CN209542614U - Pond body crack repairing test pond - Google Patents
Pond body crack repairing test pond Download PDFInfo
- Publication number
- CN209542614U CN209542614U CN201822102611.3U CN201822102611U CN209542614U CN 209542614 U CN209542614 U CN 209542614U CN 201822102611 U CN201822102611 U CN 201822102611U CN 209542614 U CN209542614 U CN 209542614U
- Authority
- CN
- China
- Prior art keywords
- pond
- installation
- test block
- test
- plane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a kind of pond body crack repairing test pond, including pond ontology, installation wallboard and simulating test pieces group;Pond ontology is equipped with installation wallboard, wallboard is installed, pond ontology is separated into drainage area and water reserve, running through on installation wallboard has rectangle installation groove, rectangle installation groove connects the drainage area and the water reserve, simulating test pieces group is covered in installation groove, simulating test pieces group separates drainage area and water reserve, and waterproof construction is equipped between simulating test pieces group and installation wallboard, and simulating test pieces group is equipped with simulation fracture.Using a kind of pond body crack repairing test pond of the utility model, it can be tested by simulating the repairing of underwater wall body slit, detect the repairing effect of underwater crack, the simulating test pieces group of its test is detachably replaced, stabilization easy for installation, while there is low cost, long service life, the true advantage of simulated environment, also can the reparation situation of waterproof performance and underwater crack to waterproof material get information about.
Description
Technical field
The utility model relates to a kind of crack repairing simulators, and in particular to a kind of pond body crack repairing test pond.
Background technique
Distress in concrete is more universal one of the disease of underwater concrete building, and underwater concrete is due to being chronically at water
Under, working environment is more severe, once generating crack, will cause leakage of buildings, direct harm is constituted to building safety,
If repaired not in time, irreparable damage may cause.But the case where due to actual motion, much with the coagulation in crack
Soil cannot be repaired under water-less environment, it is necessary to be repaired under water.
Various units have done the work of many brilliance, spy in terms of repairing concrete crack under water both at home and abroad for many years
Rope goes out underwater concrete cracks filleting blocking technology, underwater concrete cracks surface soverlay technique, underwater concrete cracks grouting
Technology, or block and fill triplicity.From early discovery, from the viewpoint of early repairing, due to sub-marine situations complexity, water-proof system is endless
It is kind.Interface between plugging material and concrete is easy the erosion by aqueous medium, and is further destroyed.Existing research
Personnel are tested the recovery technique to underwater crack, reparation gimmick and repair materials etc. are verified, and conventional authentication needs
Concrete sump is built, most one-piece casting, there are complicated construction techniques, at high cost, long construction period, and material therefor is more.
Utility model content
The utility model provides a kind of test tank that the repairing of energy fracture is detected, especially concrete underwater crack
Repairing is detected, with easy for installation, stable structure, advantage low in cost.
Technical solution is as follows:
A kind of pond body crack repairing test pond, key are: including pond ontology, installation wallboard and simulating test pieces group;
The pond ontology is equipped with the installation wallboard, and the installation wallboard is vertically arranged, and the installation wallboard is by the pond sheet
Body is separated into drainage area and water reserve, and the installation panel edges are bonded with the inner wall of the pond ontology;
Through there is a rectangle installation groove on the installation wallboard, the rectangle installation groove connects the drainage area and described
Water reserve, is covered with the simulating test pieces group in the installation groove, and the simulating test pieces group is by the drainage area and the storage
Pool separates, and waterproof construction is equipped between the simulating test pieces group and the installation wallboard, and the simulating test pieces group is equipped with mould
Quasi- crack.
Taking the remarkable result of above technical scheme is, pond body is divided into two regions by installation wallboard, is installed
Wallboard is equipped with rectangle installation groove, connects two regions, and simulating test pieces group is mounted on the rectangle installation groove partition area Liang Ge
Domain forms waterproof construction between simulating test pieces group and rectangle installation groove, repairs to the simulation fracture in simulating test pieces group
Test.After test, detachable Imitating test block group manufactures new simulating test pieces group, carries out new test.
Test block installation plate is equipped in the rectangle installation groove, the test block installation plate was equipped with water opening, the mistake
Water opening runs through along the thickness direction of the test block installation plate, and the edge of the test block installation plate is installed with the corresponding rectangle
The cell wall of groove connects, and is fixed with test block locating rod on the test block installation plate, the test block locating rod is perpendicular to the examination
Block mounting plate;
The thickness of the test block installation plate is less than the thickness of the installation wallboard, the test block installation plate and the installation wall
Plate is parallel, and the either side of the test block installation plate and the installation wallboard is in same plane;
The simulating test pieces group is equipped with mounting hole, and the mounting hole runs through the simulating test pieces group, the simulating test pieces
Group is fixed in the rectangle installation groove, and the test block locating rod is worn in the mounting hole.
The bottom plate of the pond ontology is equipped with the first drainage hole and the second drainage hole, and first drainage hole is arranged in institute
It states on the bottom plate of drainage area, second drainage hole is arranged on the bottom plate of the water reserve, first drainage hole and described
Water blockoff rubber stopper is provided in second drainage hole.
The bottom of the rectangle installation groove is equipped with and is transversely mounted inclined-plane, two vertical inner walls of the rectangle installation groove
On set that there are two vertical installation inclined-planes;The inclined-plane top edge that is transversely mounted is described to be transversely mounted close to the test block installation plate
Inclined-plane lower edge is far from the test block installation plate, and two vertical installation inclined-plane inward flanges are respectively close to the test block installation
Plate, two vertical installation chamfered outer edges are respectively further from the test block installation plate.
Described be transversely mounted on inclined-plane and two vertical installation inclined-planes is equipped with Waterproof glue line, the Waterproof glue line
It is uniformly arranged on described be transversely mounted on inclined-plane and two vertical installation inclined-planes.
The test block locating rod includes water-proof base and fixed link, and the water-proof base and the fixed link are in cylinder
Shape, the water-proof base and the fixed link are each perpendicular to the test block installation plate, and described fixed link one end and the test block are pacified
Loading board is fixed, and the water-proof base surrounds the junction that the fixed link Yu the test block installation plate is arranged in;
The fixed link is worn in the mounting hole far from one end of the water-proof base, and the water-proof base is rubber
Material.
The mounting hole includes blind hole and through-hole, and the blind hole is set towards the test block installation plate, the bottom of the blind hole
There is the through-hole, the through-hole runs through the simulating test pieces group, and the blind hole and the through-hole are connected;
The water-proof base is located in the blind hole, and the water-proof base compresses the hole bottom, and the fixed link is remote
One end from the water-proof base is pierced by the through-hole.Using above technical scheme, test block locating rod is threaded through in mounting hole
When, it is ensured that it will not leak between test block locating rod and mounting hole.
The simulating test pieces group includes mold, fixed bracket and concrete test block;
The mold is vertically arranged, and the vertically extending groove that pours is equipped at the top edge center of the mold, described to pour
The thickness direction that groove is built along the mold penetrates through, and the fixed bracket is arranged on the cell wall for pouring groove, described solid
Fixed rack is located at described pour in groove;
Described pour has poured the concrete test block in groove, the fixed bracket is located in the concrete test block,
The concrete test block center is equipped with a vertically extending simulation fracture, and the simulation fracture is along the concrete test block
Thickness direction perforation, the concrete test block are fitted closely with the groove that pours;
It is equipped at least one described test block locating rod around the parameatal test block installation plate of water of crossing, is surrounded
The mold for pouring groove vicinity is equipped at least one described mounting hole, and the mounting hole runs through the mold, institute
It states test block locating rod and the mounting hole corresponds;
The mold includes the first gang form, the second gang form and third gang form, first gang form
Laterally setting, the both ends of first gang form are vertically equipped with second gang form upwards respectively and the third combines
Template;
The lower edge of first gang form is equipped with lateral waterproof inclined-plane, second gang form and the third group
The vertical outer edge of shuttering is equipped with vertical waterproof inclined-plane, and the transverse direction waterproof inclined-plane top edge is where the blind hole
Side, the inward flange on two vertical waterproof inclined-planes is close to the side where the blind hole;
The transverse direction waterproof inclined-plane is correspondingly arranged with the inclined-plane that is transversely mounted, two vertical waterproof inclined-planes and two
The vertical installation inclined-plane is arranged in a one-to-one correspondence;
The transverse direction waterproof inclined-plane is bonded to form the waterproof knot with the Waterproof glue line being transversely mounted on inclined-plane
Structure, two vertical waterproof inclined-planes be bonded respectively with the Waterproof glue lines on corresponding two vertical installation inclined-planes to be formed it is described
Waterproof construction.Using above technical scheme, leak will not be occurred between wallboard and simulating test pieces group by installing.
The fixed bracket includes at least one spacer bar, the upper surface of first gang form and described second
Spacer bar described at least one is respectively equipped on the inner wall of gang form and the third gang form;
At least one is respectively equipped on first gang form, second gang form and the third gang form
The mounting hole.
The pond ontology is the pond of rectangular-shape, is respectively equipped with branch on four angles of bottom edge of the pond ontology
Dagger, perpendicular to the bottom surface of the pond ontology, the pond ontology is vacantly arranged the support column;
The pond ontology includes a bottom of pond and four pool walls, and the bottom of pond is horizontally disposed, the bottom of pond edge difference
If four pool walls are respectively perpendicular to the bottom of pond, and two adjacent pool walls are mutually perpendicular to simultaneously there are four the pool wall
Connection.
The utility model has the advantages that can be tested by simulating the repairing of underwater wall body slit, the repairing effect of underwater crack is detected, is surveyed
Simulating test pieces group on probation is detachably replaced, stabilization easy for installation, while having low cost, long service life, and simulated environment is true
Real advantage, also can the reparation situation of waterproof performance and underwater crack to waterproof material get information about.
Detailed description of the invention
Fig. 1 is the front view in pond body crack repairing test pond;
Fig. 2 is the diagrammatic cross-section A-A of Fig. 1;
Fig. 3 is the side view in pond body crack repairing test pond;
Fig. 4 is the diagrammatic cross-section B-B of Fig. 3;
Fig. 5 is the top view in pond body crack repairing test pond;
Fig. 6 is the partial enlarged view j of Fig. 5;
Fig. 7 is the front view of simulating test pieces group;
Fig. 8 is the top view of Fig. 7;
Fig. 9 is the rearview of Fig. 8;
Figure 10 is installation panel structure schematic diagram;
Figure 11 is the top view of Figure 10.
Specific embodiment
Below with reference to embodiment and attached drawing, the utility model is described in further detail.
As shown in Fig. 1 to Figure 11, a kind of pond body crack repairing test pond, including it is transversely mounted inclined-plane 1a, vertical installation tiltedly
Face 1b, the first drainage hole a, the second drainage hole b, test block installation plate 2, water-proof base 3a, fixed link 3b, blind hole 4a, through-hole 4b, prevent
Gelatine layer 5, concrete test block 6, the first gang form 7a, the second gang form 7b, third gang form 7c, lateral waterproof inclined-plane
7d, vertical waterproof inclined-plane 7e, simulation fracture 9, pond ontology 10, in which:
The pond ontology 10 is equipped with the installation wallboard, and the installation wallboard is vertically arranged, and the installation wallboard will
The pond ontology 10 is separated into drainage area and water reserve, the inner wall patch of the installation panel edges and the pond ontology 10
It closes, the installation wallboard top edge is concordant with 10 top edge of pond ontology;
Through there is a rectangle installation groove on the installation wallboard, the rectangle installation groove connects the drainage area and described
Water reserve, is covered with the simulating test pieces group in the installation groove, and the simulating test pieces group is by the drainage area and the storage
Pool separates, and waterproof construction is equipped between the simulating test pieces group and the installation wallboard, and the simulating test pieces group is equipped with mould
Quasi- crack 9.
It is specific:
Test block installation plate 2 is equipped in the rectangle installation groove, the test block installation plate 2 was equipped with water opening, described
It crosses water opening to run through along the thickness direction of the test block installation plate 2, the edge of the test block installation plate 2 and the corresponding rectangle
The cell wall of installation groove connects, and is fixed with test block locating rod 3 on the test block installation plate 2, the test block locating rod 3 perpendicular to
The test block installation plate 2;
The thickness of the test block installation plate 2 is less than the thickness of the installation wallboard, the test block installation plate 2 and the installation
Wallboard is parallel, and the either side of the test block installation plate 2 and the installation wallboard is in same plane;
The simulating test pieces group is equipped with mounting hole 4, and the mounting hole 4 runs through the simulating test pieces group, the simulation examination
Block group is fixed in the rectangle installation groove, and the test block locating rod 3 is threaded through in the mounting hole 4.
The bottom plate of the pond ontology 10 is equipped with the first drainage hole a and the second drainage hole b, and the first drainage hole a is set
It sets on the bottom plate of the drainage area, the second drainage hole b is arranged on the bottom plate of the water reserve, first drainage hole
Water blockoff rubber stopper is provided in a and the second drainage hole b.
The bottom of the rectangle installation groove, which is equipped with, is transversely mounted inclined-plane 1a, and two of the rectangle installation groove are vertical interior
It is set on wall and inclined-plane 1b is installed there are two vertical;The inclined-plane top edge 1a that is transversely mounted is close to the test block installation plate 2, the cross
To installation inclined-plane 1a lower edge far from the test block installation plate 2, two vertical installation inclined-plane 1b inward flanges are respectively close to institute
Test block installation plate 2 is stated, two vertical installation inclined-plane 1b outer edges are respectively further from the test block installation plate 2.
Described be transversely mounted on inclined-plane 1a and two vertical installation inclined-plane 1b is equipped with Waterproof glue line 5, described anti-
Gelatine layer 5 is uniformly arranged on described be transversely mounted on inclined-plane 1a and two vertical installation inclined-plane 1b.
The test block locating rod 3 includes water-proof base 3a and fixed link 3b, the water-proof base 3a and the fixed link 3b
Cylindrical, the water-proof base 3a and the fixed link 3b are each perpendicular to the test block installation plate 2, the fixed link 3b mono-
End is fixed with the test block installation plate 2, and the water-proof base 3a is around setting in the fixed link 3b and the test block installation plate 2
Junction;
The fixed link 3b is threaded through in the mounting hole 4 far from one end of the water-proof base 3a, the water-proof base
3a is rubber material.
The mounting hole 4 includes blind hole 4a and through-hole 4b, the blind hole 4a towards the test block installation plate 2, the blind hole
The bottom of 4a is equipped with the through-hole 4b, and the through-hole 4b runs through the simulating test pieces group, and the blind hole 4a connects with the through-hole 4b
It is logical;
The water-proof base 3a is located in the blind hole 4a, and the water-proof base 3a compresses the blind hole 4a bottom hole, described
Fixed link 3b is pierced by the through-hole 4b far from one end of the water-proof base 3a.
The simulating test pieces group includes mold, fixed bracket and concrete test block 6;
The mold is vertically arranged, and the vertically extending groove that pours is equipped at the top edge center of the mold, described to pour
The thickness direction that groove is built along the mold penetrates through, and the fixed bracket is arranged on the cell wall for pouring groove, described solid
Fixed rack is located at described pour in groove;
Described pour has poured the concrete test block 6 in groove, the fixed bracket is located at the concrete test block 6
Interior, 6 center of concrete test block is equipped with a vertically extending simulation fracture 9, and the simulation fracture 9 is along the concrete
The thickness direction of test block 6 penetrates through, and the concrete test block 6 is fitted closely with the groove that pours;
It is equipped at least one described test block locating rod 3 around the parameatal test block installation plate 2 of water of crossing, is enclosed
It is equipped at least one described mounting hole 4 around the mold for pouring groove vicinity, the mounting hole 4 runs through the mould
Tool, the test block locating rod 3 are corresponded with the mounting hole 4;
The mold includes the first gang form 7a, the second gang form 7b and third gang form 7c, and described first group
Shuttering 7a is laterally arranged, the both ends of the first gang form 7a be vertically equipped with upwards respectively the second gang form 7b and
The third gang form 7c;
The lower edge of the first gang form 7a is equipped with transverse direction waterproof inclined-plane 7d, the second gang form 7b and described
The vertical outer edge of third gang form 7c is equipped with vertical waterproof inclined-plane 7e, and the transverse direction waterproof inclined-plane top edge 7d is close to institute
The side where blind hole 4a is stated, the inward flange of two vertical waterproof inclined-plane 7e is close to the side where the blind hole 4a;
The transverse direction waterproof inclined-plane 7d and inclined-plane 1a that is transversely mounted is correspondingly arranged, two vertical waterproof inclined-plane 7e
It is arranged in a one-to-one correspondence with two vertical installation inclined-plane 1b;
The transverse direction waterproof inclined-plane 7d be bonded with the Waterproof glue line 5 being transversely mounted on inclined-plane 1a to be formed it is described anti-
Water-bound, two vertical waterproof inclined-plane 7e are pasted with the Waterproof glue line 5 on corresponding two vertical installation inclined-plane 1b respectively
Conjunction forms the waterproof construction.
The fixed bracket includes at least one spacer bar 8, the upper surface of the first gang form 7a and described
Spacer bar 8 described at least one are respectively equipped on the inner wall of second gang form 7b and the third gang form 7c;
Be respectively equipped on the first gang form 7a, the second gang form 7b and the third gang form 7c to
A few mounting hole 4.
The pond ontology 10 is the pond of rectangular-shape, is set respectively on four angles of bottom edge of the pond ontology 10
There are support column, bottom surface of the support column perpendicular to the pond ontology 10, the vacantly setting of pond ontology 10;
The pond ontology 10 includes a bottom of pond and four pool walls, and the bottom of pond is horizontally disposed, the bottom of pond edge point
It does not set there are four the pool wall, four pool walls are respectively perpendicular to the bottom of pond, and two adjacent pool walls are mutually perpendicular to
And it connects.
Finally, it should be noted that foregoing description is only the preferred embodiment of the utility model, the common skill of this field
Art personnel are under the enlightenment of the utility model, under the premise of without prejudice to the utility model aims and claim, can make
Multiple similar expressions, such transformation are each fallen within the protection scope of the utility model.
Claims (10)
1. a kind of pond body crack repairing test pond, it is characterised in that: including pond ontology (10), installation wallboard and simulating test pieces
Group;The pond ontology (10) is equipped with the installation wallboard, and the installation wallboard is vertically arranged, and the installation wallboard will be described
Pond ontology (10) is separated into drainage area and water reserve, the inner wall patch of the installation panel edges and the pond ontology (10)
It closes;
Through there is rectangle installation groove on the installation wallboard, the rectangle installation groove connects the drainage area and the water storage
Area, is covered with the simulating test pieces group in the installation groove, and the simulating test pieces group is by the drainage area and the water reserve
It separates, waterproof construction is equipped between the simulating test pieces group and the installation wallboard, the simulating test pieces group is equipped with simulation and splits
It stitches (9).
2. pond body crack repairing test pond according to claim 1, it is characterised in that: be equipped in the rectangle installation groove
Test block installation plate (2), the test block installation plate (2) were equipped with water opening, and the water opening of crossing is along the test block installation plate (2)
Thickness direction run through, the cell wall of the edge of the test block installation plate (2) and the corresponding rectangle installation groove connects, described
It is fixed on test block installation plate (2) test block locating rod (3), the test block locating rod (3) is perpendicular to the test block installation plate
(2);
The thickness of the test block installation plate (2) is less than the thickness of the installation wallboard, the test block installation plate (2) and the installation
Wallboard is parallel, and the either side of the test block installation plate (2) and the installation wallboard is in same plane;
The simulating test pieces group is equipped with mounting hole (4), and the mounting hole (4) runs through the simulating test pieces group, the simulation examination
Block group is fixed in the rectangle installation groove, and the test block locating rod (3) is threaded through in the mounting hole (4).
3. pond body crack repairing test pond according to claim 1, it is characterised in that: the bottom plate of the pond ontology (10)
It is equipped with the first drainage hole (a) and the second drainage hole (b), first drainage hole (a) is arranged on the bottom plate of the drainage area,
Second drainage hole (b) is arranged on the bottom plate of the water reserve, first drainage hole (a) and second drainage hole
(b) water blockoff rubber stopper is provided in.
4. pond body crack repairing test pond according to claim 2, it is characterised in that: the bottom of the rectangle installation groove
Equipped with being transversely mounted inclined-plane (1a), is set on the vertical inner wall of two of the rectangle installation groove and inclined-plane is installed there are two vertical
(1b);The inclined-plane top edge (1a) that is transversely mounted is described to be transversely mounted inclined-plane (1a) below close to the test block installation plate (2)
Edge is far from the test block installation plate (2), and two vertical installation inclined-plane (1b) inward flanges are respectively close to the test block installation plate
(2), two vertical installation inclined-plane (1b) outer edges are respectively further from the test block installation plate (2).
5. pond body crack repairing test pond according to claim 4, it is characterised in that: it is described be transversely mounted inclined-plane (1a) with
And be equipped with Waterproof glue line (5) on two vertical installation inclined-planes (1b), the Waterproof glue line (5) is uniformly arranged on the cross
To in installation inclined-plane (1a) and two vertical installation inclined-planes (1b).
6. pond body crack repairing test pond according to claim 5, it is characterised in that: the test block locating rod (3) includes
Water-proof base (3a) and fixed link (3b), the water-proof base (3a) and the fixed link (3b) are cylindrical, the waterproof
Pedestal (3a) and the fixed link (3b) are each perpendicular to the test block installation plate (2), described fixed link one end (3b) and the examination
Block mounting plate (2) is fixed, and the water-proof base (3a) is around setting in the fixed link (3b) and the test block installation plate (2)
Junction;
The fixed link (3b) is threaded through in the mounting hole (4) far from the one end of the water-proof base (3a), it is described prevent it is water base
Seat (3a) is rubber material.
7. pond body crack repairing test pond according to claim 6, it is characterised in that: the mounting hole (4) includes blind hole
(4a) and through-hole (4b), the blind hole (4a) are equipped with described logical towards the test block installation plate (2), the bottom of the blind hole (4a)
Hole (4b), the through-hole (4b) run through the simulating test pieces group, and the blind hole (4a) and the through-hole (4b) are connected;
The water-proof base (3a) is located in the blind hole (4a), and the water-proof base (3a) compresses blind hole (4a) bottom hole,
The fixed link (3b) is pierced by the through-hole (4b) far from the one end of the water-proof base (3a).
8. pond body crack repairing test pond according to claim 7, it is characterised in that: the simulating test pieces group includes mould
Tool, fixed bracket and concrete test block (6);
The mold is vertically arranged, the top edge center of the mold be equipped with it is vertically extending pour groove, it is described pour it is recessed
Slot is penetrated through along the thickness direction of the mold, and the fixed bracket is arranged on the cell wall for pouring groove, the fixed branch
Frame is located at described pour in groove;
Described pour has poured the concrete test block (6) in groove, and the fixed bracket is located at the concrete test block (6)
Interior, concrete test block (6) center is equipped with a vertically extending simulation fracture (9), and the simulation fracture (9) is along described
The thickness direction of concrete test block (6) penetrates through, and the concrete test block (6) fits closely with the groove that pours;
The parameatal test block installation plate (2) of water is crossed equipped at least one described test block locating rod (3) around described, is enclosed
It is equipped at least one described mounting hole (4) around the mold for pouring groove vicinity, the mounting hole (4) is through described
Mold, the test block locating rod (3) and the mounting hole (4) correspond;
The mold includes the first gang form (7a), the second gang form (7b) and third gang form (7c), and described first
Gang form (7a) is laterally arranged, and the both ends of first gang form (7a) are vertically equipped with second combination die upwards respectively
Plate (7b) and the third gang form (7c);
The lower edge of first gang form (7a) is equipped with lateral waterproof inclined-plane (7d), second gang form (7b) and institute
The vertical outer edge for stating third gang form (7c) is equipped with vertical waterproof inclined-plane (7e), described transverse direction top waterproof inclined-plane (7d)
Edge is close to the side where the blind hole (4a), and the inward flange of two vertical waterproof inclined-planes (7e) is close to the blind hole (4a)
The side at place;
The transverse direction waterproof inclined-plane (7d) is correspondingly arranged with the inclined-plane (1a) that is transversely mounted, two vertical waterproof inclined-planes
(7e) is arranged in a one-to-one correspondence with two vertical installation inclined-planes (1b);
The transverse direction waterproof inclined-plane (7d) is bonded described in formation with the Waterproof glue line (5) being transversely mounted on inclined-plane (1a)
Waterproof construction, the marine glues that two vertical waterproof inclined-planes (7e) are vertically installed on inclined-plane (1b) with corresponding two respectively
Layer (5) fitting forms the waterproof construction.
9. pond body crack repairing test pond according to claim 8, it is characterised in that: the fixed bracket includes at least one
Root spacer bar (8), the upper surface of first gang form (7a) and second gang form (7b) and the third
Spacer bar described at least one (8) are respectively equipped on the inner wall of gang form (7c);
It is respectively equipped on first gang form (7a), second gang form (7b) and the third gang form (7c)
At least one described mounting hole (4).
10. pond body crack repairing test pond according to claim 1, it is characterised in that: the pond ontology (10) is length
The pond of cube shape is respectively equipped with support column on four angles of bottom edge of the pond ontology (10), and the support column is vertical
In the bottom surface of the pond ontology (10), the pond ontology (10) is vacantly arranged;
The pond ontology (10) includes a bottom of pond and four pool walls, and the bottom of pond is horizontally disposed, the bottom of pond edge difference
If four pool walls are respectively perpendicular to the bottom of pond, and two adjacent pool walls are mutually perpendicular to simultaneously there are four the pool wall
Connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822102611.3U CN209542614U (en) | 2018-12-14 | 2018-12-14 | Pond body crack repairing test pond |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822102611.3U CN209542614U (en) | 2018-12-14 | 2018-12-14 | Pond body crack repairing test pond |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209542614U true CN209542614U (en) | 2019-10-25 |
Family
ID=68264127
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822102611.3U Active CN209542614U (en) | 2018-12-14 | 2018-12-14 | Pond body crack repairing test pond |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209542614U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109765354A (en) * | 2018-12-14 | 2019-05-17 | 重庆市排水有限公司 | A kind of pond body crack repairing test pond |
-
2018
- 2018-12-14 CN CN201822102611.3U patent/CN209542614U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109765354A (en) * | 2018-12-14 | 2019-05-17 | 重庆市排水有限公司 | A kind of pond body crack repairing test pond |
CN109765354B (en) * | 2018-12-14 | 2023-12-22 | 重庆市排水有限公司 | Cell body crack repair test pool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103410175B (en) | A kind of water seepage control construction method for karst water-rich geological underground structure waterproof construction | |
CN109322425A (en) | A kind of plug-in connection system of combined wall board and preparation method thereof | |
CN105089080A (en) | Method for making hollow layer allowing observing structural leakage on wall-surface bottom plate of underground building | |
CN209542614U (en) | Pond body crack repairing test pond | |
CN108316334A (en) | A kind of liquefied double-walled suction tube basis of automation prevention | |
CN103122642B (en) | Construction method of vertical post support change | |
CN209485809U (en) | Distress in concrete simulating test pieces group | |
CN108978729A (en) | A kind of subway station hole for hoist method for blocking | |
CN209590028U (en) | Pond crack repairing test simulator | |
CN209384462U (en) | A kind of plug-in connection system of combined wall board | |
CN209040418U (en) | A kind of external wall is cast-in-place with prefabricated thermal insulation integral system | |
CN207829209U (en) | A kind of connection structure of the precast shear wall vertical abutment joint of water-impervious | |
CN109765354A (en) | A kind of pond body crack repairing test pond | |
CN209485810U (en) | Distress in concrete simulating test pieces bracket | |
CN109521188A (en) | A kind of pond crack repairing test simulator | |
CN208073552U (en) | tunnel drainage structure | |
CN206503160U (en) | A kind of continuous underground wall structure with measure of anti float | |
CN209486105U (en) | Pond crack repairing test verifies system | |
CN205918058U (en) | GRC subassembly | |
CN105576564B (en) | A kind of water proof constructing device for submerged cable connection | |
CN110501396B (en) | Concrete repairing agent durability test system | |
CN112144749A (en) | On-spot prefabricated wallboard mounting structure | |
CN109612796A (en) | A kind of distress in concrete simulating test pieces group | |
CN103758081A (en) | Floating self-adjustment water-stopping dam | |
CN207934076U (en) | A kind of underground buoyancy model test apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |