CN209588869U - A kind of periphery hole charge constitution of cumulative smooth Hydraulic Blasting - Google Patents
A kind of periphery hole charge constitution of cumulative smooth Hydraulic Blasting Download PDFInfo
- Publication number
- CN209588869U CN209588869U CN201920269515.XU CN201920269515U CN209588869U CN 209588869 U CN209588869 U CN 209588869U CN 201920269515 U CN201920269515 U CN 201920269515U CN 209588869 U CN209588869 U CN 209588869U
- Authority
- CN
- China
- Prior art keywords
- borehole
- water
- cumulative
- periphery hole
- stemming
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
The utility model discloses a kind of periphery hole charge constitutions of cumulative smooth Hydraulic Blasting, belong to technical field of tunnel construction, the periphery hole charge constitution of cumulative smooth Hydraulic Blasting is by borehole and the water bag being arranged in borehole, binding energy tube pack and stemming composition, borehole bottom is a water-saving bag, it is two water-saving bags in the middle part of borehole, the setting of binding energy tube pack is in the middle part of the borehole bottom water bag and borehole between water bag, heel blocks stemming, the water bag in jet stream and the quick-fried borehole of light that the high temperature and high pressure gas that explosion generates is formed by troughs for collecting energy generates " water wedge " effect under blast action, promote rock incipient crack to extend extension to increase, simultaneously because the compound ponding of watrer ampoule stemming, it is more advantageous to established crack and re-extends extension increasing, it placed water bag in the quick-fried borehole of light, the water mist formed in blasting process plays the function and effect of depositing dust again , reduce ventilation time, improve operating environment, protect construction personnel's health.
Description
Technical field
The present invention relates to technical field of tunnel construction, are specifically related to a kind of periphery hole powder charge of cumulative smooth Hydraulic Blasting
Structure.
Background technique
With the continuous development of economic rapid development and road construction, the construction of subway, tunnel is also constantly being carried out, In
When engineering explosion, conventional photoface exploision, conventional Smooth Blasting Construction principle are mostly used at present are as follows:
Engineering hydraulic pressure demolition, due to there is water in borehole, the shock wave propagated in water is incompressible to water, explosion energy warp
Water transport is crossed to borehole Zhou Yan almost free of losses, is advantageous to catalase;What water generated under explosion gas expansion
" water wedge " effect is conducive to rock and is further crushed;Stemming than soil it is solid, density is big, inhibit expanding gas go out heel than
Soil is good more;Borehole has water and stemming is aqueous can play the role of atomized dust settling, substantially reduces pollution of the dust to environment.
But using in the conventional quick-fried borehole of light is powder stick and primacord, is difficult to generate enough high temperature height in explosion time
It calms the anger body, " water wedge " effect of generation is not enough to that rock incipient crack is promoted to extend extension to increase, and is also unfavorable for established split
Seam re-extends extension and increases, and can not solve the problems, such as conventional photoface exploision.
Accordingly, it is desirable to provide a kind of cumulative water of cumulative pipe device instead of powder stick and primacord in the quick-fried borehole of conventional light
The periphery hole charge constitution of trowel finish explosion, it is intended to solve the above problems.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of periphery of cumulative smooth Hydraulic Blasting
Eye charge constitution, to solve the problems in above-mentioned background technique.
To achieve the above object, the invention provides the following technical scheme:
A kind of periphery hole charge constitution of cumulative smooth Hydraulic Blasting, by borehole and the water bag, the cumulative that are arranged in borehole
Pipe pack and stemming composition, borehole bottom are a water-saving bag, are two water-saving bags in the middle part of borehole, binding energy tube pack is arranged in borehole bottom water
In the middle part of bag and borehole between water bag, heel blocks stemming.
As a further solution of the present invention, the borehole depth is L, and borehole bottom water bag length is L1, binding energy tube pack
Length be L2,0.65L≤L2≤0.75L, the length of two water-saving bags is L3 in the middle part of borehole, L3=2L1, and heel blocks stemming
Length is L4, L1+L2+L3+L4=L.
As a further solution of the present invention, the detonator lead of the binding energy tube pack extends borehole.
As a further solution of the present invention, binding energy tube pack explosion borehole distance computation formula are as follows:
A=K (2bp/St)1/α·db
K- Explosive stress wave coefficient, emulsion take K=4.5 in formula;
The ratio of b- tangential stress and radial stress, b=r/ (1-r)=0.33, wherein r is the Poisson's ratio of stemming, is taken
0.25;
α-stress wave attentuation coefficient, α=2-b=1.67;
The impact force generated on p- blasthole wall, pmaxUnidirectional compression strength=the 125MPa of=andesite;
StThe unidirectional tensile strength of rock, andesite take St=6.8MPa;
dbBorehole diameter takes db=44mm
By in above-mentioned parameter substitution formula, a=747mm is obtained, and considers that hydraulic pressure demolition improves explosive energy utilization rate, takes periphery
Eye spacing is 800mm.
As a further solution of the present invention, the calculating of every meter of blashole charge length of binding energy tube pack explosion periphery hole is public
Formula:
K in formulabCompressive strength of rock enhancement coefficient under volumetric stress is 7~15, takes K according to testb=14;
Q- explosive density, emulsion take Q=1.25g/cm3
D1- explosion velocity, takes d1=3000m/s
Dc- powder stick diameter, takes dc=27mm
The determining coefficient of n- test, takes n=0.074
Above-mentioned parameter is substituted into and obtains L1=0.232 in formula
According to periphery hole explosive payload calculation formula:
L- is hole length in formula, takes L=3.5m
Each parameter substitution formula is obtained into q=580g, it is 25mm emulsion system with 5 coil diameters that this engineering, which takes q=600g,
Make binding energy tube pack.
As a further solution of the present invention, cumulative pipe device is assembled by two panels binding energy tube, emulsion explosive and priming device
It forms;Using nonmetallic materials PVC, binding energy tube is made of two similar half pipes, and thickness of pipe wall 2mm, half pipe center has one
A slot fallen in, is called " troughs for collecting energy ";Binding energy tube sectional dimension: 70 ° of troughs for collecting energy apex angle, troughs for collecting energy distance from top 17.27mm,
Half pipe width 24.18mm, the binding energy tube width that two half pipes are mutually fastened as are 28.35mm, two 8 ° of half pipe telomerization energy directions-
10°。
As a further solution of the present invention, the periphery hole spacing of cumulative smooth Hydraulic Blasting is 80cm.
In conclusion compared with the prior art, the invention has the following beneficial effects:
Cumulative smooth Hydraulic Blasting only different from the charge constitution of periphery hole compared with conventional photoface exploision, uses
Binding energy tube pack replaces conventional explosives, and increases water bag and stemming, water bag is housed in the bottommost of the quick-fried borehole of light and top, so
The stemming back-filling blinding being processed into afterwards with professional equipment.Explode the high temperature and high pressure gas that generates by jet stream that troughs for collecting energy is formed with
And the water bag in the quick-fried borehole of light generates " water wedge " effect under blast action, promotes rock incipient crack to extend extension and increases, together
When due to the compound ponding of watrer ampoule stemming, be more advantageous to established crack and re-extend extension and increase.Cumulative hydraulic pressure smooth surface is quick-fried
It is broken to add high-temperature high-pressure jet-flow and water wedge effect and enhance expanding gas Static behavior, these three factor collective effects compared with
Good solves the problems, such as conventional photoface exploision.Simultaneously as placed water bag in the quick-fried borehole of light, in blasting process
The water mist of formation plays the function and effect of depositing dust again, reduces ventilation time, improves operating environment, protects construction personnel
Health.
(1) binding energy tube is made of common PVC material, is cooperated double cumulative energy channel pipe powder stick and its fixed device, is made cumulative
Jet stream face fits like a glove with pre- broken face, while crack initially forms, the gas sword of high energy air-flow enable energy-gathering jetting along
Crack injection, in this way, the Action of blade of the effect of Explosion stress wave, the expansion of detonation gas and energy-gathering jetting will be in rock
The moment that body forms crack organically combines, interacts, and crack is more readily formed and obtains more sufficiently extending and extending, from
And successfully realize photoface exploision, and the unit area explosive payload and unit area pore-creating amount of photoface exploision can be substantially reduced.
(2) tunnel hydraulic pressure demolition is the Incoercibility propagated in water using Explosion stress wave to water, makes explosion energy
By Water transport, the almost free of losses into borehole country rock, is advantageous to catalase.
(3) shock wave that explosive is generated in explosion time, what the rate of decay in water will far smaller than decay in air
Speed.So a certain amount of water bag is added in blasthole bottom, the shock wave for generating explosive acts directly on rock by water bag
On, it greatly reduced the consumption of explosive energy, improve blast hole utilization factor.
(4) water bag in borehole can generate " water wedge " effect under the action of explosive charge, be conducive to country rock into one
Step is broken, reduces the boulder yield that explosion generates.Meanwhile water bag can generate atomizing under the action of explosion, after reducing explosion
Dust concentration, reduce it is quick-fried after pollution to environment.
(5) add water bag effectively to block due to using stemming, avoid leaking for explosive energy, explosive energy makes full use of
On shot rock, so that blasting efficiency improves, reduces the consumption of explosive, improve the economic benefit of tunnel excavation.
In order to explain the structural features and functions of the invention more clearly, come with reference to the accompanying drawing with specific embodiment to this hair
It is bright to be described in detail.
Detailed description of the invention
Fig. 1 is cumulative smooth Hydraulic Blasting periphery hole charge constitution schematic diagram.
Fig. 2 is hydraulic pressure demolition construction flow chart in invention.
Fig. 3 is double focusing energy drug slot half pipe and its assembling schematic diagram in invention.
Fig. 4 is stemming fabrication processing figure in invention.
Fig. 5 is single line III level country rock cumulative smooth Hydraulic Blasting borehole layout drawing in invention.
Fig. 6 is snubber arrangement schematic diagram in invention.
Appended drawing reference: 1- water bag, 2- binding energy tube pack, 3- stemming.
Specific embodiment
The following further describes the technical solution of the present invention in the following with reference to the drawings and specific embodiments.
Shown in Figure 1, a kind of periphery hole charge constitution of cumulative smooth Hydraulic Blasting by borehole and is arranged in borehole
Water bag 1, binding energy tube pack 2 and stemming 3 form, cumulative smooth Hydraulic Blasting is compared with conventional photoface exploision only in periphery hole
Different from charge constitution replaces conventional explosives using binding energy tube pack 2, and increases water bag 1 and stemming 3, wherein borehole
Depth is L, and borehole bottom is a water-saving bag 1, and 1 length of borehole bottom water bag is L1, and the length of binding energy tube pack 2 is L2,0.65L≤L2
≤ 0.75L is two water-saving bags 1 in the middle part of borehole, and the length of two water-saving bags 1 is L3 in the middle part of borehole, L3=2L1, and binding energy tube pack 2 is set
It sets in the middle part of the borehole bottom water bag 1 and borehole between water bag 1, it is L4, L1+L2+L3+L4=L that heel, which blocks 3 length of stemming,.
The detonator lead of binding energy tube pack 2 extends borehole.
Wherein, when explosion designs, the determination method of periphery hole spacing are as follows:
According to 2 explosion borehole distance computation formula of binding energy tube pack
A=K (2bp/St)1/α·db
K- Explosive stress wave coefficient, emulsion take K=4.5 in formula;
The ratio of b- tangential stress and radial stress, b=r/ (1-r)=0.33, wherein r is the Poisson's ratio of stemming 3, is taken
0.25;
α-stress wave attentuation coefficient, α=2-b=1.67;
The impact force generated on p- blasthole wall, pmaxUnidirectional compression strength=the 125MPa of=andesite;
StThe unidirectional tensile strength of rock, andesite take St=6.8MPa;
dbBorehole diameter takes db=44mm
A=747mm in above-mentioned parameter substitution formula, will be obtained, considers that explosive energy utilization rate can be improved in hydraulic pressure demolition, takes periphery
Eye spacing is 800mm.
When its explosion designs, periphery hole powder charge method for determination of amount are as follows:
According to the calculation formula of every meter of blashole charge length of CUMULATIVE BLASTING periphery hole:
K in formulabCompressive strength of rock enhancement coefficient under volumetric stress, generally 7~15 take K according to testb=14
Q- explosive density, emulsion take Q=1.25g/cm3
D1- explosion velocity, takes d1=3000m/s
Dc- powder stick diameter, takes dc=27mm
The determining coefficient of n- test, takes n=0.074
Above-mentioned parameter is substituted into and obtains L1=0.232 in formula.
According to periphery hole explosive payload calculation formula:
L- is hole length in formula, takes L=3.5m
Each parameter substitution formula is obtained into q=580g, it is 25mm emulsion system with 5 coil diameters that this engineering, which takes q=600g,
Make binding energy tube pack 2.
The blasting principle of cumulative smooth Hydraulic Blasting in the present invention are as follows:
Cumulative smooth Hydraulic Blasting new technology is exactly by cumulative pipe device in the quick-fried borehole of light instead of in the quick-fried borehole of conventional light
Powder stick and primacord, water bag 1, the stemming 3 being then processed into professional equipment are housed on the bottommost of the quick-fried borehole of light and top
Back-filling blinding.The water bag 1 in jet stream and the quick-fried borehole of light that the high temperature and high pressure gas that explosion generates is formed by troughs for collecting energy is quick-fried
Broken effect is lower to generate " water wedge " effect, promotes rock incipient crack to extend extension and increases, simultaneously because 1 stemming 3 of water bag is compound stifled
Plug effect is more advantageous to established crack and re-extends extension increasing.Cumulative smooth Hydraulic Blasting adds high-temperature high-pressure jet-flow
With water wedge effect and enhance expanding gas Static behavior, it is quick-fried that these three factor collective effects preferably resolve conventional smooth surface
The problem of broken.Simultaneously as placed water bag 1 in the quick-fried borehole of light, the water mist formed in blasting process plays again
The function and effect of depositing dust, reduce ventilation time, improve operating environment, protect construction personnel's health.
(1) binding energy tube is made of common PVC material, is cooperated double cumulative energy channel pipe powder stick and its fixed device, is made cumulative
Jet stream face fits like a glove with pre- broken face, while crack initially forms, the gas sword of high energy air-flow enable energy-gathering jetting along
Crack injection, in this way, the Action of blade of the effect of Explosion stress wave, the expansion of detonation gas and energy-gathering jetting will be in rock
The moment that body forms crack organically combines, interacts, and crack is more readily formed and obtains more sufficiently extending and extending, from
And successfully realize photoface exploision, and the unit area explosive payload and unit area pore-creating amount of photoface exploision can be substantially reduced.
(2) tunnel hydraulic pressure demolition is the Incoercibility propagated in water using Explosion stress wave to water, makes explosion energy
By Water transport, the almost free of losses into borehole country rock, is advantageous to catalase.
(3) shock wave that explosive is generated in explosion time, what the rate of decay in water will far smaller than decay in air
Speed.So a certain amount of water bag 1 is added in blasthole bottom, the shock wave for generating explosive acts directly on rock by water bag 1
Shi Shang greatly reduced the consumption of explosive energy, improve blast hole utilization factor.
(4) water bag 1 in borehole can generate " water wedge " effect under the action of explosive charge, be conducive to country rock into one
Step is broken, reduces the boulder yield that explosion generates.Meanwhile water bag 1 can generate atomizing under the action of explosion, after reducing explosion
Dust concentration, reduce it is quick-fried after pollution to environment.
(5) it is effectively blocked due to using stemming 3 plus water bag 1, avoids leaking for explosive energy, explosive energy is sufficiently sharp
With on shot rock, so that blasting efficiency improves, reduces the consumption of explosive, improve the economic benefit of tunnel excavation.
A kind of construction method of cumulative smooth Hydraulic Blasting periphery hole charge constitution, it is shown in Figure 2, including following step
It is rapid:
Step 1: preparation of construction
1) stemming production and the buying of 1 process equipment of water bag: stemming production and water bag 1 are processed;
2) binding energy tube buying, injection equipment purchase, then make double focusing energy drug slot;
3) explosion design: the determination of determination, periphery hole explosive payload including periphery hole spacing and cumulative hydraulic pressure light is completed
The periphery hole charge constitution of face explosion;
Step 2: measurement and positioning borehole is arranged, then drilling, borehole cleaning completes stemming, water bag 1, double focusing energy at the same time
Drug slot works in place, and installs water bag 1, double focusing energy drug slot and stemming;
Step 3: hole-specifically checking powder charge situation, do not meet, continue to install water bag 1, double focusing energy drug slot and stemming, it is qualified then
It carries out line, detonate and work of slagging tap, and carry out deslagging;
Step 4: carry out work of getting rid of the danger, performing for preliminary bracing is then carried out, when into subsequent cycle, returns to step 1
Continue to construct.
Wherein, cumulative pipe device makes
Cumulative pipe device is assembled by two panels binding energy tube, emulsion explosive and priming device.
Binding energy tube entrusts plant produced, and using nonmetallic materials PVC, binding energy tube is changeable according to borehole depth, cumulative
Pipe is made of two similar half pipes, and there is the slot fallen in thickness of pipe wall 2mm, half pipe center, is called " troughs for collecting energy ".It is poly-
Energy tube section size: 70 ° of troughs for collecting energy apex angle, troughs for collecting energy distance from top 17.27mm, half pipe width 24.18mm, two half pipe phases
The binding energy tube width being fastened as is 28.35mm.Outline excavation face, the two adjustable cumulative sides of half pipe are directed in order to facilitate troughs for collecting energy is adjusted
To 8 ° -10 °.Half pipe and its assembling are as shown in Figure 3.
Half pipe powder charge is fitted into gun barrel after breaking the emulsions of volume two, tightens using manually powder charge is robbed using injection
Rotation lid, pressurizes to chemical injection gun, and pressure is 0.2 atmospheric pressure, holds switch for locking therewith and moves along half pipe, explosive is just from note
Medicine muzzle is successively flowed into half pipe.Two half pipes for being poured in explosive are engaged merging together, load onto detonation it is fixed and
Priming device completes the assembling of cumulative pipe device.
Entire injection process is simple and efficient to handle, and cumulative pipe device quantity required for a quick-fried borehole of circulation light can be small one
When or so group install, be not take up the powder charge time.
Wherein, binding energy tube charging process are as follows: dismantle emulsion, the emulsions of volume two merge, put emulsion
Enter injection rob in, the powder charge of half pipe, install medicine half pipe is assembled and the binding energy tube made.
The production process of water bag 1 are as follows:
It is 1. material requirements
Polybag is made of general vinyon, thick 0.8mm, diameter 35mm, length 200mm, and polybag is by moulding
Material processing factory be processed into, using auto-irrigation, self-sealing " sealing machine " make water bag 1, per hour can be processed 500~
700 bags.
2. key points for operation:
A, before starting, Yao Jinhang irrigation rate is adjusted sealing machine;
B, machine back door is opened, pump rod end nut is unclamped, adjusting displacement wing nut can be by adjusting pump rod
Sliding block left-right position obtains required filling capacity.It reduces, increases counterclockwise clockwise.
C, end nut is tightened after adjusting, and to prevent loose shift, influences filling capacity, damage adjustment bar.
D, power supply is opened, indicator light is bright, adjusts temperature control regulator to appropriate sealing temperature, when becoming red light from green light, i.e.,
Reach sealing temperature adjusted (initial temperature, which should be set as 130 DEG C, to be advisable, then gradually adjusts and increase).
E, before starting perfusion sealing, control switch is pulled out, waits machine runs twice, makes metering pump interior suction full water, it will
After air discharge, control switch is pulled up, polybag is by manually with the hands thumb and index finger are clamped and covered on discharging nozzle, by opening
Dynamic switch, i.e. completion automatic filling and sealing.
It is shown in Figure 4,3 manufacture craft of stemming are as follows:
1. material requirements
The preparation of 3 raw material of stemming: stemming 3 mainly uses three kinds of clay, sand and water materials.Clay is glutinous using completely common
Soil, water content control below 8%.The largest particles is no more than 10mm, must not have the sundries such as grass roots, bulky grain wants hand breaking.
Sand uses clean fine sand, it is preferred to use river sand, water content control below 3%.Water uses light water.Clay and sand doping are small
When crushed stone, should be sieved processing, must not put into stone in hopper, to prevent the rotation spiral shell in fine grained chippings card blade or former
Rotation is broken down;The previous day for processing stemming 3, the Nian Tu ﹑ sand and water being sieved should be manually mixed and stirred by weight ratio, with benefit
It is sufficiently humidified so as to uniformly.
3 match ratio of stemming: clay: sand: water=(70~80): (8~10): (12~20) are then used when according to red clay
Clay: sand: water=0.75:0.10:0.15 cooperation is relatively good.
2. key points for operation
Before booting, the mixture mixed and stirred in advance about 20kg is added in hopper, then opens power supply, in pushing away for rotation spiral
Pressure, pug dense extrusion when being fed forward finally continuously are squeezed out in horizontal spiral conveying former end;
Stemming 3 is expressed into certain length to be advisable with 20~30cm, is cut off later.
Then it is that should adjust proportion since sand content is higher in stemming 3 if stemming 3 is easily broken off, that is, increases clay content.
When machine run, when Ru electricity Ji ﹑ retarder heating temperature excessively high (50 DEG C of motor), hard stop, trouble-shooting are answered
Mud Guo Duo ﹑ is excessively glutinous in reason, such as hopper.After excluding to the unfavorable factor of motor, the motor surface temperature of fevers should be waited to decline
Afterwards, it then is operated.
It is heard when spice when having bulk stone hits hopper sound, should shut down in time, be further continued for operating after picking stone.
For the first time using after 24 hours, lubricating oil is needed replacing, every 500~1000h replacement is primary later.
Required operator: 3 machine of stemming is simple to operate, general 1~2 people.1 people with about it is per minute one shovel (2~
The feeding incessantly of speed 3kg), makes to keep a certain amount of pug in hopper substantially;1 people is responsible for stemming 3 to case.
Finally, powder charge is detonated:
1. periphery hole: first filling the rebasing rear dress double focusing energy drug slot pipe of 1 water-saving bag 1 in bottom hole, be continuously packed into 2 after installing explosive
Water-saving bag 1, last tamping 3 to aperture, and it is stifled tight with waddy tamping.
2. snubber: using continuous charging structure, blasting charge after 1 water-saving bag 1 is rebasing is filled out after being reloaded into 2~4 water-saving bags 1
Stem 3 blocks up tight stemming 3 with rod tamping to aperture.
3. reliever: using continuous charging structure, be initially charged with after 1 water-saving bag 1 continuous blasting charge again in blasthole, be reloaded into 2
Breeching mud 3 is blocked up after~4 water-saving bags 1 to aperture, blocks up tight stemming 3 with waddy.
It is certain it is noted that filling is closely knit 4. the blast hole projectile fillings such as snubber, reliever block.Each hole charge will be depending on enclosing
The soft or hard degree of rock is adjusted in right amount, and soft rock is reduced, and hard rock increases.
5. 1 explosive stemming 3 of water bag loads main points: successively loading 1-explosive of water bag-water bag 1-from borehole bottom to heel
Stemming 3, connection are had to close.Filling water bag 1 wants one bag one bag gently to be disclosed with tamper into borehole certain position;Backfill is stifled
Stem 3, in addition to the stemming 3 contacted with water bag 1, the stemming 3 of remaining backfill is made firm by ramming solid with waddy.
Cumulative smooth Hydraulic Blasting snubber, reliever arrangement, burden etc. and hydraulic pressure demolition and conventional photoface exploision phase
Together, only periphery hole spacing according to calculating is determined as 80cm.Cumulative smooth Hydraulic Blasting borehole layout drawing is as shown in figure 5, snubber
Arrangement schematic diagram is as shown in Figure 6.
The technical principle of the invention is described above in combination with a specific embodiment, is only the preferred embodiment of the present invention.This
The protection scope of invention is not limited merely to above-described embodiment, and all technical solutions belonged under thinking of the present invention belong to the present invention
Protection scope.Those skilled in the art, which does not need to pay for creative labor, can associate other specific realities of the invention
Mode is applied, these modes will fall within the scope of protection of the present invention.
Claims (7)
1. a kind of periphery hole charge constitution of cumulative smooth Hydraulic Blasting, which is characterized in that by borehole and be arranged in borehole
Water bag (1), binding energy tube pack (2) and stemming (3) composition, borehole bottom are a water-saving bag (1), are two water-saving bags (1) in the middle part of borehole,
Between borehole bottom water bag (1) and borehole middle part water bag (1), heel blocks stemming (3) for binding energy tube pack (2) setting.
2. the periphery hole charge constitution of cumulative smooth Hydraulic Blasting according to claim 1, which is characterized in that the borehole
Depth is L, and borehole bottom water bag (1) length is L1, and the length of binding energy tube pack (2) is L2,0.65L≤L2≤0.75L, in borehole
The length of two water-saving bag of portion (1) is L3, and L3=2L1, it is L4, L1+L2+L3+L4=L that heel, which blocks stemming (3) length,.
3. the periphery hole charge constitution of cumulative smooth Hydraulic Blasting according to claim 2, which is characterized in that the cumulative
The detonator lead of pipe pack (2) extends borehole.
4. the periphery hole charge constitution of cumulative smooth Hydraulic Blasting according to claim 1 to 3, which is characterized in that poly-
Energy pipe pack (2) explosion borehole distance computation formula are as follows:
A=K (2bp/St)1/α·db
K- Explosive stress wave coefficient in formula;
The ratio of b- tangential stress and radial stress, b=r/ (1-r), wherein r is the Poisson's ratio of stemming (3);
α-stress wave attentuation coefficient, α=2-b;
The impact force generated on p- blasthole wall, pmaxThe unidirectional compression strength of=andesite, units MPa;
StThe unidirectional tensile strength of rock;
dbBorehole diameter;
The periphery hole spacing of binding energy tube pack (2) explosion borehole is 800mm.
5. the periphery hole charge constitution of cumulative smooth Hydraulic Blasting according to claim 4, which is characterized in that binding energy tube medicine
Wrap the calculation formula of every meter of blashole charge length of (2) explosion periphery hole:
K in formulabCompressive strength of rock enhancement coefficient under volumetric stress is 7~15;
Q- explosive density, unit g/cm3;
D1- explosion velocity, unit m/s;
Dc- powder stick diameter, unit mm;
The determining coefficient of n- test,
According to periphery hole explosive payload calculation formula:
L- is hole length in formula.
6. the periphery hole charge constitution of cumulative smooth Hydraulic Blasting according to claim 5, which is characterized in that binding energy tube dress
It sets and is assembled by two panels binding energy tube, emulsion explosive and priming device;Using nonmetallic materials PVC, binding energy tube is by two phases
It is formed like half pipe, there is the slot fallen in thickness of pipe wall 2mm, half pipe center, is called " troughs for collecting energy ";Cumulative tube section ruler
It is very little: 70 ° of troughs for collecting energy apex angle, troughs for collecting energy distance from top 17.27mm, half pipe width 24.18mm, the cumulative that two half pipes are mutually fastened as
Pipe width is 28.35mm, two 8 ° -10 ° of half pipe telomerization energy directions.
7. the periphery hole charge constitution of cumulative smooth Hydraulic Blasting according to claim 6, which is characterized in that cumulative hydraulic pressure
The periphery hole spacing of photoface exploision is 80cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920269515.XU CN209588869U (en) | 2019-03-04 | 2019-03-04 | A kind of periphery hole charge constitution of cumulative smooth Hydraulic Blasting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920269515.XU CN209588869U (en) | 2019-03-04 | 2019-03-04 | A kind of periphery hole charge constitution of cumulative smooth Hydraulic Blasting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209588869U true CN209588869U (en) | 2019-11-05 |
Family
ID=68371326
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920269515.XU Expired - Fee Related CN209588869U (en) | 2019-03-04 | 2019-03-04 | A kind of periphery hole charge constitution of cumulative smooth Hydraulic Blasting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209588869U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110332860A (en) * | 2019-06-13 | 2019-10-15 | 中铁十六局集团有限公司 | A kind of the periphery hole charge constitution and its construction method of cumulative smooth Hydraulic Blasting |
CN110986713A (en) * | 2020-01-02 | 2020-04-10 | 中国矿业大学(北京) | Large-diameter ultra-deep hole radiation energy accumulation loosening pre-splitting blasting device and filling method |
CN111219190A (en) * | 2019-12-06 | 2020-06-02 | 何满潮 | Method for directional roof cutting by energy-gathered water pressure blasting |
-
2019
- 2019-03-04 CN CN201920269515.XU patent/CN209588869U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110332860A (en) * | 2019-06-13 | 2019-10-15 | 中铁十六局集团有限公司 | A kind of the periphery hole charge constitution and its construction method of cumulative smooth Hydraulic Blasting |
CN111219190A (en) * | 2019-12-06 | 2020-06-02 | 何满潮 | Method for directional roof cutting by energy-gathered water pressure blasting |
CN111219190B (en) * | 2019-12-06 | 2021-09-24 | 何满潮 | Method for directional roof cutting by energy-gathered water pressure blasting |
CN110986713A (en) * | 2020-01-02 | 2020-04-10 | 中国矿业大学(北京) | Large-diameter ultra-deep hole radiation energy accumulation loosening pre-splitting blasting device and filling method |
CN110986713B (en) * | 2020-01-02 | 2021-06-18 | 中国矿业大学(北京) | Large-diameter ultra-deep hole radiation energy accumulation loosening pre-splitting blasting device and filling method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110332860A (en) | A kind of the periphery hole charge constitution and its construction method of cumulative smooth Hydraulic Blasting | |
CN209588869U (en) | A kind of periphery hole charge constitution of cumulative smooth Hydraulic Blasting | |
CN108225137B (en) | Rock roadway in coal mine tunnels cumulative smooth Hydraulic Blasting structure and method | |
CN102269554B (en) | Method for treating underground mine goaf by forming covering layer by chamber blasting technology | |
CN205748141U (en) | A kind of Tunnel Blasting charge constitution | |
CN204718510U (en) | A kind of novel joint-cutting quick-burning charge monoblock type photoface exploision device | |
CN104596375A (en) | Fully mechanized excavation construction method for rock roadway | |
CN103968721A (en) | Hole bottom energy gathering and dissipating device suitable for inclined blast hole and capable of improving blasting excavation flatness of foundation surface | |
CN203928912U (en) | The directional cumulation demolition set that a kind of energy is strengthened | |
CN109855500A (en) | One kind being used for tunnel perimeter eye beehive-shaped charge blasting cartridge | |
CN203837604U (en) | Full-face hole bottom air-spaced loading mechanism for underground roadway tunneling | |
CN109163630A (en) | A kind of loading method of Caving Method with Large Space mining deep hole water pressure blasting explosion | |
CN110056360A (en) | A kind of construction method in highway stone matter tunnel | |
CN101832744A (en) | Blasting demolishing method | |
CN109855496A (en) | Hard rock integrates 16 years of age formula deep hole Cut Blasting method in tunnel | |
CN110440649A (en) | Hydraulic drill ring drilling large cross-section tunnel steel for shot structure and blasting method | |
CN209445908U (en) | Using the radial underwater Cutting Seam Cartridge Blasting device not coupled | |
CN209230424U (en) | A kind of compound burn cut | |
CN104912080B (en) | The construction equipment of a kind of mud filling bag embankment and technique | |
CN109186390A (en) | Hole Blasting In Open-pit Mines water spacer-coupling charging blasting method and dedicated water column bag | |
CN109405687A (en) | Underwater Cutting Seam Cartridge Blasting device and its construction method based on Uncoincided charge | |
CN209263807U (en) | Micro-vibration rock and soil blasting structure | |
CN109579645A (en) | A kind of tunnel hydraulic pressure demolition constructing structure and its application | |
CN114060088B (en) | Method for preventing and controlling water damage of separation layer of mine coal seam roof | |
CN115307501A (en) | Blasting construction method for mountain earthwork |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191105 Termination date: 20210304 |