CN204126258U - Formwork early removing system - Google Patents
Formwork early removing system Download PDFInfo
- Publication number
- CN204126258U CN204126258U CN201320873756.8U CN201320873756U CN204126258U CN 204126258 U CN204126258 U CN 204126258U CN 201320873756 U CN201320873756 U CN 201320873756U CN 204126258 U CN204126258 U CN 204126258U
- Authority
- CN
- China
- Prior art keywords
- formwork
- support
- boats
- tree
- bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a kind of formwork early removing system, comprise formwork (1), supported rod erecting (2), support rail (3), can support (4), the formwork bearing (5) of up-down adjustment, described supported rod erecting (2) is by can the support (4) of up-down adjustment be connected with formwork bearing (5), formwork bearing (5) upper surface contacts with formwork (1), and support rail (3) is fixed between adjacent two supported rod erectings (2).Adopt the formwork early removing system convenient construction of this structure, realize the object that formwork is early torn open, improve the speed of construction.
Description
Technical field
The utility model relates to a kind of template system, especially formwork early removing system.
Background technology
In current construction work during steel bar concrete dense rib floor construction, usually adopt formwork, it is dismountable that formwork and support need wait ribbed slab floor concrete strength to meet code requirement rear, long construction period, greatly, the occupation of capital is many, and affects construction speed for formwork and backing material input amount.
Utility model content
Technical problem to be solved in the utility model is that in prior art, formwork was removed slowly, and cause long construction period, material has high input.
For solving the problems of the technologies described above, the utility model adopts technical scheme as follows:
The utility model formwork early removing system, comprise formwork, supported rod erecting, support rail, can support, the formwork bearing of up-down adjustment, described supported rod erecting is by can the support of up-down adjustment be connected with formwork bearing, formwork upper surface of support contacts with formwork, and support rail is fixed between adjacent two supported rod erectings.Can form removal be done sth. in advance by such structure, shorten construction period.
As a kind of preferred version, describedly the support of up-down adjustment can comprise adjusting nut, leading screw, support supporting plate, leading screw is arranged in adjusting nut, supports supporting plate and is arranged on leading screw upper end.Make support can make to need up-down adjustment according to construction by such structure.
As another kind of preferred version, described formwork bearing comprises wooden a tree, used in making timber for boats, angle steel, connecting bolt, described angle steel is two panels, be separately positioned on the wooden a tree, used in making timber for boats left and right sides, through hole is provided with in wood a tree, used in making timber for boats, angle steel is equipped with two circular holes in the corresponding positions of wooden a tree, used in making timber for boats through hole, and wooden a tree, used in making timber for boats is fixedly connected with angle steel with circular hole through through hole by connecting bolt.Formwork bearing is located at can for supporting formwork on the support of up-down adjustment.
Adopt the formwork early removing system of said structure, can the support of up-down adjustment be connected with formwork bearing by supported rod erecting owing to have employed, formwork bearing and formwork contact the structure combined, by the support of up-down adjustment vertical rod support and over brace can be adjusted, and steel bar concrete dense rib floor intensity reach design characteristic value of cubic concrete compressive strength >=50% time, just form removal is carried out by form removal bearing, therefore compared with removing with formwork of the prior art, it can not only accelerate dismounting progress, convenient construction, shorten the construction period, and it is easy to use, save material.
In a word, adopt formwork early removing system of the present utility model, reaching quickening dismounting progress, under shortening the prerequisite of construction period effect, also bringing easy to use, saving the beneficial effect of material.
Accompanying drawing explanation
Fig. 1 is the utility model schematic diagram.
Fig. 2 is the front view that the utility model regulates support.
Fig. 3 is the front view of the utility model formwork bearing.
Detailed description of the invention
As Figure 1-3, the utility model formwork early removing system, comprise formwork 1, supported rod erecting 2, support rail 3, can support 4, the formwork bearing 5 of up-down adjustment, describedly can the support 4 of up-down adjustment be located on supported rod erecting 2, formwork bearing 5 is arranged on can on the support 4 of up-down adjustment, formwork bearing 5 contacts with formwork 1, can by can the support of up-down adjustment make formwork seat supports at formwork rear during use.
Support rail 3 is fixed on supported rod erecting 2, and described support rail 3 is preferably fixed between adjacent two supported rod erectings 2.Between supported rod erecting 2, using support rail 3 by adopting, the stability of supported rod erecting can be strengthened.
The support 4 of up-down adjustment can comprise adjusting nut 41, leading screw 42, support supporting plate 43, described leading screw 42 is arranged in adjusting nut 41, support supporting plate 43 and be arranged on leading screw 42 upper end, described leading screw 42 lower end is inserted in the cavity on supported rod erecting 2 top, and described support supporting plate 43 top is provided with formwork bearing 5.
As a kind of preferred version, angle steel 52 number is two panels, is separately positioned on wooden a tree, used in making timber for boats 51 left and right sides, is provided with through hole in wooden a tree, used in making timber for boats 51, angle steel 52 is equipped with two circular holes in the corresponding positions of wooden a tree, used in making timber for boats through hole, and wooden a tree, used in making timber for boats 51 is fixedly connected with angle steel 52 with circular hole through through hole by connecting bolt 53.
As another kind of preferred version, connecting bolt 53 is not more than 500mm along the spacing of wooden a tree, used in making timber for boats 51 length direction.
In the formwork early removing system of above-mentioned the utility model embodiment, dismounting progress can not only be accelerated, convenient construction, shorten the construction period, and easy to use, save material.Especially this formwork early removing system structure is simple, and parts are few, very economical and practical.
The method of operating of the utility model formwork early removing system: the first step, by supported rod erecting 2 according to formwork 1 distribute grid arrange, install support rail 3 form stable support system, adjustment support 4 bottom leading screw 42 is inserted in supported rod erecting 2 upper cavity.Rotating adjusting nut 41 makes support supporting plate 43 reach design elevation, wooden a tree, used in making timber for boats 51 and angle steel 52 are pressed Fig. 3 assembling, is placed on and supports on supporting plate 43, lay formwork 1, now steel concrete rib type beam superstructure early form removal housing system has assembled, pouring reinforcement concrete ribbed slab floor.
Second step, after steel bar concrete dense rib floor has been built, until steel bar concrete dense rib floor intensity reach design characteristic value of cubic concrete compressive strength >=50% time, remove connecting bolt 53, angle steel 52 is separated with wooden a tree, used in making timber for boats 51, take out formwork 1 template, whole steel bar concrete dense rib floor formwork has early been torn open.
3rd step, until steel bar concrete dense rib floor intensity reach design characteristic value of cubic concrete compressive strength meet code requirement time, rotating adjusting nut 41 moves down >=100mm to support supporting plate 43 entirety, completes whole formwork system and removes.
Below by reference to the accompanying drawings, detailed description of the invention of the present utility model is elaborated.But the utility model is not limited to above-described embodiment, in the ken that one skilled in the relevant art possesses, various change can also be made under the prerequisite not departing from the utility model aim.
Claims (1)
1. a formwork early removing system, comprise formwork (1), supported rod erecting (2), support rail (3), can the support (4) of up-down adjustment, also comprise formwork bearing (5), described supported rod erecting (2) is by can the support (4) of up-down adjustment be connected with formwork bearing (5), formwork bearing (5) upper surface contacts with formwork (1), it is characterized in that: described formwork bearing (5) comprises wooden a tree, used in making timber for boats (51), angle steel (52), connecting bolt (53), described angle steel (52) is two panels, be separately positioned on wooden a tree, used in making timber for boats (51) both sides, through hole is provided with in wood a tree, used in making timber for boats (51), angle steel (52) is equipped with circular hole in the corresponding positions of wooden a tree, used in making timber for boats through hole, wooden a tree, used in making timber for boats (51) is fixedly connected with angle steel (52) with circular hole through through hole by connecting bolt (53), describedly the support (4) of up-down adjustment can comprise adjusting nut (41), leading screw (42), support supporting plate (43), described leading screw (42) is arranged in adjusting nut (41), support supporting plate (43) and be arranged on leading screw (42) upper end, support rail (3) is fixed between adjacent two supported rod erectings (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320873756.8U CN204126258U (en) | 2013-12-29 | 2013-12-29 | Formwork early removing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320873756.8U CN204126258U (en) | 2013-12-29 | 2013-12-29 | Formwork early removing system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204126258U true CN204126258U (en) | 2015-01-28 |
Family
ID=52382625
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320873756.8U Expired - Fee Related CN204126258U (en) | 2013-12-29 | 2013-12-29 | Formwork early removing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204126258U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669833A (en) * | 2013-12-29 | 2014-03-26 | 中国建筑第七工程局有限公司 | Formwork early-dismantling system |
-
2013
- 2013-12-29 CN CN201320873756.8U patent/CN204126258U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669833A (en) * | 2013-12-29 | 2014-03-26 | 中国建筑第七工程局有限公司 | Formwork early-dismantling system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202380730U (en) | Supporting and strengthening device for beam formworks | |
CN103669655B (en) | Deformation joint both walls body concrete pouring construction process | |
CN103669833A (en) | Formwork early-dismantling system | |
CN204530742U (en) | A kind of adjustable suspension column | |
CN202347830U (en) | Simple construction operation frame | |
CN204531392U (en) | A kind of fast disassembly type template supporting device for beam slab span centre | |
CN104358577A (en) | Tunnel lining trolley | |
CN203855903U (en) | Movable support used for supporting tunnel construction template | |
CN107448215B (en) | Tunnel secondary lining A-shaped trolley width adjustable device | |
CN204357117U (en) | A kind of after-pouring band beam-slab template and lattice column thereof | |
CN204126258U (en) | Formwork early removing system | |
CN102619535B (en) | Folding tunnel widening trolley | |
CN202520328U (en) | Folding type widened trolley for tunnel | |
CN204139466U (en) | A kind of concrete prefabricated cushion block | |
CN204212413U (en) | The special connecting piece of a kind of mould middle cross beam and bottom support | |
CN204687050U (en) | A kind of mould of precast concrete rectangular beam | |
CN203701596U (en) | Scissor-type connecting-rod keel-supporting system | |
CN204456856U (en) | A kind of cast-in-situ concrete beam column template | |
CN203514803U (en) | Clamping device for building wall templates | |
CN207469744U (en) | Platform constructing device | |
CN203212956U (en) | High-speed railway track bed plate ultrahigh section adjustable template | |
CN205046843U (en) | Reinforcing apparatus's stair template of marking time in middle of installation | |
CN214687192U (en) | Precast box girder beam bottom slope adjusting device | |
CN203769307U (en) | Early-removal adjustable ejection rod device for building formwork | |
CN204139066U (en) | A kind of plate girder bracket, construction bracket and construction Hanging Basket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150128 Termination date: 20181229 |
|