CN209600541U - Transport the trolley of building waste in a kind of construction site - Google Patents

Transport the trolley of building waste in a kind of construction site Download PDF

Info

Publication number
CN209600541U
CN209600541U CN201920217564.9U CN201920217564U CN209600541U CN 209600541 U CN209600541 U CN 209600541U CN 201920217564 U CN201920217564 U CN 201920217564U CN 209600541 U CN209600541 U CN 209600541U
Authority
CN
China
Prior art keywords
bottom plate
wagon box
trolley
fixedly installed
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920217564.9U
Other languages
Chinese (zh)
Inventor
薛兴宾
王康
张博岩
彭天卫
吴松儒
蔡春磊
来永宁
聂子龙
魏文杰
穆舟祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920217564.9U priority Critical patent/CN209600541U/en
Application granted granted Critical
Publication of CN209600541U publication Critical patent/CN209600541U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Handcart (AREA)

Abstract

The utility model relates to trolley technical fields, and disclose a kind of trolley of construction site transport building waste, including bottom plate, the surface of the bottom plate is equipped with wagon box, the left end of the wagon box bottom is fixedly installed with shaft, side of the shaft far from wagon box is fixedly connected with the upper surface of bottom plate, and the plate upper surface right end is fixedly installed with the first spring, and the one end of first spring far from bottom plate is flexibly connected with the lower surface of wagon box.The trolley of construction site transport building waste, it is wrapped in runner and pulley by rope and is fixedly connected with fast pulley, rotating rocker drives runner rotation, and then rope is shunk, pass through the shaft being equipped with, therefore the right end of wagon box can be promoted, since shaft can only rotate 60 °, the garbage energy in the wagon box just made is poured, it does not need to throw wagon box, the rubbish in wagon box is poured out, it is very easy to use and time saving and energy saving.

Description

Transport the trolley of building waste in a kind of construction site
Technical field
The utility model relates to trolley technical field, the hand push of building waste is transported in specially a kind of construction site Vehicle.
Background technique
Trolley is the carrying vehicle for being pushed away, being drawn with manpower, it is the first ancestor of all vehicles, and trolley is because of cheap, dimension Shield is simple and convenient to operate, from heavy and light, can be in the local work that motor vehicles inconvenience uses, in the lighter article of short-haul operation When it is very convenient and be widely applied in production and life.
In construction site, due to space limitations, Large vehicle is inconvenient to enter, and the use of trolley is very wide General, construction site can often generate many building wastes, typically be transported using trolley, construction site uses at present Trolley wagon box and handlebar are typically mounted on together, are all that wagon box is thrown when dumping rubbish, are made in wagon box Rubbish pour out, this trolley use it is very troublesome but also more time-consuming, construction site be typically all use Hand barrow can be jolted, in some instances it may even be possible to turn over very much due to construction site pavement roughness when worker is using trolley Vehicle, worker have to remove to stablize trolley with very great strength, can make the muscular fatigue of worker in this way, and working efficiency will drop It is low.
Utility model content
In view of the deficiencies of the prior art, the utility model provides a kind of hand push of construction site transport building waste Vehicle, have convenient for dump rubbish and reduction jolt degree the advantages of, solve trolley wagon box that current construction site uses and Handlebar is typically mounted on together, is all that wagon box is thrown when dumping rubbish, and pours out the rubbish in wagon box, this Kind of trolley uses very troublesome but also more time-consuming, and construction site is typically all to use hand barrow, by In construction site pavement roughness, can jolt very much when worker is using trolley, in some instances it may even be possible to overturn, worker has to It removes to stablize trolley with very great strength, the muscular fatigue of worker can be made in this way, the problem of working efficiency will reduce.
The utility model provides the following technical solutions: transporting the trolley of building waste, including bottom in a kind of construction site The surface of plate, the bottom plate is equipped with wagon box, and the left end of the wagon box bottom is fixedly installed with shaft, and the shaft is far from wagon box Side be fixedly connected with the upper surface of bottom plate, the plate upper surface right end is fixedly installed with the first spring, first bullet The one end of spring far from bottom plate is flexibly connected with the lower surface of wagon box, and the right end of the plate upper surface is fixedly installed with baffle, institute The right side that baffle is located at the first spring is stated, the baffle is fixedly installed with handlebar, the front of the handlebar far from the side of wagon box It is movably installed with runner by bearing, the runner is fixedly installed with rocking bar far from the side of handlebar, and the front of the bottom plate is solid Dingan County is equipped with pulley, and the front of the wagon box is fixedly installed with fast pulley, and the surface wrap of the runner has rope, the rope One end be fixedly connected with runner, the other end of the rope be wrapped in the inside of pulley and extend to inside fast pulley and with it is solid Fixed wheel is fixedly connected, and the front of the bottom plate offers through-hole, and the through-hole runs through the front and rear sides of bottom plate, the through-hole it is interior Chamber fixing sleeve is connected to bearing holder (housing, cover), and the both ends of the bearing holder (housing, cover) all extend to the outside of through-hole, and the bearing holder (housing, cover) is located at outside through-hole Both ends be movably installed with wheel, the rear and front end on the right side of the lower surface of base plate is fixedly installed with buffer unit.
Preferably, the buffer unit includes fixed link, connecting rod, second spring and idler wheel, the fixed link and bottom plate Lower surface be fixedly connected, the fixed link is connected to connecting rod, the top of the connecting rod inner wall far from one end movable sleeve of bottom plate End is fixedly installed with second spring, and the second spring one end and fixed link far from connecting rod are fixed far from one end of connecting rod Connection, the bottom of the connecting rod is movably installed with idler wheel.
Preferably, the inside of the connecting rod offers cavity, the size of the connecting rod cavity and the size of fixed link It is adapted.
Preferably, the fixed link is located in the inner cavity of second spring.
Preferably, the rotatable maximum angle of the shaft is 60 °.
Preferably, the shape in the wagon box section is trapezoidal, and the left plate of the wagon box is tilted to the left 30 °.
Be compared with the prior art, the utility model have it is following the utility model has the advantages that
1, the trolley of building waste is transported in the construction site, passes through shaft, runner, rocking bar, pulley, fast pulley and rope Mutual cooperation between the structures such as rope is wrapped in runner and pulley due to rope and is fixedly connected with fast pulley, rotating rocker Runner rotation is driven, and then rope is shunk, by the shaft being equipped with, therefore the right end of wagon box can be promoted, due to shaft 60 ° can only be rotated, the garbage energy in the wagon box just made pours, and does not need to throw wagon box, makes the rubbish in wagon box Rubbish is poured out, very easy to use, and time saving and energy saving.
2, the trolley of building waste is transported in the construction site, by by the structures such as the first spring and buffer unit it Between cooperate, when trolley traveling at rugged road surface, wagon box can pitch, the first spring being equipped with have bullet Property effect, can give one upward reaction force of wagon box, reduce wagon box generate vibration, pass through second spring in buffer unit Elastic reaction, travelling can be such that idler wheel swings up and down at uneven road surface, so that there is a buffering when trolley jolts, reduce The vibration that trolley is generated because jolting avoids overturning, and the effective muscular fatigue degree for reducing worker improves work effect Rate.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structure sectional view of the utility model;
Fig. 3 is the structure top view of the utility model;
Fig. 4 is the utility model structure diagram.
In figure: 1, bottom plate;2, wagon box;3, shaft;4, the first spring;5, baffle;6, handlebar;7, runner;8, rocking bar;9, sliding Wheel;10, fast pulley;11, rope;12, bearing holder (housing, cover);13, wheel;14, buffer unit;1401, fixed link;1402, connecting rod; 1403, second spring;1404, idler wheel;15, through-hole.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-4, the trolley of building waste, including bottom plate 1 are transported in a kind of construction site, bottom plate 1 just on Side is equipped with wagon box 2, and the shape in 2 section of wagon box is trapezoidal, and the left plate of wagon box 2 is tilted to the left 30 °, and the left end of 2 bottom of wagon box is solid Dingan County is equipped with shaft 3, and the rotatable maximum angle of shaft 3 is 60 °, the upper surface of shaft 3 side far from wagon box 2 and bottom plate 1 It is fixedly connected, 1 upper surface right end of bottom plate is fixedly installed with the first spring 4, the one end of the first spring 4 far from bottom plate 1 and wagon box 2 Lower surface is flexibly connected, and the right end of 1 upper surface of bottom plate is fixedly installed with baffle 5, and baffle 5 is located at the right side of the first spring 4, baffle 5 sides far from wagon box 2 are fixedly installed with handlebar 6, and the front of handlebar 6 is movably installed with runner 7 by bearing, and runner 7 is separate The side of handlebar 6 is fixedly installed with rocking bar 8, and the front of bottom plate 1 is fixedly installed with pulley 9, and the front of wagon box 2 is fixedly installed with Fixed wheel 10, the surface wrap of runner 7 have rope 11, pass through shaft 3, runner 7, rocking bar 8, pulley 9, fast pulley 10 and rope 11 etc. Mutual cooperation between structure is wrapped in runner 7 and pulley 9 due to rope 11 and is fixedly connected with fast pulley 10, and rotation is shaken Bar 8 drives runner 7 to rotate, and then rope 11 is shunk, and by the shaft 3 being equipped with, therefore the right end of wagon box 2 can be promoted, Since shaft 3 can only rotate 60 °, the garbage energy in the wagon box 2 just made is poured, and is not needed to throw wagon box 2, be made Rubbish in wagon box 2 is poured out, very easy to use, and time saving and energy saving, and one end of rope 11 is fixedly connected with runner 7, The other end of rope 11 is wrapped in the inside of pulley 9 and extends to 10 inside of fast pulley and be fixedly connected with fast pulley 10, bottom plate 1 Front offer through-hole 15, through-hole 15 runs through the front and rear sides of bottom plate 1, and the inner cavity fixing sleeve of through-hole 15 is connected to bearing holder (housing, cover) 12, The both ends of bearing holder (housing, cover) 12 all extend to the outside of through-hole 15, and the both ends that bearing holder (housing, cover) 12 is located at outside through-hole 15 are movably installed with vehicle 13 are taken turns, the rear and front end on the right side of 1 lower surface of bottom plate is fixedly installed with buffer unit 14, by passing through the first spring 4 and buffering It cooperates between the structures such as device 14, when trolley traveling is at rugged road surface, wagon box 2 can pitch, and be equipped with The first spring 4 have elastic reaction, can give 2 one upward reaction forces of wagon box, reduce wagon box 2 generate vibration, pass through The elastic reaction of second spring 1403 in buffer unit 14, travelling can be such that idler wheel 1404 swings up and down at uneven road surface, make Obtaining when trolley jolts has a buffering, reduces the vibration that trolley is generated because jolting, avoids overturning, effectively reduce work The muscular fatigue degree of people, improves work efficiency, and buffer unit 14 includes fixed link 1401, connecting rod 1402, second spring 1403 and idler wheel 1404, fixed link 1401 be located in the inner cavity of second spring 1403, the lower surface of fixed link 1401 and bottom plate 1 is solid Fixed connection, fixed link 1401 are connected to connecting rod 1402 far from one end movable sleeve of bottom plate 1, and the inside of connecting rod 1402 opens up free The size of chamber, 1402 cavity of connecting rod is adapted with the size of fixed link 1401, and the top of 1402 inner wall of connecting rod is fixedly mounted Have a second spring 1403, the one end of second spring 1403 far from connecting rod 1402 and fixed link 1401 far from connecting rod 1402 one End is fixedly connected, and the bottom of connecting rod 1402 is movably installed with idler wheel 1404.
When using trolley, when trolley is when traveling makes by rugged road surface, have first by the first spring 4 Some elastic reactions give wagon box 2 one upward thrusts, reduce the vibration of wagon box 2, then pass through second in buffer unit 14 Spring 1403 also has elastic reaction, and the dynamics that trolley can be made to tilt slows down, when needing the rubbish in trolley wagon box When rubbish pours, by rotating rocker 8, runner 7 is driven to rotate, since rope 11 connects around pulley 9 and fast pulley 10 are fixed Connect, and shaft 3 can maximum 60 ° of rotation so that the right end of wagon box 2 rises, rubbish can group's benefit pour out, when rubbish is finished down instead Wagon box 2 can be put down to slow rotating rocker 8.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. the trolley of building waste, including bottom plate (1) are transported in a kind of construction site, it is characterised in that: the bottom plate (1) Surface is equipped with wagon box (2), and the left end of wagon box (2) bottom is fixedly installed with shaft (3), and the shaft (3) is far from wagon box (2) side is fixedly connected with the upper surface of bottom plate (1), and bottom plate (1) upper surface right end is fixedly installed with the first spring (4), first spring (4) is flexibly connected far from the one end of bottom plate (1) with the lower surface of wagon box (2), table on the bottom plate (1) The right end in face is fixedly installed with baffle (5), and the baffle (5) is located at the right side of the first spring (4), and the baffle (5) is far from vehicle The side of bucket (2) is fixedly installed with handlebar (6), and the front of the handlebar (6) is movably installed with runner (7) by bearing, described Runner (7) is fixedly installed with rocking bar (8) far from the side of handlebar (6), and the front of the bottom plate (1) is fixedly installed with pulley (9), The front of the wagon box (2) is fixedly installed with fast pulley (10), and the surface wrap of the runner (7) has rope (11), the rope One end of rope (11) is fixedly connected with runner (7), and the other end of the rope (11) is wrapped in the inside of pulley (9) and extends to Fast pulley (10) is internal and is fixedly connected with fast pulley (10), and the front of the bottom plate (1) offers through-hole (15), the through-hole (15) run through the front and rear sides of bottom plate (1), the inner cavity fixing sleeve of the through-hole (15) is connected to bearing holder (housing, cover) (12), the bearing holder (housing, cover) (12) both ends all extend to the outside of through-hole (15), and the bearing holder (housing, cover) (12) is located at the external both ends of through-hole (15) activity peace Equipped with wheel (13), the rear and front end on the right side of bottom plate (1) lower surface is fixedly installed with buffer unit (14).
2. the trolley that building waste is transported in a kind of construction site according to claim 1, it is characterised in that: described slow Flushing device (14) includes fixed link (1401), connecting rod (1402), second spring (1403) and idler wheel (1404), the fixed link (1401) it is fixedly connected with the lower surface of bottom plate (1), the fixed link (1401) is connected to company far from one end movable sleeve of bottom plate (1) The top of extension bar (1402), connecting rod (1402) inner wall is fixedly installed with second spring (1403), the second spring (1403) one end far from connecting rod (1402) is fixedly connected with fixed link (1401) far from the one end of connecting rod (1402), described The bottom of connecting rod (1402) is movably installed with idler wheel (1404).
3. the trolley that building waste is transported in a kind of construction site according to claim 2, it is characterised in that: the company The inside of extension bar (1402) offers cavity, and the size of the size and fixed link (1401) of connecting rod (1402) cavity is mutually fitted Match.
4. the trolley that building waste is transported in a kind of construction site according to claim 2, it is characterised in that: described solid Fixed pole (1401) is located in the inner cavity of second spring (1403).
5. the trolley that building waste is transported in a kind of construction site according to claim 1, it is characterised in that: described turn Axis (3) rotatable maximum angle is 60 °.
6. the trolley that building waste is transported in a kind of construction site according to claim 1, it is characterised in that: the vehicle The shape in bucket (2) section is trapezoidal, and the left plate of the wagon box (2) is tilted to the left 30 °.
CN201920217564.9U 2019-02-19 2019-02-19 Transport the trolley of building waste in a kind of construction site Expired - Fee Related CN209600541U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920217564.9U CN209600541U (en) 2019-02-19 2019-02-19 Transport the trolley of building waste in a kind of construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920217564.9U CN209600541U (en) 2019-02-19 2019-02-19 Transport the trolley of building waste in a kind of construction site

Publications (1)

Publication Number Publication Date
CN209600541U true CN209600541U (en) 2019-11-08

Family

ID=68402581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920217564.9U Expired - Fee Related CN209600541U (en) 2019-02-19 2019-02-19 Transport the trolley of building waste in a kind of construction site

Country Status (1)

Country Link
CN (1) CN209600541U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111115509A (en) * 2019-12-12 2020-05-08 郑州宇恒环保技术有限公司 Hand-push type buffering power-assisted stacking brick conveying machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111115509A (en) * 2019-12-12 2020-05-08 郑州宇恒环保技术有限公司 Hand-push type buffering power-assisted stacking brick conveying machine
CN111115509B (en) * 2019-12-12 2021-07-13 郑州宇恒环保技术有限公司 Hand-push type buffering power-assisted stacking brick conveying machine

Similar Documents

Publication Publication Date Title
CN106185129B (en) A kind of universal self-discharging garbage vehicle Ce Zhuanguatong mechanisms
CN201777614U (en) Special vehicle high-position unloading device
CN209600541U (en) Transport the trolley of building waste in a kind of construction site
CN206141590U (en) Building engineering carries shallow that thing was used
CN108839601B (en) Turnover slide of dregs dump truck
CN201249993Y (en) Afterload compression garbage truck and tipping gear thereof
CN210735178U (en) Garbage recycling and treating box
CN201077681Y (en) C shaped tipper
CN210392395U (en) Building rubbish clearance transfer device
CN204021665U (en) A kind of cram packer
CN109985711B (en) Mobile modularized building solid waste in-situ recycling treatment
CN206939605U (en) One kind hangs tub dumping device of garbage truck
CN212100447U (en) Engineering construction environmental protection transportation screening tool
CN201604562U (en) Carriage self-cleaning vibrating device for dump car
CN212047396U (en) Novel concrete transportation trolley
CN212026410U (en) Novel sliding loader frame
CN207157240U (en) Municipal works trolley
CN201280819Y (en) Engineering garbage cleaning vehicle
CN217349248U (en) Garbage can fixing structure for garbage can side-hung vehicle
CN212798158U (en) Turnover frame body for sanitation vehicle
CN211845911U (en) Buffering stable cleaning vehicle
CN219236865U (en) Tipping bucket device for construction engineering of short-distance conveying materials
CN216710426U (en) Domestic waste burns and uses pay-off conveyer
CN211468462U (en) Novel cart for building
CN210681988U (en) Compression garbage truck hangs bucket mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191108

Termination date: 20210219

CF01 Termination of patent right due to non-payment of annual fee