CN209537948U - A kind of undercrossing tunnel frame core-tube system track strengthening disk button support frame - Google Patents

A kind of undercrossing tunnel frame core-tube system track strengthening disk button support frame Download PDF

Info

Publication number
CN209537948U
CN209537948U CN201822168886.7U CN201822168886U CN209537948U CN 209537948 U CN209537948 U CN 209537948U CN 201822168886 U CN201822168886 U CN 201822168886U CN 209537948 U CN209537948 U CN 209537948U
Authority
CN
China
Prior art keywords
frame
crossbeam
limited rack
bracket
tube system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822168886.7U
Other languages
Chinese (zh)
Inventor
郎志军
王光辉
乔海洋
邓磊
王君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201822168886.7U priority Critical patent/CN209537948U/en
Application granted granted Critical
Publication of CN209537948U publication Critical patent/CN209537948U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of undercrossing tunnel frame core-tube system track strengthening disk button support frame, belong to road and bridge construction tooling technical field, including support body, is arranged on support body and for the bracket of support crossbeam and on support body and position-limited rack side is set for the position-limited rack that abuts with beam-end.The utility model provided by the utility model passes through the cooperation of support body, bracket and position-limited rack, so that during crossbeam inserting process and jacking construction, crossbeam can be abutted directly with position-limited rack, when single crossbeam is larger by jacking force, the jacking force can be transmitted on entire support body by position-limited rack, shearing force is resisted using entire support body, support frame is avoided to collapse because of local deformation.

Description

A kind of undercrossing tunnel frame core-tube system track strengthening disk button support frame
Technical field
The utility model belongs to road and bridge construction tooling technical field, is to be related to a kind of undercrossing tunnel frame structure more specifically Bridge track strengthening disk button support frame.
Background technique
Currently, flourishing with China's highway, newly-built highway intersects with existing railway route and can not keep away Exempt from, undercrossing tunnel frame core-tube system jacking construction is also applied more and more extensive.Before jacking construction, existing railway is added Gu track strengthening common practice be cooperated using H profile steel stringer the vertical I-shaped gooseneck for choosing method arrangement of horizontal lift and fender pile, Stake, anti-shifting stake is supported to form track strengthening system, to prevent railroad track from transverse shifting occurs.Anti- shifting stake is located at jacking side in place To, it is parallel with existing line, it is arranged in a straight line against existing line.Railroad rail is added using the vertical method of choosing of the horizontal lift of girder steel in length and breadth Though crossbeam is connect with anti-shifting stake later, stringer is used for reinforcing crossmember.
The core of this mode is to set anti-shifting stake in advance, but the anti-pile period for moving stake and construction cost compare Height, and after jacking construction, anti-shifting stake just loses effect, so that abandoned, causes the waste of resource.Therefore practical Novel people devises the novel large-span oblique crossing Frame Bridge undercrossing tunnel of one kind and exempts to resist traversing anchoring wire road hardened system, passes through support Frame substitutes anti-shifting stake.But if be neither easily installed and construct as support frame using existing scaffold, and it is easy to cause During crossbeam inserting process and jacking construction, supporting frame is easy local deformation and causes to collapse.
Utility model content
The purpose of this utility model is to provide a kind of undercrossing tunnel frame core-tube system track strengthening disk button support frames, have energy Enough while bearing gravity and shearing force and being not easy the characteristics of collapsing.
In order to achieve the above purposes, the technical solution adopted by the utility model is: provides a kind of undercrossing tunnel frame core-tube system route Reinforce disk button support frame, comprising: support body;Bracket is arranged on support body and is used for support crossbeam;Position-limited rack, setting exist On support body and position-limited rack side with beam-end for abutting.
Further, in undercrossing tunnel frame core-tube system track strengthening disk button support frame above-mentioned, position-limited rack is equipped with top plate, Top plate is equipped with the first card slot for being clamped with crossbeam.
Further, in undercrossing tunnel frame core-tube system track strengthening disk button support frame above-mentioned, on bracket and/or position-limited rack Equipped with the U bolt component for being connect with crossbeam.
Further, it in undercrossing tunnel frame core-tube system track strengthening disk button support frame above-mentioned, is set on bracket and/position-limited rack There is the second card slot for being clamped with U bolt component.
Further, in undercrossing tunnel frame core-tube system track strengthening disk button support frame above-mentioned, support body includes: that disk buckles branch Frame is arranged on working face;Backbar is arranged and buckles frame upper in disk, for connecting with bracket and position-limited rack;Bearing diagonal, if It sets on working face, and is abutted with the other side of position-limited rack.
Further, in undercrossing tunnel frame core-tube system track strengthening disk button support frame above-mentioned, bearing diagonal is equipped with and is used for Adjust the telescoping mechanism of bearing diagonal length.
Further, in undercrossing tunnel frame core-tube system track strengthening disk button support frame above-mentioned, telescoping mechanism includes setting Oil cylinder on bearing diagonal.
Further, in undercrossing tunnel frame core-tube system track strengthening disk button support frame above-mentioned, bearing diagonal is equipped with jack, Position-limited rack is equipped with for the plug with jack grafting.
Further, in undercrossing tunnel frame core-tube system track strengthening disk button support frame above-mentioned, support body further include: bracket Connector, on pre-buried working face after curing, and for buckleing bracket with disk and bearing diagonal is connect.
Further, in undercrossing tunnel frame core-tube system track strengthening disk button support frame above-mentioned, bracket is fixed with support body Connection, position-limited rack are connect with bracket by split bolt.
The beneficial effect of undercrossing tunnel frame core-tube system track strengthening disk button support frame provided by the utility model is: with it is existing There is technology to compare, the utility model passes through the cooperation of support body, bracket and position-limited rack, so that applying in crossbeam inserting process and jacking During work, crossbeam can be abutted directly with position-limited rack, when single crossbeam is larger by jacking force, can be incited somebody to action by position-limited rack The jacking force is transmitted on entire support body, resists shearing force using entire support body, support frame is avoided to collapse because of local deformation It collapses.
Detailed description of the invention
It, below will be to embodiment or the prior art in order to illustrate more clearly of the technical scheme in the embodiment of the utility model Attached drawing needed in description is briefly described, it should be apparent that, the accompanying drawings in the following description is only that this is practical new Some embodiments of type for those of ordinary skill in the art without any creative labor, can be with It obtains other drawings based on these drawings.
Fig. 1 is that the large-span oblique crossing Frame Bridge undercrossing tunnel of the utility model embodiment application exempts to resist traversing stake track strengthening The overlooking structure diagram of system;
Fig. 2 is that the large-span oblique crossing Frame Bridge undercrossing tunnel of the utility model embodiment application exempts to resist traversing stake track strengthening The schematic view of the front view of system;
Fig. 3 is partial enlargement structural representation at I in Fig. 1;
Fig. 4 is partial enlargement structural representation at II in Fig. 2;
Fig. 5 is partial enlargement structural representation at III in Fig. 1;
Fig. 6 is partial enlargement structural representation at IV in Fig. 2;
Fig. 7 is the side structure schematic view at coaster position;
Fig. 8 is that the large-span oblique crossing Frame Bridge undercrossing tunnel of the utility model another kind embodiment application exempts to resist traversing anchoring wire The schematic view of the front view of road hardened system;
Fig. 9 is that the large-span oblique crossing Frame Bridge undercrossing tunnel of the utility model another kind embodiment application exempts to resist traversing anchoring wire The side structure schematic view of road hardened system.
Wherein, each appended drawing reference in figure:
10- support body;
11- disk buckles bracket;12- backbar;13- bearing diagonal;14- stand connection;15- oil cylinder;
20- bracket;
30- position-limited rack;31- top plate;The first card slot of 32-;33- plug;
40- pulling apparatus;41- embedded fixing component;42- drawstring;43- chain block;
50- coaster;
51- sliding seat;511- pedestal;512- scroll wheel;513- notch;514- shrinkage pool;515- protrusion;
52- supporter;
53- limit base;531- bottom plate;532- limit plate;533- fastener;
60-U shape bolt assembly;The second card slot of 61-;62- split bolt;
70- crossbeam;71- drawstring hole;72- rail locating part;
80- stringer;
90- working face;91- rail;92- frame structure is contained;93- jacking mechanism.
Specific embodiment
In order to which technical problem to be solved in the utility model, technical solution and beneficial effect is more clearly understood, with Lower combination accompanying drawings and embodiments, the present invention will be further described in detail.It should be appreciated that specific reality described herein Example is applied only to explain the utility model, is not used to limit the utility model.
Also referring to Fig. 1 and Fig. 2 and Fig. 8 and Fig. 9, now to a kind of large-span oblique crossing Frame Bridge provided by the utility model Undercrossing tunnel exempts from that traversing anchoring wire road hardened system is resisted to be illustrated.The large-span oblique crossing Frame Bridge undercrossing tunnel exempts to resist traversing stake Track strengthening system, including crossbeam 70 between the sleeper for being threaded through rail 91 and are used for support rail 91;Support body 10, One end of crossbeam 70 is set;Bracket 20 is arranged on support body 10 and is used for support crossbeam 70;Position-limited rack 30, setting are being propped up On frame body 10 and 30 side of position-limited rack is used for and 70 end abutment of crossbeam;Pulling apparatus 40 is connect with the other end of crossbeam 70, and For being pulled to crossbeam 70;It with coaster 50, connect, and is used for 70 other end of crossbeam (one end i.e. far from support body 10) It is slided on working face 90.
Large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model exempts to resist traversing anchoring wire road hardened system, and existing Technology is compared, and by the setting of support body 10, bracket 20, position-limited rack 30, pulling apparatus 40 and coaster 50, is resisted instead of traditional Stake is moved, track can be avoided by the traction action for shoring effect and pulling apparatus 40 of position-limited rack 30 when carrying out jacking construction Circuit traversing, since without presetting anti-shifting stake, cast-in-situ reinforced concrete structure is exempted to resist traversing support frame to replace, evaded cast-in-place structural The characteristics of long construction period, shortens the construction cross events with railway, greatly accelerates construction speed, meanwhile, cast in place reinforced bar Concrete structure is replaced by circulation materials such as disk button bracket and I-steel, greatly reduces construction cost.Support frame is mainly by line The rail of road reinforcing crossmember transmitting and the gravity of train, are conducive to the stabilization of holding system, and coaster 50 is arranged again, can subtract Few friction, reduces resistance when jacking construction, so that can control the traversing of track circuit more conveniently in jack-in process. In addition, all fixture components are all disposed within outside working face, concealed work is few, is more advantageous to quality control and on-site maintenance Adjustment.
The utility model is more convenient by using construction, more efficiently exempts to resist traversing stake support frame " disk button bracket+top Stull " forms one kind and exempts to resist traversing anchoring wire road strengthening construction system.Specifically, exempt to resist traversing stake track strengthening, refer specifically to Cancellation resists traversing stake and crown beam, replaces to set up in original position and exempts to resist traversing stake support frame " disk button bracket+top I-shaped Steel stull ", the pre-buried limit pull ring in frame structure top tail portion, pulls route during jacking, avoids track from occurring traversing, sliding simultaneously Vehicle auxiliary, reduces the friction to frame structure top, reduces the resistance of jacking.
Further, also referring to Fig. 1, Fig. 3 and Fig. 5, as large-span oblique crossing Frame Bridge provided by the utility model Undercrossing tunnel exempts from a kind of specific embodiment for resisting traversing anchoring wire road hardened system, and pulling apparatus 40 includes: to be embedded in working face The drawstring 42 and setting that embedded fixing component 41, one end and the connection of crossbeam 70 and the other end on 90 are connect with embedded fixing component 41 exist Chain block 43 on drawstring 42 and for tightening drawstring 42.
Further, also referring to Fig. 1, Fig. 3 and Fig. 5, as large-span oblique crossing Frame Bridge provided by the utility model Undercrossing tunnel exempts from a kind of specific embodiment for resisting traversing anchoring wire road hardened system, 70 one end of crossbeam be equipped with for drawstring 42 The drawstring hole 71 of connection, 71 periphery of drawstring hole are equipped with stiffening plate.
Further, also referring to Fig. 1 and Fig. 2, as being worn under large-span oblique crossing Frame Bridge provided by the utility model Railway exempts from a kind of specific embodiment for resisting traversing anchoring wire road hardened system, and crossbeam 70 is equipped with rail locating part 72, rail limit Position part 72 is abutted with 91 side of rail, in order to push rail 91 mobile using crossbeam 70.Rail locating part 72 and rail 91 it Between can pass through the cushion blocks such as batten.
Also referring to Fig. 1, Fig. 2 and Fig. 5 to Fig. 7, now to a kind of undercrossing tunnel jacking construction provided by the utility model Track strengthening auxiliary jacking jigger (i.e. coaster 50) is illustrated.The undercrossing tunnel jacking construction track strengthening assists jacking Jigger including the sliding seat 51 for sliding on working face 90 and is arranged on sliding seat 51 and for one with crossbeam 70 The supporter 52 of end connection.
Undercrossing tunnel jacking construction track strengthening provided by the utility model assists jacking jigger, with prior art phase Than crossbeam 80 is propped up by supporter 52, separates crossbeam 80 and rail 91 with lower box structure, sliding seat 51 is recycled to make cross One end of beam 80 can be slided, and replace sliding friction by rolling friction, can reduce crossbeam and rail and lower box structure contain or It rubs between the soil body, convenient for other constructing operations such as drawings.
Further, also referring to Fig. 5 to Fig. 7, as undercrossing tunnel jacking construction route provided by the utility model A kind of specific embodiment of auxiliary jacking jigger is reinforced, sliding seat 51 includes: pedestal 511, for being connect with supporter 52, And it is internal equipped with cavity;It with scroll wheel 512, is rotatably arranged in cavity, and protrudes from 511 lower part of pedestal, in working face It is rolled on 90.
Further, referring to Figure 6 together and Fig. 7, as undercrossing tunnel jacking construction route provided by the utility model A kind of specific embodiment of auxiliary jacking jigger is reinforced, is equipped with several scroll wheels 512 being disposed in parallel relation to one another in cavity.
Further, referring to Fig. 7, as undercrossing tunnel jacking construction track strengthening auxiliary top provided by the utility model Into a kind of specific embodiment of jigger, cavity is equipped on the side wall on the direction vertical with the rotation axis of scroll wheel 512 Notch 513.
Further, referring to Fig. 7, as undercrossing tunnel jacking construction track strengthening auxiliary top provided by the utility model Into a kind of specific embodiment of jigger, supporter 52 is equipped with the height adjustment mechanism for adjusting 52 height of supporter. Supporter 52 includes jack or several cushion blocks successively stacked.
Further, referring to Figure 6 together and Fig. 7, as undercrossing tunnel jacking construction route provided by the utility model A kind of specific embodiment of auxiliary jacking jigger is reinforced, sliding seat 51 and supporter 52 are rotatablely connected.Specifically, sliding seat 51 are equipped with shrinkage pool 514, and supporter 52 is equipped with and the protrusion 515 for being placed in shrinkage pool.
Further, also referring to Fig. 1, Fig. 2 and Fig. 5 to Fig. 7, as undercrossing tunnel jacking provided by the utility model Construction line reinforces a kind of specific embodiment of auxiliary jacking jigger, further includes: limit base 53 is arranged on supporter 52 And it is connected for being limited with the one end of crossbeam 70.
Further, also referring to Fig. 5 to Fig. 7, as undercrossing tunnel jacking construction route provided by the utility model A kind of specific embodiment of auxiliary jacking jigger is reinforced, limit base 53 includes: bottom plate 531, and lower part is used for and supporter 52 It connects and top is used for support crossbeam 70;With limit plate 532, the position that 70 two sides of crossbeam are corresponded on bottom plate 531 is set, is used for Crossbeam 70 is limited.
Further, also referring to Fig. 5 to Fig. 7, as undercrossing tunnel jacking construction route provided by the utility model Reinforce a kind of specific embodiment of auxiliary jacking jigger, limit base 53 further include: fastener 533 is arranged in limit plate 532 On, and for holding out against crossbeam 70.
Further, also referring to Fig. 5 to Fig. 7, as being worn under large-span oblique crossing Frame Bridge provided by the utility model Railway exempts from a kind of specific embodiment for resisting traversing anchoring wire road hardened system, and limit base 53 includes: bottom plate 531, lower part be used for Supporter 52 connects and top is used for support crossbeam 70;The portion that 70 two sides of crossbeam are corresponded on bottom plate 531 is arranged in limit plate 532 Position, for being limited to crossbeam 70;With fastener 533, it is arranged on limit plate 532, and for holding out against crossbeam 70.
Also referring to Fig. 1 to Fig. 4, now a kind of undercrossing tunnel frame core-tube system track strengthening disk provided by the utility model is buckled Formula support frame (i.e. support frame) is illustrated.The undercrossing tunnel frame core-tube system track strengthening disk button support frame, including support body, Bracket on support body and for support crossbeam is set and setting is on support body and position-limited rack side is used for and beam-end The position-limited rack of abutting.
Undercrossing tunnel frame core-tube system track strengthening disk button support frame provided by the utility model, by support body, bracket and The cooperation of position-limited rack, so that crossbeam 70 can be abutted directly with position-limited rack during 70 inserting process of crossbeam and jacking construction, When single crossbeam 70 is larger by jacking force, the jacking force can be transmitted on entire support body by position-limited rack, be utilized Entire support body resists shearing force, and support frame is avoided to collapse because of local deformation.
Further, also referring to Fig. 1 to Fig. 4, add as undercrossing tunnel frame core-tube system route provided by the utility model Gu a kind of specific embodiment of disk button support frame, position-limited rack 30 be equipped with top plate 31, top plate be equipped with for crossbeam 70 First card slot 32 of clamping.
Further, also referring to Fig. 1 to Fig. 4, add as undercrossing tunnel frame core-tube system route provided by the utility model Gu a kind of specific embodiment of disk button support frame, bracket 20 and/or position-limited rack 30 are equipped with the U for connecting with crossbeam 70 Shape bolt assembly 60.It can also be connected using U bolt component 60 between stringer 80 and crossbeam 70.
Further, referring to Fig. 3, as undercrossing tunnel frame core-tube system track strengthening disk button branch provided by the utility model A kind of specific embodiment of support, bracket 20 and/position-limited rack 30 are equipped with the second card for being clamped with U bolt component 60 Slot 61.
Further, also referring to Fig. 1 to Fig. 4, add as undercrossing tunnel frame core-tube system route provided by the utility model Gu a kind of specific embodiment of disk button support frame, support body includes: that disk buckles bracket 11, is arranged on working face 90;Bearing Beam 12 is arranged and buckles 11 top of bracket in disk, for connecting with bracket 20 and position-limited rack 30;Bearing diagonal 13 is arranged on working face, And it is abutted with the other side of position-limited rack 30.Backbar 12 is vertical with crossbeam 70, and bracket 20 and position-limited rack 30 hang down with backbar 12 It is direct-connected to connect.
Further, referring to Fig. 2, as undercrossing tunnel frame core-tube system track strengthening disk button branch provided by the utility model A kind of specific embodiment of support, bearing diagonal 13 are equipped with the telescoping mechanism for adjusting 13 length of bearing diagonal.Specifically, it stretches Contracting mechanism may include the oil cylinder 15 being arranged on bearing diagonal 13.
Further, also referring to Fig. 1 to Fig. 4 as undercrossing tunnel frame core-tube system track strengthening provided by the utility model A kind of specific embodiment of disk button support frame, bearing diagonal 13 are equipped with jack, and position-limited rack 30 is equipped with for inserting with jack The plug 33 connect.
Further, also referring to Fig. 1 to Fig. 4, add as undercrossing tunnel frame core-tube system route provided by the utility model Gu a kind of specific embodiment of disk button support frame, support body further include: stand connection 14, pre-buried work after curing On face 90, and for buckleing bracket 11 with disk and bearing diagonal 13 is connect.Stand connection can be foundation bolt.
Further, also referring to Fig. 1 to Fig. 4, add as undercrossing tunnel frame core-tube system route provided by the utility model Gu a kind of specific embodiment of disk button support frame, bracket 20 are fixedly connected with support body 10, position-limited rack 30 and bracket 20 are logical Cross the connection of split bolt 62.
Also referring to Fig. 1 and Fig. 2, now a kind of large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model is exempted from Traversing anchoring wire road reinforcing construction process is resisted to be illustrated.The large-span oblique crossing Frame Bridge undercrossing tunnel exempts from that traversing anchoring wire road is resisted to add Gu construction technology, comprising the following steps:
B, curing face 70 is set on front side of rail 91;
C, support frame is set up on the working face 70 of 91 front side of rail;
D, crossbeam 70 is penetrated between the tie of rail 91 pillow, and the front end of crossbeam 70 is connect with support frame, rear end Portion is connect with coaster 50;
F, 70 middle part of crossbeam is connect with rail 91, and the rear end of crossbeam 70 is connect with the front end of pulling apparatus 40, it will Contain 92 with the frame structure to jacking and connect in the rear end of pulling apparatus 40;
G, carry out jacking construction, and with frame structure contain 92 jacking with driving pulling apparatus 40 to keep the straight of rail 91, The traversing situation of Synchronous rail 91 drives pulling apparatus 40 to retract rail 91 if it is more than preset range that rail 91 is traversing, Until completing the jacking construction in a stage;
H, step G is repeated until jacking construction is completed.Herein with the front in the direction of jacking.
Large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model exempts to resist traversing anchoring wire road reinforcing construction process, with The prior art is compared, and is moved stake by will resist and is replaced with the support frame of more convenient construction and cooperate leading for coaster 50 and pulling apparatus 40 It is pulled in jacking construction and avoids track circuit traversing.Due to resisting traversing stake and crown beam without default, cast-in-situ reinforced concrete knot is evaded The characteristics of structure long construction period, the setting of the fixture components such as support frame sets up, coaster 50 and pulling apparatus 40 only take up extremely short Time can carry out simultaneously in other work with track strengthening, greatly shorten construction period, reduce construction cost.Meanwhile support frame The gravity of the rail 91 and train that are mainly transmitted by crossbeam 70, is conducive to the stabilization of holding system, and setting auxiliary is slided again Vehicle 50 can reduce friction, resistance when jacking construction be reduced, so that can control track more conveniently in jack-in process Route it is traversing.In addition, all fixture components are all disposed within outside working face, concealed work is few, is more advantageous to quality control System and on-site maintenance adjustment.
Further, exempt from that traversing anchoring wire road is resisted to add as large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model Gu a kind of specific embodiment of construction technology, further comprising the steps of:
A, preparation of construction;
E, stringer 80 is set on crossbeam 70 and is connected firmly;
I, stringer 80, pulling apparatus 40, coaster 50, crossbeam 70 and support frame are removed;
Step A is before step B, and step E is between step D and step F, and step I is after step H.
Further, exempt from that traversing anchoring wire road is resisted to add as large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model Gu a kind of specific embodiment of construction technology, support frame includes: support body 10;Bracket 20 is arranged on support body 10 and uses In support crossbeam 70;With position-limited rack 30, it is arranged on support body 10 and 30 side of position-limited rack is used for and 70 end abutment of crossbeam.Step The step of " penetrating crossbeam 70 between the sleeper of rail 91 " in rapid D specifically includes: a digging machine is arranged in the front side of rail 91 Position-limited rack 30 is held out against, crossbeam 70 is penetrated into rail 91 by another digging machine being arranged withstanding one end of crossbeam 70 in the rear side of rail 91 Lower part, until the end of crossbeam 70 is contacted with position-limited rack 30.
Further, exempt from that traversing anchoring wire road is resisted to add as large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model Gu a kind of specific embodiment of construction technology, support body includes: that disk buckles bracket 11, is arranged on working face 90;Backbar 12, It is arranged and buckles 11 top of bracket in disk, for is connect with bracket 20 and position-limited rack 30;With bearing diagonal 13, it is arranged on working face, and It is abutted with the other side of position-limited rack 30;Bearing diagonal 13 is equipped with the telescoping mechanism for adjusting 13 length of bearing diagonal;Bracket 20 with Support body 10 is fixedly connected, and position-limited rack 30 is connect with bracket 20 by split bolt 62.In step G, it is more than if rail 91 is traversing Preset range then adjusts pulling apparatus 40, telescoping mechanism and split bolt 62, rail 91 is made to return to original position.
Further, exempt from that traversing anchoring wire road is resisted to add as large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model Gu a kind of specific embodiment of construction technology, crossbeam 70 is equipped with the rail locating part 72 for abutting with 91 side of rail. The step of " connecting at 70 middle part of crossbeam with rail 91 " in step F specifically includes: interlayer is set between crossbeam 70 and rail 91, And it is stoppered with wooden wedge, then pass through rail locating part 72 for 91 side clamping of rail.
Further, exempt from that traversing anchoring wire road is resisted to add as large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model Gu a kind of specific embodiment of construction technology, in step G, if observe rail 91 it is traversing be more than preset range, and accelerate to drive Dynamic pulling apparatus 40 pulls rail 91, when the discovery traversing sign not restored of rail 91, then suspends jacking construction, and Continue that pulling apparatus 40 is driven to retract rail 91, is further continued for carrying out jacking construction.
Specifically, large-span oblique crossing Frame Bridge undercrossing tunnel provided by the utility model exempts to resist traversing anchoring wire road strengthening construction A kind of specific embodiment of technique is as follows.
Preparation of construction:
1, frame structure is contained prefabricated, maintenance and is completed, and intensity arrived design requirement;The pile foundation engineerings such as fender pile, support stake are It completes;The construction of roadbed grouting and reinforcing finishes, through examining bearing capacity to meet the requirements.
2, optical cable, cable are manually verified, and complete move change or poling protection.Apparent safety nameplate is set. Security protection has worked in place.
3, to rail conditions, gauge, pillow away from, vehicle flowrate, cargo dead-weight, busy idle etc. sufficiently investigated, route adds Gu scheme and consolidation time it has been determined that and sufficiently linked up with railway department, reach an agreement.
4, track strengthening material, machinery, personnel are in place.Scene carried out safely, confide a technological secret.What track strengthening used Compliance inspection is carried out after the materials arrivals such as stringer, crossbeam, disk button steel pipe frame, is checked and accepted, it is qualified through detection.
Wear lateral I-steel:
1, crossbeam 70 uses I45 (Type B) I-steel, arranges perpendicular to line direction, is divided between existing line concrete crosstie 0.6m, crossbeam 70 are inserted between existing pillow, and the insertion of crossbeam 70 is using " inserting a method every six " circular insertion.70 spacing frame structure of crossbeam with It is interior (to insert 5 by 5-0-5 arrangement and stay a hole), it (inserts 2 by 2-0-2 arrangement other than frame structure and stays a hole).I-shaped steel joint uses two Block 20mm thick steel plate is arranged that M20mm high-strength bolt connects, connector interlaced arrangement, and connector to be avoided to be located at track by clamping plate shape Underface.
2,70 supporting point of crossbeam in frame structure: end in place is supported on the I-steel at the top of steel pipe support, and jacking end is supported on Frame structure top surface, between supported with coaster and sheeting caps;Frame structure 70 supporting point of outer crossbeam: it is supported in two sides line protection dowel crown beam On.
3, penetrating for work steel is divided to two groups from route both ends while being carried out, and is manually opened between existing pillow using " inserting a method every six " Then slot is inserted into using crane, artificial assistance.Slot bottom is located at track lower outer, buries short sleeper, supports lateral I-steel, It is separated between I-steel and track using bamboo slab rubber, and urgent with wooden wedge.I-steel is inserted into one, in time later ballast aggregate, smashes Gu closely knit, can carry out next work steel penetrates construction." the short lumps of wood+angle steel " limiting device is installed on the outside of track.
Set up stringer I-steel:
To increase rigidity and stability, in two sides, road shoulder sets 2 road length stringers altogether, wherein the every Shu Junwei 2 in two sides road shoulder position × HN900 × 300 × 16 × 28 section longitudinal beams composition.Every beam stringer center tap uses interlaced arrangement form, and work steel connector is adopted It is arranged with two blocks of 32mm thick steel plates by clamping plate shape, the connection of M30mm high-strength bolt.Stringer is located on crossbeam 70, is hung using crane Dress, the mode of hand fit are in place, and stringer is connect with crossbeam 70 with U-typed card, and stringer both ends and midfeather use sleeper pile Support.
Route resists traversing:
1, route holds anti-shifting stake and crown beam to cancel in place, and replacing is disk button steel pipe frame and top I-steel.Route 70 one end of reinforcing crossmember rides over frame structure top surface, and one end rides on the I-steel at the top of steel pipe frame.Disk button steel pipe frame and top work Word steel carries out diagonal brace reinforcing, plays the role of a support route.
2, stent base carries out concrete hardening.Bracket is set up, and 6 rows are laterally arranged in frame body, and longitudinal length is the same as track strengthening width Unanimously, lateral, longitudinal pitch is 0.6 meter, is highly calculated downwards by lateral I-steel, and deducting I-steel height is frame body height Degree, cloth is away from 1.2 meters.
3, cradle top first places 15 I-shapeds by root in frame body jacking by 0.6 meter of frame body horizontal spacing along jacking direction Steel.45b I-steel is placed along line direction "-" type in 15 I-steel top surfaces, and front and back setting is two rows of, and high infraversion malposition is made into L-type.
4, after I-steel installs, the crossbeam 70 of track strengthening is fixed on crown beam.Lateral I-steel and crown beam work Each crosspoint of word steel is respectively adopted two U-typed card connections and is fixed.It is inserted with plank in U-typed card top surface backing plate gap Tightly.While jacking, there is special messenger to observe the straight situation of crown beam I-steel, the elastic situation of butt joint is checked And reinforcing.It notes abnormalities, processing in time or pause jacking.
5,5 tons of chain blocks, 20 wirerope are used uniformly every 3 meters of setting anchor bar pull rings in frame structure top plate tail portion Track strengthening system is tensed, unified command, special messenger commander in jacking, with jacking with tension route.Contain and cross to reduce frame structure The frictional force of beam 70 places coaster 50 between crossbeam 70 and frame structure contain top plate.
Jacking is tried to examine:
Crossbeam 70, stringer install, and steel pipe support and top I-steel install, and 70 both ends of track strengthening crossbeam are It is firm to support, and pull ring route tenses, and operator in place, after everything in readiness, carries out examination jacking.While jacking, group Special messenger's whole process observes the straight situation of track and the straight situation of cradle top I-steel, and rear is commanded to add for individual cucurbits It is fast or slow down tension speed.Putting the extreme direction before jacking individually when discovery route has dimpling metaboly, illustrates that this cucurbit is drawn Tight speed is not able to satisfy route and resists traversing requirement, to accelerate speed tension.Whole process, special messenger commander, by adjusting individual hands The tension speed of cucurbit is drawn to guarantee that route is straight.When discovery is regulated the speed, bending deformation without diminution trend, also be used in a hurry Intercom notifies the pause jacking of jacking construction backstage, ascertains the reason, again jacking.When carrying out vehicle, jacking is fixed tentatively, road is kept away under worker Vehicle, the lower support timber wedge of crossbeam 70 are urgent.Each top journey terminates, and will check transverse and longitudinal beam, holder part, it is ensured that do not have Bending deformation, it is working properly.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model Protection scope within.

Claims (10)

1. a kind of undercrossing tunnel frame core-tube system track strengthening disk button support frame characterized by comprising
Support body;
Bracket is arranged on the support body and is used for support crossbeam;With
Position-limited rack, is arranged on the support body and the position-limited rack side with the beam-end for abutting.
2. undercrossing tunnel frame core-tube system track strengthening disk button support frame as described in claim 1, it is characterised in that: the limit Frame is equipped with top plate, and the top plate is equipped with the first card slot for being clamped with the crossbeam.
3. undercrossing tunnel frame core-tube system track strengthening disk button support frame as claimed in claim 1 or 2, it is characterised in that: described Bracket and/or the position-limited rack are equipped with the U bolt component for connecting with the crossbeam.
4. undercrossing tunnel frame core-tube system track strengthening disk button support frame as claimed in claim 3, it is characterised in that: the bracket The second card slot for being clamped with the U bolt component is equipped with/the position-limited rack.
5. undercrossing tunnel frame core-tube system track strengthening disk button support frame as described in claim 1, which is characterized in that the bracket Body includes:
Disk buckles bracket, is arranged on working face;
Backbar is arranged and buckles frame upper in the disk, for connecting with the bracket and the position-limited rack;With
Bearing diagonal, setting abut on the working face, and with the other side of the position-limited rack.
6. undercrossing tunnel frame core-tube system track strengthening disk button support frame as claimed in claim 5, it is characterised in that: the oblique branch Support is equipped with the telescoping mechanism for adjusting the bearing diagonal length.
7. undercrossing tunnel frame core-tube system track strengthening disk button support frame as claimed in claim 6, it is characterised in that: described flexible Mechanism includes the oil cylinder being arranged on the bearing diagonal.
8. undercrossing tunnel frame core-tube system track strengthening disk button support frame as claimed in claim 5, it is characterised in that: the oblique branch Support is equipped with jack, and the position-limited rack is equipped with for the plug with the jack grafting.
9. undercrossing tunnel frame core-tube system track strengthening disk button support frame as claimed in claim 5, it is characterised in that: the bracket Body further include:
Stand connection, on pre-buried working face after curing, and for buckleing bracket with the disk and the bearing diagonal is connect.
10. undercrossing tunnel frame core-tube system track strengthening disk button support frame as described in claim 1, it is characterised in that: the support Frame is fixedly connected with the support body, and the position-limited rack is connect with the bracket by split bolt.
CN201822168886.7U 2018-12-21 2018-12-21 A kind of undercrossing tunnel frame core-tube system track strengthening disk button support frame Expired - Fee Related CN209537948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822168886.7U CN209537948U (en) 2018-12-21 2018-12-21 A kind of undercrossing tunnel frame core-tube system track strengthening disk button support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822168886.7U CN209537948U (en) 2018-12-21 2018-12-21 A kind of undercrossing tunnel frame core-tube system track strengthening disk button support frame

Publications (1)

Publication Number Publication Date
CN209537948U true CN209537948U (en) 2019-10-25

Family

ID=68265472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822168886.7U Expired - Fee Related CN209537948U (en) 2018-12-21 2018-12-21 A kind of undercrossing tunnel frame core-tube system track strengthening disk button support frame

Country Status (1)

Country Link
CN (1) CN209537948U (en)

Similar Documents

Publication Publication Date Title
CN106702910B (en) A kind of main girder construction technique of the double rope face low-pylon cable-stayed bridges of double tower
CN101230785B (en) Construction method for large section and multiple sections tunnel lining
CN105736016B (en) Tunnel double-lining framework of steel reinforcement construction equipment and its application
CN105926669B (en) A kind of Construction Method of Metro Station
CN109944170A (en) Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method
CN100441779C (en) Space-precasting translation-emplacing method for bridge construction
CN102979041B (en) Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway
CN105421248B (en) Large-Span Continuous girder span building up station turns and closure construction method
CN109505200A (en) Large-span oblique crossing Frame Bridge undercrossing tunnel exempts to resist traversing anchoring wire road reinforcing construction process
CN107905114B (en) A kind of construction method of large span Successive interference cancellation
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN111287095A (en) Special construction method for main beam of lower-towing super-large bridge
CN110331668A (en) A kind of back-cable-free cable-stayed bridge inclined in two-way V-shaped bridge tower construction method
CN107620261B (en) Based on the horizontal existing railway track reinforcement means for holding formula just beam
CN209537958U (en) Undercrossing tunnel jacking construction track strengthening assists jacking jigger
CN104480810B (en) Low circuit continuous frame formula support rail girder construction and the construction method thereof of putting of middle low speed magnetic suspension
CN107905111B (en) A kind of rigid frame-continuous girder end bay construction technology
CN110453613A (en) A kind of cantilever method construction of Large span girder bridge box beam tunneling boring
CN110409319A (en) A kind of cast-in-place floorings bracket of large span steel reinforced concrete combination beam and construction method
CN111074795A (en) Construction method for pouring continuous beam in cantilever mode spanning existing railway
CN111807232A (en) Cable crane system and hoisting method
CN110541353A (en) Movable type bent cap pouring support and construction method
CN209537947U (en) Large-span oblique crossing Frame Bridge undercrossing tunnel exempts to resist traversing anchoring wire road hardened system
CN111270616A (en) Off-line construction and capping beam jacking system and construction method for lower structure of temporary bridge of railway
CN209537948U (en) A kind of undercrossing tunnel frame core-tube system track strengthening disk button support frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191025