CN209482742U - Extra small camber angle Glass Curtain Wall Construction equipment - Google Patents

Extra small camber angle Glass Curtain Wall Construction equipment Download PDF

Info

Publication number
CN209482742U
CN209482742U CN201920058675.XU CN201920058675U CN209482742U CN 209482742 U CN209482742 U CN 209482742U CN 201920058675 U CN201920058675 U CN 201920058675U CN 209482742 U CN209482742 U CN 209482742U
Authority
CN
China
Prior art keywords
curtain wall
glass curtain
camber angle
extra small
construction equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920058675.XU
Other languages
Chinese (zh)
Inventor
周伟
张家国
曾梓义
闵伟佳
邱宝川
谢涛
李薇
徐鹏
羊虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Construction Industry Group Co Ltd
Original Assignee
Chengdu Construction Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Construction Industry Group Co Ltd filed Critical Chengdu Construction Industry Group Co Ltd
Priority to CN201920058675.XU priority Critical patent/CN209482742U/en
Application granted granted Critical
Publication of CN209482742U publication Critical patent/CN209482742U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of extra small camber angle Glass Curtain Wall Construction equipment, especially a kind of to be related to the extra small camber angle Glass Curtain Wall Construction equipment in Glass Curtain Wall Construction field.The extra small camber angle Glass Curtain Wall Construction equipment of the utility model, including glass curtain wall transport agent and sliding rail, the glass curtain wall transport agent includes luggage carrier and the idler wheel that is arranged in below luggage carrier, the luggage carrier has two parallel longitudinal rods and a transverse bar to be formed by connecting, the transverse bar is vertical with longitudinal rod, baffle is provided on the transverse bar, the glass curtain wall transport agent is provided with traction rope far from one end of baffle, the idler wheel is located in the sliding slot of sliding rail, and the hoist engine is connected with traction rope.The extra small camber angle Glass Curtain Wall Construction equipment operation of the utility model is easy, at low cost, transportational process safety and stability, can complete extra small camber angle operation, and conevying efficiency is high.

Description

Extra small camber angle Glass Curtain Wall Construction equipment
Technical field
It is related to glass curtain wall the utility model relates to a kind of extra small camber angle Glass Curtain Wall Construction equipment, especially one kind to apply The extra small camber angle Glass Curtain Wall Construction equipment in work field.
Background technique
With the continuous development of Building technology, penetrating atmosphere, bright, the unique curtain wall construction of construction are being built in recent years It is widely used in design.Traditional architecture type is mainly based on concrete construction, as building structure technology is continuous Perfect, there is a large amount of steel building in existing technology, and compared to traditional concrete construction, this steel building is greener Colour circle is protected, intensity is big, has good application effect and vast potential for future development from heavy and light etc..Elevation of building becomes more and more multiple It is miscellaneous, requirements at the higher level are constantly proposed to construction.Skyscraper be especially encounter it is in high-rise gradually flare and in outer layer water Flat projection is in the curtain wall of arc line shaped, and the design requirement of hanging device is higher in construction.And the hanging device of the prior art Be difficult to steadily control be such curtain wall hoisting process in safety, be easy that safety accident occurs during lifting.Especially make It is 50 ° that flare curtain wall and horizontal sextant angle, which are less than,.Monolithic bilayer doubling glass weight surpasses 400 jin, curtain wall construction, according to The prior art need to use heavy mechanical equipment to be lifted, and have to large area place and installation swing working radius very high It is required that there is very big operation difficulty for flare curtain wall.
Utility model content
The technical issues of the utility model is solved is to provide a kind of easy to operate, at low cost, transportational process safety and stability, It can complete extra small camber angle operation, and the extra small camber angle Glass Curtain Wall Construction equipment that conevying efficiency is high.
The utility model used extra small camber angle Glass Curtain Wall Construction equipment, including glass curtain in order to solve the above problem Wall transport agent and sliding rail, the glass curtain wall transport agent includes luggage carrier and the idler wheel that is arranged in below luggage carrier, described Luggage carrier is formed by connecting by two parallel longitudinal rods and a transverse bar, and the transverse bar is vertical with longitudinal rod, the transverse direction Baffle is provided on bar, the glass curtain wall transport agent is provided with traction rope far from one end of baffle, and the idler wheel, which is located at, to be slided In the sliding slot of rail, the hoist engine is connected with traction rope.
Further, the glass curtain wall transport agent is provided with traction pendant, the traction far from one end of baffle Rope is mounted on traction pendant.
Further, the traction pendant is formed by connecting by the orthogonal plate of two panels, set respectively on the two boards It is equipped with connecting hole.
Further, the front of the luggage carrier, middle part and rear portion are respectively arranged with the support rod parallel with longitudinal rod, The both ends of support rod are arranged in the idler wheel.
Further, the idler wheel is ball bearing.
Further, the sliding rail includes bottom plate, outer panel and interior plate, the outer panel is higher than interior plate.
Further, being provided with lightening hole on the glass curtain wall transport agent.
Further, the sliding rail both ends are provided with limiter.
Further, being provided with cushion on the glass curtain wall transport agent.
The beneficial effects of the utility model are: the application, which abandons the prior art, carries out glass using Large-scale Hoistings equipment such as cranes The technical solution of glass curtain wall lifting, and cladding glass is delivered using light and handy flexible glass curtain wall transport agent, and utilize cunning Rail accurately to constrain the handling track of glass curtain wall transport agent, and such cladding glass will not lifted as the prior art It is shaken in journey, draws the movement of glass curtain wall transport agent as power-equipment in conjunction with hoist engine, make entire handling process Speed, motion profile is all stably and controllable, the safety of handling can not only be effectively ensured, but also can save place, make large-scale curtain Wall glass hanging is no longer limited narrow etc. complicated construction environment, and it is low to hang space enrironment requirement.The application's can also be by sliding rail It is fixed on full hall scaffold, hoisting process does not have to remove frame body, that is, avoids in traditional hoisting process frame body to the shadow of lifting It rings, and takes full advantage of the bearing capacity of frame body.
Detailed description of the invention
Fig. 1 is the main view of the glass curtain wall transport agent of the application.
Fig. 2 is the side view of the glass curtain wall transport agent of the application.
Fig. 3 is the structural schematic diagram of the sliding rail of the application.
In the figure, it is marked as luggage carrier 1, longitudinal rod 2, transverse bar 3, traction rope 4, traction pendant 5, idler wheel 6, sliding rail 7, sliding slot 8。
Specific embodiment
As shown in Fig. 1, Fig. 2 and Fig. 3, the extra small camber angle Glass Curtain Wall Construction equipment of the application, including glass curtain wall fortune Transmission carrier and sliding rail 7, the glass curtain wall transport agent includes luggage carrier 1 and the idler wheel 6 that is arranged in below luggage carrier 1, described Luggage carrier 1 has two parallel longitudinal rods 2 and a transverse bar 3 to be formed by connecting, and the transverse bar 3 is vertical with longitudinal rod 2, described Baffle is provided on transverse bar 3, the glass curtain wall transport agent is provided with traction rope 4, the idler wheel 6 far from one end of baffle In the sliding slot 8 of sliding rail 7, the hoist engine is connected with traction rope 4.The application is abandoned the prior art and is hung using large sizes such as cranes The standby technical solution for carrying out glass curtain wall lifting of installing, and curtain wall glass is delivered using light and handy flexible glass curtain wall transport agent Glass, and using sliding rail 7 come the accurate handling track for constraining glass curtain wall transport agent, such cladding glass will not be as the prior art It is shaken in hoisting process like that, draws the movement of glass curtain wall transport agent as power-equipment in conjunction with hoist engine, make The speed of entire handling process, motion profile is all stably and controllable, even extra small camber angle glass curtain of the camber angle less than 50 degree, Lifting construction can also be completed, the safety of handling can be not only effectively ensured in the equipment of the application, but also can save place, make large size Cladding glass lifting is no longer limited narrow etc. complicated construction environment, and it is low to hang space enrironment requirement.The application's can also be by cunning Rail 7 is fixed on full hall scaffold, and hoisting process does not have to remove frame body, that is, avoids in traditional hoisting process frame body to lifting It influences, and takes full advantage of the bearing capacity of frame body.
The glass curtain wall transport agent is provided with traction pendant 5 far from one end of baffle, and the traction rope 4, which is mounted on, to be led Draw on pendant 5, for glass curtain wall transport agent stability under loading when guaranteeing traction and facilitates the fixation of traction rope 4, the application Traction rope 4 is connected using traction pendant 5.
In order to adapt to different lifting requirements, herein described traction pendant 5 is formed by connecting by the orthogonal plate of two panels, Connecting hole is respectively arranged on the two boards.It can be according to two connecting holes of site operation situation flexible choice when Specific construction In one.
In order to make the equipment of the application is mobile in traction transportational process to stablize, the front of the application luggage carrier 1, middle part and Rear portion is respectively arranged with the support rod parallel with longitudinal rod 2, and the idler wheel 6 is arranged in the both ends of support rod, makes equipment in this way Mobile supporting point is evenly distributed on luggage carrier 1, the local pressure excessive deformation avoided.
Mobile quick in order to make, efficiently, herein described idler wheel 6 is ball bearing.Ball bearing frictional force is small, and belongs to Standard component is easy to purchase, at low cost.
In order to form scleronomic constraint to glass curtain wall transport agent, the sliding rail 7 of the application includes bottom plate, outer panel and inside Plate, the outer panel are higher than interior plate, and idler wheel 6 is constrained on bottom plate when transporting in this way, in the slot of outer panel and interior plate formation, Outer panel is higher than interior plate can turn up while reducing frictional force to avoid trolley.
In order to reduce apparatus of load, the application is provided with lightening hole on the glass curtain wall transport agent, in this way can be with Mitigate overall weight when lifting as far as possible, mitigate load, improves safety.
7 both ends of sliding rail of the application are provided with limiter, it is possible to prevente effectively from pulley derails.
Being provided with cushion on the glass curtain wall transport agent of the application prevents the scuffing of glass.
The specific steps of Glass Curtain Wall Construction are carried out using the equipment of the application are as follows:
Preparation of construction
It confides a technological secret.Project Technical responsible person is to construction personnel, the administrative staff to take part in building with regard to large glass Curtain Wall Design figure Paper, special construction plan and special safe construction solution technique are told somebody what one's real intentions are, and all management implementation personnel must know lifting bulk flow Journey, safety requirements.
Prepare security protection articles.Construction personnel's person ownership security protection articles should meet code requirement, lift work Warning line is set in range, full-time security official must garrison lifting scene.
The accurate location of connector is checked by curtain wall installation baseline, and by connector channel steel and main body steel construction component and completely Hall frame bolt is secured.
Material, component are stored by Design of Construction Organization classification, by place to use, and paste bright caution sign on glass board material, To prevent breaking.
Keel are checked before installation, require straight, rule side, must not have apparent deformation, scratch and pollution.
Before construction and installation, check whether each link position post-install is complete, if meet design requirement.
Draw the transport installation of hoisting apparatus
Installation fixed point double track traction hoisting apparatus, including track installation, travelling bogie are carried out according to hoisting apparatus structural map Installation, hoist engine installation and wirerope cis-position line install four parts.
Full hall frame stability should be sufficiently checked before track installation, guarantee that the bearing capacity of frame body is met the requirements.
Rail assembly, hoist engine are not less than 1.5T and wirerope is hoisted to mounting surface.
By design in attachment rail, determines the drilling specification of anchor bolt, chemical anchor bolts are implanted on track installation control line, in advance It buries the diameter of bolt and is no less than 10mm.
U-shaped steel plate track is molded using 4mm steel plate, and travelling bogie uses 60mm × 40mm × 5mm steel square using vehicle body Pipe securely welds, and principal weld height should be greater than 5mm.Wheel is formed using 6309 model bearings with steel-pipe welding.
Travelling bogie checks whether it blocks in such as sliding slot 8 completely after hanging on U-shaped steel plate track, and ensures that bearing wheel is smooth Without Caton.
It places distance according to hoist engine and calculates and topple, bottom is arranged the rubber mount of high frictional force, wirerope and penetrates cunning Wheel group.
Φ 8 and the above wirerope are selected, cis-position traction wire rope is installed, and keep the tension of wirerope.
Glass block ground is in place
Just with glass transportation trolley by glass transportation to installation site after track installation, glass transportation trolley uses steel Material welding, glass is fixed on travelling bogie, mouth holds glass with angle steel and fixes glass with dedicated tying band under travelling bogie Glass.
Personnel in place, arrange that two personnel check and supervise in middle level and hang by the construction personnel's lifting of two, arrangement ground before constructing Dress process arranges that a personnel are responsible for the operation of 7 platform of upper layer sliding rail;By arrangement and method for construction, 7 platform device of sliding rail, peace are checked comprehensively Full measure reliability, the reinforcing situation of scaffold, the reliable placement of the tool and part of high altitude operation.Inspection finishes examination lifting and makees Industry, travelling bogie promote 5cm, formal to lift by crane after confirming that whole equipment stress are all gone well.
The traction lifting of glass block
It is determining that the errorless and safe wire cable of hoist engine installation is reliable, observation glass frame is had to while lifting glass Glass collides with steel while movement for son, forbids people from station hanging glazing underface, while having drawn police circles Line forbids other party construction personnel current, then starts to be lifted again.
Lifting worker plan shelf on 4 people simultaneously take charge with intercom and glass be installed, below 6 people be responsible for carry glass Glass and binding, 1 people are responsible for out hoist engine and are kept in touch at any time using intercom and above.
Individually glass is sling not less than 1T with bottle gouard moved by hands when glass hanging transports in place, then manually uses flitch again Slowly glass is prized onto supporting bar, and installs pressing plate.
Arc position glass due to be concentric reducer be not available rail transport installation, only using wirerope replace track, Wirerope and glass shelf are fixed together, remaining transport and installation method are identical as track.

Claims (9)

1. extra small camber angle Glass Curtain Wall Construction equipment, it is characterised in that: including hoist engine, glass curtain wall transport agent and sliding rail (7), the glass curtain wall transport agent includes the idler wheel (6) of luggage carrier (1) and setting below luggage carrier (1), the loading Frame (1) is formed by connecting by two parallel longitudinal rod (2) He Yigen transverse bars (3), and the transverse bar (3) and longitudinal rod (2) are hung down Directly, it is provided with baffle on the transverse bar (3), the glass curtain wall transport agent is provided with traction rope far from one end of baffle (4), the idler wheel (6) is located in the sliding slot (8) of sliding rail (7), and the hoist engine is connected with traction rope (4).
2. extra small camber angle Glass Curtain Wall Construction equipment as described in claim 1, it is characterised in that: the glass curtain wall transport Carrier is provided with traction pendant (5) far from one end of baffle, and the traction rope (4) is mounted in traction pendant (5).
3. extra small camber angle Glass Curtain Wall Construction equipment as claimed in claim 2, it is characterised in that: the traction pendant (5) It is formed by connecting by the orthogonal plate of two panels, is respectively arranged with connecting hole on the two boards.
4. extra small camber angle Glass Curtain Wall Construction equipment as described in claim 1, it is characterised in that: the luggage carrier (1) Front, middle part and rear portion are respectively arranged with the support rod parallel with longitudinal rod (2), and the idler wheel (6) is arranged in the two of support rod End.
5. extra small camber angle Glass Curtain Wall Construction equipment as described in claim 1, it is characterised in that: the idler wheel (6) is rolling Pearl bearing.
6. extra small camber angle Glass Curtain Wall Construction equipment as described in claim 1, it is characterised in that: the sliding rail (7) includes Bottom plate, outer panel and interior plate, the outer panel are higher than interior plate.
7. extra small camber angle Glass Curtain Wall Construction equipment as described in claim 1, it is characterised in that: the glass curtain wall transport Lightening hole is provided on carrier.
8. extra small camber angle Glass Curtain Wall Construction equipment as described in claim 1, it is characterised in that: sliding rail (7) both ends It is provided with limiter.
9. extra small camber angle Glass Curtain Wall Construction equipment as described in claim 1, it is characterised in that: the glass curtain wall transport Cushion is provided on carrier.
CN201920058675.XU 2019-01-14 2019-01-14 Extra small camber angle Glass Curtain Wall Construction equipment Active CN209482742U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920058675.XU CN209482742U (en) 2019-01-14 2019-01-14 Extra small camber angle Glass Curtain Wall Construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920058675.XU CN209482742U (en) 2019-01-14 2019-01-14 Extra small camber angle Glass Curtain Wall Construction equipment

Publications (1)

Publication Number Publication Date
CN209482742U true CN209482742U (en) 2019-10-11

Family

ID=68131129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920058675.XU Active CN209482742U (en) 2019-01-14 2019-01-14 Extra small camber angle Glass Curtain Wall Construction equipment

Country Status (1)

Country Link
CN (1) CN209482742U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215241A (en) * 2021-12-16 2022-03-22 安徽省公路桥梁工程有限公司 Oversized glass curtain wall mounting structure and construction method thereof
CN116397899A (en) * 2023-04-24 2023-07-07 广东瑞昊建设有限公司 Curtain wall auxiliary installation equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215241A (en) * 2021-12-16 2022-03-22 安徽省公路桥梁工程有限公司 Oversized glass curtain wall mounting structure and construction method thereof
CN114215241B (en) * 2021-12-16 2023-12-08 安徽省公路桥梁工程有限公司 Oversized glass curtain wall mounting structure and construction method thereof
CN116397899A (en) * 2023-04-24 2023-07-07 广东瑞昊建设有限公司 Curtain wall auxiliary installation equipment
CN116397899B (en) * 2023-04-24 2023-11-21 广东瑞昊建设有限公司 Curtain wall auxiliary installation equipment

Similar Documents

Publication Publication Date Title
CN205955236U (en) Container formula of taking pulley platform of unloading of encorbelmenting
CN209482742U (en) Extra small camber angle Glass Curtain Wall Construction equipment
CN107043060A (en) A kind of installation method of inverse formula installation lift
CN103883129B (en) A kind of steel structural roof beam installation method
CN110240048A (en) A kind of external attached type skyscraper goods jack system
CN108915272A (en) A kind of inclined-plane cell cube hanging method
CN104528526B (en) Prefabricated non-slag rail plate air turning device
CN105019664B (en) High-altitude sliding installation method for box room type electric room
CN208814562U (en) A kind of visualization formula glass curtain wall plate vertical transit system
CN104973517B (en) A kind of electronic gantry platform that installs for sintering machine head device and its using method
CN205973518U (en) Track portal jib crane
RU163614U1 (en) RIGGING AND TRANSPORT SELF-LOADING MACHINE
CN203834369U (en) Device capable of being rotated by 360 degrees and vertically lifted for bridge
CN103979442B (en) The method of 6400 tons of Hydraulic double-type crane lifting cost tropsch reactors
CN214167159U (en) Hoisting system for installing anti-falling beam stop block in box girder
CN108328532A (en) A kind of mechanical type anti-fall device
CN107023036A (en) A kind of station load segment rapid constructing method
CN103486330A (en) Method for installing and constructing high-altitude pipeline inside workshop
CN207078901U (en) Gravity motion hanging beam
CN113213315A (en) Transfer method for building partition board
CN106639288B (en) Method for installing and using vertical transport platform for stone in outer wall scaffold
CN112660993A (en) Box girder falling-prevention stop block mounting system and construction method
CN211198379U (en) Simple and easy track hoist device
JP2020153208A (en) Suspended scaffold and erection method therefor
CN206751325U (en) A kind of bridge pipe fitting platform truck

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant