CN209481012U - Vertical shaft well-bucket replaces system - Google Patents

Vertical shaft well-bucket replaces system Download PDF

Info

Publication number
CN209481012U
CN209481012U CN201920063348.3U CN201920063348U CN209481012U CN 209481012 U CN209481012 U CN 209481012U CN 201920063348 U CN201920063348 U CN 201920063348U CN 209481012 U CN209481012 U CN 209481012U
Authority
CN
China
Prior art keywords
bucket
well
vertical shaft
main orbit
support plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920063348.3U
Other languages
Chinese (zh)
Inventor
何智
蔡国礼
张鲲
刘思奇
谭航
徐拓
罗烨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 8 Co Ltd
Original Assignee
Sinohydro Bureau 8 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 8 Co Ltd filed Critical Sinohydro Bureau 8 Co Ltd
Priority to CN201920063348.3U priority Critical patent/CN209481012U/en
Application granted granted Critical
Publication of CN209481012U publication Critical patent/CN209481012U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of vertical shaft well-buckets to replace system, including main orbit, main orbit extends to vertical shaft and hangs position, it further include at least one replacement track intersected with main orbit, the intersection of main orbit and replacement track is installed with track switch, carrier loader is installed on main orbit and replacement track, carrier loader is equipped with well-bucket, is equipped on main orbit and replacement track for driving carrier loader to run traction component.The vertical shaft well-bucket replacement system have the advantages that it is of simple structure and low cost, easy to operate, safety in utilization can be improved.

Description

Vertical shaft well-bucket replaces system
Technical field
The utility model relates generally to slag tap in vertical shaft sinking shaft work progress well-bucket and concrete bucket replacement technology, especially It is related to a kind of vertical shaft well-bucket replacement system.
Background technique
China's Construction of Silo has formed more perfect construction technology theoretical system.During Construction of Silo, well-bucket Carry slag tap, the important process such as blanking and conveying people goods and materials.Since action has diversification, applied in vertical shaft During work, there is frequently replacement well-bucket item.
Currently, there is no the standardized methods about well-bucket replacement during China's Construction of Silo.Construction of Silo well-bucket For substitute mode based on manually replacing, well-bucket drops to certain position after hanging out well, and well-bucket is elapsed out original position by worker It sets, then places well-bucket, remove kibble rope, replacement is then placed on original well-bucket position with well-bucket, connects well-bucket steel wire Rope completes well-bucket replacement.The problems such as this process is quite cumbersome, time-consuming and laborious, deviates in the process there is also wirerope, and worker The well-bucket of manual passage suspension this during, there are biggish security risks.
Utility model content
The technical problems to be solved in the utility model is to overcome the deficiencies of the prior art and provide that a kind of structure is simple, cost Vertical shaft well-bucket replacement system cheap, easy to operate, that safety in utilization can be improved.
In order to solve the above technical problems, the utility model uses following technical scheme:
A kind of vertical shaft well-bucket replaces system, including main orbit, the main orbit extend to vertical shaft and hang position, further include to The intersection of a few replacement track intersected with main orbit, the main orbit and replacement track is installed with track switch, the backbone Carrier loader is installed on road and replacement track, the carrier loader is equipped with the well-bucket, is all provided on main orbit and replacement track Have for driving carrier loader to run traction component.
As a further improvement of the above technical scheme:
The carrier loader includes support plate and the rail wheel for being installed in support plate bottom, and the corresponding support plate passes through rail Road wheel is laid on corresponding main orbit and replacement track, and the corresponding traction component is connected with corresponding support plate, accordingly The well-bucket be arranged in corresponding support plate.
The support plate is kept off equipped with steady bucket, and the steady bucket is blocked equipped with intermediate low week along the high steady bucket chamber of pot-shaped, described Well-bucket setting is intracavitary in the steady bucket of pot-shaped.
The support board ends are provided with lock, and the both ends of the traction component and the lock of respective ends connect.
The traction component includes winch, traction steel rope of cable and fixed pulley, and the winch installs corresponding main orbit and more switches tracks One end of position is hung on road far from vertical shaft, the traction steel rope of cable is on winch, one end of traction steel rope of cable and support plate one The lock connection at end, the other end of traction steel rope of cable are connect after being altered course by fixed pulley with the lock of the support plate other end.
The winch includes fixed bottom plate, reel and positive and negative motor, and the fixed bottom plate installs corresponding main orbit and replacement One end of position is hung on track far from vertical shaft, the reel and positive and negative motor are mounted on fixed bottom plate, the positive and negative motor Output end connect with reel, the traction steel rope of cable is on reel.
The well-bucket includes staving, hangs handle and connecting plate, and the staving is arranged on carrier loader, and the handle that hangs passes through connection Plate is mounted on staving.
Compared with the prior art, the advantages of the utility model are:
The vertical shaft well-bucket of the utility model replaces system, including main orbit, main orbit extend to vertical shaft and hang position, also wrap Include at least one replacement track intersected with main orbit, the intersection of main orbit and replacement track is installed with track switch, main orbit and Carrier loader is installed on replacement track, carrier loader is equipped with well-bucket, is equipped on main orbit and replacement track for driving fortune Carrier vehicle runs traction component.In use, being laid with main orbit and replacement track according to well head section on-site actual situations, prolong main orbit It extends to vertical shaft and hangs position, in the intersection installing track switch of main orbit and replacement track to realize that track switches, then in backbone Carrier loader is installed on road and replacement track, the well-bucket of construction function needed for being placed on carrier loader further according to construction requirement, finally Setting traction component is connected with corresponding carrier loader, and required well-bucket is formally transported to vertical shaft according to construction function when construction and is hung It puts position and well-bucket is lifted by crane into decentralization, when carrying out the decentralization of another function well-bucket, preamble well-bucket is returned back into backbone using carrier loader The intersection front end (avoiding interference with) in road and replacement track, then another function well-bucket is switched by track switch from intersection transport It on to main orbit and is transported to vertical shaft and hangs position, to realize that well-bucket is replaced.For traditional approach, which utilizes more Track switching transporting mode realizes the well-bucket replacement of different function, and structure is simple and convenient to operate, and does not need worker manual Passage, substantially increases safety, while also reducing cost of labor.
Detailed description of the invention
Fig. 1 is the overlooking structure diagram of the utility model vertical shaft well-bucket replacement system.
Fig. 2 is the schematic view of the front view of the utility model vertical shaft well-bucket replacement system.
Fig. 3 is the structural schematic diagram of carrier loader in the utility model vertical shaft well-bucket replacement system.
Fig. 4 is the structural schematic diagram of winch in the utility model vertical shaft well-bucket replacement system.
Each label indicates in figure:
1, main orbit;2, track is replaced;3, track switch;4, carrier loader;41, support plate;411, it latches;42, rail wheel;43, Steady bucket gear;431, the steady bucket chamber of pot-shaped;5, well-bucket;51, staving;52, handle is hung;53, connecting plate;6, traction component;61, winch; 611, fixed bottom plate;612, reel;613, positive and negative motor;62, traction steel rope of cable;63, fixed pulley.
Specific embodiment
The utility model is described in further details below with reference to Figure of description and specific embodiment.
Fig. 1 to Fig. 4 shows a kind of embodiment of the utility model vertical shaft well-bucket replacement system, including main orbit 1, backbone Road 1 extends to vertical shaft and hangs position, further includes at least one replacement track 2 intersected with main orbit 1, main orbit 1 with more switch tracks The intersection in road 2 is installed with track switch 3, is installed with carrier loader 4 on main orbit 1 and replacement track 2, carrier loader 4 is equipped with well-bucket 5, main orbit 1 and replacement track 2 on be equipped with for drive carrier loader 4 run traction component 6.In use, existing according to well head section Field actual conditions are laid with main orbit 1 and replacement track 2, so that main orbit 1 is extended to vertical shaft and hang position, in main orbit 1 and replace Then the intersection installing track switch 3 of track 2 installs carrier loader 4 on main orbit 1 and replacement track 2 to realize that track switches, then The well-bucket 5 of construction function needed for being placed on carrier loader 4 according to construction requirement, is finally arranged traction component 6 and corresponding delivery Vehicle 4 connects, and according to construction function required well-bucket 5 is transported to vertical shaft when formal construction and hangs position and lift by crane well-bucket 5 and transferred, When carrying out the decentralization of another function well-bucket 5, preamble well-bucket 5 is returned back into main orbit 1 using carrier loader 4 and replaces the phase of track 2 The front end Jiao Chu (avoids interference with), then switches from intersection another function well-bucket 5 by track switch 3 and is transported on main orbit 1 simultaneously It is transported to vertical shaft and hangs position, to realize that well-bucket 5 is replaced.For traditional approach, which is turned using multi-track switching The well-bucket 5 that fortune mode realizes different function is replaced, and structure is simple and convenient to operate, does not need worker and elapsing manually, significantly Safety is improved, while also reducing cost of labor.
In the present embodiment, carrier loader 4 includes support plate 41 and the rail wheel 42 for being installed in 41 bottom of support plate, corresponding branch Fagging 41 is laid on corresponding main orbit 1 and replacement track 2 by rail wheel 42, and corresponding traction component 6 is propped up with corresponding Fagging 41 connects, and corresponding well-bucket 5 is arranged in corresponding support plate 41.In the structure, traction component 6 is power source, traction Component 6 drives support plate 41 to run along main orbit 1 and replacement track 2, so that the operation of well-bucket 5 to vertical shaft is driven to hang position, It is simple and practical in structure.
In the present embodiment, support plate 41 is equipped with steady bucket gear 43, and it is steady along high pot-shaped that steady bucket gear 43 is equipped with intermediate low week Bucket chamber 431, well-bucket 5 are arranged in the steady bucket chamber 431 of pot-shaped.In the structure, the steady bucket chamber of the pot-shaped that steady bucket gear 43 is formed 431 is to well-bucket 5 form constraint positioning, ensure that the stability of operation.
In the present embodiment, 41 both ends of support plate are provided with lock 411, the both ends of traction component 6 and the lock of respective ends 411 connections.The lock 411 is the combination of U-bolt and straight screw rod, easy to disassemble, improves the convenience used.
In the present embodiment, traction component 6 includes winch 61, traction steel rope of cable 62 and fixed pulley 63, and winch 61 installs corresponding master One end of position is hung on track 1 and replacement track 2 far from vertical shaft, traction steel rope of cable 62 is on winch 61, traction steel rope of cable 62 One end connect with the lock 411 of 41 one end of support plate, the other end of traction steel rope of cable 62 by fixed pulley 63 alter course after with support The lock 411 of 41 other end of plate connects.In the structure, winch 61 drives traction steel rope of cable 62 back and forth to pull, to drive support plate 41 move back and forth, to realize dislocation replacement.
In the present embodiment, winch 61 includes fixed bottom plate 611, reel 612 and positive and negative motor 613, and fixed bottom plate 611 is installed One end of position is hung on corresponding main orbit 1 and replacement track 2 far from vertical shaft, reel 612 and positive and negative motor 613 are mounted on fixation On bottom plate 611, the output end of positive and negative motor 613 is connect with reel 612, and traction steel rope of cable 62 is on reel 612.The structure In, positive and negative rotation band 612 positive and negative rotation of movable reel of positive and negative motor 613, to drive traction steel rope of cable 62 back and forth to pull, to realize support Plate 41 moves back and forth.
In the present embodiment, well-bucket 5 includes staving 51, hangs handle 52 and connecting plate 53, and staving 51 is arranged on carrier loader 4, hangs Handle 52 is mounted on staving 51 by connecting plate 53.In the structure, when hanging, it is connect with handle 52 is hung to staving 51 using suspension hook It is hung, it is easy to operate.
Although the utility model is disclosed as above with preferred embodiment, it is not intended to limit the utility model.It is any Those skilled in the art, in the case where not departing from technical solutions of the utility model range, all using the disclosure above Technology contents many possible changes and modifications are made to technical solutions of the utility model, or be revised as the equivalent of equivalent variations Embodiment.Therefore, all contents without departing from technical solutions of the utility model, according to the utility model technical spirit to the above reality Any simple modifications, equivalents, and modifications that example is done are applied, should all be fallen in the range of technical solutions of the utility model protection.

Claims (7)

1. a kind of vertical shaft well-bucket replaces system, it is characterised in that: including main orbit (1), the main orbit (1) extends to vertical shaft and hangs Position is put, further includes at least one replacement track (2) intersected with main orbit (1), the main orbit (1) and replacement track (2) Intersection be installed with track switch (3), the main orbit (1) and replacement track (2) on be installed with carrier loader (4), the delivery Vehicle (4) is equipped with the well-bucket (5), is equipped on main orbit (1) and replacement track (2) for driving carrier loader (4) operation to be led Draw component (6).
2. vertical shaft well-bucket according to claim 1 replaces system, it is characterised in that: the carrier loader (4) includes support plate (41) and it is installed in the rail wheel (42) of support plate (41) bottom, the corresponding support plate (41) passes through rail wheel (42) laying On corresponding main orbit (1) and replacement track (2), the corresponding traction component (6) connects with corresponding support plate (41), The corresponding well-bucket (5) is arranged on corresponding support plate (41).
3. vertical shaft well-bucket according to claim 2 replaces system, it is characterised in that: the support plate (41) is equipped with steady bucket It keeps off (43), the steady bucket gear (43) is equipped with intermediate low week along the high steady bucket chamber (431) of pot-shaped, and the well-bucket (5) is arranged in pot In the steady bucket chamber (431) of shape.
4. vertical shaft well-bucket according to claim 3 replaces system, it is characterised in that: support plate (41) both ends are provided with It latches (411), the both ends of the traction component (6) and the lock (411) of respective ends connect.
5. vertical shaft well-bucket according to claim 4 replaces system, it is characterised in that: the traction component (6) includes winch (61), traction steel rope of cable (62) and fixed pulley (63), the winch (61) are installed remote in corresponding main orbit (1) and replacement track (2) From one end that vertical shaft hangs position, the traction steel rope of cable (62) is on winch (61), one end of traction steel rope of cable (62) and branch Fagging (41) one end lock (411) connection, traction steel rope of cable (62) the other end by fixed pulley (63) alter course after with support plate (41) lock (411) connection of the other end.
6. vertical shaft well-bucket according to claim 5 replaces system, it is characterised in that: the winch (61) includes fixed bottom plate (611), reel (612) and positive and negative motor (613), the fixed bottom plate (611) install corresponding main orbit (1) and replacement track (2) one end of position is hung on far from vertical shaft, the reel (612) and positive and negative motor (613) are mounted on fixed bottom plate (611) On, the output end of the positive and negative motor (613) is connect with reel (612), and the traction steel rope of cable (62) is wound on reel (612) On.
7. vertical shaft well-bucket according to any one of claim 1 to 6 replaces system, it is characterised in that: well-bucket (5) packet It includes staving (51), hang handle (52) and connecting plate (53), the staving (51) is arranged on carrier loader (4), and described hang handle (52) lead to Connecting plate (53) is crossed to be mounted on staving (51).
CN201920063348.3U 2019-01-15 2019-01-15 Vertical shaft well-bucket replaces system Active CN209481012U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920063348.3U CN209481012U (en) 2019-01-15 2019-01-15 Vertical shaft well-bucket replaces system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920063348.3U CN209481012U (en) 2019-01-15 2019-01-15 Vertical shaft well-bucket replaces system

Publications (1)

Publication Number Publication Date
CN209481012U true CN209481012U (en) 2019-10-11

Family

ID=68131096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920063348.3U Active CN209481012U (en) 2019-01-15 2019-01-15 Vertical shaft well-bucket replaces system

Country Status (1)

Country Link
CN (1) CN209481012U (en)

Similar Documents

Publication Publication Date Title
CN107298388A (en) Bridge crane with suspender maintenance rig
CN209481012U (en) Vertical shaft well-bucket replaces system
CN202358850U (en) Light lift-type cantilever crane
CN107082374A (en) The Construction crane of water filling weightening counter-jib is set
CN103612983B (en) Underground coal mine automatic moving type telpher
CN203199923U (en) Automatic lifting device based on manual hole digging pile
CN202321479U (en) Multifunctional tower crane hoist
CN205442039U (en) Bucket wheel machine
CN205167246U (en) Stirring equipment
CN104591002B (en) A kind of low clearance double girder overhead crane
CN209618679U (en) Claw and boom hoisting
CN201095871Y (en) Distribution vehicle possessing lifting set
CN209478597U (en) A kind of concrete feeding equipment
CN203345921U (en) Device for hoisting electric locomotive
CN110094223A (en) Cooperate monorail crane dedicated unit for large-mining-height working surface hydraulic support withdrawing
CN202316989U (en) Suspended anode casting structure and suspended travelling casting frame
CN202379615U (en) Maintenance hoisting system for wind generating set
CN206645695U (en) More component special hangers
CN104344075A (en) Rapid hoisting and mounting method for suspending temporary air/water pipeline on shaft wall in vertical shaft construction
CN2176357Y (en) Universal direction steel cable crane
CN202272462U (en) Blank distributing and conveying machine with lifting function
CN2615111Y (en) Automatic slings for light container
CN204355973U (en) A kind of lifting hopper take-up
CN205187648U (en) Fast to hoist structure for case
CN220663876U (en) Electric remote control transportation system for concrete materials

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant