CN209509155U - A kind of drainage system improving piping lane space utilization - Google Patents

A kind of drainage system improving piping lane space utilization Download PDF

Info

Publication number
CN209509155U
CN209509155U CN201822139197.3U CN201822139197U CN209509155U CN 209509155 U CN209509155 U CN 209509155U CN 201822139197 U CN201822139197 U CN 201822139197U CN 209509155 U CN209509155 U CN 209509155U
Authority
CN
China
Prior art keywords
piping lane
space utilization
water level
catch pit
drainage system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822139197.3U
Other languages
Chinese (zh)
Inventor
王小成
郑勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Institute Of Planning And Design Co Ltd
Original Assignee
Suzhou Institute Of Planning And Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Institute Of Planning And Design Co Ltd filed Critical Suzhou Institute Of Planning And Design Co Ltd
Priority to CN201822139197.3U priority Critical patent/CN209509155U/en
Application granted granted Critical
Publication of CN209509155U publication Critical patent/CN209509155U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of drainage systems for improving piping lane space utilization, are related to piping lane technical field, it is intended to the problem of in the prior art, draining pump and drainpipe in piping lane affect urban duct laying for solution, cause space waste in piping lane.Its key points of the technical solution are that including piping lane ontology, it is provided with catch pit in the piping lane ontology, immersible pump is placed on the catch pit bottom wall, there are two the immersible pump settings, the immersible pump is connected with drainpipe, and the valve body for controlling drainpipe on-off is provided on the drainpipe;The warning device for being provided with water level monitoring device in the catch pit and being connect with water level monitoring device.The utility model has achieved the effect that improve piping lane space utilization rate.

Description

A kind of drainage system improving piping lane space utilization
Technical field
The utility model relates to piping lane technical fields, more particularly, to a kind of drainage system for improving piping lane space utilization.
Background technique
So-called piping lane is exactly " underground urban duct corridor ", i.e., builds a municipal administration below urban road and share tunnel, The various municipal works pipelines such as electric power, communication, water supply and sewage, heat supply are integrated in one, " unified planning, unification are built, uniformly for implementation Management ", to accomplish the comprehensive utilization of the underground space and sharing for resource.
At present in the catch pit technology of pipe gallery, the ponding in pipe gallery from arranging cannot need that catch pit is arranged.Collection The water that puddle is mainly collected is mainly derived from the infiltration of piping lane corridor body, the fragmentary leak of pipeline and various municipal pipeline short time Sewage after interior unwatering and cleaning terrace sprinkling water.Each cabin of each pipe gallery is respectively provided with a catch pit, often A catch pit is connected with dredge pump, for extracting ponding out catch pit.
Referring to Fig.1, in the prior art, it is provided with catch pit 18 in piping lane, is provided with grid 11 on the catch pit 18, The top of the grid 11 is placed with draining pump 6 by the side wall of piping lane, and described 6 one end of draining pump is protruded into catch pit 18, separately One end is connected with drainpipe 13, and the drainpipe 13 is placed along the side wall of piping lane, the described one end of drainpipe 13 far from draining pump 6 The outdoor drainage inspection shaft 61 being connected to outside piping lane.
Prior art among the above has the following deficiencies: due to needing to be laid with a large amount of urban duct in piping lane, is The space in piping lane is made full use of, urban duct needs to be bonded to each other setting as far as possible.But above-mentioned technology draining pump 6 and row The meeting occupied space of water pipe 13, the space close to piping lane side wall can not be laid with pipeline, cause the waste in space in piping lane, the problem Have to be solved.
Utility model content
The purpose of the utility model is to provide a kind of drainage system for improving piping lane space utilization, has and improve piping lane sky Between utilization rate effect.
The purpose of this utility model has the technical scheme that
A kind of drainage system improving piping lane space utilization, including piping lane ontology are provided in the piping lane ontology and catchment It cheats, immersible pump is placed on the catch pit bottom wall, there are two the immersible pump settings, and the immersible pump is connected with drainpipe, The valve body for controlling drainpipe on-off is provided on the drainpipe;Be provided in the catch pit water level monitoring device and with The warning device of water level monitoring device connection.
By using above-mentioned technical proposal, draining pump is changed into immersible pump, so that immersible pump is installed in catch pit, because This be laid with above grid pipeline just will not due to draining pump hinder and wasting space, thus reached raising piping lane space benefit With the effect of rate.Water level monitoring device and warning device play the protective effect to immersible pump, can prevent in catch pit Water level is lower than immersible pump, and immersible pump is caused to can not work normally, to reduce repair rate, reduces maintenance cost.
The utility model is further arranged to: the water level monitoring device includes the low water positioned at catch pit bottom position Position detection needle.
By using above-mentioned technical proposal, low water level detection is analyzed for water level, when low water level detection needle detects When water level, the water level in catch pit is located above low water level;Water when low water level detection needle does not detect water level, in catch pit Position is located at below low water level detection needle.
The utility model is further arranged to: the valve body includes motor-driven valve, low water level detection needle and motor-driven valve Electric Actuator electrical connection.
By using above-mentioned technical proposal, the liquid level in catch pit sensed using low water level detection needle judges water, Control motor-driven valve turns on or off according to the actual situation, pays close attention to water and hand in catch pit in real time without staff Dynamic draining, liberates manpower.
The utility model is further arranged to: the valve body further includes hand-operated valve.
By using above-mentioned technical proposal, hand-operated valve cooperates with motor-driven valve, can cope with emergency case, such as motor-driven valve damage Bad or power failure, to ensure the normal work of piping lane inner water drainage system.
The utility model is further arranged to: including rack, the bottom end of the rack is provided with reinforcing rib.
By using above-mentioned technical proposal, by street illumination cable hub slot, power cable hub slot, communications cable line concentration Slot, feedwater piping, storm sewer, sewage conduct and gas pipeline are placed on rack, to reach easy to assembly reasonable Effect.Reinforcing rib increases the bearing capacity of rack, to improve the structural stability of rack.
The utility model is further arranged to: the rack and reinforcing rib are galvanized steel layer frame.
By using above-mentioned technical proposal, in rack and reinforcing rib external galvanized layer, the anti-of rack and reinforcing rib is improved Corrosive nature, energy effective protection steel layer frame, to extend the service life of rack and reinforcing rib.
The utility model is further arranged to: the catch pit is provided with multiple, and multiple catch pits pass through aqueduct It communicates.
By using above-mentioned technical proposal, catch pit is interconnected, increases the maximum capacity of catch pit, improve simultaneously The adaptibility to response of emergency case.When a pipeline breaking, water increases severely, and immersible pump can not drain ponding in time, at this time water body From aqueduct into the catch pit communicated with the catch pit dredging accumulated water, to effectively drain.
The utility model is further arranged to: the piping lane body interior be provided with for separate piping lane ontology every The width of piping lane ontology is divided into multiple chambers by plate, the partition.
By using above-mentioned technical proposal, multiple separate chambers will be divided into piping lane, when surprisingly occurring, reduce independence Chamber between influence, to improve the stability of piping lane.
In conclusion the advantageous effects of the utility model are as follows:
1. by the setting of immersible pump, to achieve the effect that improve piping lane space utilization rate;
2. the setting of needle is detected by low water level, to achieve the effect that be monitored the water level in catch pit;
3. by the setting of aqueduct, to effectively improve drainage effect.
Detailed description of the invention
Fig. 1 is the overall structure diagram of background technique;
Fig. 2 is the overall structure diagram of the utility model embodiment.
In figure, 1, piping lane ontology;11, grid;12, immersible pump;13, drainpipe;14, low water level detects needle;16, electronic Valve;17, hand-operated valve;18, catch pit;2, warning device;3, rack;31, reinforcing rib;4, aqueduct;5, partition;51, chamber; 6, draining pump;61, outdoor drainage inspection shaft.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Referring to Fig. 2, for a kind of drainage system for improving piping lane space utilization disclosed by the utility model, including piping lane ontology 1, it is provided with multiple partitions 5 in piping lane ontology 1, is arranged side by side between multiple partitions 5 along the width direction of piping lane ontology 1, it will Piping lane ontology 1 is divided into multiple chambers 51.It is respectively equipped with catch pit 18 in each chamber 51, is mainly used for concentrating piping lane ontology 1 Infiltration, the fragmentary leak of pipeline and in the various municipal pipeline short time unwatering and clean terrace sprinkling water after sewage. Aqueduct 4 is provided between the catch pit 18 of adjacent chamber 51, the catch pit 18 of each chamber 51 is connected each other by aqueduct 4 It is logical.When water is larger, aqueduct 4 provides a drainage line, to improve the drainability of catch pit 18.It is catchmenting 18 top of hole is covered with grid 11, for protecting the personnel to walk in piping lane.
Referring to Fig. 2, it is fixed with immersible pump 12 on the bottom wall of catch pit 18, is respectively provided with that there are two divings in each catch pit 18 12 are pumped, is connected with drainpipe 13 on immersible pump 12, the outdoor drainage inspection shaft water in catch pit 18 being delivered to outside piping lane 61.The valve body for controlling 13 on-off of drainpipe is provided on drainpipe 13, valve body includes motor-driven valve 16 and hand-operated valve 17.It catchments Water level monitoring device and the warning device connecting with water level monitoring device 2 are provided on the side wall in hole 18.In the present embodiment, electric Dynamic valve 16 and hand-operated valve 17, which are arranged at, to be drained on the roof of piping lane side wall and grid 11.Warning device 2 is buzzer, Well, on the other hand, staff can find water level monitoring dress by the sound that buzzer issues for the warning of one side buzzer Set abnormal catch pit 18.It changes draining pump 6 into immersible pump 12, so that immersible pump 12 is installed in catch pit 18, therefore increases It can be laid with the space of pipeline above big grid 11, to achieve the effect that improve piping lane space utilization rate.
Referring to Fig. 2, water level monitoring device includes the low water level detection needle 14 positioned at 18 bottom position of catch pit.In this reality It applies in example, 18 depth of catch pit is 1 meter, and low water level detects bottom wall 350mm of the needle 14 apart from catch pit 18.In the present embodiment, The Electric Actuator of buzzer and motor-driven valve 16 detects needle 14 with low water level by PLC and connect.When low water level detects needle 14 to PLC When exporting high level, water level is located at 14 top of low water level detection needle, and the Electric Actuator that PLC controls motor-driven valve 16 is opened.When low When water-level detecting needle 14 exports low level to PLC, water level is located at 14 lower section of low water level detection needle, and PLC controls the electricity of motor-driven valve 16 Dynamic actuator is closed, while PLC control buzzer work.When occur motor-driven valve 16 damage can not close the case where occur when, can To close drainpipe 13 by hand-operated valve 17, buzzer work can play suggesting effect, conveniently find and need to close drainpipe 13 catch pit 18.
Referring to Fig. 2, it is fixed with rack 3 on the side wall of piping lane, by street illumination cable hub slot, power cable line concentration Slot, communications cable hub slot, feedwater piping, storm sewer, sewage conduct and gas pipeline are placed on rack 3, to reach To reasonable effect easy to assembly.The bottom of rack 3 is provided with reinforcing rib 31, and reinforcing rib 31 is fixed on by high-strength bolt On the side wall of piping lane ontology 1, the structural stability of rack 3 is improved.Rack 3 and reinforcing rib 31 are galvanized steel layer frame, The corrosion resistance for improving rack 3 and reinforcing rib 31, prolongs the service life.
Referring to Fig. 2, piping lane is internally provided with the partition 5 for separating piping lane, and the width of piping lane is divided into multiple by partition 5 Chamber 51, when surprisingly occurring, reduces loss, improves the knot of piping lane so that the pipeline in each chamber 51 is relatively independent Structure stability.
The implementation principle of above-described embodiment are as follows: draining pump 6 is changed into immersible pump 12, so that immersible pump 12 is installed in and catchments Hole 18 in, therefore above grid 11 be laid with pipeline just will not due to draining pump 6 hinder and wasting space, mentioned to reach The effect of high piping lane space utilization rate.Water level monitoring device and warning device 2 play the protective effect to immersible pump 12, can be with It prevents the water level in catch pit 18 lower than immersible pump 12, immersible pump 12 is caused to can not work normally, thus reduce repair rate, Reduce maintenance cost.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical Within novel protection scope.

Claims (8)

1. a kind of drainage system for improving piping lane space utilization, including piping lane ontology (1), the piping lane ontology (1) is interior to be provided with Catch pit (18), it is characterised in that: be placed with immersible pump (12) on catch pit (18) bottom wall, immersible pump (12) setting There are two, the immersible pump (12) is connected with drainpipe (13), is provided on the drainpipe (13) for controlling drainpipe (13) valve body of on-off;Water level monitoring device and the alarm connecting with water level monitoring device dress are provided in the catch pit (18) Set (2).
2. a kind of drainage system for improving piping lane space utilization according to claim 1, it is characterised in that: the water level prison Surveying device includes low water level detection needle (14) positioned at catch pit (18) bottom position.
3. a kind of drainage system for improving piping lane space utilization according to claim 2, it is characterised in that: the valve body packet It includes motor-driven valve (16), low water level detection needle (14) is electrically connected with the Electric Actuator of motor-driven valve (16).
4. a kind of drainage system for improving piping lane space utilization according to claim 3, it is characterised in that: the valve body is also Including hand-operated valve (17).
5. a kind of drainage system for improving piping lane space utilization according to claim 4, it is characterised in that: including rack (3), the bottom end of the rack (3) is provided with reinforcing rib (31).
6. a kind of drainage system for improving piping lane space utilization according to claim 5, it is characterised in that: the rack (3) and reinforcing rib (31) is galvanized steel layer frame.
7. a kind of drainage system for improving piping lane space utilization according to claim 6, it is characterised in that: the catch pit (18) it is provided with multiple, multiple catch pits (18) are communicated by aqueduct (4).
8. a kind of drainage system for improving piping lane space utilization according to claim 7, it is characterised in that: the piping lane sheet Body (1) is internally provided with the partition (5) for separating piping lane ontology (1), and the partition (5) divides the width of piping lane ontology (1) It is cut into multiple chambers (51).
CN201822139197.3U 2018-12-19 2018-12-19 A kind of drainage system improving piping lane space utilization Active CN209509155U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822139197.3U CN209509155U (en) 2018-12-19 2018-12-19 A kind of drainage system improving piping lane space utilization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822139197.3U CN209509155U (en) 2018-12-19 2018-12-19 A kind of drainage system improving piping lane space utilization

Publications (1)

Publication Number Publication Date
CN209509155U true CN209509155U (en) 2019-10-18

Family

ID=68195798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822139197.3U Active CN209509155U (en) 2018-12-19 2018-12-19 A kind of drainage system improving piping lane space utilization

Country Status (1)

Country Link
CN (1) CN209509155U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119210A (en) * 2020-01-07 2020-05-08 广州地铁设计研究院股份有限公司 Drainage system of piping lane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119210A (en) * 2020-01-07 2020-05-08 广州地铁设计研究院股份有限公司 Drainage system of piping lane

Similar Documents

Publication Publication Date Title
CN204662649U (en) A kind of integral intelligent pumping plant
CN204212093U (en) Job site automatic spray dust falling system
CN103290918A (en) Underground prefabricated pump station
WO2018171341A1 (en) System for using energy-storing water pipes of multiple high-rise buildings to generate electricity
CN108360562B (en) Comprehensive pipe gallery
CN102705006B (en) Method for governing operating tunnel flood by adopting wellpoint dewatering method
CN209509155U (en) A kind of drainage system improving piping lane space utilization
CN207194141U (en) The waterproof construction of outer wall of basement back side
CN206396801U (en) Cable work well and its drainage arrangement
CN105525669B (en) The anti-waterlogging wisdom flood diversion equipment of city heavy rain
CN109610521A (en) A kind of drainage system and method improving piping lane space utilization
CN212926160U (en) Cable well and pressure flow automatic drainage device thereof
CN208949850U (en) A kind of draining of pipe well combination wind-light-electricity complementary changes salt system
CN110904997B (en) Underground comprehensive pipe gallery transportation system
CN209194585U (en) It is a kind of with waterproof, the underground pipe gallery structure of drain function
CN209670037U (en) Cable hand wellhole self-draining arrangement
CN209703564U (en) One kind can well before self-draining communication building office
CN208167944U (en) It crosses sea, cross river section drainage pumping plant
CN109235392A (en) A kind of draining of pipe well combination wind-light-electricity complementary changes salt system and its application method
CN102562153A (en) Setting method for auxiliary system of electric power tunnel
CN203296162U (en) Buried prefabricated pump station
CN206279546U (en) A kind of drainage of foundation pit system
CN201809752U (en) Water supply and drainage system for plunge pool
Krolikowska et al. An evaluation of potential losses associated with the loss of vacuum sewerage system reliability
CN111677971A (en) Direct-buried steam main pipe moisture-removing system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant