CN209508007U CN201821901473.9U CN201821901473U CN209508007U CN 209508007 U CN209508007 U CN 209508007U CN 201821901473 U CN201821901473 U CN 201821901473U CN 209508007 U CN209508007 U CN 209508007U
Authority
CN
China
Prior art keywords
tempering
wind
cooling system
water
entered
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821901473.9U
Other languages
Chinese (zh)
Inventor
董清世
祝伟
唐法君
甘强
李书明
吴宏伟
赵春宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINYI PHOTOVOLTAIC INDUSTRY (ANHUI) HOLDING Co Ltd
Original Assignee
XINYI PHOTOVOLTAIC INDUSTRY (ANHUI) HOLDING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINYI PHOTOVOLTAIC INDUSTRY (ANHUI) HOLDING Co Ltd filed Critical XINYI PHOTOVOLTAIC INDUSTRY (ANHUI) HOLDING Co Ltd
Priority to CN201821901473.9U priority Critical patent/CN209508007U/en
Application granted granted Critical
Publication of CN209508007U publication Critical patent/CN209508007U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to glass manufacturing apparatus technical field, more particularly to cooling system is entered the wind in a kind of tempering workshop, ventilation gallery including liquid distribution and for being connected to outside air environment and tempering blower, liquid distribution includes the spray pipe for being connected with extraneous water inlet line, and spray pipe is installed on the top of ventilation gallery along the width direction of ventilation gallery and is capable of forming cascade in water spray.Cooling water can equably be spilt to the bottom of ventilation gallery cloth in this way, form one of cascade in ventilation gallery, then the air that self-ventilation gallery enters tempering blower can realize the decline of its own temperature by passing through cascade.In this way, tempering workshop air inlet cooling system just realizes effective cooling to the air for entering tempering blower.So when the production of tempered glass is when carrying out the summer high temperature moon, cooling system is entered the wind in starting tempering workshop, that is, the cooling wind temperature that can guarantee that tempering blower is blown out reaches requirement, and then ensure that the tempered glass quality prepared.

Description

Enter the wind cooling system in tempering workshop
Technical field
The utility model belongs to glass manufacturing apparatus technical field more particularly to a kind of tempering workshop air inlet cooling system.
Background technique
Tempered glass needs to carry out quenching processing after the heating, to realize toughening process in production.It and is to ensure quenching Process is gone on smoothly, then needs to install cooling air grid, and reach glass substrate by cooling air grid by blower conveying cold air Surface, realize tempering processing.
In actual production, generally there is a plurality of toughened glass production line in workshop.In the summer high temperature moon, when a plurality of life When producing line is started simultaneously, the air themperature that will lead in workshop is significantly raised, and the raising of air themperature then will have a direct impact on The leaving air temp of cooling air grid so that the leaving air temp of cooling air grid rises, and then will lead to the tempering quality drop of glass substrate It is low.
Utility model content
The purpose of this utility model is to provide a kind of tempering workshops to enter the wind cooling system, it is intended to solve in the prior art The technical issues of tempering workshop air temperature rises and the tempering quality of glass substrate is caused to decline.
In order to achieve the above purposes, the technical solution adopted by the utility model is:, and cooling system, packet are entered the wind in a kind of tempering workshop Include liquid distribution and the ventilation gallery for being connected to outside air environment and tempering blower, the liquid distribution include for The spray pipe that extraneous water inlet line is connected, the spray pipe are set in the ventilation gallery, and the spray pipe is described in The width direction of ventilation gallery is installed on the top of the ventilation gallery and is capable of forming cascade in water spray.
Further, the tempering workshop air inlet cooling system further includes water circle device, and the water circle device includes Draining pump and outlet pipe, the draining pump are installed on the bottom of the ventilation gallery, and one end of the outlet pipe is connected to described Draining pump, the other end of the outlet pipe extend outside the ventilation gallery and for being connected with extraneous water inlet line.
Further, the bottom of the ventilation gallery offers catch basin, and spray pipe described in the catch basin face is arranged, The draining pump is installed in the catch basin.
Further, the water circle device further includes the level sensor for controlling mould group and being electrically connected with the control mould group Device, the water level sensor are installed in the catch basin, and the draining pump is electrically connected with the control mould group.
Further, the bottom of the ventilation gallery is equipped with catchment covers funnel-shaped, and the catchment covers cover at institute State the opening of catch basin.
Further, the liquid distribution further includes the water inlet pipe for being connected with extraneous water inlet line, it is described enter Water pipe is connected to the spray pipe.
Further, the water inlet pipe is equipped with the control valve for controlling the water flow on-off in the water inlet pipe.
Further, the control valve is solenoid valve, and the solenoid valve is electrically connected with the control mould group;
Alternatively, the control valve is manually-operated gate.
Further, the spray pipe offers several apopores along its axis direction.
Further, the spray pipe is equipped with several water jets along its axis direction.
The utility model has the beneficial effects that cooling system is entered the wind in the tempering workshop of the utility model, when work, the external world is cooling Water enters in spray pipe from water inlet line, since the width direction of spray pipe edge ventilation gallery is installed on the top of ventilation gallery Portion, such cooling water can be spilt by the top cloth of spray pipe equably self-ventilation gallery to the bottom of ventilation gallery, Jin Erke One of cascade is formed in ventilation gallery, then the air that self-ventilation gallery enters tempering blower can be by passing through cascade Realize the decline of its own temperature.In this way, cooling system is entered the wind in the tempering workshop of the utility model, just realize to entering steel Change effective cooling of the air of blower.So when the production of tempered glass the summer high temperature moon carry out when, starting tempering workshop into Wind cooling system, that is, the cooling wind temperature that can guarantee that tempering blower is blown out reaches requirement, and then ensure that the tempering prepared Glass quality.
Detailed description of the invention
It, below will be to embodiment or the prior art in order to illustrate more clearly of the technical scheme in the embodiment of the utility model Attached drawing needed in description is briefly described, it should be apparent that, the accompanying drawings in the following description is only that this is practical new Some embodiments of type for those of ordinary skill in the art without any creative labor, can be with It obtains other drawings based on these drawings.
Fig. 1 is the structural schematic diagram one that cooling system is entered the wind in tempering workshop provided by the embodiment of the utility model;
Fig. 2 is the structural schematic diagram two that cooling system is entered the wind in tempering workshop provided by the embodiment of the utility model;
Fig. 3 is the structural schematic diagram three that cooling system is entered the wind in tempering workshop provided by the embodiment of the utility model;
Fig. 4 is the structural schematic diagram four that cooling system is entered the wind in tempering workshop provided by the embodiment of the utility model;
Fig. 5 is the structural schematic diagram five that cooling system is entered the wind in tempering workshop provided by the embodiment of the utility model.
Wherein, each appended drawing reference in figure:
10-ventilation 11-catch basin of gallery, 12-catchment covers
20-liquid distribution 21-spray pipe, 22-water inlet pipes
23-control valve 24-apopore, 25-water jets
30-water circle device 31-draining pump, 32-outlet pipes
40-tempering blower 211-particle size, 212-conical transitional parts of pipeline section
213-thin footpath pipeline sections.
Specific embodiment
The embodiments of the present invention are described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning Same or similar element or element with the same or similar functions are indicated to same or similar label eventually.Below by ginseng The embodiment for examining the description of attached drawing 1~5 is exemplary, it is intended to for explaining the utility model, and should not be understood as practical to this Novel limitation.
In the description of the present invention, it should be understood that term " length ", " width ", "upper", "lower", " preceding ", The orientation or positional relationship of the instructions such as " rear ", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" is based on attached Orientation or positional relationship shown in figure, is merely for convenience of describing the present invention and simplifying the description, rather than indication or suggestion Signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to this The limitation of utility model.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more of the features.The meaning of " plurality " is two or two in the description of the present invention, More than, unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " Gu It is fixed " etc. terms shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be Mechanical connection, is also possible to be electrically connected;It can be directly connected, two can also be can be indirectly connected through an intermediary The interaction relationship of connection or two elements inside element.It for the ordinary skill in the art, can basis Concrete condition understands the concrete meaning of above-mentioned term in the present invention.
As shown in Figures 1 to 3, cooling system, including liquid distribution are entered the wind in tempering workshop provided by the embodiment of the utility model 20 and the ventilation gallery 10 for being connected to outside air environment and tempering blower 40, liquid distribution 20 include for the external world The spray pipe 21 that is connected of water inlet line, spray pipe 21 is set in ventilation gallery 10, and spray pipe 21 is along ventilation gallery 10 Width direction is installed on the top of ventilation gallery 10 and is capable of forming cascade in water spray.
Specifically, the cooling water source in spray pipe 21 can be the cooling water generated in production process in tempering workshop. Spray pipe 21 can be the lightings pipeline such as pvc pipe.By cooling water source is chosen to be generated in production process in workshop it is cold But water just realizes make full use of to existing resource in workshop in this way, significantly reduces tempering workshop air inlet cooling system Use cost.And by the way that spray pipe 21 is set as pvc pipe road, then having benefited from pvc pipe lightweight, at low cost and have enough Mechanical property the advantages of, just alleviate the self weight of spray pipe 21 in this way so that its top for being not easy self-ventilation gallery 10 is fallen, Its manufacturing cost is also reduced simultaneously, ensure that the use durability degree during its long service.
Cooling system is entered the wind in the tempering workshop of the utility model, and when work, extraneous cooling water enters leaching from water inlet line In water pipe 21, due to spray pipe 21 along ventilation gallery 10 width direction be installed on ventilation gallery 10 top, such cooling water It can be spilt by the top cloth of the equably self-ventilation gallery 10 of spray pipe 21 to the bottom of ventilation gallery 10, and then can be in ventilation corridor One of cascade is formed in road 10, then the air that self-ventilation gallery 10 enters tempering blower 40 can be by passing through cascade Realize the decline of its own temperature.In this way, cooling system is entered the wind in the tempering workshop of the utility model, just realize to entering steel Change effective cooling of the air of blower 40.So when the production of tempered glass the summer high temperature moon carry out when, start tempering workshop It cooling system entered the wind, that is, can guarantee that the cooling wind temperature that is blown out of tempering blower 40 reaches requirement, and then ensure that and prepare Tempered glass quality.
In the present embodiment, as shown in Figures 1 to 3, air inlet cooling system in tempering workshop further includes water circle device 30, water Circulator 30 include draining pump 31 and outlet pipe 32, draining pump 31 be installed on ventilation gallery 10 bottom, the one of outlet pipe 32 End is connected to draining pump 31, and the other end of outlet pipe 32 extends outside ventilation gallery 10 and for being connected with extraneous water inlet line It is logical.Specifically, by the way that water circle device 30 is arranged, and by the draining pump of water circle device 30 31 set on the bottom of ventilation gallery 10 Portion, such draining pump 31 can the cooling draining pump 31 by savings in ventilation 10 bottom of gallery enter in outlet pipe 32, then by being discharged Pipe 32 is drained in extraneous water inlet line, and extraneous water inlet line is connected with spray pipe 21, has so just established The water circulation path of effect, and then on the one hand realize and cooling water is recycled, it on the other hand also achieves to tempering workshop Interior existing resource makes full use of, and then also saves the cost of implementation of air cooling-down process.
In the present embodiment, as shown in Figures 1 to 3, the bottom of ventilation gallery 10 offers catch basin 11,11 face of catch basin Spray pipe 21 is arranged, and draining pump 31 is installed in catch basin 11.Specifically, it by opening up catch basin 11, just realizes in this way pair It puts aside in the centralized collection of the cooling water of ventilation 10 bottom of gallery.Since draining pump 31 is provided in catch basin 11, drain in this way Cooling draining pump 31 in catch basin 11 31 can be drawn in outlet pipe 32 by pump to greatest extent, thus realize to savings in The cooling water of ventilation 10 bottom of gallery makes full use of.Simultaneously as cooling water is put aside in catch basin 11, it is just in this way Retarding effect will not be generated to the air draught circulated in ventilation gallery 10, so just ensure that the air inlet effect of ventilation gallery 10 Rate.Optionally, ventilation 10 bottom of gallery can be formed with recess hole, and catch basin 11 is opened in the bottom in recess hole.Splash down in this way in The cooling aqueous on 11 periphery of catch basin can also flow into catch basin 11 along the inclined wall in recess hole.
Further, as shown in figure 5, also catchment covers 12 funnel-shaped can be equipped in the bottom of ventilation gallery 10, collect Water cover 12 covers at the opening of catch basin 11.Specifically, by being provide with catchment covers 12 in the opening of catch basin 11, so just The efficient collection to cooling water is realized, is enabled from the cooling water under the drippage of spray pipe 21 rapidly in the guiding of catchment covers 12 Lower savings also accelerates the efficiency of water circulation in catch basin 11 in this way.Meanwhile catchment covers 12 can be cone-shaped hood, so in cone The catchment covers 12 of shape are just provided with good air dynamic behaviour, and then effectively reduce it to air in ventilation gallery 10 Block noise reduction.
In the present embodiment, water circle device 30 further includes the water for controlling mould group (not shown) and being electrically connected with control mould group Level sensor (not shown), water level sensor are installed in catch basin 11, and draining pump 31 is electrically connected with control mould group.Specifically, Controlling mould group can be PLC programmable controller or single-chip microcontroller.Water of the water circle device 30 in specific works, in catch basin 11 When position rises to preset height, that is, it can trigger water level sensor and issue the first electric signal and conduct first electric signal to control Mould group, and the starting of draining pump 31 can be controlled according to first electric signal by controlling mould group then, and then implement draining.And work as catch basin 11 When interior water level decreasing to preset height, that is, it can trigger water level sensor and issue the second electric signal and conduct second electric signal To control mould group, and control mould group then can according to second electric signal control draining pump 31 close.It just realizes to water storage in this way The automation for the cooling water put aside in slot 11 is drained and is recycled.Meanwhile water level sensor and control mould group also achieve To the flexible start-up and shut-down control of draining pump 31, so that draining pump 31 is in close state when being not necessarily to and draining, and then the energy is saved Consumption.
In the present embodiment, as shown in Figures 1 to 3, liquid distribution 20 further includes for being connected with extraneous water inlet line Water inlet pipe 22, water inlet pipe 22 is connected to spray pipe 21.Meanwhile water inlet pipe 22 is equipped with for controlling the water flow in water inlet pipe 22 The control valve 23 of on-off.Specifically, by making spray pipe 21 be connected with water inlet pipe 22, and control is set on water inlet pipe 22 Valve 23, such operator can control the on-off of water flow in water inlet pipe 22 according to the actual temperature in tempering workshop, in turn The on-off for controlling water flow in spray pipe 21, it is interim in this way the summer high temperature moon overing, operator can opening controlling valve 23, realization Cooling to the cooling gas that tempering blower 40 is issued.And when it is not necessary that control valve 23 can be closed, to save energy when cooling down Source.
In the present embodiment, control valve 23 is solenoid valve, and solenoid valve is electrically connected with control mould group;Alternatively, control valve 23 is Manually-operated gate.Specifically, since control valve 23 is solenoid valve, and it is electrically connected with control mould group, it can be according to control in this way Auto switching is realized in the order of mould group, improves the automatization level of liquid distribution 20.
Further, water circle device 30 further includes the temperature sensor for being installed at the air outlet of tempering blower 40 (not shown), temperature sensor are electrically connected with control mould group.In this way, temperature sensor can real-time monitor tempering blower 40 Air outlet at air temperature variations, then after air themperature at air outlet is more than predetermined value, temperature sensor Corresponding electric signal is exported to control mould group, controls mould group after receiving the electric signal, can send and order to control valve 23, It controls control valve 23 to open, to carry out water drenching operation, reduces air outlet temperature.And when the air themperature of air outlet is less than predetermined value Afterwards, temperature sensor can export corresponding electric signal to control mould group, control mould group after receiving the electric signal, Ji Kexiang Control valve 23 sends order, and control control valve 23 is closed, and terminates water drenching operation, to reduce resource consumption.
In the present embodiment, as shown in Figure 1, spray pipe 21 offers several apopores 24 along its axis direction.Specifically, The water-out manners of spray pipe 21 can be discharged by several apopores 24, this have the advantage that can drop significantly The manufacture complexity of low spray pipe 21, to reduce the whole manufacturing cost of liquid distribution 20.
Further, as shown in figure 3, spray pipe 21 include particle size pipeline section 211 and thin footpath pipeline section 213, particle size pipeline section 211 with Water inlet pipe 22 is connected, and thin footpath pipeline section 213 is connected with particle size pipeline section 211, and each apopore 24 is provided with thin footpath pipeline section 213 On.Conical transitional part 212 is equipped between particle size pipeline section 211 and thin footpath pipeline section 213.In this way, since spray pipe 21 is by wide diameter tube Section 211 and thin footpath pipeline section 213 are formed, and such cooling water first arrives at particle size after being flowed into spray pipe 21 from water inlet pipe 22 Pipeline section 211, then entered in thin footpath pipeline section 213 via conical transitional part 212.In the process, transversal due to spray pipe 21 Face area changes, and the pressure from the cooling water in particle size pipeline section 211 to thin footpath pipeline section 213 is just made to get a promotion in this way, And then it ensure that cooling water can be sprayed with higher speed from each apopore 24.
Preferably, as Fig. 2, Fig. 3 and Fig. 4 spray pipe 21 can be equipped with several water jets 25 along its axis direction.It is each in this way Cooling water can be equably sprayed in ventilation gallery 10 by a water jet 25, just increase cooling water and ventilation gallery 10 in this way The contact area of interior air draught, so as to the air draught by way of it is cooled down to the maximum extent, this Sample has just been obviously improved the cooling efficiency of air draught.
Further, each water jet 25 is high-pressure atomization water jet.In this way, being sprayed via each high-pressure atomization water jet Cooling water be just able to form water mist area in certain space, just further increase cooling water and air draught in this way Contact area, so that the cooling efficiency of air draught is further promoted.
The above is only the preferred embodiments of the present utility model only, is not intended to limit the utility model, all practical at this Made any modifications, equivalent replacements, and improvements etc., should be included in the guarantor of the utility model within novel spirit and principle Within the scope of shield.

Claims (10)

1. cooling system is entered the wind in a kind of tempering workshop, it is characterised in that: including liquid distribution and for being connected to outside air ring The ventilation gallery in border and tempering blower, the liquid distribution include the spray pipe for being connected with extraneous water inlet line, institute Spray pipe is stated in the ventilation gallery, and the spray pipe is installed on the ventilation along the width direction of the ventilation gallery The top of gallery is simultaneously capable of forming cascade in water spray.
2. cooling system is entered the wind in tempering workshop according to claim 1, it is characterised in that: the tempering workshop air inlet cooling Equipment further includes water circle device, and the water circle device includes draining pump and outlet pipe, and the draining pump is installed on described logical The bottom in wind porch road, one end of the outlet pipe are connected to the draining pump, and the other end of the outlet pipe extends described logical Outside wind porch road and for being connected with extraneous water inlet line.
3. cooling system is entered the wind in tempering workshop according to claim 2, it is characterised in that: open the bottom of the ventilation gallery Equipped with catch basin, the setting of spray pipe described in the catch basin face, the draining pump is installed in the catch basin.
4. cooling system is entered the wind in tempering workshop according to claim 3, it is characterised in that: the water circle device further includes Control mould group and the water level sensor being electrically connected with the control mould group, the water level sensor are installed in the catch basin, The draining pump is electrically connected with the control mould group.
5. cooling system is entered the wind in tempering workshop according to claim 3, it is characterised in that: the bottom peace of the ventilation gallery Equipped with catchment covers funnel-shaped, the catchment covers cover at the opening of the catch basin.
6. cooling system is entered the wind in tempering workshop according to claim 4, it is characterised in that: the liquid distribution further includes using In the water inlet pipe being connected with extraneous water inlet line, the water inlet pipe is connected to the spray pipe.
7. cooling system is entered the wind in tempering workshop according to claim 6, it is characterised in that: the water inlet pipe is equipped with and is used for Control the control valve of the water flow on-off in the water inlet pipe.
8. cooling system is entered the wind in tempering workshop according to claim 7, it is characterised in that: the control valve is solenoid valve, The solenoid valve is electrically connected with the control mould group;
Alternatively, the control valve is manually-operated gate.
9. cooling system is entered the wind in described in any item tempering workshops according to claim 1~5, it is characterised in that: the spray pipe Several apopores are offered along its axis direction.
10. cooling system is entered the wind in described in any item tempering workshops according to claim 1~5, it is characterised in that: the spray pipe Several water jets are installed along its axis direction.
CN201821901473.9U 2018-11-16 2018-11-16 Enter the wind cooling system in tempering workshop Active CN209508007U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821901473.9U CN209508007U (en) 2018-11-16 2018-11-16 Enter the wind cooling system in tempering workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821901473.9U CN209508007U (en) 2018-11-16 2018-11-16 Enter the wind cooling system in tempering workshop

Publications (1)

Publication Number Publication Date
CN209508007U true CN209508007U (en) 2019-10-18

Family

ID=68189683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821901473.9U Active CN209508007U (en) 2018-11-16 2018-11-16 Enter the wind cooling system in tempering workshop

Country Status (1)

Country Link
CN (1) CN209508007U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109437533A (en) * 2018-11-16 2019-03-08 信义光伏产业(安徽)控股有限公司 Enter the wind cooling system in tempering workshop
CN112556045A (en) * 2020-12-08 2021-03-26 铜陵精达里亚特种漆包线有限公司 Cooling system that enameled wire workshop was used

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109437533A (en) * 2018-11-16 2019-03-08 信义光伏产业(安徽)控股有限公司 Enter the wind cooling system in tempering workshop
CN112556045A (en) * 2020-12-08 2021-03-26 铜陵精达里亚特种漆包线有限公司 Cooling system that enameled wire workshop was used

Similar Documents

Publication Publication Date Title
CN209508007U (en) Enter the wind cooling system in tempering workshop
CN209260153U (en) A kind of forging material quickly cooling device
CN209588479U (en) Cooling device is used in a kind of production of environment-friendly and energy-efficient refractory material
CN103727605A (en) Air-conditioning system with condensed water recycling device
CN201200979Y (en) Online spraying and cleaning equipment
CN103541468A (en) Double-layer glass water curtain wall
CN109437533A (en) Enter the wind cooling system in tempering workshop
CN205851500U (en) Novel air-conditioning outdoor unit system for washing intelligently
CN202246631U (en) Control system of accumulation incubator
CN209715878U (en) A kind of fuel assembly cleaning device
CN203964211U (en) Utilization is purified waste water and air-conditioning is carried out to the device of atomization heat radiation
CN203851582U (en) Cleaning aerating and cooling device for pigsty
CN204757065U (en) Automatic wash semi -closed smoke ventilator
CN205784683U (en) A kind of energy-efficient cooling tower operation control system
CN109504846A (en) A kind of roll cryogenic treatment apparatus
CN205443421U (en) Novel copper wire cooling device
CN213924474U (en) Energy-saving control device for cooling bottom of molten tin bath
CN213631661U (en) Energy-saving temperature control device of closed tower
CN2672605Y (en) Automatic dust cleaner for air conditioner
CN203413781U (en) Condensed water recycling device of surface air cooler
CN203349410U (en) Directly-heated-type air conditioning unit
CN204757143U (en) Two side injection formula variable frequency air conditioner indoor sets in big space
CN206535825U (en) A kind of cleaning equipment for parts of laser fast shaping
CN206851516U (en) A kind of energy-saving climatic chamber
CN204678512U (en) A kind of mobile air conditioner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant