
Priority to CN201920175119.0U priority Critical patent/CN209639541U/en
Application granted granted Critical
Publication of CN209639541U publication Critical patent/CN209639541U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Details (AREA)
  • Tunnel Furnaces (AREA)

Abstract

The utility model relates to a kind of tunnel oven high temperature preheating band structures, are successively symmetrical arranged 3 pairs of exhaust smoke holes in preheating zone front end;3 pairs of fuel nozzles are set gradually on the right side of exhaust smoke hole;Exhaust smoke hole is connected to vertical gas pass, and vertical gas pass is connected to flue is summarized, and the flue that summarizes is connected to by total smoke outlet and pipeline with the smoke exhaust fan that tunnel oven side is arranged in;Vertical gas pass and summarizes flue and be arranged in the side wall of preheating zone;The installation control flashboard in vertical gas pass;The fuel nozzle that the utility model is installed close to exhaust smoke hole, the local temperature more directly improved, makes temperature of kiln head quickly reach 600-700 DEG C, meets the temperature requirement of magnesia-calcium brick firing.

Description

A kind of tunnel oven high temperature preheating band structure
Technical field
The utility model relates to a kind of tunnel oven high temperature preheating band structures.
Background technique
Tunnel oven is widely used in the industrial circles such as ceramics, refractory material, abrasive material;Tunnel oven is continuous work kiln, one As length at more than tens to one hundred meter, be burnt into section number square metre.It is distributed according to kiln temperature, is divided into preheating zone, clinkering zone, cold But band three parts;Burner is equipped in clinkering zone, fuel combustion enters in kiln, and flame forms negative in preheating zone smoke evacuation system Flow to preheating zone under pressure effect, carry out heat exchange with the green body loaded full of the kiln car in kiln, heated green body, flame cooling at Flue gas, by including that preheating zone smoke evacuation system expels from kiln.
Product code is placed on dedicated kiln car that wicket enters in kiln from preheating zone, and general ceramics and refractory products require to exist The problems such as preheating zone is uniformly heated up, and heating rate cannot be too fast, otherwise will appear the cracking of product green body.
The kiln car that green body is loaded under dynamical system promotion, which is arranged to clinkering zone, to be moved, in this motion process and in kiln Flame carries out countercurrent heat-transfer, and temperature steps up, and reaches the maximum sintering temperature of technique requirement in firing end of tape, subsequently into Cooling zone gradually cools down, and completes entire sintering process from outlet kiln discharge.
The firing process of the products such as the conventional products being burnt into using tunnel oven, such as ceramics, most of refractory material, it is desirable that It uniformly heats up in preheating zone, heating rate cannot be too fast, a series of problems, such as otherwise will cause the cracking of product green body.For this purpose, Conventional tunnel kiln devises the exhaust smoke hole in a row that distribution length accounts for preheating zone total length 2/3rds or so in preheating zone, two in kiln Side is symmetrical.In this way, adjusting by the flue gas flow to exhaust smoke hole in a row, the temperature of preheating zone along its length is just had adjusted Distribution, to adapt to the requirement of product sintering curve;Temperature curve 10 as shown in Fig. 5 is that ordinary crossing kiln preheating zone temperature is pressed It is required that the case where slowly rising.
Magnesia-calcium brick is the compound magnesia refractory product of alkalinity using MgO and CaO as main chemical compositions, and the porosity is low, loading Softening start temperature is generally greater than 1700 DEG C, and alkali resistance slag is functional.Magnesia-calcium brick is mainly used as the AOD furnace of smelting stainless steel The cylinder-packing of furnace lining and VOD ladle substitutes original magnesite-chrome brick, is important magnesia-calica refractory.But the firing of magnesia-calcium brick Technique is brought rapidly up after requiring product to enter kiln, reaches 600-700 DEG C;Otherwise, firing quality can be seriously affected;Conventional tunnel kiln Preheat band structure, it is difficult to reach this particular/special requirement.
Utility model content
The utility model technical problem of being solved, which is to provide one kind, makes tunnel oven high temperature preheating quick heating, meets magnesia-calcium brick The tunnel oven high temperature preheating band structure of firing temperature.
The utility model adopts the following technical solution:
The utility model is successively symmetrical arranged 3 pairs of exhaust smoke holes in preheating zone front end;3 pairs of combustions are set gradually on the right side of exhaust smoke hole Expect burner;The exhaust smoke hole is connected to vertical gas pass, and vertical gas pass is connected to flue is summarized, and the flue that summarizes is by always discharging fume Mouth and pipeline are connected to the smoke exhaust fan that tunnel oven side is arranged in;The vertical gas pass and summarizes flue and be arranged at preheating zone In side wall;The installation control flashboard in the vertical gas pass.
Exhaust smoke hole described in the utility model is 3 pairs, and the centre distance of adjacent two pairs of exhaust smoke holes is 1m, first couple of row in left side Cigarette hole centre distance kiln import 1.5m.
Fuel nozzle described in the utility model is 3 pairs;The burner centre distance of adjacent two pairs of fuel nozzles is 1m;Left side Last of the burner centre distance of a pair of of fuel nozzle and right side are center 1.2m to the centre distance of exhaust smoke hole.
The length of the utility model preheating zone is 22m.
The utility model good effect is as follows: the utility model is only successively symmetrical arranged 3 pairs of exhaust smoke holes in preheating zone front end, Close to preheating zone kiln hood central exhaust, high-temperature flue gas is set to cool down under slow situation in the kiln of preheating zone, until kiln hood just collects In expel from kiln, substantially increase the temperature of preheating zone front, with product generate countercurrent heat-transfer during improve product Temperature.And firing general setting 10-20 in conventional tunnel kiln preheating zone is to exhaust smoke hole, distribution more than 10 parking stalls and Preheating zone uneasiness is charged burner, is adjusted by the flue gas flow to exhaust smoke hole in a row, and heating is slow.The utility model is close to row The fuel nozzle of cigarette hole installation, the local temperature more directly improved make temperature of kiln head quickly reach 600-700 DEG C, meet magnesium The temperature requirement of calcium brick firing.The temperature curve 9 that attached drawing 5 indicates is exactly that the utility model tunnel oven high temperature preheating band temperature exists The case where the initial segment is with regard to rapid increase.It forms a sharp contrast with ordinary crossing kiln preheating zone temperature curve 10.
Detailed description of the invention
It is attached that FIG. 1 is a schematic structural view of the utility model;
Attached drawing 2 is the A-A of attached drawing 1 to schematic cross-sectional view;
Attached drawing 3 is the B-B direction schematic cross-sectional view of attached drawing 1;
Attached drawing 4 is the utility model overlooking structure diagram;
Attached drawing 5 is preheating zone temperature distribution history contrast schematic diagram.
Specific embodiment
As shown in attached drawing 1-4, (the tunnel oven product load wagon length conduct of the utility model preheating zone 1 front end 1-3 parking stall Along kiln length measuring unit, for a kiln car length generally in 1.5-2.5 meters of ranges, usual tunnel furnace preheating zone length is 15- The length of 20 vehicles) 3 pairs of exhaust smoke holes 3 are successively symmetrical arranged at concentration;3 pairs of fuel are successively symmetrical arranged on 3 right side of exhaust smoke hole to burn Mouth 7;Exhaust smoke hole 3 and the long 7m of the total layout area of fuel nozzle, are equivalent to 3.5 kiln car bit lengths;And conventional tunnel kiln preheating zone The general setting 10-20 of firing to exhaust smoke hole 3, charge burner more than 10 parking stalls and in preheating zone uneasiness by distribution;Institute It states exhaust smoke hole 3 to be connected to vertical gas pass 4, vertical gas pass 4 is connected to flue 6 is summarized, and the flue 6 that summarizes passes through total smoke outlet 8 Be connected to the smoke exhaust fan (not shown) that tunnel oven side is arranged in, the vertical gas pass 4 and summarize flue 6 be arranged at it is pre- In tropical side wall;The installation control flashboard 5 in the vertical gas pass 4.
At runtime, the flame generated from tunnel kiln firing zone combustion system, in kiln hood, (tunnel oven is close for the utility model 1 entrance location of preheating zone) concentrated setting 3 suction function of exhaust smoke hole under all flow to kiln hood through exhaust smoke hole 3, vertical gas pass 4, Summarize flue 6, total smoke outlet 8 and kiln Outer Tube, smoke exhaust fan, and by smoke stack emission, improves temperature of kiln head.Meanwhile with row The temperature in this region that the adjacent fuel nozzle 7 in cigarette hole 3 further increases;It ensure that the preheating zone that product firing process needs The temperature requirement of high temperature.Kiln car enters clinkering zone 2 thereafter after the heating process that entire preheating zone 1 experienced technique requirement; Preheating zone 1 and clinkering zone 2 are continuous overall structures.
As shown in Fig. 5, in kiln operation, the utility model makes high-temperature flue gas in kiln close to kiln hood central exhaust Cool down under slow situation, just concentrate and expel from kiln until kiln hood, substantially increase the temperature of preheating zone front, is produced with product The temperature of product is improved during raw countercurrent heat-transfer, the fuel nozzle of installation more directly improves the part of 1 kiln hood of preheating zone Temperature, the temperature distribution history that the temperature distribution history 9 and conventional tunnel kiln preheating zone that the utility model preheating zone 1 is formed are formed B10 is compared, and in the little range in the parking stall kiln hood 1-3, heating rapidly, makes local temperature quickly reach 500-700 DEG C, meets The firing condition of the firing process of magnesia-calcium brick.
Finally, it is stated that the above is only the preferred embodiment of the utility model only, not to limit this reality With novel, any modification, equivalent replacement or improvement made within the spirit and principle of the present invention etc. should all include It is within the protection scope of the utility model.

Claims (4)

1. a kind of tunnel oven high temperature preheating band structure, it is characterised in that be successively symmetrical arranged 3 pairs of exhaust smoke holes in preheating zone (1) front end (3);3 pairs of fuel nozzles (7) are set gradually on the right side of exhaust smoke hole (3);
The exhaust smoke hole (3) is connected to vertical gas pass (4), and vertical gas pass (4) is connected to flue (6) is summarized, described to summarize flue (6) it is connected to by total smoke outlet (8) and pipeline with the smoke exhaust fan that tunnel oven side is arranged in;The vertical gas pass (4) and summarize Flue (6) is arranged in preheating zone (1) side wall;
Installation control flashboard (5) in the vertical gas pass (4).
2. a kind of tunnel oven high temperature preheating band structure according to claim 1, it is characterised in that the exhaust smoke hole (3) is 3 Right, the centre distance of adjacent two pairs of exhaust smoke holes (3) is 1m, first couple of exhaust smoke hole (3) centre distance kiln import 1.5m in left side.
3. a kind of tunnel oven high temperature preheating band structure according to claim 1, it is characterised in that the fuel nozzle (7) is 3 pairs;The burner centre distance of adjacent two pairs of fuel nozzles (7) is 1m;The burner centre distance of the first pair of fuel nozzle (7) in left side It is center 1.2m to the centre distance of exhaust smoke hole (3) with last of right side.
4. a kind of tunnel oven high temperature preheating band structure according to claim 1, it is characterised in that the length of the preheating zone (1) Degree is 22m.
CN201920175119.0U 2019-01-31 2019-01-31 A kind of tunnel oven high temperature preheating band structure Active CN209639541U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920175119.0U CN209639541U (en) 2019-01-31 2019-01-31 A kind of tunnel oven high temperature preheating band structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920175119.0U CN209639541U (en) 2019-01-31 2019-01-31 A kind of tunnel oven high temperature preheating band structure

Publications (1)

Publication Number Publication Date
CN209639541U true CN209639541U (en) 2019-11-15

Family

ID=68492924

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920175119.0U Active CN209639541U (en) 2019-01-31 2019-01-31 A kind of tunnel oven high temperature preheating band structure

Country Status (1)

Country Link
CN (1) CN209639541U (en)

Similar Documents

Publication Publication Date Title
CN106017072A (en) Energy-saving hot wind circulation tunnel kiln and waste heat recycling method of tunnel kiln
CN106521120A (en) Bearing steel heating decarbonization control method
CN106287725A (en) Grading combustion technology low NOx flat flame heat-accumulating burner
CN102878808B (en) Series connection industrial kiln
CN209371763U (en) A kind of tunnel oven for bauxite roasting
CN213147379U (en) Gas combustion mechanism for heating section of copper ingot gas walking-beam heating furnace
CN209639541U (en) A kind of tunnel oven high temperature preheating band structure
CN206073077U (en) The low NOx flat flames heat-accumulating burner of grading combustion technology
CN202928349U (en) Series-connection industrial furnace
EP2733124A1 (en) Method and apparatus for injecting oxygen into a furnace
CN105238901B (en) A kind of multiduty hot-blast stove high temperature preheating system
CN105333730B (en) Bottom heated type energy-saving aluminum rod furnace
CN111424128A (en) Reducing gas heating furnace and heating process for producing sponge iron by gas-based reduction
CN109489035A (en) A kind of low NOx drainage burner
CN110044176A (en) A kind of burner of the tunnel oven of the vertical upper spraying, combustion of premixed flow
CN108716852A (en) A kind of kiln firing oxidation panel secondary combustion system
CN209853984U (en) Combustion type glass tempering heating device
CN204227896U (en) A kind of bridge type smelting furnace
CN103601363B (en) The method of the gas-fired cupola heat cascade utilization that a kind of rock wool produces
CN105886752A (en) Thermal treatment furnace for steel wires
CN205077087U (en) Hot -blast furnace high temperature preheating system of multipurpose
CN204718364U (en) Many rows combustion gas melting shaft furnace
CN205957173U (en) Ultralow NOx flame combustion technology regenerative burner
CN205784529U (en) A kind of Novel tunnel furnace fired for china bowl
CN106152502A (en) A kind of efficiently direct fired heated air boiler

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant