CN209469874U CN201821825948.0U CN201821825948U CN209469874U CN 209469874 U CN209469874 U CN 209469874U CN 201821825948 U CN201821825948 U CN 201821825948U CN 209469874 U CN209469874 U CN 209469874U
Authority
CN
China
Prior art keywords
pedestal
hanger
pipe installation
installation bracket
wing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821825948.0U
Other languages
Chinese (zh)
Inventor
谢彬彬
张鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201821825948.0U priority Critical patent/CN209469874U/en
Application granted granted Critical
Publication of CN209469874U publication Critical patent/CN209469874U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of I-beam pipe installation brackets, including the pedestal to be bonded with the lower end surface of I-beam lower wing plate, it is connected with the first hanger being bonded with the upper surface of the first side of I-beam lower wing plate to suspend pedestal in midair above pedestal and is bonded with the upper surface of I-beam lower wing plate second side to suspend the second hanger of pedestal in midair, pedestal and the second hanger are detachably connected, and the mounting rack to pipe laying is equipped with below pedestal.In I-beam pipe installation bracket provided by the utility model, the two sides of pedestal are connected with the first hanger and the second hanger respectively, so that the lower wing plate of I-steel be made to be fixed between the first hanger, the second hanger and pedestal.It is additionally provided with mounting rack below pedestal, pipeline can be installed in mounting rack, to realize that pipeline is taken root on the lower wing plate of I-beam, and without carrying out secondary welding to I-beam.

Description

A kind of I-beam pipe installation bracket
Technical field
The utility model relates to Construction Technology field, in particular to a kind of I-beam pipe installation bracket.
Background technique
Usually the beam column using steel construction as building, beam column of steel structure are generally not allowed secondary weldering in many engineering projects It connects, is concentrated to avoid the upper generation thermal stress of beam column of steel structure, influence the intensity of beam column.And all multi-pipelines are needed in steel in building It takes root in structural beams, but the prior art is not directed to the mode of suitably taking root of steel I-beam.
Therefore, the I-beam pipe installation bracket that how providing one kind can make pipeline take root on steel I-beam is ability Field technique personnel technical problem urgently to be solved.
Utility model content
The purpose of the utility model is to provide a kind of I-beam pipe installation brackets, are suspended in mounting rack by hanger The lower section of steel I-beam, pipeline can be fixed in mounting rack, and then solve the problems, such as that pipeline is taken root on steel I-beam.
To achieve the above object, the utility model provides a kind of I-beam pipe installation bracket, including to I-beam The pedestal of the lower end surface fitting of lower wing plate, be connected with above the pedestal be bonded with the upper surface of the first side of I-beam lower wing plate to It suspends the first hanger of the pedestal in midair and is bonded with the upper surface of described I-beam lower wing plate second side to suspend the pedestal in midair The second hanger, the pedestal and second hanger are detachably connected, are equipped with below the pedestal to pipe laying Mounting rack.
Preferably, first hanger is connected with the tube chamber welds with base, is equipped between the two to fixed I-shaped lower flange of girder plate The pre-determined distance of first side.
Preferably, second hanger is fixed with the pedestal by connecting bolt.
Preferably, first hanger, second hanger and the pedestal are shaped steel structure piece.
Preferably, the diameter of the connection bolt is greater than or equal to 10mm.
Preferably, the mounting rack is in concave shape, including column and crossbeam, under the upper end of the column and the pedestal End face is fixedly connected, lower end is fixedly connected with the crossbeam.
Preferably, the crossbeam is equipped with the pipeline clamp to fixed -piping.
Preferably, the quantity of the column is two or more, and all the column is all connected to the same bottom The lower end surface of seat.
Preferably, the quantity of the column is two or more, and each column is connected to different institutes State the lower end surface of pedestal.
Preferably, the crossbeam is equipped with two or more pipeline clamps.
I-beam pipe installation bracket provided by the utility model, including the first hanger, the second hanger and pedestal, the One hanger and the second hanger are bonded with the upper surface of the upper surface of I-beam lower wing plate second side and second side respectively, pedestal and work The lower end surface of word steel lower wing plate is bonded, and the two sides of pedestal are connected with the first hanger and the second hanger respectively, to make I-steel Lower wing plate is fixed between the first hanger, the second hanger and pedestal.It is additionally provided with mounting rack below pedestal, pipeline can be installed on In shelving, to realize that pipeline is taken root on the lower wing plate of I-beam, and without carrying out secondary welding to I-beam.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is the embodiments of the present invention, for those of ordinary skill in the art, without creative efforts, also Other attached drawings can be obtained according to the attached drawing of offer.
Fig. 1 is the structural representation of the first specific embodiment of I-beam pipe installation bracket provided by the utility model Figure;
Fig. 2 is the structural representation of second of specific embodiment of I-beam pipe installation bracket provided by the utility model Figure.
Wherein, the appended drawing reference in Fig. 1 and Fig. 2 are as follows:
Pedestal 1, the first hanger 2, the second hanger 3, mounting rack 4, pipeline clamp 5, I-beam 6, interconnecting piece 11, connection bolt 12。
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
In order to make those skilled in the art more fully understand the utility model, with reference to the accompanying drawing and specifically The utility model is described in further detail for embodiment.
Fig. 1 and Fig. 2 are please referred to, the first is specific real for I-beam pipe installation bracket provided by the utility model by Fig. 1 Apply the structural schematic diagram of mode;Fig. 2 is second of specific embodiment party of I-beam pipe installation bracket provided by the utility model The structural schematic diagram of formula.
The structure of I-beam pipe installation bracket provided by the utility model is as shown in Figure 1 or 2, and I-beam 6 refers to Structural beams based on I-steel, I-steel include the web at upper and lower two wing plate and middle part, and upper and lower two wing plate is usually along water Square to setting.I-beam pipe installation bracket provided by the utility model is fixedly mounted on the lower wing plate of I-beam 6, then By Pipe installing in I-beam pipe installation bracket, realize that pipeline is taken root on I-beam 6, and need not carry out to I-beam 6 Secondary welding.
Specifically, I-beam pipe installation bracket includes the first hanger 2, the second hanger 3 and pedestal 1, pedestal 1 can be with The lower end surface of 6 lower wing plate of I-beam is bonded, and the length of pedestal 1 is greater than the width of lower wing plate, when I-beam pipe installation bracket with When I-beam 6 is connected, the both ends that pedestal 1 is typically normal to the web of I-beam 6 and pedestal 1 extend to the outer of the two sides of wing plate Side.First hanger 2 is fixedly connected with the first end of pedestal 1, and has pre-determined distance, the first side of I-steel lower wing plate between the two It being inserted into the gap between the first hanger 2 and pedestal 1, pre-determined distance is greater than or equal to the thickness of lower wing plate, wherein it is preferred that Embodiment be pre-determined distance be equal to bottom wing plate thickness.The second end of second hanger 3 and pedestal 1 is bolted, is clamped Etc. modes realize detachably connected, the second hanger 3 is installed on above second side of lower wing plate and the second end phase with pedestal 1 Even, the first hanger 2 and the second hanger 3 support force upward by lower wing plate, while both making to apply pedestal 1 upward pulling force Effect realizes that pedestal 1 is connected with lower wing plate.
The mounting rack 4 for pipe laying is connected with below pedestal 1, mounting rack 4 can be specially rectangle mounting rack, U-shaped installation Frame or inverted-triangular mounting rack etc. the modes such as can be connected through a screw thread with pedestal 1, be bolted or weld and be connected.
The process of the installation of I-beam pipe installation bracket is, the first hanger 2, mounting rack 4 and pedestal 1 first pass through welding or It the modes such as is bolted and carries out pre-connection, be therebetween the gap of pre-determined distance with width.By the first lateral edge of lower wing plate Gap is inserted between the first hanger 2 and pedestal 1, and pedestal 1 and the lower end surface of lower wing plate fit at this time, then the second hanger 3 is pacified Second side loaded on lower wing plate, the second hanger 3 are connected with the second end of pedestal 1, realize that pedestal 1 is connected with lower wing plate.
In the present embodiment, the pedestal 1 of I-beam pipe installation bracket is lifted respectively by the first hanger 2 and the second hanger 3 In the two sides of 6 lower wing plate of I-beam, to realize that pedestal 1 is connected with lower wing plate.The lower section of pedestal 1 is additionally provided with the peace of pipe laying 4 are shelved, pipeline is enable to be connected with I-beam 6 without carrying out secondary welding.
Optionally, the interconnecting piece 11 of plate is equipped between the first hanger 2 and pedestal 1, the thickness of interconnecting piece 11 is equal to lower wing plate Thickness, the two is connected with interconnecting piece 11 by welding.To guarantee bonding strength, the length of weld seam is greater than or equal to 100mm.Certainly, it can also directly be welded between the first hanger 2 and pedestal 1, the width of weld seam is greater than or equal to the thickness of lower wing plate The length of degree, weld seam is greater than or equal to 100mm.
Optionally, it is realized between the second hanger 3 and pedestal 1 by connection bolt 12 detachably connected.To guarantee that connection is strong It spends, the quantity that bolt 12 is connected on 1 length direction of pedestal will be generally greater than or equal to 2, and the spacing of any two connections bolt 12 More than or equal to 60mm, the diameter for connecting bolt 12 is greater than or equal to 10mm.To guarantee that the second hanger 3 and pedestal 1 can be under Wing plate fitting, settable block between the second hanger 3 and pedestal 1, block are located at the second hanger 3 or pedestal 1 far from lower wing plate The thickness of one end and block is greater than or equal to the thickness of lower wing plate.When the second hanger 3 is connected with pedestal 1, block makes second to hang Distance between frame 3 and pedestal 1 is greater than or equal to the thickness of lower wing plate, connects bolt 12 between block and lower wing plate for second Hanger 3 is connected with pedestal 1, and the second hanger 3 fits closely under the action of bolt pretightening with lower wing plate with pedestal 1, thus real Fixation between existing pedestal 1 and lower wing plate.
In addition, shaped steel structure piece can be selected in the first hanger 2, the second hanger 3 and pedestal 1.Three can specifically select slot Steel, I-steel or square steel tube, fashioned iron are able to bear biggish shear stress, so can in pipeline and pipeline mass of medium When larger will not deformation occurs, ensure that the intensity of I-beam pipe installation bracket.In addition, to further increase I-beam pipe The intensity of road mounting bracket, the first hanger 2 and the second hanger 3 can be as close as possible to the webs of I-beam 6, between the two and web Distance may be less than or equal to 100mm, and the two is parallel with pedestal 1.
In the present embodiment, the first end of the first hanger 2 and pedestal 1 is weldingly connected, the second end of the second hanger 3 and pedestal 1 It is bolted, all has pre-determined distance between the two and pedestal 1.Lower wing plate is first inserted into the first hanger 2 and bottom in installation process Between seat 1, then the second hanger 3 is fixed with pedestal 1, so that installation process be made to be simplified.
Optionally, mounting rack 4 includes the column and horizontally extending crossbeam that extend along the vertical direction, column it is upper End is weldingly connected with the lower end surface of pedestal 1, and the end of lower end and crossbeam is weldingly connected, as shown in Figure 1 or 2, two columns and It is in concave-shaped structure between crossbeam, pipeline is arranged on crossbeam.
In addition, being the displacement of restriction conduit horizontal direction, crossbeam is equipped with pipeline clamp 5, as shown in Figure 1 or 2, pipeline card Hoop 5 is in reverse U shape, and pipeline is fixed on the middle part of pipeline clamp 5, and the both ends of pipeline clamp 5 are fixedly connected with crossbeam.Optionally, Crossbeam is equipped with the perforative mounting hole of through-thickness, and the both ends of pipeline clamp 5 are equipped with external screw thread, and both ends pass through installation Pipeline is fixed on crossbeam by hole, then is connected by nut with the end of pipeline clamp 5, and rotating nuts tighten clip, in turn Pipeline is fixed.
Optionally, in the first specific embodiment, I-beam pipe installation bracket needs the quantity of fixed pipeline Less, the quantity of column is two or more, wherein usually two.Whole columns are all connected under same pedestal 1 End face, as shown in Figure 1, pipeline is fixed in mounting rack 4.It is equipped with a pedestal 1 in entire I-beam pipe installation bracket, and is led to It is crossed to be connected with an I-beam 6.
Optionally, in second of specific embodiment, I-beam pipe installation bracket needs the quantity of fixed pipeline It is more, as shown in Fig. 2, the quantity of 4 central post of mounting rack is two or more, and it is equipped in I-beam pipe installation bracket Two or more pedestals 1, each pedestal 1 are fixed with 6 phase of I-beam, and each column is connected to different bottoms The lower end surface of seat 1, is dispersed the quality of pipeline and its medium by multiple pedestals 1 and more root posts, and then avoid I-shaped Beam pipe installation bracket or girder are broken because of load excessive.It obviously, is a plurality of pipeline of fixation, crossbeam is set along its length There are two or more than two pipeline clamps 5, each pipeline clamp 5 can fix a root canal road.
In the present embodiment, mounting rack 4 includes horizontally disposed crossbeam and the column being arranged along the vertical direction, crossbeam It is connected by column with pedestal 1, pipeline is fixed on pedestal 1 by pipeline clamp 5.4 crossbeam of mounting rack is horizontally disposed Biggish support force can be provided to pipeline, and keep column and the stress on pipeline clamp 5 smaller, so avoid mounting rack 4 because Stress is excessively concentrated and is damaged, and the service life of I-beam pipe installation bracket is extended.
It should be noted that in the present specification, such as first and second etc relational terms are used merely to one Entity is distinguished with other several entities, and without necessarily requiring or implying between these entities, there are any this actual Relationship or sequence.
I-beam pipe installation bracket provided by the utility model is described in detail above.It is used herein Specific case is expounded the principles of the present invention and embodiment, and the explanation of above example is only intended to help to manage Solve the method and its core concept of the utility model.It should be pointed out that for those skilled in the art, not Under the premise of being detached from the utility model principle, several improvements and modifications can be made to this utility model, these improve and repair Decorations are also fallen into the protection scope of the utility model claims.

Claims (10)

1. a kind of I-beam pipe installation bracket, which is characterized in that including to be bonded with the lower end surface of I-beam (6) lower wing plate Pedestal (1), be connected with above the pedestal (1) and be bonded with the upper surface of I-beam (6) first side of lower wing plate to described in suspending in midair It the first hanger (2) of pedestal (1) and is bonded with the upper surface of the I-beam (6) lower wing plate second side to suspend the bottom in midair The second hanger (3) of seat (1), the pedestal (1) and second hanger (3) are detachably connected, set below the pedestal (1) There is the mounting rack (4) to pipe laying.
2. I-beam pipe installation bracket according to claim 1, which is characterized in that first hanger (2) with it is described Pedestal (1) is weldingly connected, and the pre-determined distance to fixed I-beam (6) first side of lower wing plate is equipped between the two.
3. I-beam pipe installation bracket according to claim 2, which is characterized in that second hanger (3) with it is described Pedestal (1) is fixed by connection bolt (12).
4. I-beam pipe installation bracket according to claim 3, which is characterized in that first hanger (2), described Two hangers (3) and the pedestal (1) are shaped steel structure piece.
5. I-beam pipe installation bracket according to claim 4, which is characterized in that the diameter of connection bolt (12) More than or equal to 10mm.
6. according to claim 1 to I-beam pipe installation bracket described in 5 any one, which is characterized in that the mounting rack (4) be in concave shape, including column and crossbeam, the upper end of the column is fixedly connected with the lower end surface of the pedestal (1), lower end and The crossbeam is fixedly connected.
7. I-beam pipe installation bracket according to claim 6, which is characterized in that the crossbeam is equipped with to fixing pipe The pipeline clamp (5) in road.
8. I-beam pipe installation bracket according to claim 7, which is characterized in that the quantity of the column be two or Two or more, all the column is all connected to the lower end surface of the same pedestal (1).
9. I-beam pipe installation bracket according to claim 7, which is characterized in that the quantity of the column be two or Two or more, each column are connected to the lower end surface of the different pedestals (1).
10. I-beam pipe installation bracket according to claim 7, which is characterized in that the crossbeam set there are two or two A above pipeline clamp (5).
CN201821825948.0U 2018-11-05 2018-11-05 A kind of I-beam pipe installation bracket Expired - Fee Related CN209469874U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821825948.0U CN209469874U (en) 2018-11-05 2018-11-05 A kind of I-beam pipe installation bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821825948.0U CN209469874U (en) 2018-11-05 2018-11-05 A kind of I-beam pipe installation bracket

Publications (1)

Publication Number Publication Date
CN209469874U true CN209469874U (en) 2019-10-08

Family

ID=68088004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821825948.0U Expired - Fee Related CN209469874U (en) 2018-11-05 2018-11-05 A kind of I-beam pipe installation bracket

Country Status (1)

Country Link
CN (1) CN209469874U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109210275A (en) * 2018-11-05 2019-01-15 上海宝冶集团有限公司 A kind of I-beam pipe installation bracket
WO2024187764A1 (en) * 2023-03-16 2024-09-19 中建科工集团有限公司 Pipe support

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109210275A (en) * 2018-11-05 2019-01-15 上海宝冶集团有限公司 A kind of I-beam pipe installation bracket
WO2024187764A1 (en) * 2023-03-16 2024-09-19 中建科工集团有限公司 Pipe support

Similar Documents

Publication Publication Date Title
CN209469874U (en) A kind of I-beam pipe installation bracket
CN212478241U (en) Novel steel structure spherical net rack ceiling conversion layer connecting structure
CN109210275A (en) A kind of I-beam pipe installation bracket
CN208122301U (en) A kind of floor support plate supporting apparatus
CN204850474U (en) Concrete feeding pump line fixing system
CN102926554B (en) Steel hanging seat formwork support and construction method thereof
CN211772964U (en) Bridging suspension beam for box culvert first-aid repair
CN215568425U (en) Device of takeing root of electric pipeline gallows in steel construction truss
CN217003409U (en) Pipeline bearing structure is synthesized to assembled
CN110778009A (en) Suspended ceiling structure
CN208074270U (en) A kind of fixing device of petroleum pipeline
CN208167533U (en) A kind of heavy type truss pipe support system
CN107740585B (en) Hanging installation method for ultra-long inclined steel structure circular pipe
CN213538700U (en) Supporting structure for concrete construction of cantilever end of steel-concrete composite beam bridge
CN210860106U (en) Assembled gallows of fire-fighting pipeline
CN209524163U (en) Beam-column combined fixing support structure for horizontally laying heavy pipelines side by side
JP3602479B2 (en) Bridge deck slab mounting structure
CN209705416U (en) A kind of ears hanger of petrochemical industry horizontal pipe
CN210532664U (en) Air conditioner is support bracket for water pipe
CN102286923A (en) Method for building viaduct on sea
CN209211715U (en) Drag-line Glass Rib curtain wall system
CN207901085U (en) Multiplexing combined pipeline support bracket for installing large-diameter steel pipe
CN218480600U (en) Auxiliary device for hanging and installing large boiler drum
CN217177710U (en) Pipeline anti-seismic mounting structure
CN204681017U (en) A kind of joist steel upright base

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191008

Termination date: 20211105

CF01 Termination of patent right due to non-payment of annual fee