CN209537958U - Undercrossing tunnel jacking construction track strengthening assists jacking jigger - Google Patents
Undercrossing tunnel jacking construction track strengthening assists jacking jigger Download PDFInfo
- Publication number
- CN209537958U CN209537958U CN201822168710.1U CN201822168710U CN209537958U CN 209537958 U CN209537958 U CN 209537958U CN 201822168710 U CN201822168710 U CN 201822168710U CN 209537958 U CN209537958 U CN 209537958U
- Authority
- CN
- China
- Prior art keywords
- jacking
- crossbeam
- jigger
- supporter
- undercrossing tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 75
- 238000005728 strengthening Methods 0.000 title claims abstract description 48
- 241001584775 Tunga penetrans Species 0.000 title claims abstract description 35
- 238000005096 rolling process Methods 0.000 claims abstract description 5
- 230000007246 mechanism Effects 0.000 claims description 8
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 description 38
- 239000010959 steel Substances 0.000 description 38
- 238000004873 anchoring Methods 0.000 description 19
- 238000000034 method Methods 0.000 description 13
- 230000003014 reinforcing effect Effects 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 7
- 230000008569 process Effects 0.000 description 7
- 241001669679 Eleotris Species 0.000 description 4
- 239000004567 concrete Substances 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000005452 bending Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 238000011065 in-situ storage Methods 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 238000003908 quality control method Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 230000006641 stabilisation Effects 0.000 description 2
- 238000011105 stabilization Methods 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 244000261422 Lysimachia clethroides Species 0.000 description 1
- 244000082204 Phyllostachys viridis Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 230000005856 abnormality Effects 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000011229 interlayer Substances 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a kind of undercrossing tunnel jacking construction track strengthening auxiliary jacking jigger, belong to road and bridge construction tooling technical field, including the sliding seat for sliding on working face and the supporter on the sliding seat and for connecting with the one end of the crossbeam is set.The utility model is propped up crossbeam by supporter, it separates crossbeam with lower box structure, recycles sliding seat that one end of crossbeam is enable to slide, sliding friction is replaced by rolling friction, it can reduce and rub between crossbeam and lower box structure, convenient for other constructing operations such as drawings.
Description
Technical field
The utility model belongs to road and bridge construction tooling technical field, is to be related to a kind of undercrossing tunnel jacking more specifically
Construction line reinforces auxiliary jacking jigger.
Background technique
Currently, flourishing with China's highway, newly-built highway intersects with existing railway route and can not keep away
Exempt from, undercrossing tunnel frame core-tube system jacking construction is also applied more and more extensive.Before jacking construction, existing railway is added
Gu track strengthening common practice be cooperated using H profile steel stringer the vertical I-shaped gooseneck for choosing method arrangement of horizontal lift and fender pile,
Stake, anti-shifting stake is supported to form track strengthening system, to prevent railroad track from transverse shifting occurs.Anti- shifting stake is located at jacking side in place
To, it is parallel with existing line, it is arranged in a straight line against existing line.Railroad rail is added using the vertical method of choosing of the horizontal lift of girder steel in length and breadth
Though crossbeam is connect with anti-shifting stake later, stringer is used for reinforcing crossmember.
The core of this mode is to set anti-shifting stake in advance, but the anti-pile period for moving stake and construction cost compare
Height, and after jacking construction, anti-shifting stake just loses effect, so that abandoned, causes the waste of resource.Therefore practical
Novel people devises the novel large-span oblique crossing Frame Bridge undercrossing tunnel of one kind and exempts to resist traversing anchoring wire road hardened system, passes through support
Frame substitutes anti-shifting stake, and carries out traction to crossbeam by pulling apparatus to retract rail.But since crossbeam is by lower part
The friction of frame structure is bigger, if directlying adopt pulling apparatus pulls crossbeam, needs biggish pulling force, constructing operation is relatively more tired
It is difficult.
Utility model content
The purpose of this utility model is to provide a kind of undercrossing tunnel jacking construction track strengthenings to assist jacking jigger, tool
The characteristics of having to reduce and rub between crossbeam and lower box structure, being convenient for constructing operation.
In order to achieve the above purposes, the technical solution adopted by the utility model is: provides a kind of undercrossing tunnel jacking construction line
Road reinforces auxiliary jacking jigger, comprising: sliding seat, for being slided on working face;And supporter, it is arranged in the sliding seat
Above and for being connect with the one end of the crossbeam.
Further, in undercrossing tunnel jacking construction track strengthening auxiliary jacking jigger above-mentioned, the sliding seat packet
It includes: pedestal, for being connect with the supporter, and it is internal equipped with cavity;And scroll wheel, it is rotatably arranged in the cavity, and
The pedestal lower part is protruded from, for rolling on the working face.
Further, it in undercrossing tunnel jacking construction track strengthening auxiliary jacking jigger above-mentioned, is set in the cavity
There are several scroll wheels being disposed in parallel relation to one another.
Further, in undercrossing tunnel jacking construction track strengthening above-mentioned auxiliary jacking jigger, the cavity with
Side wall on the vertical direction of the rotation axis of the scroll wheel is equipped with notch.
Further, in undercrossing tunnel jacking construction track strengthening auxiliary jacking jigger above-mentioned, on the supporter
Equipped with the height adjustment mechanism for adjusting the supporter height.
Further, in undercrossing tunnel jacking construction track strengthening above-mentioned auxiliary jacking jigger, the sliding seat with
The supporter rotation connection.
Further, in undercrossing tunnel jacking construction track strengthening auxiliary jacking jigger above-mentioned, on the sliding seat
Equipped with shrinkage pool, the supporter is equipped with and the protrusion for being placed in the shrinkage pool.
Further, in undercrossing tunnel jacking construction track strengthening auxiliary jacking jigger above-mentioned, further includes: limit
Seat is arranged on the supporter and for connecting with the limit of the one end of the crossbeam.
Further, in undercrossing tunnel jacking construction track strengthening auxiliary jacking jigger above-mentioned, the limit base packet
Include: bottom plate, lower part is used to connect with the supporter and top is for crossbeam described in support;And limit plate, it is arranged at the bottom
The position that the crossbeam two sides are corresponded on plate, for being limited to the crossbeam.
Further, in undercrossing tunnel jacking construction track strengthening auxiliary jacking jigger above-mentioned, the limit base is also
Include: fastener, be arranged on the limit plate, and for holding out against the crossbeam.
The beneficial effect of undercrossing tunnel jacking construction track strengthening auxiliary jacking jigger provided by the utility model is:
Compared with prior art, the utility model is propped up crossbeam by supporter, and crossbeam and rail and the lower part soil body is made to loosen or divide
From recycling sliding seat enables one end of crossbeam to slide, and replaces sliding friction by rolling friction, can reduce crossbeam and iron
It rubs between rail and the culvert of lower box structure or the soil body, convenient for other constructing operations such as drawings.
Detailed description of the invention
It, below will be to embodiment or the prior art in order to illustrate more clearly of the technical scheme in the embodiment of the utility model
Attached drawing needed in description is briefly described, it should be apparent that, the accompanying drawings in the following description is only that this is practical new
Some embodiments of type for those of ordinary skill in the art without any creative labor, can be with
It obtains other drawings based on these drawings.
Fig. 1 is that the large-span oblique crossing Frame Bridge undercrossing tunnel of the utility model embodiment application exempts to resist traversing stake track strengthening
The overlooking structure diagram of system;
Fig. 2 is that the large-span oblique crossing Frame Bridge undercrossing tunnel of the utility model embodiment application exempts to resist traversing stake track strengthening
The schematic view of the front view of system;
Fig. 3 is partial enlargement structural representation at I in Fig. 1;
Fig. 4 is partial enlargement structural representation at II in Fig. 2;
Fig. 5 is partial enlargement structural representation at III in Fig. 1;
Fig. 6 is partial enlargement structural representation at IV in Fig. 2;
Fig. 7 is the side structure schematic view (bottom and middle part are split) at coaster position;
Fig. 8 is that the large-span oblique crossing Frame Bridge undercrossing tunnel of another embodiment application of the present invention exempts from that traversing anchoring wire road is resisted to add
Gu the schematic view of the front view of system;
Fig. 9 is that the large-span oblique crossing Frame Bridge undercrossing tunnel of another embodiment application of the present invention exempts from that traversing anchoring wire road is resisted to add
Gu the side structure schematic view of system.
Wherein, each appended drawing reference in figure:
10- support body;
11- disk buckles bracket;12- backbar;13- bearing diagonal;14- stand connection;15- oil cylinder;
20- bracket;
30- position-limited rack;31- top plate;The first card slot of 32-;33- plug;
40- pulling apparatus;41- embedded fixing component;42- drawstring;43- chain block;
50- coaster;
51- sliding seat;511- pedestal;512- scroll wheel;513- notch;514- shrinkage pool;515- protrusion;
52- supporter;
53- limit base;531- bottom plate;532- limit plate;533- fastener;
60-U shape bolt assembly;The second card slot of 61-;62- split bolt;
70- crossbeam;71- drawstring hole;72- rail locating part;
80- stringer;
90- working face;91- rail;92- frame structure is contained;93- jacking mechanism.
Specific embodiment
In order to which technical problem to be solved in the utility model, technical solution and beneficial effect is more clearly understood, with
Lower combination accompanying drawings and embodiments, the present invention will be further described in detail.It should be appreciated that specific reality described herein
Example is applied only to explain the utility model, is not used to limit the utility model.
Also referring to Fig. 1 and Fig. 2 and Fig. 8 and Fig. 9, now to a kind of large-span oblique crossing Frame Bridge provided by the utility model
Undercrossing tunnel exempts from that traversing anchoring wire road hardened system is resisted to be illustrated.The large-span oblique crossing Frame Bridge undercrossing tunnel exempts to resist traversing stake
Track strengthening system, including crossbeam 70 between the sleeper for being threaded through rail 91 and are used for support rail 91;Support body 10,
One end of crossbeam 70 is set;Bracket 20 is arranged on support body 10 and is used for support crossbeam 70;Position-limited rack 30, setting are being propped up
On frame body 10 and 30 side of position-limited rack is used for and 70 end abutment of crossbeam;Pulling apparatus 40 is connect with the other end of crossbeam 70, and
For being pulled to crossbeam 70;It with coaster 50, connect, and is used for 70 other end of crossbeam (one end i.e. far from support body 10)
It is slided on working face 90.
Large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model exempts to resist traversing anchoring wire road hardened system, and existing
Technology is compared, and by the setting of support body 10, bracket 20, position-limited rack 30, pulling apparatus 40 and coaster 50, is resisted instead of traditional
Stake is moved, track can be avoided by the traction action for shoring effect and pulling apparatus 40 of position-limited rack 30 when carrying out jacking construction
Circuit traversing, since without presetting anti-shifting stake, cast-in-situ reinforced concrete structure is exempted to resist traversing support frame to replace, evaded cast-in-place structural
The characteristics of long construction period, shortens the construction cross events with railway, greatly accelerates construction speed, meanwhile, cast in place reinforced bar
Concrete structure is replaced by circulation materials such as disk button bracket and I-steel, greatly reduces construction cost.Support frame is mainly by line
The rail of road reinforcing crossmember transmitting and the gravity of train, are conducive to the stabilization of holding system, and coaster 50 is arranged again, can subtract
Few friction, reduces resistance when jacking construction, so that can control the traversing of track circuit more conveniently in jack-in process.
In addition, all fixture components are all disposed within outside working face, concealed work is few, is more advantageous to quality control and on-site maintenance
Adjustment.
The utility model is more convenient by using construction, more efficiently exempts to resist traversing stake support frame " disk button bracket+top
Stull " forms one kind and exempts to resist traversing anchoring wire road strengthening construction system.Specifically, exempt to resist traversing stake track strengthening, refer specifically to
Cancellation resists traversing stake and crown beam, replaces to set up in original position and exempts to resist traversing stake support frame " disk button bracket+top I-shaped
Steel stull ", the pre-buried limit pull ring in frame structure top tail portion, pulls route during jacking, avoids track from occurring traversing, sliding simultaneously
Vehicle auxiliary, reduces the friction to frame structure top, reduces the resistance of jacking.
Further, also referring to Fig. 1, Fig. 3 and Fig. 5, as large-span oblique crossing Frame Bridge provided by the utility model
Undercrossing tunnel exempts from a kind of specific embodiment for resisting traversing anchoring wire road hardened system, and pulling apparatus 40 includes: to be embedded in working face
The drawstring 42 and setting that embedded fixing component 41, one end and the connection of crossbeam 70 and the other end on 90 are connect with embedded fixing component 41 exist
Chain block 43 on drawstring 42 and for tightening drawstring 42.
Further, also referring to Fig. 1, Fig. 3 and Fig. 5, as large-span oblique crossing Frame Bridge provided by the utility model
Undercrossing tunnel exempts from a kind of specific embodiment for resisting traversing anchoring wire road hardened system, 70 one end of crossbeam be equipped with for drawstring 42
The drawstring hole 71 of connection, 71 periphery of drawstring hole are equipped with stiffening plate.
Further, also referring to Fig. 1 and Fig. 2, as being worn under large-span oblique crossing Frame Bridge provided by the utility model
Railway exempts from a kind of specific embodiment for resisting traversing anchoring wire road hardened system, and crossbeam 70 is equipped with rail locating part 72, rail limit
Position part 72 is abutted with 91 side of rail, in order to push rail 91 mobile using crossbeam 70.Rail locating part 72 and rail 91 it
Between can pass through the cushion blocks such as batten.
Also referring to Fig. 1, Fig. 2 and Fig. 5 to Fig. 7, now to a kind of undercrossing tunnel jacking construction provided by the utility model
Track strengthening auxiliary jacking jigger (i.e. coaster 50) is illustrated.The undercrossing tunnel jacking construction track strengthening assists jacking
Jigger including the sliding seat 51 for sliding on working face 90 and is arranged on sliding seat 51 and for one with crossbeam 70
The supporter 52 of end connection.
Undercrossing tunnel jacking construction track strengthening provided by the utility model assists jacking jigger, with prior art phase
Than crossbeam 80 is propped up by supporter 52, separates crossbeam 80 and rail 91 with lower box structure, sliding seat 51 is recycled to make cross
One end of beam 80 can be slided, and replace sliding friction by rolling friction, can reduce between crossbeam and rail and the lower part soil body
Friction, convenient for other constructing operations such as drawings.
Further, also referring to Fig. 5 to Fig. 7, as undercrossing tunnel jacking construction route provided by the utility model
A kind of specific embodiment of auxiliary jacking jigger is reinforced, sliding seat 51 includes: pedestal 511, for being connect with supporter 52,
And it is internal equipped with cavity;It with scroll wheel 512, is rotatably arranged in cavity, and protrudes from 511 lower part of pedestal, in working face
It is rolled on 90.
Further, referring to Figure 6 together and Fig. 7, as undercrossing tunnel jacking construction route provided by the utility model
A kind of specific embodiment of auxiliary jacking jigger is reinforced, is equipped with several scroll wheels 512 being disposed in parallel relation to one another in cavity.
Further, referring to Fig. 7, as undercrossing tunnel jacking construction track strengthening auxiliary top provided by the utility model
Into a kind of specific embodiment of jigger, cavity is equipped on the side wall on the direction vertical with the rotation axis of scroll wheel 512
Notch 513.
Further, referring to Fig. 7, as undercrossing tunnel jacking construction track strengthening auxiliary top provided by the utility model
Into a kind of specific embodiment of jigger, supporter 52 is equipped with the height adjustment mechanism for adjusting 52 height of supporter.
Supporter 52 includes jack or several cushion blocks successively stacked.
Further, referring to Figure 6 together and Fig. 7, as undercrossing tunnel jacking construction route provided by the utility model
A kind of specific embodiment of auxiliary jacking jigger is reinforced, sliding seat 51 and supporter 52 are rotatablely connected.Specifically, sliding seat
51 are equipped with shrinkage pool 514, and supporter 52 is equipped with and the protrusion 515 for being placed in shrinkage pool.
Further, also referring to Fig. 1, Fig. 2 and Fig. 5 to Fig. 7, as undercrossing tunnel jacking provided by the utility model
Construction line reinforces a kind of specific embodiment of auxiliary jacking jigger, further includes: limit base 53 is arranged on supporter 52
And it is connected for being limited with the one end of crossbeam 70.
Further, also referring to Fig. 5 to Fig. 7, as undercrossing tunnel jacking construction route provided by the utility model
A kind of specific embodiment of auxiliary jacking jigger is reinforced, limit base 53 includes: bottom plate 531, and lower part is used for and supporter 52
It connects and top is used for support crossbeam 70;With limit plate 532, the position that 70 two sides of crossbeam are corresponded on bottom plate 531 is set, is used for
Crossbeam 70 is limited.
Further, also referring to Fig. 5 to Fig. 7, as undercrossing tunnel jacking construction route provided by the utility model
Reinforce a kind of specific embodiment of auxiliary jacking jigger, limit base 53 further include: fastener 533 is arranged in limit plate 532
On, and for holding out against crossbeam 70.
Further, also referring to Fig. 5 to Fig. 7, as being worn under large-span oblique crossing Frame Bridge provided by the utility model
Railway exempts from a kind of specific embodiment for resisting traversing anchoring wire road hardened system, and limit base 53 includes: bottom plate 531, lower part be used for
Supporter 52 connects and top is used for support crossbeam 70;The portion that 70 two sides of crossbeam are corresponded on bottom plate 531 is arranged in limit plate 532
Position, for being limited to crossbeam 70;With fastener 533, it is arranged on limit plate 532, and for holding out against crossbeam 70.
Also referring to Fig. 1 to Fig. 4, now a kind of undercrossing tunnel frame core-tube system track strengthening disk provided by the utility model is buckled
Formula support frame (i.e. support frame) is illustrated.The undercrossing tunnel frame core-tube system track strengthening disk button support frame, including support body,
Bracket on support body and for support crossbeam is set and setting is on support body and position-limited rack side is used for and beam-end
The position-limited rack of abutting.
Undercrossing tunnel frame core-tube system track strengthening disk button support frame provided by the utility model, by support body, bracket and
The cooperation of position-limited rack, so that crossbeam 70 can be abutted directly with position-limited rack during 70 inserting process of crossbeam and jacking construction,
When single crossbeam 70 is larger by jacking force, the jacking force can be transmitted on entire support body by position-limited rack, be utilized
Entire support body resists shearing force, and support frame is avoided to collapse because of local deformation.
Further, also referring to Fig. 1 to Fig. 4, add as undercrossing tunnel frame core-tube system route provided by the utility model
Gu a kind of specific embodiment of disk button support frame, position-limited rack 30 be equipped with top plate 31, top plate be equipped with for crossbeam 70
First card slot 32 of clamping.
Further, also referring to Fig. 1 to Fig. 4, add as undercrossing tunnel frame core-tube system route provided by the utility model
Gu a kind of specific embodiment of disk button support frame, bracket 20 and/or position-limited rack 30 are equipped with the U for connecting with crossbeam 70
Shape bolt assembly 60.It can also be connected using U bolt component 60 between stringer 80 and crossbeam 70.
Further, referring to Fig. 3, as undercrossing tunnel frame core-tube system track strengthening disk button branch provided by the utility model
A kind of specific embodiment of support, bracket 20 and/position-limited rack 30 are equipped with the second card for being clamped with U bolt component 60
Slot 61.
Further, also referring to Fig. 1 to Fig. 4, add as undercrossing tunnel frame core-tube system route provided by the utility model
Gu a kind of specific embodiment of disk button support frame, support body includes: that disk buckles bracket 11, is arranged on working face 90;Bearing
Beam 12 is arranged and buckles 11 top of bracket in disk, for connecting with bracket 20 and position-limited rack 30;Bearing diagonal 13 is arranged on working face,
And it is abutted with the other side of position-limited rack 30.Backbar 12 is vertical with crossbeam 70, and bracket 20 and position-limited rack 30 hang down with backbar 12
It is direct-connected to connect.
Further, referring to Fig. 2, as undercrossing tunnel frame core-tube system track strengthening disk button branch provided by the utility model
A kind of specific embodiment of support, bearing diagonal 13 are equipped with the telescoping mechanism for adjusting 13 length of bearing diagonal.Specifically, it stretches
Contracting mechanism may include the oil cylinder 15 being arranged on bearing diagonal 13.
Further, also referring to Fig. 1 to Fig. 4 as undercrossing tunnel frame core-tube system track strengthening provided by the utility model
A kind of specific embodiment of disk button support frame, bearing diagonal 13 are equipped with jack, and position-limited rack 30 is equipped with for inserting with jack
The plug 33 connect.
Further, also referring to Fig. 1 to Fig. 4, add as undercrossing tunnel frame core-tube system route provided by the utility model
Gu a kind of specific embodiment of disk button support frame, support body further include: stand connection 14, pre-buried work after curing
On face 90, and for buckleing bracket 11 with disk and bearing diagonal 13 is connect.Stand connection can be foundation bolt.
Further, also referring to Fig. 1 to Fig. 4, add as undercrossing tunnel frame core-tube system route provided by the utility model
Gu a kind of specific embodiment of disk button support frame, bracket 20 are fixedly connected with support body 10, position-limited rack 30 and bracket 20 are logical
Cross the connection of split bolt 62.
Also referring to Fig. 1 and Fig. 2, now a kind of large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model is exempted from
Traversing anchoring wire road reinforcing construction process is resisted to be illustrated.The large-span oblique crossing Frame Bridge undercrossing tunnel exempts from that traversing anchoring wire road is resisted to add
Gu construction technology, comprising the following steps:
B, curing face 70 is set on front side of rail 91;
C, support frame is set up on the working face 70 of 91 front side of rail;
D, crossbeam 70 is penetrated between the tie of rail 91 pillow, and the front end of crossbeam 70 is connect with support frame, rear end
Portion is connect with coaster 50;
F, 70 middle part of crossbeam is connect with rail 91, and the rear end of crossbeam 70 is connect with the front end of pulling apparatus 40, it will
Contain 92 with the frame structure to jacking and connect in the rear end of pulling apparatus 40;
G, carry out jacking construction, and with frame structure contain 92 jacking with driving pulling apparatus 40 to keep the straight of rail 91,
The traversing situation of Synchronous rail 91 drives pulling apparatus 40 to retract rail 91 if it is more than preset range that rail 91 is traversing,
Until completing the jacking construction in a stage;
H, step G is repeated until jacking construction is completed.Herein with the front in the direction of jacking.
Large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model exempts to resist traversing anchoring wire road reinforcing construction process, with
The prior art is compared, and is moved stake by will resist and is replaced with the support frame of more convenient construction and cooperate leading for coaster 50 and pulling apparatus 40
It is pulled in jacking construction and avoids track circuit traversing.Due to resisting traversing stake and crown beam without default, cast-in-situ reinforced concrete knot is evaded
The characteristics of structure long construction period, the setting of the fixture components such as support frame sets up, coaster 50 and pulling apparatus 40 only take up extremely short
Time can carry out simultaneously in other work with track strengthening, greatly shorten construction period, reduce construction cost.Meanwhile support frame
The gravity of the rail 91 and train that are mainly transmitted by crossbeam 70, is conducive to the stabilization of holding system, and setting auxiliary is slided again
Vehicle 50 can reduce friction, resistance when jacking construction be reduced, so that can control track more conveniently in jack-in process
Route it is traversing.In addition, all fixture components are all disposed within outside working face, concealed work is few, is more advantageous to quality control
System and on-site maintenance adjustment.
Further, exempt from that traversing anchoring wire road is resisted to add as large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model
Gu a kind of specific embodiment of construction technology, further comprising the steps of:
A, preparation of construction;
E, stringer 80 is set on crossbeam 70 and is connected firmly;
I, stringer 80, pulling apparatus 40, coaster 50, crossbeam 70 and support frame are removed;
Step A is before step B, and step E is between step D and step F, and step I is after step H.
Further, exempt from that traversing anchoring wire road is resisted to add as large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model
Gu a kind of specific embodiment of construction technology, support frame includes: support body 10;Bracket 20 is arranged on support body 10 and uses
In support crossbeam 70;With position-limited rack 30, it is arranged on support body 10 and 30 side of position-limited rack is used for and 70 end abutment of crossbeam.Step
The step of " penetrating crossbeam 70 between the sleeper of rail 91 " in rapid D specifically includes: a digging machine is arranged in the front side of rail 91
Position-limited rack 30 is held out against, crossbeam 70 is penetrated into rail 91 by another digging machine being arranged withstanding one end of crossbeam 70 in the rear side of rail 91
Lower part, until the end of crossbeam 70 is contacted with position-limited rack 30.
Further, exempt from that traversing anchoring wire road is resisted to add as large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model
Gu a kind of specific embodiment of construction technology, support body includes: that disk buckles bracket 11, is arranged on working face 90;Backbar 12,
It is arranged and buckles 11 top of bracket in disk, for is connect with bracket 20 and position-limited rack 30;With bearing diagonal 13, it is arranged on working face, and
It is abutted with the other side of position-limited rack 30;Bearing diagonal 13 is equipped with the telescoping mechanism for adjusting 13 length of bearing diagonal;Bracket 20 with
Support body 10 is fixedly connected, and position-limited rack 30 is connect with bracket 20 by split bolt 62.In step G, it is more than if rail 91 is traversing
Preset range then adjusts pulling apparatus 40, telescoping mechanism and split bolt 62, rail 91 is made to return to original position.
Further, exempt from that traversing anchoring wire road is resisted to add as large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model
Gu a kind of specific embodiment of construction technology, crossbeam 70 is equipped with the rail locating part 72 for abutting with 91 side of rail.
The step of " connecting at 70 middle part of crossbeam with rail 91 " in step F specifically includes: interlayer is set between crossbeam 70 and rail 91,
And it is stoppered with wooden wedge, then pass through rail locating part 72 for 91 side clamping of rail.
Further, exempt from that traversing anchoring wire road is resisted to add as large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model
Gu a kind of specific embodiment of construction technology, in step G, if observe rail 91 it is traversing be more than preset range, and accelerate to drive
Dynamic pulling apparatus 40 pulls rail 91, when the discovery traversing sign not restored of rail 91, then suspends jacking construction, and
Continue that pulling apparatus 40 is driven to retract rail 91, is further continued for carrying out jacking construction.
Specifically, large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model exempts to resist traversing anchoring wire road strengthening construction
A kind of specific embodiment of technique is as follows.
Preparation of construction:
1, frame structure is contained prefabricated, maintenance and is completed, and intensity arrived design requirement;The pile foundation engineerings such as fender pile, support stake are
It completes;The construction of roadbed grouting and reinforcing finishes, through examining bearing capacity to meet the requirements.
2, optical cable, cable are manually verified, and complete move change or poling protection.Apparent safety nameplate is set.
Security protection has worked in place.
3, to rail conditions, gauge, pillow away from, vehicle flowrate, cargo dead-weight, busy idle etc. sufficiently investigated, route adds
Gu scheme and consolidation time it has been determined that and sufficiently linked up with railway department, reach an agreement.
4, track strengthening material, machinery, personnel are in place.Scene carried out safely, confide a technological secret.What track strengthening used
Compliance inspection is carried out after the materials arrivals such as stringer, crossbeam, disk button steel pipe frame, is checked and accepted, it is qualified through detection.
Wear lateral I-steel:
1, crossbeam 70 uses I45 (Type B) I-steel, arranges perpendicular to line direction, is divided between existing line concrete crosstie
0.6m, crossbeam 70 are inserted between existing pillow, and the insertion of crossbeam 70 is using " inserting a method every six " circular insertion.70 spacing frame structure of crossbeam with
It is interior (to insert 5 by 5-0-5 arrangement and stay a hole), it (inserts 2 by 2-0-2 arrangement other than frame structure and stays a hole).I-shaped steel joint uses two
Block 20mm thick steel plate is arranged that M20mm high-strength bolt connects, connector interlaced arrangement, and connector to be avoided to be located at track by clamping plate shape
Underface.
2,70 supporting point of crossbeam in frame structure: end in place is supported on the I-steel at the top of steel pipe support, and jacking end is supported on
Frame structure top surface, between supported with coaster and sheeting caps;Frame structure 70 supporting point of outer crossbeam: it is supported in two sides line protection dowel crown beam
On.
3, penetrating for work steel is divided to two groups from route both ends while being carried out, and is manually opened between existing pillow using " inserting a method every six "
Then slot is inserted into using crane, artificial assistance.Slot bottom is located at track lower outer, buries short sleeper, supports lateral I-steel,
It is separated between I-steel and track using bamboo slab rubber, and urgent with wooden wedge.I-steel is inserted into one, in time later ballast aggregate, smashes
Gu closely knit, can carry out next work steel penetrates construction." the short lumps of wood+angle steel " limiting device is installed on the outside of track.
Set up stringer I-steel:
To increase rigidity and stability, in two sides, road shoulder sets 2 road length stringers altogether, wherein the every Shu Junwei 2 in two sides road shoulder position
× HN900 × 300 × 16 × 28 section longitudinal beams composition.Every beam stringer center tap uses interlaced arrangement form, and work steel connector is adopted
It is arranged with two blocks of 32mm thick steel plates by clamping plate shape, the connection of M30mm high-strength bolt.Stringer is located on crossbeam 70, is hung using crane
Dress, the mode of hand fit are in place, and stringer is connect with crossbeam 70 with U-typed card, and stringer both ends and midfeather use sleeper pile
Support.
Route resists traversing:
1, route holds anti-shifting stake and crown beam to cancel in place, and replacing is disk button steel pipe frame and top I-steel.Route
70 one end of reinforcing crossmember rides over frame structure top surface, and one end rides on the I-steel at the top of steel pipe frame.Disk button steel pipe frame and top work
Word steel carries out diagonal brace reinforcing, plays the role of a support route.
2, stent base carries out concrete hardening.Bracket is set up, and 6 rows are laterally arranged in frame body, and longitudinal length is the same as track strengthening width
Unanimously, lateral, longitudinal pitch is 0.6 meter, is highly calculated downwards by lateral I-steel, and deducting I-steel height is frame body height
Degree, cloth is away from 1.2 meters.
3, cradle top first places 15 I-shapeds by root in frame body jacking by 0.6 meter of frame body horizontal spacing along jacking direction
Steel.45b I-steel is placed along line direction "-" type in 15 I-steel top surfaces, and front and back setting is two rows of, and high infraversion malposition is made into L-type.
4, after I-steel installs, the crossbeam 70 of track strengthening is fixed on crown beam.Lateral I-steel and crown beam work
Each crosspoint of word steel is respectively adopted two U-typed card connections and is fixed.It is inserted with plank in U-typed card top surface backing plate gap
Tightly.While jacking, there is special messenger to observe the straight situation of crown beam I-steel, the elastic situation of butt joint is checked
And reinforcing.It notes abnormalities, processing in time or pause jacking.
5,5 tons of chain blocks, 20 wirerope are used uniformly every 3 meters of setting anchor bar pull rings in frame structure top plate tail portion
Track strengthening system is tensed, unified command, special messenger commander in jacking, with jacking with tension route.Contain and cross to reduce frame structure
The frictional force of beam 70 places coaster 50 between crossbeam 70 and frame structure contain top plate.
Jacking is tried to examine:
Crossbeam 70, stringer install, and steel pipe support and top I-steel install, and 70 both ends of track strengthening crossbeam are
It is firm to support, and pull ring route tenses, and operator in place, after everything in readiness, carries out examination jacking.While jacking, group
Special messenger's whole process observes the straight situation of track and the straight situation of cradle top I-steel, and rear is commanded to add for individual cucurbits
It is fast or slow down tension speed.Putting the extreme direction before jacking individually when discovery route has dimpling metaboly, illustrates that this cucurbit is drawn
Tight speed is not able to satisfy route and resists traversing requirement, to accelerate speed tension.Whole process, special messenger commander, by adjusting individual hands
The tension speed of cucurbit is drawn to guarantee that route is straight.When discovery is regulated the speed, bending deformation without diminution trend, also be used in a hurry
Intercom notifies the pause jacking of jacking construction backstage, ascertains the reason, again jacking.When carrying out vehicle, jacking is fixed tentatively, road is kept away under worker
Vehicle, the lower support timber wedge of crossbeam 70 are urgent.Each top journey terminates, and will check transverse and longitudinal beam, holder part, it is ensured that do not have
Bending deformation, it is working properly.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model
Protection scope within.
Claims (8)
1. a kind of undercrossing tunnel jacking construction track strengthening assists jacking jigger characterized by comprising
Sliding seat, for being slided on working face;
Supporter is arranged on the sliding seat and for connecting with the one end of crossbeam;With
Limit base is arranged on the supporter and for connecting with the limit of the one end of the crossbeam;
The sliding seat includes:
Pedestal, for being connect with the supporter, and it is internal equipped with cavity;With
Scroll wheel is rotatably arranged in the cavity, and protrudes from the pedestal lower part, for rolling on the working face.
2. undercrossing tunnel jacking construction track strengthening as described in claim 1 assists jacking jigger, it is characterised in that: described
Several scroll wheels being disposed in parallel relation to one another are equipped in cavity.
3. undercrossing tunnel jacking construction track strengthening as described in claim 1 assists jacking jigger, it is characterised in that: described
Cavity is equipped with notch on the side wall on the direction vertical with the rotation axis of the scroll wheel.
4. undercrossing tunnel jacking construction track strengthening as described in claim 1 assists jacking jigger, it is characterised in that: described
Supporter is equipped with the height adjustment mechanism for adjusting the supporter height.
5. undercrossing tunnel jacking construction track strengthening as described in claim 1 assists jacking jigger, it is characterised in that: described
Sliding seat and the supporter are rotatablely connected.
6. undercrossing tunnel jacking construction track strengthening as claimed in claim 5 assists jacking jigger, which is characterized in that described
Sliding seat is equipped with shrinkage pool, and the supporter is equipped with and the protrusion for being placed in the shrinkage pool.
7. undercrossing tunnel jacking construction track strengthening as described in claim 1 assists jacking jigger, which is characterized in that described
Limit base includes:
Bottom plate, lower part is used to connect with the supporter and top is for crossbeam described in support;With
The position that the crossbeam two sides are corresponded on the bottom plate is arranged in limit plate, for limiting to the crossbeam.
8. undercrossing tunnel jacking construction track strengthening as claimed in claim 7 assists jacking jigger, which is characterized in that described
Limit base further include:
Fastener is arranged on the limit plate, and for holding out against the crossbeam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822168710.1U CN209537958U (en) | 2018-12-21 | 2018-12-21 | Undercrossing tunnel jacking construction track strengthening assists jacking jigger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822168710.1U CN209537958U (en) | 2018-12-21 | 2018-12-21 | Undercrossing tunnel jacking construction track strengthening assists jacking jigger |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209537958U true CN209537958U (en) | 2019-10-25 |
Family
ID=68265417
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822168710.1U Expired - Fee Related CN209537958U (en) | 2018-12-21 | 2018-12-21 | Undercrossing tunnel jacking construction track strengthening assists jacking jigger |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209537958U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110939065A (en) * | 2019-12-05 | 2020-03-31 | 中铁二十二局哈尔滨铁路建设集团有限责任公司 | Method for jacking bridge by using temporary steel support auxiliary frame |
CN114318979A (en) * | 2021-12-31 | 2022-04-12 | 中铁六局集团石家庄铁路建设有限公司 | Automatic pulling-through system and method for reinforcing I-steel of jacking line of frame-structured bridge |
-
2018
- 2018-12-21 CN CN201822168710.1U patent/CN209537958U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110939065A (en) * | 2019-12-05 | 2020-03-31 | 中铁二十二局哈尔滨铁路建设集团有限责任公司 | Method for jacking bridge by using temporary steel support auxiliary frame |
CN110939065B (en) * | 2019-12-05 | 2021-12-17 | 中铁二十二局哈尔滨铁路建设集团有限责任公司 | Method for jacking bridge by using temporary steel support auxiliary frame |
CN114318979A (en) * | 2021-12-31 | 2022-04-12 | 中铁六局集团石家庄铁路建设有限公司 | Automatic pulling-through system and method for reinforcing I-steel of jacking line of frame-structured bridge |
CN114318979B (en) * | 2021-12-31 | 2023-08-18 | 中铁六局集团石家庄铁路建设有限公司 | Automatic penetrating and pulling system and method for frame bridge jacking line reinforcement I-steel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106702910B (en) | A kind of main girder construction technique of the double rope face low-pylon cable-stayed bridges of double tower | |
CN101230785B (en) | Construction method for large section and multiple sections tunnel lining | |
CN109944170A (en) | Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method | |
CN102979041B (en) | Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway | |
CN105421248B (en) | Large-Span Continuous girder span building up station turns and closure construction method | |
CN109505200A (en) | Large-span oblique crossing Frame Bridge undercrossing tunnel exempts to resist traversing anchoring wire road reinforcing construction process | |
CN209537958U (en) | Undercrossing tunnel jacking construction track strengthening assists jacking jigger | |
CN206722852U (en) | A kind of mobile inverted arch trestle of growing up for carrying inverted arch template | |
CN100464026C (en) | Girder-exchange construction method for existing railway bridge by successively incremeantal launching framework process | |
CN107905114B (en) | A kind of construction method of large span Successive interference cancellation | |
CN107620261B (en) | Based on the horizontal existing railway track reinforcement means for holding formula just beam | |
CN107905124B (en) | A kind of symmetrical expression rigid frame-continuous girder construction technology | |
CN106979021B (en) | Large-section loess tunnel excavates and preliminary bracing quick closure cyclization method | |
CN101831888B (en) | 1200 tonner water conservancy aqueduct transportation and erection equipment | |
CN103485288A (en) | Construction process of double-layer jacking culvert penetrating through existing railway lines | |
CN110453613A (en) | A kind of cantilever method construction of Large span girder bridge box beam tunneling boring | |
CN109235265A (en) | System for track girder of constructing | |
CN110409319A (en) | A kind of cast-in-place floorings bracket of large span steel reinforced concrete combination beam and construction method | |
CN209537947U (en) | Large-span oblique crossing Frame Bridge undercrossing tunnel exempts to resist traversing anchoring wire road hardened system | |
CN202991063U (en) | Large-section tunnel hydraulic trolley | |
CN111270616A (en) | Off-line construction and capping beam jacking system and construction method for lower structure of temporary bridge of railway | |
CN206409242U (en) | Tunnel double-lining formwork jumbo | |
CN110258217A (en) | The horizontal lift beam overhead transmission line construction method of prestressing force | |
CN209537948U (en) | A kind of undercrossing tunnel frame core-tube system track strengthening disk button support frame | |
CN111042003A (en) | Construction method of cable-stayed bridge concrete beam combined hanging basket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191025 |