CN209494059U - Full BOLT HEADING DIES digitizer formula housing roof plate and wallboard intermediate node connection structure - Google Patents
Full BOLT HEADING DIES digitizer formula housing roof plate and wallboard intermediate node connection structure Download PDFInfo
- Publication number
- CN209494059U CN209494059U CN201821863885.8U CN201821863885U CN209494059U CN 209494059 U CN209494059 U CN 209494059U CN 201821863885 U CN201821863885 U CN 201821863885U CN 209494059 U CN209494059 U CN 209494059U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- roof boarding
- installation
- hole
- nut
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/24—Structural elements or technologies for improving thermal insulation
- Y02A30/244—Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires
Landscapes
- Connection Of Plates (AREA)
Abstract
Full BOLT HEADING DIES digitizer formula housing roof plate and wallboard intermediate node connection structure, are related to plate-type house construction field, the wallboard including being vertically arranged and the horizontally disposed roof boarding for being connected to wallboard top surface.Elongated rubber sheet gasket is folded between the connection bottom surface of the roof boarding and the connection top surface of the wallboard, one end of bolt in the installation through-hole of the roof boarding corresponds to screw thread and wears to the fixture nut of the wallboard, and the other end of bolt passes through installation nut fastening;It is tamped in the installation through-hole of the roof boarding by pea gravel concreten;Pass through extruded polystyrene board in the top of the close outdoor side formation connecting sewing in the junction of the roof boarding and the wallboard, the connecting sewing and installation through-hole to fill.The utility model solves that site welding between existing wallboard and roof boarding is more, welding quality is not easy to guarantee, be not connected firmly, can not modularization the technical issues of connecting.
Description
Technical field
The utility model relates to plate-type house construction field, especially full BOLT HEADING DIES digitizer formula housing roof plate and wallboard
Intermediate node connection structure.
Background technique
Existing plate-type house is mostly made of batten, is connected between batten by adhesive mortar.And one between existing steel frame plate
As be welded to connect or self threading pin shimming connection, have the following disadvantages: that 1, site welding is more.2, welding quality is not easy to guarantee.
3, weld mends anti-decaying paint after needing.4, connecting node is insecure.It 5, can not modularization connection.
Utility model content
The purpose of the utility model is to provide full BOLT HEADING DIES digitizer formula housing roof plate and wallboard intermediate node connection structure,
Solve site welding between existing wallboard and roof boarding is more, welding quality is not easy to guarantee, be not connected firmly, can not modularization connect
The technical issues of connecing.
To achieve the above objectives, the present invention adopts the following technical solutions:
Full BOLT HEADING DIES digitizer formula housing roof plate and wallboard intermediate node connection structure, including the wallboard and water being vertically arranged
It is flat that the roof boarding for being connected to wallboard top surface is set.
The side of the roof boarding is equipped at intervals with installation through-hole, and the installation through-hole is arranged in roof boarding close to connection bottom
Face position, the installation through-hole are welded with reinforcement steel plate on connection bottom surface side inner wall, are equipped with and wear in the installation through-hole
Bolt and matched installation nut to outside roof boarding connection bottom surface.
Fixture nut is embedded with close to connection top side location, corresponding bolt setting position in the wallboard, in the wallboard
It is welded with reinforcement steel plate close to connection top side location, the fixture nut is welded on reinforcement steel plate, is connected corresponding solid on top surface
Determine the pre-buried position of nut and offers connecting hole.
It is folded with elongated rubber sheet gasket between the connection bottom surface of the roof boarding and the connection top surface of the wallboard, it is described
One end of bolt in the installation through-hole of roof boarding corresponds to screw thread and wears to the fixture nut of the wallboard, and the other end of bolt
Pass through installation nut fastening;It is tamped in the installation through-hole of the roof boarding by pea gravel concreten;The roof boarding and the wall
It is filled out in the top of the close outdoor side formation connecting sewing in the junction of plate, the connecting sewing and installation through-hole by extruded polystyrene board
It fills.
The cross section of the connecting sewing is in linear type.
The wallboard and the roof boarding are formed by board making.
The plate includes that panel body, the steel frame for being wrapped in panel body border and interval are located in panel body
Steel wire;The panel body is rectangular panel body, outwardly protrudes to form fin on the inside of border;The steel frame be both ends vertically to
The crimping C-shaped steel of inner bending;The steel frame correspondence is wrapped on the fin of panel body.
The roof boarding includes sequentially connected left side roof boarding, at least one intermediate roof boarding and right side roof boarding.
Installation through-hole on the roof boarding of left side is opened up along its long outward side and two width to side interval, left side roof boarding
Long inside side is also spaced connecting hole between the horizontally roofing for opening up and connecting with intermediate roof boarding, is equipped in connecting hole between roofing
Bolt and matching nut are connected between roofing.
Installation through-hole on intermediate roof boarding is opened up along its two width to side interval, and the side of intermediate roof boarding is long to side
Be fixed with nut, the other side is long be provided with horizontally roofing to side between connecting hole, be equipped in connecting hole between roofing between roofing and connect
Connecting bolt and matching nut.
Installation through-hole on the roof boarding of right side is opened up along long outward side and two width to side interval, the length of right side roof boarding
Inside side is also spaced the nut for being provided with the fixed setting connecting with intermediate roof boarding.
The wallboard further includes that interval is provided with connecting hole between the wallboard of one side, is equipped between wallboard in connecting hole between wallboard
Bolt and matched nut are connected, corresponding be fixed in the other side of wallboard connects bolted nut between wallboard.
The utility model has the characteristics that and the utility model has the advantages that splicing between wallboard and roof boarding compared with prior art
Node is all made of to be bolted entirely, and welding is easy to operate, and is easy to implement the modularization extension in house, and the company of full bolt
The good integrity and energy conservation and environmental protection for connecing mode house are easy to implement green construction, while full bolt connecting mode on-site consolidation letter
It is single, it is easy to construct, short construction period saves construction cost;Rubber sheet gasket is set at the connecting node between wallboard, realizes plate
Between flexible connection, enhance house overall sealing performance and stability;It is alkaline-resisting by being laid at connecting node between wallboard
The Construction treatments such as fibrous mesh cloth and anticracking grout, effectively blocking cold-heat bridge, improve house whole service life.
The utility model can be widely applied to single layer peasants and herdsmen guarantee house, single layer base station assistance building and other single layer rooms
Room.
Detailed description of the invention
Fig. 1 is the schematic view of facade structure of the utility model.
Fig. 2 is the planar structure schematic diagram of plate.
Appended drawing reference: the connection of 1- first wallboard, the connection of 2- second wallboard, 3- installation through-hole, 4- bolt, 5- installation
Nut, 6- fixture nut, 7- rubber sheet gasket, 8- pea gravel concreten, 9- extruded polystyrene board, 10- plate, 10.1- plate
Main body, 10.2- steel frame, 10.3- steel wire, 11- reinforcement steel plate.
Specific embodiment
It is shown in Figure 1, full BOLT HEADING DIES digitizer formula housing roof plate and wallboard intermediate node connection structure, including set vertically
The wallboard 1 and the horizontally disposed roof boarding 2 for being connected to 1 top surface of wallboard set;The side of the roof boarding 2 is equipped at intervals with installation through-hole
3, installation through-hole 3 penetrates through setting along the thickness direction of roof boarding, and the installation through-hole 3 is arranged in roof boarding close to connection bottom surface
Position, the installation through-hole 3 are welded with reinforcement steel plate 11 on connection bottom surface side inner wall, are equipped in the installation through-hole 3
The bolt 4 and matched installation nut 5 connected outside bottom surface is worn to roof boarding 2;Close to connection top side location, right in the wallboard 1
It answers bolt 4 that position is set and is embedded with fixture nut 6, close connection top side location is welded with reinforcement steel plate 11, institute in the wallboard 1
It states fixture nut 6 to be welded on reinforcement steel plate 11, corresponds to the pre-buried position of fixture nut 6 on connection top surface and offer connecting hole;Institute
It states and is folded with elongated rubber sheet gasket 7, the roof boarding 2 between the connection bottom surface of roof boarding 2 and the connection top surface of the wallboard 1
Installation through-hole 3 in one end of bolt 4 correspond to screw thread and wear to the fixture nut 6 of the wallboard 1, and the other end of bolt 4
It is fastened by installation nut 5;It is tamped in the installation through-hole 3 of the roof boarding 2 by pea gravel concreten 8;The roof boarding 2 and institute
It states the junction of wallboard 1 and forms connecting sewing close to outdoor side, gathered in the top of the connecting sewing and installation through-hole 3 by extrusion molding
Benzene plate 9 is filled;The cross section of the connecting sewing is in linear type;Wallboard 1 and 2 outer surface of roof boarding are entirely through anticracking grout pressure
Enter one layer of alkali proof fiber grid cloth;The roof boarding 2 include sequentially connected left side roof boarding, at least one intermediate roof boarding and
Right side roof boarding;Installation through-hole 3 on the roof boarding of left side is opened up along its long outward side and two width to side interval, left side roofing
The inside side of the length of plate is also spaced connecting hole between the horizontally roofing for opening up and connecting with intermediate roof boarding, between roofing in connecting hole
Equipped with connection bolt and matching nut between roofing;Installation through-hole 3 on intermediate roof boarding is opened up along its two width to side interval, in
Between roof boarding side it is long be fixed with nut to side, the other side is long be provided with horizontally roofing to side between connecting hole, roofing
Between be equipped in connecting hole between roofing and connect bolt and matching nut;Installation through-hole 3 on the roof boarding of right side along long outward side and
Two width are opened up to side interval, and the inside side of the length of right side roof boarding is also spaced the fixed setting for being provided with and connecting with intermediate roof boarding
Nut;The wallboard 1 further includes that interval is provided with connecting hole between the wallboard of one side, is equipped between wallboard in connecting hole between wallboard
Bolt and matched nut are connected, corresponding be fixed in the other side of wallboard connects bolted nut between wallboard.
Shown in Figure 2, the wallboard 1 and the roof boarding 2 are made by plate 10;The plate 10 includes plate
The steel wire 10.3 that material main body 10.1, the steel frame 10.2 for being wrapped in panel body border and interval are located in panel body;Institute
Panel body 10.1 is stated to outwardly protrude to form fin on the inside of rectangular panel body, border;The steel frame 10.2 be both ends vertically to
The crimping C-shaped steel of inner bending;The correspondence of steel frame 10.2 is wrapped on the fin of panel body 10.1.
The construction method of the utility model wallboard and roof boarding connecting node:
Wallboard and roof boarding are transported to scene by step 1, lift wallboard to installation site, between wallboard and base, wallboard
After connection, lifting roof boarding to wallboard top surface.
Step 2 wears the bolt in the installation through-hole of roof boarding to the fixture nut of panel tops, and in bolt
The other end completes the connection of wallboard and roof boarding connecting node by installation nut fastening.
Step 3 repeats step 2 to completing all connecting nodes.
Step 4 tamps installation through-hole by pea gravel concreten.
Step 5 will be tamped in the top of connecting sewing and installation through-hole by extruded polystyrene board, and wallboard and roof boarding are completed
Installation.
Claims (6)
1. full BOLT HEADING DIES digitizer formula housing roof plate and wallboard intermediate node connection structure, it is characterised in that: including being vertically arranged
Wallboard (1) and the horizontally disposed roof boarding (2) for being connected to wallboard (1) top surface;
The side of the roof boarding (2) is equipped at intervals with installation through-hole (3), and installation through-hole (3) setting is close in roof boarding
Basal surface position is connected, the installation through-hole (3) is welded with reinforcement steel plate (11), the installation on connection bottom surface side inner wall
The bolt (4) worn to outside roof boarding (2) connection bottom surface and matched installation nut (5) are equipped in through-hole (3);
Fixture nut (6), the wall are embedded with close to connection top side location, corresponding bolt (4) setting position in the wallboard (1)
It is welded with reinforcement steel plate (11) in plate (1) close to connection top side location, the fixture nut (6) is welded on reinforcement steel plate (11)
On, fixture nut (6) pre-buried position, which is corresponded to, on connection top surface offers connecting hole;
Elongated rubber sheet gasket is folded between the connection bottom surface of the roof boarding (2) and the connection top surface of the wallboard (1)
(7), one end of the bolt (4) in the installation through-hole (3) of the roof boarding (2) corresponds to screw thread and wears to the fixation of the wallboard (1)
In nut (6), and the other end of bolt (4) passes through installation nut (5) fastening;Lead in the installation through-hole (3) of the roof boarding (2)
Pea gravel concreten (8) is crossed to tamp;The junction of the roof boarding (2) and the wallboard (1) forms connecting sewing close to outdoor side,
It is filled in the top of the connecting sewing and installation through-hole (3) by extruded polystyrene board (9).
2. full BOLT HEADING DIES digitizer formula housing roof plate according to claim 1 and wallboard intermediate node connection structure, special
Sign is: the cross section of the connecting sewing is in linear type.
3. full BOLT HEADING DIES digitizer formula housing roof plate according to claim 1 and wallboard intermediate node connection structure, special
Sign is: the wallboard (1) and the roof boarding (2) are made by plate (10).
4. full BOLT HEADING DIES digitizer formula housing roof plate according to claim 3 and wallboard intermediate node connection structure, special
Sign is: the plate (10) includes panel body (10.1), the steel frame (10.2) for being wrapped in panel body border and interval
The steel wire (10.3) being located in panel body;The panel body (10.1) is rectangular panel body, outwardly protrudes shape on the inside of border
At fin;The steel frame (10.2) is the crimping C-shaped steel of the perpendicularly inward bending in both ends;The corresponding package of the steel frame (10.2)
On the fin of panel body (10.1).
5. full BOLT HEADING DIES digitizer formula housing roof plate according to any one of claims 1-4 is connect with wallboard intermediate node
Structure, it is characterised in that: the roof boarding (2) includes sequentially connected left side roof boarding, at least one intermediate roof boarding and the right side
Side roof boarding;
Installation through-hole (3) on the roof boarding of left side is opened up along its long outward side and two width to side interval, left side roof boarding
Long inside side is also spaced connecting hole between the horizontally roofing for opening up and connecting with intermediate roof boarding, is equipped in connecting hole between roofing
Bolt and matching nut are connected between roofing;
Installation through-hole (3) on intermediate roof boarding is opened up along its two width to side interval, and the side of intermediate roof boarding is long to side
Be fixed with nut, the other side is long be provided with horizontally roofing to side between connecting hole, be equipped in connecting hole between roofing between roofing and connect
Connecting bolt and matching nut;
Installation through-hole (3) on the roof boarding of right side is opened up along long outward side and two width to side interval, the length of right side roof boarding
Inside side is also spaced the nut for being provided with the fixed setting connecting with intermediate roof boarding.
6. full BOLT HEADING DIES digitizer formula housing roof plate according to any one of claims 1-4 is connect with wallboard intermediate node
Structure, it is characterised in that: the wallboard (1) further includes that interval is provided with connecting hole between the wallboard of one side, connecting hole between wallboard
Interior be equipped between wallboard connects bolt and matched nut, the other side of wallboard is corresponding be fixed with connected between wallboard it is bolted
Nut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821863885.8U CN209494059U (en) | 2018-11-13 | 2018-11-13 | Full BOLT HEADING DIES digitizer formula housing roof plate and wallboard intermediate node connection structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821863885.8U CN209494059U (en) | 2018-11-13 | 2018-11-13 | Full BOLT HEADING DIES digitizer formula housing roof plate and wallboard intermediate node connection structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209494059U true CN209494059U (en) | 2019-10-15 |
Family
ID=68150352
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821863885.8U Active CN209494059U (en) | 2018-11-13 | 2018-11-13 | Full BOLT HEADING DIES digitizer formula housing roof plate and wallboard intermediate node connection structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209494059U (en) |
-
2018
- 2018-11-13 CN CN201821863885.8U patent/CN209494059U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105888447B (en) | The passive room exterior wall erection of doors and windows method of assembled | |
CN204716023U (en) | Assembling passive room exterior wall | |
CN106193444A (en) | A kind of embedding stacked waterproof sealing wallboard | |
CN201826393U (en) | Assembled movable house | |
CN109853800B (en) | Assembled low-energy-consumption curtain wall system and construction method thereof | |
CN111188475A (en) | Moisture-proof heat-preservation decoration integrated plate for assembled building outer wall and mounting method thereof | |
CN2791145Y (en) | New high-strength assembled external-wall heat-insulation board and complete assembled wall body | |
CN209494059U (en) | Full BOLT HEADING DIES digitizer formula housing roof plate and wallboard intermediate node connection structure | |
CN104631650A (en) | Net plate external wall with insulating layer and construction method | |
CN209494046U (en) | It is bolted the board-like one storey house system of modularization steel frame entirely | |
CN204112529U (en) | The residence outer wall plate of gas concrete | |
CN204531006U (en) | The prefabricated combined wall board of embedded steel column and constructing with the connected node of girder steel | |
CN209494058U (en) | Full BOLT HEADING DIES digitizer formula house connects wallboard intermediate node connection structure | |
CN206769187U (en) | A kind of integrated exterior wall hanging plate | |
CN212866667U (en) | Side income formula prefabricated rainwater fill mounting structure | |
CN108708650B (en) | Jamb | |
CN210563122U (en) | Thermal insulation decorative composite ALC peripheral wall panel | |
CN210857566U (en) | External wall insulation board and external wall insulation structure | |
CN207934327U (en) | Assembling window wall integrated module and assembled architecture with the module | |
CN205777260U (en) | The decorative board system of fabricated construction without modulus | |
CN105804356A (en) | Modulus-free assembled structural decorative board system and construction method thereof | |
CN205530700U (en) | Side fascia and steel column connection node of steel construction house | |
CN206599884U (en) | Steel building Side fascia and the strong axle edge of a wing assembled connecting node of H profile steel post | |
CN109537767A (en) | A kind of cell board and window integrated system and preparation method thereof | |
CN210887666U (en) | Connection structure of exterior window and assembled outer wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 406-6, floor 4, building 6, No. 38, Yongda Road, Daxing biomedical industry base, Zhongguancun Science and Technology Park, Daxing District, Beijing Patentee after: CSCEC Integrated Construction Co.,Ltd. Address before: 100195 83 Changqing Garden Road, Haidian District, Beijing Patentee before: CHINA CONSTRUCTION MODULAR HOUSING Co.,Ltd. |
|
CP03 | Change of name, title or address |