CN209584731U - A kind of adjustable height railway bed structure - Google Patents

A kind of adjustable height railway bed structure Download PDF

Info

Publication number
CN209584731U
CN209584731U CN201920094694.8U CN201920094694U CN209584731U CN 209584731 U CN209584731 U CN 209584731U CN 201920094694 U CN201920094694 U CN 201920094694U CN 209584731 U CN209584731 U CN 209584731U
Authority
CN
China
Prior art keywords
support column
track
supporting course
adjustable height
hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920094694.8U
Other languages
Chinese (zh)
Inventor
张千里
叶阳升
陈锋
李中国
蔡德钩
王立军
王鹏程
崔颖辉
陈志旺
刘林霄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
Original Assignee
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Railway Sciences Corp Ltd CARS, Railway Engineering Research Institute of CARS filed Critical China Academy of Railway Sciences Corp Ltd CARS
Priority to CN201920094694.8U priority Critical patent/CN209584731U/en
Application granted granted Critical
Publication of CN209584731U publication Critical patent/CN209584731U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

A kind of adjustable height railway bed structure, wherein adjustable height railway bed structure includes the support column that ballastless track structure two sides are arranged in;The two sides of every support column are symmetrically arranged with built-in hanger, and the bottom of the built-in hanger is embedded in supporting course in advance, and top passes through track plates, and is connect by hoist cable with the lifting device at the top of support column;By the collective effect of built-in hanger, support column and lift structure when construction, the quick and accurate elevation adjustment of ballastless track structure may be implemented, and implementation process does not influence train driving, efficiency greatly improves.Lifter is uniformly controlled by automatic system, it is ensured that is not deflected when promotion;By being provided with the stability for limiting barricade, it can be achieved that construction middle orbit structure transverse direction is turned up in roadbed in track two sides;The utility model construction procedure is easy, and material therefor is easy to obtain, is not take up redundant space, can greatly save working hour, compared with the conventional method, greatlys save sedimentation regulation expense.

Description

A kind of adjustable height railway bed structure
Technical field
The utility model belongs to roadbed and non-fragment orbit engineering field, in particular to a kind of adjustable height railway bed structure.
Background technique
At this stage, China constantly obtains new breakthrough in the construction of high-speed railway and highway, especially in mileage and speed It is even more to take its place in the front ranks of the world on degree, line crossing range is wide, maintenance and maintenance relative difficulty.China's complex geologic conditions, especially It is under the special geologic conditions such as geological structural belt, goaf, Deep Thick Soft Ground area, in addition the environment such as sleet and temperature and humidity because Differential settlement, or the elevation variation of part, part height inevitably occur under long-time use for the variation of element, route Journey deformation leads to guideway irregularity, influences the comfort and traffic safety of train operation.When sedimentation and deformation is more than fastener adjustment amount When, it needs to be adjusted the absolute altitude of track structure.Previous regulation mode mostly uses and removes track plates readjustment road bed Restoring track structure after elevation, difficulty is big and costly, and needing to stop transport when threatening nearby lines traffic safety, and rebuilding is passed through The train of route makes troubles to normal railway transportation to travelling, and conveyance loss is very big.Therefore, it is necessary in Yi Fasheng At the variation of track structure settling height and deformation, maintaining structure can be reduced by providing one kind, shorten the adjustable high-speed rail of construction time Road road structure.
Utility model content
The utility model proposes a kind of adjustable height railway bed structures, need column of stopping transport when railway bed is turned up to solve Vehicle renovates the problems such as costly, influence is big, and specific technical solution is as follows:
A kind of adjustable height railway bed structure, the support column comprising ballastless track structure transverse ends;The support column by Supporting course and track plates are sequentially passed through upwards down and are slidably connected in the two, and the two sides of every support column are symmetrically arranged with pre-buried hang Part, the bottom of the built-in hanger is embedded in supporting course, top passes through track plates, and passes through hoist cable and mentioning at the top of support column Rise device connection.
The built-in hanger includes the hanging ring on inverted T-shaped part and inverted T-shaped part;Inverted T-shaped part vertical part wear connected track plate and Supporting course and external end head are pierced by track plates, and bottom end is arranged in supporting course cross section middle and lower part.
The support column is made of steel or concrete, across the mounting hole set corresponding on track plates and supporting course and bottom On the basis of end branch is located at, and along the longitudinal arranged for interval in a row of track.
The support column is reserved to pour together with basis, and the support column is pierced by supporting course and track plates from bottom to top, Along the longitudinal arranged for interval in a row of track.
The support column lower end has poured Extended chemotherapy in basis and has poured limiting block on the outside of supporting course two Wall, the Extended chemotherapy is square body or circle and cross section is greater than support column cross section.
The support column and track plates, bearing interlayer are provided with separation layer, the support column respectively with track plates and branch Holding interlayer can be slid vertically by separation layer, and the separation layer top is equipped with seal gasket.
The lifting device include lifter, lifter top platform sling, lifter and support intercolumniation connecting plate and Backing plate between lifter and platform sling.
Platform sling transverse direction midpoint face lifter, transverse ends portion correspond to built-in hanger and are connected with hoist cable, hoist cable lower end Head is connected on hanging ring;The in-orbit upward one row's built-in hanger of correspondence of platform sling is separately provided or the setting of multiple rows of joint.
Horizontal length of the outer end of the built-in hanger and platform sling away from the nearlyr side of track apart from track adapts on track Width needed for driving a vehicle;Height of the support column from top to basis adapts to needed for track plates and supporting course thickness, and promotion Highly.
A kind of implementation method of the adjustable height railway bed structure, the specific steps are as follows:
Step 1: the limit barricade on cast-in-place basis, Extended chemotherapy and two sides, wherein support column can integrally be poured with above structure It builds, or is inserted directly by the drilling of track plates and supporting course;
Step 2: smearing separation layer in support column cylinder surrounding, wherein the height of support column is based on track plates and supporting course Thickness and design promoted needed for reserved height determine;
Step 3: it is when production supporting course and track plates that the progress of inverted T-shaped part is pre-buried, and corresponding Extended chemotherapy sets support column Mounting hole, and keep hole wall smooth and smear separation layer;When being wherein concrete column for support column, by supporting course and track Mounting hole corresponds to support column lifting in plate, when being steel column for support column, is then inserted into when need to only use;
Step 4: determining tracks positioned absolute altitude, connecting plate is installed in support top end, lifter, In are installed on connecting plate Platform sling is installed above lifter, and backing plate is installed between lifter and platform sling, wherein platform sling is individually set according to promotion demand point Or rail is arranged to multiple rows of joint;
Step 5: hoist cable is installed at platform sling both ends, hanging ring is installed at top outside inverted T-shaped part, and by hoist cable lower end and hanging ring Connection;
Step 6: starting lifter control signal parallel connection and simultaneously, track plates and branch are thus promoted stage by stage or by several times Layer is held, filler between supporting course lower part and basis is filled in designed elevation requirement to be achieved;
Step 7: then needing to extract out steel column for steel column for support column, and mounting hole is blocked, support column is concrete When column, seal gasket is installed on separation layer top, two kinds of support columns are both needed to dismantle lift structure and hanging ring wait repeat to follow Ring uses;
Step 8: mounting hole is opened or removes separation layer top seal rubber mat when track needs further to be turned up, And loosen filler between supporting course lower part and basis, step step 4 is then repeated to step 7.
The utility model has the following beneficial effects:
The tune of roadbed may be implemented by the collective effect of built-in hanger, support column and lift structure in the utility model Height without removing to original ballastless track structure and roadbed, and does not influence train operation;By to built-in hanger when construction The setting of middle T-piece, convenient symmetrically to hang liter, the stability of structure, convenient construction when ensure that height-regulating;Setting for support column It can be to provide fulcrum in adjustable height work progress, limit barricade can limit the lateral displacement of track plates and supporting course, make it Only it is vertical it is upper slide, structure lateral position will not generate variation during height-regulating, track transverse direction form when guarantee is constructed; Support column and track plates, the smooth degree for supporting interformational sliding can then be ensured for the setting of separation layer, for separation layer top Seal gasket, can construction of prevention work when support column and track plates, the sleet for supporting interlayer, dust and small crushed stone crash into, the knot Structure can be carried out multiple height-regulating when posterior settlement persistently occurs;In construction, lifter is uniformly controlled by automatic system, it can Guarantee the synchronous progress promoted, conducive to the ride comfort and integrality for guaranteeing track, construction efficiency is greatly improved.The utility model can It is adjusted for elevation caused by track differential settlement, is equally applicable to the height-regulating construction at initial stage when track is newly-built to be laid with.This reality Easy with novel construction procedure, equipment is light, construction efficiency is high, and material therefor is easy to obtain, and can greatly save duration and expense With.
Detailed description of the invention
Fig. 1 is that adjustable height railway bed structure construction uses schematic diagram;
Fig. 2 is support column and built-in hanger connection schematic diagram;
Fig. 3 is built-in hanger structure chart.
Appended drawing reference: 1- track plates;2- supporting course;3- support column;4- lifter;5- platform sling;6- backing plate;7- connecting plate; 8- hoist cable;9- built-in hanger;10- separation layer;11- barricade;12- filler;13- hanging ring;14- inverted T-shaped part;The basis 15-;16- expands Big basis.
Specific embodiment
As depicted in figs. 1 and 2, a kind of adjustable height railway bed structure includes the support across 1 transverse ends portion of track plates Column 3;The support column 3 sequentially passes through supporting course 2 and track plates 1 from bottom to top and can slide in the two, every support column 3 Two sides are symmetrically arranged with built-in hanger 9, and the bottom of the built-in hanger 9 is embedded in supporting course 2, top passes through track plates 1, and leads to Hoist cable 8 is crossed to connect with the lifting device at 3 top of support column.
As shown in figure 3, the built-in hanger 9 is steel component comprising inverted T-shaped part 14, the inverted T-shaped part, with track plates 1 It is poured together with supporting course 2 pre-buried in advance;Setting has pre-buried or is welded with hanging ring 13 in 14 upper end of inverted T-shaped part;The inverted T-shaped Connected track plate 1 and supporting course 2 are worn in 14 top of part and external end head is pierced by track plates 1, under bottom is arranged in 2 cross section of supporting course Portion.
In the present embodiment, the support column 3 is inserted through the corresponding mounting hole set and bottom end on track plates 1 and supporting course 2 Branch be located on basis 15 or and poured together with basis 15 it is reserved, in the longitudinal arranged for interval in a row of track;
Extended chemotherapy 16 has been poured between the support column 3 and basis 15 and has poured limit barricade in 2 liang of outsides of supporting course 11, the Extended chemotherapy 16 is square body or circle and cross section is greater than 3 cross section of support column;The support column 3 and track plates 1, separation layer 10 is provided between supporting course 2, the separation layer 10 is lube layer, is achieved in mutual sliding, and be isolated 10 top of layer are equipped with seal gasket.
In the present embodiment, the lifting device includes the platform sling 5 of lifter 4,4 top of lifter, lifter 4 and support column The backing plate 6 between connecting plate 7 and lifter 4 and platform sling 5 between 3.The hydraulic jack that the lifter 4 is controlled using signal Top, platform sling 5 are made of steel structure, backing plate 6 of the lumps of wood or square plate, and connecting plate 7 has square plate to be made;The platform sling 5 Lateral midpoint face lifter 4, transverse ends portion correspond to built-in hanger 9 and are connected with hoist cable 8, and 8 lower end of hoist cable is connected to hanging ring On 13;The platform sling 5 corresponding row's built-in hanger 9 on track longitudinal direction is separately provided or the setting of multiple rows of joint.
In the present embodiment, height of the support column 3 from top to basis 15 adapts to track plates 1 and 2 thickness of supporting course, with And promote desired height.
In conjunction with Fig. 1 to Fig. 3, a kind of implementation method of adjustable height railway bed structure is further illustrated, it is specific to walk It is rapid as follows:
Step 1: the limit barricade 11 of cast-in-place basic 15, Extended chemotherapy 16 and two sides, wherein support column 3 is concrete column Or steel column, it can be with above structure formed by integrally casting or by setting hole insertion.
Step 2: smearing separation layer 10 in 3 cylinder surrounding of support column, wherein the height of support column 3 is based on track plates 1 and branch Reserved height needed for the thickness and design for holding layer 2 are promoted determines.
Step 3: production supporting course 2 and whens track plates 1 carry out inverted T-shaped part 14 pre-buried, and corresponding Extended chemotherapy 16 is set 3 mounting hole of support column keeps hole wall smooth and smears separation layer 10;When being wherein concrete column for support column 3, by supporting course 2 and track plates 1 in mounting hole correspond to support column 3 lifting, for support column be steel column when, then when need to only use be inserted into.
Step 4: determining tracks positioned absolute altitude, connecting plate 7 is installed on 3 top of support column, lifter is installed on connecting plate 7 4, platform sling 5 is installed above lifter 4, and backing plate 6 is installed between lifter 4 and platform sling 5;Wherein platform sling 5 is according to the demand that promoted Point individually set or track longitudinally multiple rows of joint is arranged.
Step 5: hoist cable 8 is installed at 5 both ends of platform sling, in the outer top hanging ring 13 of inverted T-shaped part 14, and by 8 lower end of hoist cable with hang Ring 13 connects.
Step 6: lifter 4 is controlled, signal is in parallel simultaneously to be started simultaneously, thus promotes 1 He of track plates stage by stage or by several times Supporting course 2, designed elevation requirement to be achieved, fills filler 12 between 2 lower part of supporting course and basis 15.
Step 7: for that can be extracted out when support column 3 is drilling insertion setting, and mounting hole is blocked, support column 3 is integrated When pouring, seal gasket is installed on 10 top of separation layer, two kinds of support columns 3 be both needed to dismantle lift structure and hanging ring 13 with to Repetitive cycling uses.
Step 8: mounting hole is opened or removes 10 top seal rubber mat of separation layer when roadbed is further turned up, and Filler 12 between 2 lower part of supporting course and basis 15 is loosened, then repeats step step 4 to step 7.
When pouring jointly for support column 3 and basis 15, mounting hole need to be positioned in advance in track structure early period and be set, or Scene positioning is carried out in the plate for adjusting height of rail after building up sets and install support column 3;T-type built-in fitting can be in track slab construction early period Simultaneously it is pre-buried or the later period drill be implanted into.
Obviously, above-described embodiment is only intended to clearly illustrate made by the outstanding feature of the utility model and illustrates, and is not It is the restriction to the utility model embodiment;For those skilled in the art, basis is used above explained On can still make other variations or changes in different ways, if not carrying out inventive improvements to it, belong to the utility model Protection scope.

Claims (9)

1. a kind of adjustable height railway bed structure, it is characterised in that: the support column (3) comprising ballastless track structure transverse ends; The support column (3) sequentially passes through supporting course (2) and track plates (1) from bottom to top and is slidably connected in the two, every support column (3) two sides are symmetrically arranged with built-in hanger (9), and the bottom of the built-in hanger (9) is embedded in supporting course (2), top passes through Track plates (1), and connect by hoist cable (8) with the lifting device at the top of support column (3).
2. a kind of adjustable height railway bed structure according to claim 1, it is characterised in that: built-in hanger (9) packet Hanging ring (13) on part containing inverted T-shaped (14) and inverted T-shaped part (14);Wear connected track plate (1) and bearing in inverted T-shaped part (14) vertical part Layer (2) and external end head be pierced by track plates (1), bottom end be arranged in supporting course (2) cross section middle and lower part.
3. a kind of adjustable height railway bed structure according to claim 1, it is characterised in that: the support column (3) is steel Or concrete is made, and passes through the corresponding mounting hole set on track plates (1) and supporting course (2) and bottom end branch is located at basic (15) On, and along the longitudinal arranged for interval in a row of track.
4. a kind of adjustable height railway bed structure according to claim 1, it is characterised in that: the support column (3) be with Basic (15) pour reserved together, and the support column (3) is pierced by supporting course (2) and track plates (1) from bottom to top, longitudinal along track Arranged for interval in a row.
5. a kind of adjustable height railway bed structure according to claim 3 or 4, it is characterised in that: under the support column (3) End has poured Extended chemotherapy (16) in basic (15) and has poured limit barricade (11) in (2) two outside of supporting course, described Extended chemotherapy (16) is square body or circle and cross section is greater than support column (3) cross section.
6. a kind of adjustable height railway bed structure according to claim 5, it is characterised in that: the support column (3) and rail Be provided between guidance tape (1), supporting course (2) separation layer (10), the support column (3) respectively with track plates (1) and supporting course (2) Between can be slid vertically by separation layer (10), separation layer (10) top is equipped with seal gasket.
7. a kind of adjustable height railway bed structure according to claim 1, it is characterised in that: the lifting device includes to mention Rise the platform sling (5) on device (4), lifter (4) top, connecting plate (7) and lifter (4) between lifter (4) and support column (3) Backing plate (6) between platform sling (5).
8. a kind of adjustable height railway bed structure according to claim 7, it is characterised in that: in platform sling (5) transverse direction Point face lifter (4), transverse ends portion correspond to built-in hanger (9) and are connected with hoist cable (8), and hoist cable (8) lower end, which is connected to, to be hung On ring (13);The in-orbit upward one row's built-in hanger (9) of correspondence of platform sling (5) is separately provided or the setting of multiple rows of joint.
9. a kind of adjustable height railway bed structure according to claim 1 or 8, it is characterised in that: the built-in hanger (9) Width needed for adapting to track up train with horizontal length of outer end of the platform sling (5) away from the nearlyr side of track apart from track;It is described Support column (3) adapts to track plates (1) and supporting course (2) thickness from the height of top to basis (15), and promotes desired height.
CN201920094694.8U 2019-01-21 2019-01-21 A kind of adjustable height railway bed structure Active CN209584731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920094694.8U CN209584731U (en) 2019-01-21 2019-01-21 A kind of adjustable height railway bed structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920094694.8U CN209584731U (en) 2019-01-21 2019-01-21 A kind of adjustable height railway bed structure

Publications (1)

Publication Number Publication Date
CN209584731U true CN209584731U (en) 2019-11-05

Family

ID=68352814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920094694.8U Active CN209584731U (en) 2019-01-21 2019-01-21 A kind of adjustable height railway bed structure

Country Status (1)

Country Link
CN (1) CN209584731U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109554961A (en) * 2019-01-21 2019-04-02 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of adjustable height railway bed structure and its implementation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109554961A (en) * 2019-01-21 2019-04-02 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of adjustable height railway bed structure and its implementation method
CN109554961B (en) * 2019-01-21 2024-04-09 中国铁道科学研究院集团有限公司铁道建筑研究所 Height-adjustable railway roadbed structure and implementation method thereof

Similar Documents

Publication Publication Date Title
CN103757993B (en) High-speed railway subgrade sedimentation repair system and method
KR101434911B1 (en) Reclamation of the linear adjusting form of a rail track configuration settings for the rail assembly equipment
CN108951322A (en) A kind of ballastless track structure sedimentation lifting apparatus and its lifting method
CN102926299A (en) Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device
CN102359069A (en) Existing line reinforcing method in under-crossing railway frame bridge small-included angle large-height inclined jacking construction
CN109235291B (en) Railway bridge beam replacing system
CN1904315A (en) Tunnel overhead arch mould plate trolley possessing floating type traffic under carriage
CN106702834A (en) Midline deviation rectifying method for sedimentary offset ballastless track
CN109554961A (en) A kind of adjustable height railway bed structure and its implementation method
CN209584731U (en) A kind of adjustable height railway bed structure
CN109355986A (en) A kind of non-fragment orbit sedimentation regulation method based on rope saw cut
CN109338831A (en) A kind of non-fragment orbit method for correcting error based on rope saw cut
CN105648925A (en) Bridge girder erection machine for erecting sectional assembled box beam
CN105421160B (en) A kind of concrete bedding top surface line type control method
CN202300410U (en) Shield machine bracket capable of passing through station conveniently
JP3816011B2 (en) Railway vehicle wheel return line device and rail vehicle wheel return line method
EP1092065A1 (en) Railway system and its supporting structure, as well as their method of construction
KR102197762B1 (en) A Special train for replacing gravel ballast to concrete ballast
CN206874289U (en) Just lining construction hydraulic template trolley
CN204780515U (en) Quick refill -unit in road and railroad crossing mouth road surface
CN107653756A (en) A kind of city rail U-type groove plate-type ballastless railway roadbed track plates supporting adjuster and its application method
CN209584744U (en) A kind of set rail tamping car and corresponding band are automatically aligned to the set rail tamping unit of function
CN209177871U (en) Platform structure for memorial archway continuously hoisting
CN1150371C (en) Support equipment and technological process to correct the displacement of surface track in goaf
CN208121485U (en) A kind of small-radius shield precast track plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant