Prior art keywords
accurate adjustment
support portion
trolley
auxiliary
piping lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822201834.5U
Other languages
Chinese (zh)
Inventor
高树青
姚淇誉
敖长江
张凡
刘斌
郭志光
禚锦鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Civil Engineering Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN201822201834.5U priority Critical patent/CN209493971U/en
Application granted granted Critical
Publication of CN209493971U publication Critical patent/CN209493971U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A pipe gallery erection trolley with a fine adjustment assembly comprises an outer trolley assembly and a fine adjustment assembly; the outer trolley assembly comprises an upper beam frame, at least one lifting device and an auxiliary traction device; the upper beam frame comprises an upper beam frame and a supporting part; the hoisting equipment is transversely connected on the upper beam frame in a sliding manner; the auxiliary traction device is arranged on the supporting part; the fine adjustment assembly comprises at least one auxiliary crown block, an auxiliary supporting plate, a fine adjustment device and at least one fine adjustment longitudinal beam; the beam mounting frame is provided with at least one auxiliary crown block; the fine adjustment device is embedded in the fine adjustment longitudinal beam; the auxiliary supporting plate is arranged on the supporting part; and the fine adjustment longitudinal beam is arranged below the auxiliary crown block. The utility model discloses a combined action of outer platform truck subassembly, accurate adjustment subassembly for the staff can adjust the position of placing the thing, makes the butt joint that the thing can be accurate place, just the utility model discloses a controlling means erects the platform truck to the pipe rack that has the accurate adjustment subassembly and carries out overall control, easy operation saves the time cost.

Description

A kind of piping lane erection trolley with accurate adjustment component
Technical field
The utility model relates to pipe gallery technical field of construction equipment more particularly to a kind of piping lane to set up trolley.
Background technique
Piping lane sets up trolley and refers to the identical reinforced concrete structure of section for elongate structures such as tunnel or piping lanes Removable formwork non-standard equipment.It is primary using the structure of transvers plate equipment of sizing the purpose is to replace traditional falsework mode Property formwork in place, to carry out reinforcing bar binding, concreting.
Existing piping lane it is prefabricated frequently with field cast-in-place, small segment precast assembly, piecemeal assembled and overlapping fabricated construction, The installation country integral prefabricated for large-scale piping lane is temporarily without mature technology.
Utility model content
The utility model provides a kind of piping lane erection trolley of the accurate adjustment with accurate adjustment component, has availability high, operates letter It is single, the low advantage of time cost.Its specific technical solution is as follows.
A kind of piping lane erection trolley with accurate adjustment component, including outer trolley component, accurate adjustment component;
The outer trolley component includes upper roof beam structure, at least one lifting appliance, auxiliary hitch;
The upper roof beam structure includes upper roof beam structure and support portion, and the both ends of the upper roof beam structure are respectively articulated with the first support portion, second Support portion;Second support portion bottom the first support portion of relative height ratio is high;The lifting appliance, which slides laterally, is connected to institute It states on roof beam structure;The auxiliary hitch be arranged on first support portion and lead be relatively upper roof beam structure from it is interior to Outside;
The accurate adjustment component includes an at least assistant crown block, auxiliary drop panel, adjuster and at least two accurate adjustment stringers;
At least one assistant crown block is provided on the upper roof beam structure, the assistant crown block longitudinal sliding motion is connected to the upper beam On frame;The adjuster is embedded on the accurate adjustment stringer;The auxiliary drop panel is arranged on the support portion;The accurate adjustment Stringer is arranged below the assistant crown block.
Further, the upper roof beam structure is additionally provided at least one driving mechanism, and the driving mechanism is described for driving It plays hanging device and assistant crown block is slided on the upper roof beam structure.
Further, first support portion is in " Y " font;The center hinge of first support portion and rectangle mobile platform It connects;Fixed support device is respectively arranged at the relative inner at four angles of the rectangle mobile platform;Second support portion In " mouth " font;The bottom of second support portion is provided with several traveling wheels;Second support portion towards described Traction mechanism is provided on the downside of first support portion.
Further, the auxiliary drop panel includes chute board and pulley mechanism;The chute board is placed in described second On front side of support part;The pulley mechanism, which can slide up and down, to be connected on first support portion;The upper side of the pulley mechanism is set Several pulley blocks are set, glide direction is to be parallel to the upper roof beam structure;Sliding horizontal plane and the pulley in the chute board Mechanism upper side horizontal plane is in same level.
Further, the adjuster includes lifting jack, accurate adjustment jack, traction jack and control module; The control module is used to carry out control braking to the lifting jack, accurate adjustment jack, traction jack;The raising thousand Jin roof pendant is directly embedded on the accurate adjustment stringer;The accurate adjustment jack is set to the side of the accurate adjustment stringer;The traction The side at the both ends of the accurate adjustment stringer is arranged in jack insertion, and the traction jack removably connects described second On the downside of support part;The adjuster and the compound action of the assistant crown block, auxiliary hitch carry out position tune to object is placed It is whole.
Further, the auxiliary hitch includes mounting rack, motor and tracting cable;The motor and tracting cable installation On the mounting rack, the motor braking tracting cable rotation;The auxiliary hitch can slide up and down be connected to it is described On first support portion.
Specifically, it further includes accepting vehicle that the piping lane with accurate adjustment component, which sets up trolley, the undertaking vehicle bottom setting There are several traveling wheels, for delivering required object;The undertaking vehicle upper side is provided with several steering columns, and the steering column is laid with In the undertaking vehicle upper side.
Specifically, it further includes control device that the piping lane with accurate adjustment component, which sets up trolley, the control device is wireless, Or/and trolley component and outer trolley component in wired connection, platform is set up for controlling the entire piping lane with accurate adjustment component The braking of vehicle all parts.
The utility model has the beneficial effects that the utility model forms band by outer trolley component, accurate adjustment component, control device There is the piping lane of accurate adjustment component to set up trolley, lifting appliance is slidably connected on roof beam structure and lifting appliance is slidably connected at stringer On, enable staff to adjust the position for placing object, and since the slidable adjustment of lifting appliance acts on, so that this is practical new Type can be suitable for different piping lanes and construct, and promote availability, while the positioning device being arranged on accurate adjustment stringer plays positioning Effect enables placement object accurately to dock, and the utility model is whole to piping lane erection trolley progress by control device Operating procedure is saved in control, saves time cost.
Detailed description of the invention
Fig. 1 is the stereochemical structure signal that the piping lane provided by the embodiment of the utility model with accurate adjustment component sets up trolley Figure;
Fig. 2 is that another stereochemical structure that the piping lane provided by the embodiment of the utility model with accurate adjustment component sets up trolley is shown It is intended to.
Icon: assistant crown block 1, slideway supporting plate 21, pulley mechanism 22, pulley blocks 221, lifting jack 31, accurate adjustment is very heavy Jack 33, rack 4, upper roof beam structure 41, support portion, the first support portion 421, the second support portion 422, traveling wheel are drawn in top 32 4221, rectangle mobile platform 4211, fixed support device 4212, lifting appliance 5, auxiliary hitch.
Specific embodiment
Specific embodiment of the present utility model is described further with reference to the accompanying drawing:
Such as Fig. 1 to Fig. 2, the present embodiment provides a kind of piping lane with accurate adjustment component sets up trolley, including outer trolley component, Accurate adjustment component;
The outer trolley component includes upper roof beam structure 4, at least one lifting appliance 5, auxiliary hitch 6;
The accurate adjustment component includes an at least assistant crown block 1, auxiliary drop panel, adjuster and at least one accurate adjustment stringer 7;
The rack 4 includes upper roof beam structure 42 and support portion, and the support portion includes the first support portion 421 and the second support portion 422, the both ends of the upper roof beam structure 42 are respectively articulated with the first support portion 421, the second support portion 422;Second support portion, 422 bottom Relative height ratio the first support portion 421 in portion's is high, and in the utility model embodiment, second support portion, which walks in, have been placed At placement object upper surface;What the lifting appliance 5 slid laterally is connected on the upper roof beam structure 4;The auxiliary hitch 6 It is arranged on first support portion 421 and lead is to go up roof beam structure 41 from inside to outside relatively;The upper roof beam structure 41 is also set up There is at least one driving mechanism, the driving mechanism is for driving the lifting appliance 5 and assistant crown block 1 in the upper roof beam structure 41 Upper sliding;Further, first support portion 421 is in " Y " font;First support portion includes rectangle mobile platform 4211;The center of first support portion 421 and the rectangle mobile platform 4211 is hinged;The rectangle mobile platform 4211 Fixed support device 4212 is respectively arranged at the relative inner at four angles;Second support portion 422 is in " mouth " font;It is described The bottom of second support portion 422 is provided with several traveling wheels;Second support portion 422 towards first support portion 421 downside is provided with traction mechanism 4222.
In the utility model embodiment, two lifting appliances, respectively the first lifting appliance lifting appliance 5 and are set Two lifting appliance assistant crown blocks 1.
At least one assistant crown block 1 is provided on the upper roof beam structure, being connected to for 1 longitudinal sliding motion of assistant crown block is described On upper roof beam structure 41;The adjuster is embedded on the accurate adjustment stringer 7;The auxiliary drop panel is arranged on the support portion; The accurate adjustment stringer 7 is placed on 1 lower section of assistant crown block;Further, the auxiliary drop panel includes chute board 21 and pulley Mechanism 22;The chute board 21 is placed in 422 front side of the second support portion;The pulley mechanism 22 can slide up and down connection On first support portion 421;Several pulley blocks 221 are arranged in the upper side of the pulley mechanism 42, and glide direction is flat Row is in the upper roof beam structure 41;Sliding horizontal plane and the 22 upper side horizontal plane of pulley mechanism in the chute board 21 are in same On one horizontal plane;The adjuster includes lifting jack 31, accurate adjustment jack 312, traction jack 33 and control module; The control module is used to carry out control braking to the lifting jack 31, accurate adjustment jack 32, traction jack 33;It is described Very heavy 31 roof pendant of raising is directly embedded on the accurate adjustment stringer 7;Very heavy 32 top of the accurate adjustment be set to the accurate adjustment stringer 7 towards The side of second support portion 422;The traction jack 33 is embedded in the side that the both ends of the accurate adjustment stringer 7 are arranged in, The traction jack 33 removably connects 422 downside of the second support portion;The adjuster and the lifting appliance 5, the compound action of auxiliary hitch 6 carries out position adjustment to object is placed;The auxiliary hitch 6 includes mounting rack, electricity Machine and tracting cable;The motor and tracting cable are mounted on the mounting rack, the motor braking tracting cable rotation;The auxiliary Traction device 6, which can slide up and down, to be connected on first support portion 421.
In the utility model embodiment, two lifting appliances, respectively the first lifting appliance lifting appliance 5 and are set Two lifting appliance assistant crown blocks 1;The driving mechanism drives the lifting appliance 5 and assistant crown block 1;Two raisings are very heavy Top, which is respectively perpendicular, to be embedded on the accurate adjustment stringer 7, the regulation to object and the progress of accurate adjustment stringer 7 upper and lower position is placed;The essence It adjusts jack 32 to be set to the side towards second support portion 422 of the accurate adjustment stringer, carries out left and right position to object is placed The regulation set;The traction jack 33 is embedded in the side that the rear end of the accurate adjustment stringer 7 is arranged in, the traction jack 33 422 downside of the second support portion is removably connected, is bonded so that placing object.
In the utility model embodiment, it further includes accepting vehicle that the piping lane with accurate adjustment component, which sets up trolley, described It accepts vehicle bottom and is provided with several traveling wheels, for delivering required object;The undertaking vehicle upper side is provided with several steering columns, The steering column is laid on the undertaking vehicle upper side.
In the utility model embodiment, it further includes control device that the piping lane with accurate adjustment component, which sets up trolley, institute State that control device is wireless or/and wired connection accurate adjustment component, outer trolley component, it is entire described with accurate adjustment component for controlling The braking of piping lane erection trolley all parts.
Its specific embodiment are as follows:
Staff sets up trolley to the entire piping lane with accurate adjustment component by using control device 9 and controls, institute It states undertaking vehicle 8 and placement object is transported to the specified close outer trolley component to the position of the second support portion 422, then control institute It states lifting appliance 5 and slides into 8 top of undertaking vehicle, control first lifting appliance and be attached to object is placed, with season On auxiliary hitch 6 on 63 pairs of placement objects of tracting cable it is corresponding draw hang position be attached, first lifting appliance, The collective effect of the steering column 81 of auxiliary hitch 6 and undertaking 8 upper side of vehicle orders to place object to first support portion 421 Object is placed in a mobile fragment position, the connection of the second lifting appliance, then will be placed object again and is moved to set position and transfers one Section distance, auxiliary hitch 6 are decontroled to object is placed to traction, and then the accurate adjustment jack 32 on accurate adjustment stringer 7 is braked simultaneously, Horizontal adjustment is carried out to the position for placing object;Then first, the after the completion of adjustment, assistant crown block 5 falls to basis for object is placed, Two assistant crown blocks lift by crane the first accurate adjustment stringer and the second accurate adjustment stringer, and the first accurate adjustment stringer and the second accurate adjustment stringer are placed on It places above object and the first accurate adjustment stringer and the second accurate adjustment stringer is agreed with respectively on respective auxiliary drop panel, control raising thousand Current placement object 1-2cm from the ground is improved on jin top 31, connects leading for 422 downside of the second support portion by drawing jack 33 Draw and is slided on the first accurate adjustment stringer of pulling of mechanism 4222 and each leisure of the second accurate adjustment stringer chute board 21 and pulley mechanism 22 To adjust position, the orientation until currently placing object is agreed with with previous placement object;After the completion of adjustment, accurate adjustment component is decontroled to working as The preceding control for placing object, the piping lane with accurate adjustment component set up trolley entirety to side movement, then carry out placing next placement Object.
In conclusion the piping lane designed by the utility model with accurate adjustment component sets up trolley, set by designing lifting It is standby to be slidably connected on roof beam structure and assistant crown block is slidably connected on roof beam structure, enable staff to adjust placement object Position enable the utility model to be suitable for different piping lane and construct, mention and since the slidable adjustment of lifting appliance acts on Availability is risen, while the adjuster being arranged on accurate adjustment stringer plays positioning action, placement object is accurately docked, And the utility model sets up trolley to the piping lane with accurate adjustment component by control device and carries out whole control, saves operation step Suddenly, time cost is saved.
Above embodiments are only sufficiently open rather than limitation the utility model, all creation purports based on the utility model, The replacement of equivalence techniques feature without creative work should be considered as the range of the application exposure.

Claims (8)

1. a kind of piping lane with accurate adjustment component sets up trolley, which is characterized in that including outer trolley component, accurate adjustment component;
The outer trolley component includes rack, at least one lifting appliance, auxiliary hitch;
The rack includes upper roof beam structure and support portion, and the support portion includes the first support portion and the second support portion;The upper beam The both ends of frame are respectively articulated with the first support portion, the second support portion;Second support portion bottom the first support portion of relative height ratio It is high;The lifting appliance, which slides laterally, to be connected on the upper roof beam structure;The auxiliary hitch setting is in first support In portion and lead is to go up roof beam structure from inside to outside relatively;
The accurate adjustment component includes an at least assistant crown block, auxiliary drop panel, adjuster and at least two accurate adjustment stringers;
At least one assistant crown block is provided on the upper roof beam structure, the assistant crown block longitudinal sliding motion is connected to the upper roof beam structure On;The adjuster is embedded on the accurate adjustment stringer;The auxiliary drop panel is arranged on the support portion;The accurate adjustment is vertical Beam is arranged below the assistant crown block.
2. the piping lane according to claim 1 with accurate adjustment component sets up trolley, which is characterized in that the upper roof beam structure is also set It is equipped at least one driving mechanism, the driving mechanism is for driving the lifting appliance and assistant crown block in the upper roof beam structure Sliding.
3. the piping lane according to claim 1 with accurate adjustment component sets up trolley, which is characterized in that first support portion In " Y " font;First support portion includes rectangle mobile platform;In first support portion and the rectangle mobile platform The heart is hinged;Fixed support device is respectively arranged at the relative inner at four angles of the rectangle mobile platform;Described second Support part is in " mouth " font;The bottom of second support portion is provided with several traveling wheels;Second support portion towards described Traction mechanism is provided on the downside of first support portion.
4. the piping lane according to claim 1 with accurate adjustment component sets up trolley, which is characterized in that the auxiliary drop panel packet Include chute board and pulley mechanism;The chute board is placed on front side of second support portion;The pulley mechanism can slide up and down Be connected on first support portion;Several pulley blocks are arranged in the upper side of the pulley mechanism, and glide direction is parallel In the upper roof beam structure;Sliding horizontal plane and the pulley mechanism upper side horizontal plane in the chute board are in same level On.
5. the piping lane according to claim 1 with accurate adjustment component sets up trolley, which is characterized in that the adjuster packet Include lifting jack, accurate adjustment jack, traction jack and control module;The control module is for very heavy to the raising Top, accurate adjustment jack, traction jack carry out control braking;The lifting jack is vertically embedded on the accurate adjustment stringer; The accurate adjustment jack is set to the side of the accurate adjustment stringer;The accurate adjustment stringer is arranged in the traction jack insertion The side at both ends, the traction jack removably connect on the downside of second support portion;The adjuster with it is described auxiliary The compound action of overhead traveling crane, auxiliary hitch is helped to carry out position adjustment to object is placed.
6. the piping lane according to claim 1 with accurate adjustment component sets up trolley, which is characterized in that the auxiliary traction dress It sets including mounting rack, motor and tracting cable;The motor and tracting cable are mounted on the mounting rack, the motor braking traction Cable rotation;The auxiliary hitch, which can slide up and down, to be connected on first support portion.
7. according to claim 1 to 6 it is one of any described in the piping lane erection trolley with accurate adjustment component, which is characterized in that institute Stating the piping lane with accurate adjustment component and setting up trolley further includes accepting vehicle, and the undertaking vehicle bottom is provided with several wheels, for transporting Object needed for carrying;The undertaking vehicle upper side is provided with several steering columns, and the steering column is laid on the undertaking vehicle upper side.
8. according to claim 1 to 6 it is one of any described in the piping lane erection trolley with accurate adjustment component, which is characterized in that institute Stating the piping lane with accurate adjustment component and setting up trolley further includes control device, and the control device is wireless or/and wired connection accurate adjustment Component and outer trolley component set up the braking of trolley all parts for controlling the entire piping lane with accurate adjustment component.
CN201822201834.5U 2018-12-26 2018-12-26 Pipe rack erects platform truck with accurate subassembly Expired - Fee Related CN209493971U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822201834.5U CN209493971U (en) 2018-12-26 2018-12-26 Pipe rack erects platform truck with accurate subassembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822201834.5U CN209493971U (en) 2018-12-26 2018-12-26 Pipe rack erects platform truck with accurate subassembly

Publications (1)

Publication Number Publication Date
CN209493971U true CN209493971U (en) 2019-10-15

Family

ID=68154966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822201834.5U Expired - Fee Related CN209493971U (en) 2018-12-26 2018-12-26 Pipe rack erects platform truck with accurate subassembly

Country Status (1)

Country Link
CN (1) CN209493971U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680713A (en) * 2018-12-26 2019-04-26 中国建筑土木建设有限公司 Fine adjustment rack gallery trolley
CN111676849A (en) * 2020-04-27 2020-09-18 山东省亚欧特重工机械有限公司 Intelligent culvert section laying machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680713A (en) * 2018-12-26 2019-04-26 中国建筑土木建设有限公司 Fine adjustment rack gallery trolley
CN109680713B (en) * 2018-12-26 2023-12-26 中国建筑土木建设有限公司 Fine adjustment frame gallery trolley
CN111676849A (en) * 2020-04-27 2020-09-18 山东省亚欧特重工机械有限公司 Intelligent culvert section laying machine

Similar Documents

Publication Publication Date Title
CN103015325B (en) Construction method of cast-in-place concrete crash barrier with eaves
CN208815424U (en) A kind of bridge descending hanging basket
CN203007849U (en) Movable construction device for cast-in-place concrete crash barriers with hanging eaves
CN209493971U (en) Pipe rack erects platform truck with accurate subassembly
CN102042021A (en) Automatically walking stepped mobile trestle
CN208087078U (en) A kind of boom hoisting of large span steel reinforced concrete combination beam Bridge Erector
CN102134832B (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane
CN109694024A (en) A kind of self-propelled lifting hoisting platform device
CN112323644A (en) Beam transporting vehicle, beam transporting system, steel box beam assembling system and steel box beam assembling method
CN207498754U (en) A kind of novel track-laying machine of city track traffic engineering
CN106939554A (en) Expanded letter steel girder erecting machine and its beam erecting method
CN206635657U (en) A kind of symmetrical formula Bridge Erector of setting a roof beam in place
CN109680713A (en) Fine adjustment rack gallery trolley
CN109505411A (en) Tube truss structure roofing installation method
CN209620097U (en) Pipe gallery erecting equipment
CN207293976U (en) A kind of cantilever crane set up for bridge subsection transport
CN108482519B (en) Reinforcing bar net piece transport vechicle
CN216583934U (en) Kerbstone transferring and installing integrated device
CN205936647U (en) Be applied to all -hydraulic steel mould trolley in big section step arch of colliery
CN212175493U (en) Super-wide bridge erecting machine
CN210003298U (en) subway station rail top air duct construction trolley
CN110080121B (en) Hanging basket uplink system and construction method
CN209652767U (en) The synchronous device for setting up girder and floorings
CN208717748U (en) A kind of large span steel reinforced concrete combination beam Bridge Erector support leg device
CN201963311U (en) Automatic-marching type movable scaffoldbridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191015