CN209599197U - Decorative stone workshop plate rack - Google Patents
Decorative stone workshop plate rack Download PDFInfo
- Publication number
- CN209599197U CN209599197U CN201920348601.XU CN201920348601U CN209599197U CN 209599197 U CN209599197 U CN 209599197U CN 201920348601 U CN201920348601 U CN 201920348601U CN 209599197 U CN209599197 U CN 209599197U
- Authority
- CN
- China
- Prior art keywords
- channel steel
- bracket
- rectangular frame
- backing pin
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to decorative stone workshop plate racks, including the spaced turnover bracket in a pair of of left and right, turnover bracket includes rectangular frame and two bracket bases being mounted on mill floor, it is time interval setting with two bracket bases on same turnover bracket, the front part and rear section of rectangular frame are respectively equipped with the installation axle that a center line extends along the longitudinal direction, bracket base is equipped with the articulated structure installed for installation axle, rectangular frame is hinged on corresponding two stands pedestal by two installation axles, a positioning plate is additionally provided in the front part and/or rear section of rectangular frame, plate rack further includes the backing pin of a cylindrical structure, positioning plate is equipped with the backing pin passed through for backing pin and perforates, bracket base be equipped with for turnover bracket overturn to it is perpendicular with mill floor when for backing pin lower end The location hole of insertion.Compared with the prior art, workshop space is saved, easy to use, structure is simple.
Description
Technical field
The utility model belongs to Workshop Production auxiliary device field, and in particular to a kind of theslabstone board workshop plate
Rack.
Background technique
Decorative stone, that is, Decorative Building Stone, Decorative Building Stone refer to have can the processing performances such as sawing, polishing, building
Build the stone material on object as finishing material, including lithotome and artificial stone's two major classes, lithotome refer to natural marble and
Granite, artificial stone then include terrazzo, artificial marble, granolith and other artificial stones.Decorative stone with build
The difference for building stone material has been dicoration more.The plate rack for specializing in stone plate placement is equipped in stone material workshop at present,
Plate rack is fixed on mill floor, occupies floor space.
Utility model content
The purpose of this utility model is to provide a kind of decorative stone workshop plate racks, to solve existing plate
Material rack occupies the problem of floor space.
To achieve the above object, the following technical solution is employed for the utility model: decorative stone workshop plate
Rack includes the spaced turnover bracket in a pair of of left and right, and turnover bracket includes that rectangular frame and two are mounted on mill floor
On bracket base, with two bracket bases on same turnover bracket be time interval setting, the front side portion of rectangular frame
Divide and rear section is respectively equipped with the installation axle that a center line extends along the longitudinal direction, bracket base is equipped with to be installed for installation axle
Articulated structure, rectangular frame is hinged on corresponding two stands pedestal by two installation axles, the front part of rectangular frame and/
Or a positioning plate is additionally provided on rear section, plate rack further includes the backing pin of a cylindrical structure, and positioning plate, which is equipped with, to be supplied
The perforation of backing pin that backing pin passes through, bracket base be equipped with for turnover bracket overturn to it is perpendicular with mill floor when for backing pin
The location hole of lower end insertion.
The utility model has the advantages that usually opening two turnover brackets, turnover bracket is perpendicular with mill floor, and backing pin is inserted in branch vertically
On frame pedestal, the positioning of turnover bracket is realized, then stone plate is placed on two turnover brackets;It is not needed less in stone slab amount
When using plate rack, each backing pin is extracted, then inwardly two turnover brackets of overturning, rack is packed up;It is allowed to other devices
Open space, such as ash can, tool box.Compared with the prior art, workshop space is saved, easy to use, structure is simple.
Further, bracket base includes a horizonal base plate and the position-limited hoop that is mounted on the top surface of horizonal base plate, horizontal
Bottom plate connects mill floor, and the cross section of position-limited hoop is Ω type, and the installation axle on rectangular frame is installed in rotation on position-limited hoop
In, the articulated structure is formed by position-limited hoop.
Further, rectangular frame includes upper channel steel, lower channel steel and the connection channel steel being connected between upper and lower channel steel, connection
Channel steel has two or more, and each channel steel that connects is spaced setting side by side, and the notch of upper channel steel upward, is equipped in upper channel steel and is used to support
The support batten of plate.
Further, the side wall of upper channel steel is equipped with the holding screw for positioning the support batten, and holding screw has
Two or more, the interval setting side by side on upper channel steel length direction of each holding screw.
Further, the lower end of backing pin is pyramidal structure.Facilitate the positioning on backing pin insertion bracket base, with bracket base
Hole intimate contact, avoids turnover bracket from shaking.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment
Attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only the embodiments of the present invention, for this
For the those of ordinary skill of field, without creative efforts, it can also be obtained according to these attached drawings others
Attached drawing;
Fig. 1 is the structural schematic diagram of decorative stone workshop plate rack in the open mode;
Fig. 2 is structural schematic diagram of the decorative stone workshop plate rack in collapsed state;
Fig. 3 is the enlarged drawing in Fig. 2 at A.
In figure: channel steel under 100- turnover bracket, 110- rectangular frame, the upper channel steel of 111-, 112-, 113- connection channel steel,
114- supports batten, 115- holding screw, 116- positioning plate, 117- installation axle, 120- bracket base, 121- position-limited hoop, 122-
Location hole, 130- backing pin, 200- track.
Specific embodiment
In order to keep the technical purpose, technical scheme and beneficial effects of the utility model clearer, with reference to the accompanying drawing and
Specific embodiment is further illustrated the technical solution of the utility model.
The embodiment of decorative stone workshop plate rack, as shown in Figure 1 to Figure 2, mill floor, which is equipped with, to be supplied
The track 200 of carriage walking, plate rack are arranged between two tracks 200, plate rack include it is a pair of between left and right every
The turnover bracket 100 of setting, two turnover brackets, 100 structure is identical, and turnover bracket 100 includes rectangular frame 110 and two installations
Bracket base 120 on mill floor is time interval setting with two bracket bases 120 on same turnover bracket,
Bracket base 120 includes a horizonal base plate and the position-limited hoop 121 being mounted on the top surface of horizonal base plate, and horizonal base plate connects workshop
Ground, the cross section of position-limited hoop 121 are Ω type.
Rectangular frame 110 includes upper channel steel 111, lower channel steel 112 and the connection channel steel 113 being connected between upper and lower channel steel,
Connection channel steel 113 has two or more, each to connect the interval setting side by side of channel steel 113, the notch of upper channel steel 11 upward, upper channel steel 111
In the support batten 114 for being used to support plate is installed, the side wall of upper channel steel 11 is equipped with for holding out against the tight of support batten 114
Determine screw 115, holding screw 115 is there are two more than, and interval is set each holding screw 115 side by side on upper 111 length direction of channel steel
It sets.
The front part and rear section of rectangular frame 110 are respectively equipped with the installation axle that a center line extends along the longitudinal direction
117, installation axle 117 is installed in rotation in position-limited hoop 121, and rectangular frame 110 is hinged on corresponding by two installation axles 117
On two stands pedestal 120, a positioning plate 116 is additionally provided in the front part and rear section of rectangular frame 110.
Plate rack further includes the backing pin 130 of a cylindrical structure, and positioning plate 116 is equipped with to be passed through for backing pin 130
Backing pin perforation, the horizonal base plate of bracket base 120 are equipped with for when the overturning of turnover bracket 110 is extremely perpendicular with mill floor
For the location hole 122 of 130 lower end of backing pin insertion;The lower end of backing pin 130 is pyramidal structure, and backing pin 130 is facilitated to be inserted into bracket base
Location hole intimate contact on 120, with bracket base 120 avoids turnover bracket 100 from shaking.
Usually two turnover brackets 100 are opened, turnover bracket 100 and mill floor are perpendicular, and backing pin 130 is inserted in branch vertically
On frame pedestal 120, the positioning of turnover bracket is realized, then stone plate is placed on 100 on two turnover brackets, it is few in stone slab amount
When not needing using plate rack, each backing pin 130 is extracted, then inwardly two turnover brackets 100 of overturning, rack is packed up,
Space, such as ash can, tool box are got out of the way to other devices.Compared with the prior art, workshop space is saved, easy to use, knot
Structure is simple.
It should be noted last that: the technical solution of the utility model that the above embodiments are only illustrative and not limiting is appointed
What to the utility model carry out equivalent replacement and do not depart from the spirit and scope of the utility model modification or part replace,
It should cover within the scope of the utility model claims protection.
Claims (5)
1. decorative stone workshop plate rack, it is characterised in that: including the spaced turnover bracket in a pair of of left and right,
Turnover bracket includes rectangular frame and two bracket bases being mounted on mill floor, with two on same turnover bracket
Bracket base is time interval setting, and the front part and rear section of rectangular frame are respectively equipped with a center line along the longitudinal direction
The installation axle of extension, bracket base are equipped with the articulated structure installed for installation axle, and rectangular frame is hinged on by two installation axles
On corresponding two stands pedestal, a positioning plate, plate rack are additionally provided in the front part and/or rear section of rectangular frame
It further include the backing pin of a cylindrical structure, positioning plate is equipped with the backing pin passed through for backing pin and perforates, and bracket base is equipped with and is used for
Turnover bracket overturn to it is perpendicular with mill floor when for backing pin lower end insertion location hole.
2. decorative stone workshop plate rack according to claim 1, it is characterised in that: bracket base includes
One horizonal base plate and the position-limited hoop being mounted on the top surface of horizonal base plate, horizonal base plate connect mill floor, position-limited hoop it is transversal
Face is Ω type, and the installation axle on rectangular frame is installed in rotation in position-limited hoop, and the articulated structure is formed by position-limited hoop.
3. decorative stone workshop plate rack according to claim 2, it is characterised in that: rectangular frame includes
Upper channel steel, lower channel steel and the connection channel steel being connected between upper and lower channel steel, connection channel steel have two or more, and each connection channel steel is arranged side by side
Interval setting, the notch of upper channel steel upward, are equipped with the support batten for being used to support plate in upper channel steel.
4. decorative stone workshop plate rack according to claim 3, it is characterised in that: the side wall of upper channel steel
It is equipped with the holding screw for positioning the support batten, for holding screw there are two more than, each holding screw is long in upper channel steel
Spend interval setting side by side on direction.
5. decorative stone workshop plate rack according to claim 1-4, it is characterised in that: backing pin
Lower end be pyramidal structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920348601.XU CN209599197U (en) | 2019-03-19 | 2019-03-19 | Decorative stone workshop plate rack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920348601.XU CN209599197U (en) | 2019-03-19 | 2019-03-19 | Decorative stone workshop plate rack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209599197U true CN209599197U (en) | 2019-11-08 |
Family
ID=68406429
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920348601.XU Expired - Fee Related CN209599197U (en) | 2019-03-19 | 2019-03-19 | Decorative stone workshop plate rack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209599197U (en) |
-
2019
- 2019-03-19 CN CN201920348601.XU patent/CN209599197U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106393454B (en) | Stone chamfering cutting machine | |
CN209599197U (en) | Decorative stone workshop plate rack | |
CN205403770U (en) | Modular raise dust height detecting device | |
CN206903122U (en) | A kind of stone material dry suspending assembly buckle | |
CN201152024Y (en) | Oblique wall ledger beam strutting piece | |
CN210714105U (en) | Construction enclosure | |
CN206408918U (en) | A kind of finishing scaffold | |
CN107184011A (en) | A kind of exhibiting device of conveniently laying potted landscape | |
CN208854581U (en) | A kind of production line operating platform | |
CN202627462U (en) | Portable scaffold | |
CN205577210U (en) | A ancient building roof supporting beam | |
CN212926945U (en) | Building site is with scaffold frame of just dismantling | |
CN210598068U (en) | Novel scaffold convenient to install and detach | |
CN210476922U (en) | Prefabricated part placing frame | |
CN203769307U (en) | Early-removal adjustable ejection rod device for building formwork | |
CN208586925U (en) | It is a kind of reusable convenient for the dust-proof protection canopy of Single-person operation type sand basin | |
CN209891703U (en) | Construction equipment is strutted to building engineering wall body pouring template | |
CN216109571U (en) | Wall brick is spread and is pasted strutting arrangement with adjustable | |
CN204126258U (en) | Formwork early removing system | |
CN205077805U (en) | Dry pendant mounting structure of wall | |
CN212036795U (en) | Landscape seat | |
CN205926376U (en) | Novel cleaning device for furniture before water paint construction | |
CN205617821U (en) | Building wall strutting arrangement | |
CN205531092U (en) | Building removable barricade | |
CN217438644U (en) | Asphalt laying equipment for municipal road construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191108 |
|
CF01 | Termination of patent right due to non-payment of annual fee |