CN209494046U - It is bolted the board-like one storey house system of modularization steel frame entirely - Google Patents
It is bolted the board-like one storey house system of modularization steel frame entirely Download PDFInfo
- Publication number
- CN209494046U CN209494046U CN201821863987.XU CN201821863987U CN209494046U CN 209494046 U CN209494046 U CN 209494046U CN 201821863987 U CN201821863987 U CN 201821863987U CN 209494046 U CN209494046 U CN 209494046U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- roof boarding
- wall
- roof
- board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/24—Structural elements or technologies for improving thermal insulation
- Y02A30/244—Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires
Landscapes
- Building Environments (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及板式单层房屋施工领域,特别是一种全螺栓连接模数化钢边框板式单层房屋体系。The utility model relates to the construction field of slab-type single-story houses, in particular to a system of full-bolt connection modular steel-frame slab-type single-story houses.
背景技术Background technique
现有装配式技术更适用于多、高层房屋,应用于单层房屋成本较高,技术手段较复杂。市面上也有无边框条形板组合的单层板式房屋,主要应用于农牧民保障房、基站设备房等,该体系房屋存在如下缺点:1、板材构件数量较多。2、拼接板缝较多。3、安装较复杂,安装时间相对较长。4、板材无骨架,整体强度相对较低。5、模数化扩展难以实现。6、板材与板材通过卡件与砂浆粘结连接,不结实。7、施工现场湿作业较多。Existing prefabricated technology is more suitable for multi-story and high-rise buildings, and the cost of applying to single-story buildings is relatively high, and the technical means are more complicated. There are also single-story panel houses with frameless strip panels on the market, which are mainly used in affordable housing for farmers and herdsmen, base station equipment rooms, etc. The housing of this system has the following disadvantages: 1. The number of panel components is large. 2. There are many seams in the splicing panels. 3. The installation is more complicated and the installation time is relatively long. 4. The board has no skeleton, and the overall strength is relatively low. 5. Modular expansion is difficult to realize. 6. The plates are bonded and connected with the mortar through clamps, which is not strong. 7. There are many wet operations on the construction site.
实用新型内容Utility model content
本实用新型的目的是提供一种全螺栓连接模数化钢边框板式单层房屋体系,要解决现有单层板式房屋拼装板材构件数量较多、模数化扩展难以实现及安装复杂的问题,并解决拼接板缝多、安装时间长、板材整体强度低、板材间连接不结实、施工现场湿作业多等问题。The purpose of this utility model is to provide a full-bolt connection modularized steel frame single-story house system, to solve the problems of the existing single-story board house with a large number of assembled board members, difficult realization of modular expansion and complicated installation. It also solves the problems of many seams in the spliced panels, long installation time, low overall strength of the panels, weak connections between panels, and many wet operations on the construction site.
为实现上述目的,本实用新型采用如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
全螺栓连接模数化钢边框板式单层房屋体系,包括基础、竖直向连接在基础上的墙体及水平向连接在墙体顶面的屋面;墙体由可拆卸连接的墙板围合而成,屋面由可拆卸连接的屋面板从一侧依次连接而成。Full-bolt connection modular steel frame slab single-storey house system, including the foundation, the wall connected vertically to the foundation and the roof connected horizontally to the top of the wall; the wall is enclosed by detachable wall panels The roof is formed by detachably connected roof panels sequentially connected from one side.
所述墙板和屋面板均由板材制作而成;所述板材包括板材主体、包裹在板材主体周圈的钢边框及间隔设在板材主体内的钢丝网;板材主体为矩形板体、周圈内侧向外凸出形成凸肋;钢边框为两端垂直向内弯折的卷边C形钢;钢边框对应包裹在板材主体的凸肋上。Both the wallboard and the roof panel are made of panels; the panels include a panel body, a steel frame wrapped around the perimeter of the panel body, and steel wire mesh spaced inside the panel body; the panel body is a rectangular panel body with a perimeter The inner side protrudes outward to form a convex rib; the steel frame is a curled C-shaped steel with both ends bent vertically inward; the steel frame is correspondingly wrapped on the convex rib of the main body of the plate.
所述墙板由板材沿其底边内侧间隔开设墙板底部安装孔、一侧边内侧间隔开设墙板侧边安装孔、另一侧边对应墙板侧边安装孔开设位置预埋墙板侧边固定螺母、顶边内侧间隔预埋墙板顶边固定螺母而成;墙板侧边安装孔内设有穿至板材外侧的墙板螺栓及配套的墙板安装螺母;墙板底部安装孔内、墙板侧边安装孔内、墙板侧边固定螺母预埋位置及墙板顶边固定螺母预埋位置均预埋焊接有墙板补强钢板。The wall panel is provided with installation holes at the bottom of the wall panel at intervals along the inner side of the bottom edge of the panel, side installation holes of the wall panel at intervals on the inner side of one side, and pre-embedded on the side of the wall panel at the positions corresponding to the installation holes at the other side of the wall panel. The side fixing nuts and the inner side of the top side are pre-embedded with the top side fixing nuts of the wall board; the wall board bolts and matching wall board installation nuts that penetrate to the outside of the board are installed in the wall board side mounting holes; the wall board bottom mounting holes are , In the mounting hole on the side of the wall panel, the pre-embedded position of the fixing nut on the side of the wall panel and the pre-embedded position of the fixing nut on the top edge of the wall panel are pre-embedded and welded with a wall panel reinforcement steel plate.
一字连接的相邻两墙板的连接面之间设有通长的橡胶垫片,并一墙板的墙板螺栓穿至相邻墙板的墙板侧边固定螺母内、且墙板螺栓另一侧通过墙板安装螺母紧固,并墙板侧边安装孔内通过细石混凝土填实;一字连接的相邻两墙板外侧面之间的连接缝呈一字形、并连接缝内通过挤塑聚苯板填充。There is a full-length rubber gasket between the connecting surfaces of two adjacent wall panels connected in a straight line, and the wall panel bolts of one wall panel penetrate into the wall panel side fixing nuts of the adjacent wall panels, and the wall panel bolts The other side is fastened by the installation nut of the wall panel, and the installation hole on the side of the wall panel is filled with fine stone concrete; Filled by extruded polystyrene board.
L形连接的相邻两墙板的连接面之间设有通长的橡胶垫片,并位于竖直向的墙板的墙板螺栓穿至位于水平向的墙板的墙板侧边固定螺母内、且墙板螺栓另一侧通过墙板安装螺母紧固,并墙板侧边安装孔内通过细石混凝土填实;L形连接的相邻两墙板外侧面之间的连接缝呈L形、并连接缝内通过挤塑聚苯板填充。There is a long rubber gasket between the connecting surfaces of the adjacent two wall panels of the L-shaped connection, and the wall panel bolts on the vertical wall panel pass through the wall panel side fixing nuts on the horizontal wall panel The inside and the other side of the wallboard bolts are fastened by the wallboard installation nuts, and the installation holes on the side of the wallboard are filled with fine stone concrete; the connection joint between the outer sides of two adjacent wallboards connected in L shape is L Shaped and connected seams are filled with extruded polystyrene boards.
所述屋面板包括依次连接的左侧屋面板、至少一个中间屋面板及右侧屋面板。The roof panels include a left roof panel, at least one middle roof panel and a right roof panel connected in sequence.
所述左侧屋面板由板材沿其长向外侧边间隔开竖直向的贯通孔、长向内侧边间隔开设水平向的屋面板安装孔、两宽向侧边对称间隔开设竖直向的贯通孔而成。The left side roof panel is separated by vertical through holes along the lengthwise outer side of the plate, horizontal roof panel installation holes are set apart from the long side towards the inner side, and vertical through holes are opened symmetrically between the two widthwise side sides. made of through holes.
所述中间屋面板由板材沿其一长向侧边间隔开设水平向的屋面板安装孔、另一长向侧边对应屋面板安装孔开设位置预埋屋面板固定螺母、两宽向侧边对称间隔开设竖直向的贯通孔而成。The middle roof panel is provided with horizontal roof panel installation holes at intervals along one long side of the panel, and pre-buried roof panel fixing nuts at the positions corresponding to the roof panel installation holes on the other long side, and the two widthwise sides are symmetrical. Vertical through-holes are formed at intervals.
所述右侧屋面板由板材沿其长向外侧边间隔开设竖直向的贯通孔、长向内侧边间隔预埋屋面板固定螺母、两宽向一对侧边间隔开设竖直向的贯通孔而成。The right side roof panel is provided with vertical through-holes at intervals along its lengthwise outer side, pre-embedded roof panel fixing nuts at intervals along its lengthwise inner side, and vertical through-holes at intervals between two widthwise sides. Made through holes.
屋面板安装孔及贯通孔内均设有穿至板材外侧的屋面板螺栓及配套的屋面板安装螺母;There are roof panel bolts and matching roof panel installation nuts that penetrate to the outside of the panel in the roof panel installation holes and through holes;
屋面板安装孔内及屋面板固定螺母设置位置均预埋有屋面板补强钢板。Roof panel reinforcement steel plates are pre-embedded in the installation holes of the roof panel and at the positions where the roof panel fixing nuts are set.
相邻两屋面板的连接面之间设有通长的橡胶垫片,并一屋面板的屋面板安装孔内的屋面板螺栓穿至相邻屋面板的屋面板固定螺母内、且屋面板螺栓的另一侧通过屋面板安装螺母紧固,并屋面板安装孔内通过细石混凝土填实;相邻两屋面板上表面之间的连接缝呈一字形、并连接缝内通过挤塑聚苯板填充。There is a long rubber gasket between the connecting surfaces of two adjacent roof panels, and the roof panel bolts in the roof panel installation hole of one roof panel penetrate into the roof panel fixing nuts of the adjacent roof panel, and the roof panel bolts The other side of the roof panel is fastened by the installation nut of the roof panel, and the installation hole of the roof panel is filled with fine stone concrete; the connection seam between the upper surfaces of two adjacent roof panels is in the shape of a line, and the joint is filled with extruded polystyrene Plate filling.
所述屋面板与墙板之间的连接面处垫有橡胶垫片,屋面板的贯通孔内的屋面板螺栓穿至墙板的墙板顶边固定螺母内、并屋面板螺栓的另一侧通过屋面板安装螺母紧固,并贯通孔内通过细石混凝土填实。The joint surface between the roof panel and the wall panel is padded with a rubber gasket, and the roof panel bolts in the through holes of the roof panel penetrate into the fixing nuts at the top edge of the wall panel and connect to the other side of the roof panel bolts. Fasten through the installation nut of the roof panel, and fill the through hole with fine stone concrete.
所述基础包括基础桩和设在基础桩上的一圈地梁,所述地梁内间隔预埋有地脚螺丝。The foundation includes foundation piles and a circle of ground beams arranged on the foundation piles, and foundation screws are pre-embedded at intervals in the ground beams.
所述基础与墙板之间的连接面内铺设有橡胶垫片,地脚螺丝的上部穿至墙板底部安装孔内、并通过墙板安装螺母紧固,并底部安装孔内通过细石混凝土填实。Rubber gaskets are laid on the connecting surface between the foundation and the wallboard, the upper part of the anchor screw penetrates into the installation hole at the bottom of the wallboard, and is fastened by the installation nut of the wallboard, and the fine stone concrete is passed through the bottom installation hole fill.
所述墙体的一侧墙板上开有门和窗,且门下方设有台阶。A door and a window are opened on one side of the wall, and a step is arranged under the door.
所述屋面的屋面板顶面通过防水砂浆整体做一层坡屋面、其向一侧倾斜设置、且倾斜坡度为2%。The top surface of the roof panel of the roof is made of a whole layer of sloping roof with waterproof mortar, which is inclined to one side, and the slope is 2%.
坡屋面的底部收口位置铺设一层钢压条、并通过间隔设置的水泥钉固定、且通过密封膏密封。A layer of steel bead is laid on the bottom closing position of the sloping roof, fixed by cement nails arranged at intervals, and sealed by sealing paste.
屋面四周均向外延伸、超出墙体形成屋檐,并屋檐的下表面外侧四周设有滴水槽。All sides of the roof extend outwards and exceed the walls to form eaves, and drip grooves are arranged around the outside of the lower surface of the eaves.
所述墙体的墙板外侧整体通过抗裂砂浆压入一层耐碱纤维网格布。The outer side of the wall panel of the wall body is pressed into a layer of alkali-resistant fiber mesh cloth through anti-crack mortar as a whole.
所述屋面的屋面板上表面整体通过抗裂砂浆压入一层耐碱纤维网格布,并做防水处理。The upper surface of the roof panel of the roof is pressed into a layer of alkali-resistant fiber mesh cloth through anti-crack mortar as a whole, and is treated with waterproofing.
应用所述的全螺栓连接模数化钢边框板式单层房屋体系的安装方法,步骤为:Applying the installation method of the full-bolt connection modularized steel frame slab type single-storey house system, the steps are:
步骤一,现场浇筑基础,按图纸预埋地脚螺丝。Step 1: On-site pouring of the foundation, and pre-embedding anchor screws according to the drawings.
步骤二,将墙板和屋面板运至现场,吊装第一块墙板至安装位置,并在第一块墙板两侧设临时支撑,测量校核位置后在墙板底部安装孔内安装墙板安装螺母进行第一块墙板与基础紧固。Step 2, transport the wall panels and roof panels to the site, hoist the first wall panel to the installation position, and set up temporary supports on both sides of the first wall panel, measure and check the position and install the wall in the installation hole at the bottom of the wall panel Panel mounting nuts secure the first wall panel to the foundation.
步骤三,吊装紧邻第一块墙板的第二块墙板至安装位置,测量校核位置后在墙板底部安装孔内安装墙板安装螺母进行第二块墙板与基础紧固,然后在墙板侧边安装孔内安装墙板螺栓进行第一块墙板与第二块墙板间紧固。Step 3, hoist the second wall panel next to the first wall panel to the installation position, measure and check the position, install the wall panel installation nut in the installation hole at the bottom of the wall panel to fasten the second wall panel to the foundation, and then Wallboard bolts are installed in the mounting holes on the side of the wallboard to fasten the first wallboard and the second wallboard.
步骤四,重复上述步骤三,依次安装剩余墙板至完成所有墙板安装。Step 4, repeat the above step 3, and install the remaining wall panels in sequence until all the wall panels are installed.
步骤五,吊装中间屋面板至安装位置,测量校核位置后在贯通孔内安装垂直方向设置的屋面板螺栓进行屋面板与墙板间紧固。Step 5: hoist the middle roof panel to the installation position, measure and check the position and install the roof panel bolts arranged in the vertical direction in the through hole to fasten the roof panel and the wall panel.
步骤六,依次安装两侧剩余屋面板,相邻屋面板连接面之间通过水平向设置的屋面板螺栓连接,然后安装垂直方向设置的屋面板螺栓进行屋面板与墙板间紧固,至完成所有屋面板安装。Step 6, install the remaining roof panels on both sides in sequence, connect the connecting surfaces of adjacent roof panels with the roof panel bolts set in the horizontal direction, and then install the roof panel bolts set in the vertical direction to fasten the roof panel and the wall panel until the completion All roof panels installed.
步骤七,墙体外表面处理:在墙板接缝处填充挤塑聚苯板,并铺设耐碱纤维网格布和抗裂砂浆。Step 7, external surface treatment of the wall: Fill the joints of the wall panels with extruded polystyrene boards, and lay alkali-resistant fiber mesh cloth and crack-resistant mortar.
步骤八,屋面处理:在屋面板接缝处铺设耐碱纤维网格布和抗裂砂浆,并做防水处理。Step 8, roof treatment: Lay alkali-resistant fiber mesh cloth and anti-crack mortar at the joints of roof panels, and do waterproof treatment.
步骤九,墙体内表面处理:在墙板底部四周包裹防潮垫,并铺设耐碱纤维网格布和抗裂砂浆,完成施工。Step 9, wall surface treatment: Wrap moisture-proof pads around the bottom of the wallboard, and lay alkali-resistant fiber mesh cloth and anti-cracking mortar to complete the construction.
与现有技术相比本实用新型具有以下特点和有益效果:Compared with the prior art, the utility model has the following characteristics and beneficial effects:
本实用新型中板材只有屋面板和墙板两种类型,板材类型少,墙板为2m模数,便于板材在工厂批量标准化生产,同时由于板材类型少,可节约生产时间用于提高板材生产的标准度和预制率,提高其使用的通用性;基础、屋面板及墙板之间的拼接节点均采用全螺栓连接,无焊接,操作简单,且便于实现房屋的模数化扩展,且全螺栓的连接方式房屋的整体性好、且节能环保,便于实现绿色施工,同时全螺栓连接方式现场拼装简单,易于施工,施工周期短,节约施工成本;基础、屋面板及墙板之间的连接节点处设置橡胶垫片,实现板材之间的柔性连接,增强房屋整体密封性能和稳定性;基础、屋面板及墙板之间的连接节点处通过铺设耐碱纤维网格布及抗裂砂浆等构造处理,有效阻断冷热桥,提高房屋整体使用寿命。In the utility model, there are only two types of panels: roof panels and wall panels. There are few types of panels, and the wall panels have a modulus of 2m, which is convenient for batch standardized production of panels in the factory. At the same time, due to fewer types of panels, production time can be saved to improve panel production. The standard degree and prefabrication rate improve the versatility of its use; the splicing joints between the foundation, roof panels and wall panels are all bolted, without welding, easy to operate, and easy to realize the modular expansion of the house, and all bolts The connection method of the house has good integrity, energy saving and environmental protection, and is convenient for green construction. At the same time, the full bolt connection method is easy to assemble on site, easy to construct, and the construction period is short, saving construction costs; the connection nodes between the foundation, roof panels and wall panels Rubber gaskets are set at the joints to realize the flexible connection between the boards and enhance the overall sealing performance and stability of the house; the connection nodes between the foundation, roof boards and wall boards are constructed by laying alkali-resistant fiber mesh cloth and crack-resistant mortar. Treatment can effectively block the cold and heat bridge and improve the overall service life of the house.
本实用新型可广泛应用于单层农牧民保障房、单层基站辅助用房及其他单层房屋。The utility model can be widely used in single-story farmers and herdsmen security houses, single-story base station auxiliary houses and other single-story houses.
附图说明Description of drawings
下面结合附图对本实用新型做进一步详细的说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.
图1是本实用新型房屋体系的立体图。Fig. 1 is a perspective view of the housing system of the present invention.
图2是本实用新型房屋体系的正立面图。Fig. 2 is the front elevation view of the housing system of the present utility model.
图3是本实用新型房屋体系的侧立面图。Fig. 3 is a side elevation view of the housing system of the present invention.
图4是檐口大样图。Figure 4 is a large sample diagram of the cornice.
图5是图4中A部的的放大图。Fig. 5 is an enlarged view of part A in Fig. 4 .
图6是墙板布置图。Figure 6 is a wall panel layout.
图7是地脚螺丝布置图。Figure 7 is a layout diagram of anchor screws.
图8是屋面板布置图。Figure 8 is a layout diagram of roof panels.
图9是一字墙板间拼接节点图。Fig. 9 is a splicing node diagram between straight wallboards.
图10是L形墙板间拼接节点图。Figure 10 is a splicing node diagram between L-shaped wall panels.
图11是屋面板与屋面板间拼接节点图。Fig. 11 is a splicing node diagram between roof panels and roof panels.
图12是屋面板与墙板间拼接节点图。Figure 12 is a splicing node diagram between the roof panel and the wall panel.
图13是墙板与基础间连接节点图。Figure 13 is a connection node diagram between the wallboard and the foundation.
图14是板材结构图。Figure 14 is a structural diagram of the plate.
附图标记:1—基础、2—墙板、3—屋面板、3.1—左侧屋面板、3.2—中间屋面板、3.3—右侧屋面板、4—橡胶垫片、5—钢丝网、6—地脚螺丝、7—细石混凝土、8—门、9—窗、10—墙板补强钢板、11—屋面板补强钢板、12—钢压条、13—密封膏、14—滴水槽、15—挤塑聚苯板、16—板材主体、17—钢边框。Reference signs: 1—foundation, 2—wall panel, 3—roof panel, 3.1—left roof panel, 3.2—middle roof panel, 3.3—right roof panel, 4—rubber gasket, 5—steel mesh, 6 —Anchor screws, 7—fine stone concrete, 8—doors, 9—windows, 10—reinforced steel plates for wall panels, 11—reinforced steel plates for roof panels, 12—steel beading, 13—sealing paste, 14—drip tanks, 15—extruded polystyrene board, 16—board body, 17—steel frame.
具体实施方式Detailed ways
参见图1-图3所示,全螺栓连接模数化钢边框板式单层房屋体系,包括基础1、竖直向连接在基础1上的墙体及水平向连接在墙体顶面的屋面;墙体由可拆卸连接的墙板2围合而成,屋面由可拆卸连接的屋面板3从一侧依次连接而成;所述墙板2和屋面板3均由板材制作而成;参见图14所示,所述板材包括板材主体16、包裹在板材主体周圈的钢边框17及间隔设在板材主体内的钢丝网5;板材主体为矩形板体、周圈内侧向外凸出形成凸肋;钢边框为两端垂直向内弯折的卷边C形钢;钢边框对应包裹在板材主体的凸肋上;钢边框尺寸为160*60*20mm;参见图2和图3所示,所述墙体的一侧墙板2上开有门8和窗9,且门上方设有雨棚、门下方设有台阶,相邻另一侧墙板上开有用于预埋馈线的空洞11;参见图4和图5所示,所述屋面的屋面板3顶面通过防水砂浆整体做一层坡屋面、其向一侧倾斜设置、且倾斜坡度为2%;坡屋面的底部收口位置铺设一层钢压条12、并通过间隔设置的水泥钉固定、且通过密封膏13密封,密封膏13为硅酮密封膏;屋面四周均向外延伸、超出墙体形成屋檐,并屋檐的下表面外侧四周设有滴水槽14;滴水槽宽20mm、深10mm,水泥钉设置间距为500mm。Referring to Figures 1-3, the single-storey housing system with modular steel frame panels connected by full bolts includes a foundation 1, a wall connected vertically to the foundation 1, and a roof connected horizontally to the top of the wall; The wall is enclosed by detachably connected wall panels 2, and the roof is formed by sequentially connecting detachably connected roof panels 3 from one side; the wall panels 2 and roof panels 3 are both made of plates; see the figure As shown in 14, the plate includes a plate main body 16, a steel frame 17 wrapped around the circumference of the plate main body, and steel wire mesh 5 arranged at intervals in the plate main body; Rib; the steel frame is rolled C-shaped steel with both ends bent vertically inward; the steel frame is correspondingly wrapped on the convex rib of the main body of the plate; the size of the steel frame is 160*60*20mm; see Figure 2 and Figure 3, A door 8 and a window 9 are opened on one side of the wall, and a canopy is provided above the door, and steps are provided below the door, and a cavity 11 for pre-embedded feeder is opened on the adjacent wall on the other side. ; Referring to Fig. 4 and shown in Fig. 5, the roof panel 3 top surface of the roof is integrally made into a layer of sloping roof by waterproof mortar, which is inclined to one side, and the slope is 2%; the bottom closing position of the sloping roof is laid A layer of steel beading 12, fixed by cement nails arranged at intervals, and sealed by sealing paste 13, the sealing paste 13 is a silicone sealing paste; all sides of the roof extend outward, beyond the wall to form the eaves, and the outer surface of the lower surface of the eaves Drip tanks 14 are arranged around; the drip tanks are 20 mm wide and 10 mm deep, and the distance between cement nails is 500 mm.
参见图6所示,所述墙板2由板材沿其底边内侧间隔开设墙板底部安装孔、一侧边内侧间隔开设墙板侧边安装孔、另一侧边对应墙板侧边安装孔开设位置预埋墙板侧边固定螺母、顶边内侧间隔预埋墙板顶边固定螺母而成;墙板侧边安装孔内设有穿至板材外侧的墙板螺栓及配套的墙板安装螺母;墙板底部安装孔内、墙板侧边安装孔内、墙板侧边固定螺母预埋位置及墙板顶边固定螺母预埋位置均预埋焊接有墙板补强钢板10;墙板补强钢板10焊接在钢边框内侧,墙板补强钢板在工厂即焊接完成,尺寸为150*100*6;墙板底部安装孔及墙板侧边安装孔尺寸均为150*150*130mm;参见图6所示,本实施例中,墙体长度方向布置三块墙板,宽度方向布置两块墙板;参见图9所示,一字连接的相邻两墙板2的连接面之间设有通长的橡胶垫片4,并一墙板的墙板螺栓穿至相邻墙板的墙板侧边固定螺母内、且墙板螺栓另一侧通过墙板安装螺母紧固,并墙板侧边安装孔内通过细石混凝土7填实;一字连接的相邻两墙板2外侧面之间的连接缝呈一字形、并连接缝内通过挤塑聚苯板15填充;并在墙板外侧整体通过抗裂砂浆压入一层耐碱纤维网格布;参见图10所示,L形连接的相邻两墙板2的连接面之间设有通长的橡胶垫片4,并位于竖直向的墙板的墙板螺栓穿至位于水平向的墙板的墙板侧边固定螺母内、且墙板螺栓另一侧通过墙板安装螺母紧固,并墙板侧边安装孔内通过细石混凝土7填实;L形连接的相邻两墙板2外侧面之间的连接缝呈L形、并连接缝内通过挤塑聚苯板15填充,并在墙板外侧整体通过抗裂砂浆压入一层耐碱纤维网格布。Referring to Fig. 6, the wall panel 2 is provided with installation holes at the bottom of the wall panel at intervals along the inside of the bottom edge of the panel, side installation holes of the wall panel at intervals on the inner side of one side, and corresponding installation holes at the side of the wall panel on the other side. The fixing nuts on the side of the wallboard are pre-embedded at the opening position, and the fixing nuts on the top side of the wallboard are embedded at intervals on the inner side of the top side; the mounting holes on the side of the wallboard are provided with wallboard bolts and matching wallboard installation nuts that penetrate to the outside of the board ; In the installation holes at the bottom of the wallboard, in the installation holes at the side of the wallboard, at the pre-embedded positions of the fixing nuts at the side of the wallboard, and at the pre-embedded positions of the fixing nuts at the top side of the wallboard, there are pre-embedded and welded wallboard reinforcement steel plates 10; The strong steel plate 10 is welded on the inner side of the steel frame, and the wall panel reinforcement steel plate is welded at the factory, with a size of 150*100*6; the dimensions of the mounting holes at the bottom of the wall panel and the mounting holes at the side of the wall panel are both 150*150*130mm; see As shown in Figure 6, in this embodiment, three wall panels are arranged in the length direction of the wall body, and two wall panels are arranged in the width direction; There is a long rubber gasket 4, and the wall panel bolt of one wall panel penetrates into the wall panel side fixing nut of the adjacent wall panel, and the other side of the wall panel bolt is fastened by the wall panel installation nut, and the wall panel The side installation holes are filled with fine stone concrete 7; the joints between the outer surfaces of two adjacent wall panels 2 connected in a straight line are in a straight line, and the joints are filled with extruded polystyrene boards 15; The outer side of the board is pressed into a layer of alkali-resistant fiber mesh cloth through anti-cracking mortar; as shown in Figure 10, a long rubber gasket 4 is provided between the connecting surfaces of two adjacent wall boards 2 connected in L shape, and The wallboard bolts of the vertical wallboard pass through the wallboard side fixing nuts of the horizontal wallboard, and the other side of the wallboard bolts is fastened by the wallboard installation nuts, and the wallboard side mounting holes The inside is filled with fine stone concrete 7; the connection joint between the outer sides of two adjacent wall panels 2 connected in L shape is L-shaped, and the inside of the connection joint is filled with extruded polystyrene board 15, and passes through the outer side of the wall panel as a whole Crack-resistant mortar is pressed into a layer of alkali-resistant fiber mesh cloth.
参见图8所示,所述屋面板3包括依次连接的左侧屋面板3.1、至少一个中间屋面板3.2及右侧屋面板3.3;所述左侧屋面板由板材沿其长向外侧边间隔开竖直向的贯通孔、长向内侧边间隔开设水平向的屋面板安装孔、两宽向侧边对称间隔开设竖直向的贯通孔而成;所述中间屋面板由板材沿其一长向侧边间隔开设水平向的屋面板安装孔、另一长向侧边对应屋面板安装孔开设位置预埋屋面板固定螺母、两宽向侧边对称间隔开设竖直向的贯通孔而成;所述右侧屋面板由板材沿其长向外侧边间隔开设竖直向的贯通孔、长向内侧边间隔预埋屋面板固定螺母、两宽向一对侧边间隔开设竖直向的贯通孔而成;屋面板安装孔及贯通孔内均设有穿至板材外侧的屋面板螺栓及配套的屋面板安装螺母;屋面板安装孔内及屋面板固定螺母设置位置均预埋有屋面板补强钢板11;贯通孔的尺寸为160*160*150mm;参见图11所示,相邻两屋面板3的连接面之间设有通长的橡胶垫片4,并一屋面板的屋面板安装孔内的屋面板螺栓穿至相邻屋面板的屋面板固定螺母内、且屋面板螺栓的另一侧通过屋面板安装螺母紧固,并屋面板安装孔内通过细石混凝土7填实;相邻两屋面板2上表面之间的连接缝呈一字形、并连接缝内通过挤塑聚苯板15填充,在屋面板上表面整体通过抗裂砂浆压入一层耐碱纤维网格布,并做防水处理;挤塑聚苯板15厚度为40mm;所述屋面的屋面板3上表面整体通过抗裂砂浆压入一层耐碱纤维网格布,并做防水处理;抗裂砂浆及压入一层耐碱纤维网格布厚度为5mm。Referring to Fig. 8, the roof panel 3 includes a left roof panel 3.1, at least one middle roof panel 3.2 and a right roof panel 3.3 connected in sequence; It is formed by opening vertical through holes, opening horizontal roof panel installation holes at intervals on the inner side of the long side, and setting vertical through holes at symmetrical intervals on the two widthwise sides; the middle roof panel is made of plates along one Horizontal roof panel installation holes are set at intervals on the long side, roof panel fixing nuts are pre-embedded in the position corresponding to the roof panel installation holes on the other long side, and vertical through holes are symmetrically spaced between the two widthwise sides. ; The right side roof panel is provided with vertical through holes at intervals along the lengthwise outer side of the plate, pre-buried roof panel fixing nuts at intervals along the lengthwise inner side, and vertically arranged vertically at intervals between two widthwise sides. It is made of through-holes; the roof panel mounting holes and the through-holes are equipped with roof panel bolts and matching roof panel installation nuts that penetrate to the outside of the panel; roof panel installation holes and roof panel fixing nuts are pre-buried with roof Panel reinforcement steel plate 11; the size of the through hole is 160*160*150mm; see Figure 11, a long rubber gasket 4 is provided between the connecting surfaces of two adjacent roof panels 3, and the roof of one roof panel The roof panel bolts in the panel installation holes penetrate into the roof panel fixing nuts of the adjacent roof panel, and the other side of the roof panel bolts is fastened by the roof panel installation nuts, and the roof panel installation holes are filled with fine stone concrete 7 The joints between the upper surfaces of two adjacent roof panels 2 are in the shape of a line, and the joints are filled with extruded polystyrene boards 15, and a layer of alkali-resistant fiber mesh is pressed into the upper surface of the roof panels through anti-crack mortar The thickness of the extruded polystyrene board 15 is 40mm; the upper surface of the roof panel 3 of the roof is pressed into a layer of alkali-resistant fiber mesh cloth through the anti-crack mortar as a whole, and waterproofed; the anti-crack mortar And press into a layer of alkali-resistant fiber grid cloth with a thickness of 5mm.
参见图12所示,所述屋面板3与墙板2之间的连接面处垫有橡胶垫片4,屋面板3的贯通孔内的屋面板螺栓穿至墙板2的墙板顶边固定螺母内、并屋面板螺栓的另一侧通过屋面板安装螺母紧固,并贯通孔内通过细石混凝土7填实。As shown in Figure 12, rubber gaskets 4 are placed on the connection surface between the roof panel 3 and the wall panel 2, and the roof panel bolts in the through holes of the roof panel 3 pass through the top edge of the wall panel 2 and are fixed. The inside of the nut and the other side of the roof panel bolt are fastened by the roof panel installation nut, and the through hole is filled with fine stone concrete 7 .
参见图7所示,所述基础1包括基础桩和设在基础桩上的一圈地梁,所述地梁内间隔预埋有地脚螺丝6;参见图13所示,所述基础1与墙板2之间的连接面内铺设有橡胶垫片4,地脚螺丝6的上部穿至墙板底部安装孔内、并通过墙板安装螺母紧固,并底部安装孔内通过细石混凝土7填实。As shown in Figure 7, the foundation 1 includes foundation piles and a circle of ground beams arranged on the foundation piles, and anchor screws 6 are pre-embedded in the intervals of the ground beams; as shown in Figure 13, the foundation 1 and A rubber gasket 4 is laid on the connecting surface between the wall panels 2, the upper part of the anchor screw 6 penetrates into the installation hole at the bottom of the wall panel, and is fastened by the installation nut of the wall panel, and the fine stone concrete 7 is passed through the bottom installation hole. fill.
应用所述的全螺栓连接模数化钢边框板式单层房屋体系的安装方法,步骤为:Applying the installation method of the full-bolt connection modularized steel frame slab type single-storey house system, the steps are:
步骤一,现场浇筑基础,按图纸预埋地脚螺丝。Step 1: On-site pouring of the foundation, and pre-embedding anchor screws according to the drawings.
步骤二,将墙板和屋面板运至现场,吊装第一块墙板至安装位置,并在第一块墙板两侧设临时支撑,测量校核位置后在墙板底部安装孔内安装墙板安装螺母进行第一块墙板与基础紧固。Step 2, transport the wall panels and roof panels to the site, hoist the first wall panel to the installation position, and set up temporary supports on both sides of the first wall panel, measure and check the position and install the wall in the installation hole at the bottom of the wall panel Panel mounting nuts secure the first wall panel to the foundation.
步骤三,吊装紧邻第一块墙板的第二块墙板至安装位置,测量校核位置后在墙板底部安装孔内安装墙板安装螺母进行第二块墙板与基础紧固,然后在墙板侧边安装孔内安装墙板螺栓进行第一块墙板与第二块墙板间紧固。Step 3, hoist the second wall panel next to the first wall panel to the installation position, measure and check the position, install the wall panel installation nut in the installation hole at the bottom of the wall panel to fasten the second wall panel to the foundation, and then Wallboard bolts are installed in the mounting holes on the side of the wallboard to fasten the first wallboard and the second wallboard.
步骤四,重复上述步骤三,依次安装剩余墙板至完成所有墙板安装。Step 4, repeat the above step 3, and install the remaining wall panels in sequence until all the wall panels are installed.
步骤五,吊装位于中间屋面板至安装位置,测量校核位置后在贯通孔孔内安装垂直方向的屋面板螺栓进行屋面板与墙板间紧固。Step 5: hoist the roof panel located in the middle to the installation position, measure and check the position and install the roof panel bolts in the vertical direction in the through hole to fasten the roof panel and the wall panel.
步骤六,依次安装两侧剩余屋面板,相邻屋面板连接面之间通过水平向设置的屋面板螺栓连接,然后安装垂直方向屋面板螺栓进行屋面板与墙板间紧固,至完成所有屋面板安装。Step 6, install the remaining roof panels on both sides in sequence, and connect the adjacent roof panel connecting surfaces through horizontal roof panel bolts, and then install vertical roof panel bolts to fasten the roof panels and wall panels until all roof panels are completed. Panel mount.
步骤七,墙板冷热桥处理:在墙板接缝处填充挤塑聚苯板。Step 7, heat and cold bridge treatment of wall panels: Fill extruded polystyrene boards at the joints of wall panels.
步骤八,墙板抗裂砂浆处理:在墙板接缝处铺设一层耐碱纤维网格布,在耐碱纤维网格布上铺设一层抗裂砂浆。Step 8, wallboard anti-cracking mortar treatment: Lay a layer of alkali-resistant fiber mesh cloth at the joint of the wallboard, and lay a layer of anti-cracking mortar on the alkali-resistant fiber mesh cloth.
步骤九,墙板整体抗裂砂浆处理:在墙板外侧整体铺设一层耐碱纤维网格布,在耐碱纤维网格布上整体铺设一层抗裂砂浆。Step 9, overall anti-cracking mortar treatment of the wallboard: Lay a layer of alkali-resistant fiber mesh cloth on the outside of the wallboard as a whole, and lay a layer of anti-cracking mortar on the alkali-resistant fiber mesh cloth as a whole.
步骤十,屋面板缝处理:在屋面板缝处铺设一层耐碱纤维网格布,在耐碱纤维网格布上铺设一层抗裂砂浆,在屋面板上表面整体铺设一层耐碱纤维网格布,在耐碱纤维网格布上整体铺设一层抗裂砂浆。Step 10, roof panel seam treatment: Lay a layer of alkali-resistant fiber mesh cloth on the roof panel seam, lay a layer of anti-cracking mortar on the alkali-resistant fiber mesh cloth, and lay a layer of alkali-resistant fiber on the upper surface of the roof panel as a whole Mesh cloth, a layer of anti-cracking mortar is laid on the alkali-resistant fiber mesh cloth as a whole.
步骤十一,屋面防水处理:在抗裂砂浆层上铺设一层防水砂浆的防水层,然后在防水层上再铺设一层抗裂砂浆。Step 11, roof waterproof treatment: Lay a waterproof layer of waterproof mortar on the anti-crack mortar layer, and then lay a layer of anti-crack mortar on the waterproof layer.
步骤十二,室内墙板处理:在墙板底部四周包裹防潮垫,并在墙板上整体铺设一层耐碱纤维网格布,并在耐碱纤维网格布上铺设一层抗裂砂浆,完成施工。Step 12, indoor wallboard treatment: Wrap moisture-proof pads around the bottom of the wallboard, and lay a layer of alkali-resistant fiber mesh cloth on the wallboard as a whole, and lay a layer of anti-cracking mortar on the alkali-resistant fiber mesh cloth, Complete construction.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821863987.XU CN209494046U (en) | 2018-11-13 | 2018-11-13 | It is bolted the board-like one storey house system of modularization steel frame entirely |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821863987.XU CN209494046U (en) | 2018-11-13 | 2018-11-13 | It is bolted the board-like one storey house system of modularization steel frame entirely |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209494046U true CN209494046U (en) | 2019-10-15 |
Family
ID=68151173
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201821863987.XU Active CN209494046U (en) | 2018-11-13 | 2018-11-13 | It is bolted the board-like one storey house system of modularization steel frame entirely |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209494046U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109386058A (en) * | 2018-11-13 | 2019-02-26 | 中建集成房屋有限公司 | It is bolted the board-like one storey house system of modularization steel frame and its installation method entirely |
| CN111794513A (en) * | 2020-07-23 | 2020-10-20 | 中亿丰建设集团股份有限公司 | Construction method of assembled floor slab |
-
2018
- 2018-11-13 CN CN201821863987.XU patent/CN209494046U/en active Active
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109386058A (en) * | 2018-11-13 | 2019-02-26 | 中建集成房屋有限公司 | It is bolted the board-like one storey house system of modularization steel frame and its installation method entirely |
| CN109386058B (en) * | 2018-11-13 | 2023-07-25 | 中建集成房屋有限公司 | Method for installing full-bolt connection modular steel frame plate type single-layer house system |
| CN111794513A (en) * | 2020-07-23 | 2020-10-20 | 中亿丰建设集团股份有限公司 | Construction method of assembled floor slab |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206174206U (en) | Embedded outer wall suitable for steel house room | |
| CN111705996A (en) | Prefabricated wall module unit, prefabricated composite wall and construction method | |
| CN111379329A (en) | Connecting node structure of silicon-magnesium wallboard and steel structure of steel structure house and construction method thereof | |
| CN111255059A (en) | Assembly type concrete house structure and node connection method thereof | |
| CN107700676B (en) | A dry-connected panel structure system and its construction method | |
| CN209799019U (en) | connecting node structure of silicon-magnesium wallboard and steel structure of steel structure house | |
| CN209494046U (en) | It is bolted the board-like one storey house system of modularization steel frame entirely | |
| CN111926994A (en) | External hanging type prefabricated external window-containing auxiliary frame wallboard module, external wall panel and house building | |
| CN111926993A (en) | Built-in prefabricated external window-containing auxiliary frame wallboard module, connecting node and house building | |
| CN109184067B (en) | Assembly process of light steel load-bearing wallboard | |
| EP0666948A4 (en) | Improvements in/or relating to insulated construction panels and/or methods of manufacturing such panels and/or methods of construction using such panels. | |
| CN219241456U (en) | Steel construction assembled integral house | |
| CN111851857A (en) | Single-sided precast concrete steel wire mesh frame insulation board wall and construction method thereof | |
| CN111305590A (en) | Assembly type low-energy-consumption transformation structure and rapid transformation method for existing building balcony | |
| CN207063610U (en) | Transformer substation building spliced by prefabricated parts | |
| CN206034713U (en) | Precast concrete is small -size from waterproof insulation roofing system | |
| US3919812A (en) | Joindure of modules in prefabricated buildings | |
| CN115853270A (en) | Heat-preservation construction process | |
| CN211143325U (en) | Connecting structure of roof and wall of passive steel structure house | |
| CN115749380A (en) | Single-layer prefabricated wall plate bearing farm house and manufacturing method thereof | |
| CN111411690B (en) | Structure system capable of being assembled rapidly and construction method thereof | |
| CN107989259A (en) | The mountable double-deck Side fascia and mounting structure and waterproof construction of band mo(u)lding panel | |
| CN102535683A (en) | External wall self-insulation slat system, and building structure and construction method thereof | |
| CN109386058B (en) | Method for installing full-bolt connection modular steel frame plate type single-layer house system | |
| CN220848144U (en) | Prefabricated hollow concrete wall with flexible connection structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 406-6, floor 4, building 6, No. 38, Yongda Road, Daxing biomedical industry base, Zhongguancun Science and Technology Park, Daxing District, Beijing Patentee after: CSCEC Integrated Construction Co.,Ltd. Address before: 100195 83 Changqing Garden Road, Haidian District, Beijing Patentee before: CHINA CONSTRUCTION MODULAR HOUSING Co.,Ltd. |