CN209466455U - Construction reinforcing steel bars of wallboards positioning tool - Google Patents
Construction reinforcing steel bars of wallboards positioning tool Download PDFInfo
- Publication number
- CN209466455U CN209466455U CN201821704623.7U CN201821704623U CN209466455U CN 209466455 U CN209466455 U CN 209466455U CN 201821704623 U CN201821704623 U CN 201821704623U CN 209466455 U CN209466455 U CN 209466455U
- Authority
- CN
- China
- Prior art keywords
- hole
- positioning
- movable block
- wallboards
- steel bars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 17
- 229910001294 Reinforcing steel Inorganic materials 0.000 title claims abstract description 14
- 239000011440 grout Substances 0.000 claims abstract description 19
- 230000002787 reinforcement Effects 0.000 claims abstract description 15
- 238000003780 insertion Methods 0.000 claims abstract description 5
- 230000037431 insertion Effects 0.000 claims abstract description 5
- 239000002184 metal Substances 0.000 claims abstract description 3
- 229910052751 metal Inorganic materials 0.000 claims abstract description 3
- 239000000463 material Substances 0.000 claims description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 210000003205 muscle Anatomy 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 230000000694 effects Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model proposes a kind of construction reinforcing steel bars of wallboards positioning tool, the position-adjustable of the location hole on such positioning tool, therefore the prefabricated mould of different size can be suitable for, applicability is preferable.It includes positioning plate made of metal, several spaced grout holes along its length and the first positioning hole for reinforcement foundation insertion are provided on positioning plate, the corresponding first positioning hole of each grout hole, the first positioning hole is arranged in can be along the movable block that positioning plate width direction slidably reciprocates, the sliding slot to slidably reciprocate for movable block is offered on the positioning plate, limit slot is offered on the two sidewalls of sliding slot respectively, the two sides of the movable block have the positive stop lug boss to match with limit slot shape, positive stop lug boss is in limit slot, the side of sliding slot offers one and arranges the 2nd location hole, there is interconnecting piece on the movable block, through-hole is offered on interconnecting piece, the second location hole is connect with through-hole by bolt.
Description
Technical field
The utility model relates to equipment technology field for building, specifically a kind of construction reinforcing steel bars of wallboards positioning tool.
Background technique
Currently, concrete material is mainly injected into prefabricated molds by way of grouting when PC prefabricated panel foundation construction
In tool, and grouting when, need to guarantee constitute wallboard reinforcement foundation and grout sleeve hole location on same position coaxial line, from
And guarantee the smooth installation and construction speed of prefabricated panel, although existing tooling can accurately guarantee reinforcement foundation and grout sleeve
Hole location is in on the coaxial line of position, still, due to the position of the location hole in tooling be it is fixed, can not be adjusted, because
This is not available on the prefabricated mould of other specifications, and applicability is lower.
Utility model content
Technical problem to be solved in the utility model is to overcome the deficiencies of existing technologies, and provides a kind of construction wallboard steel
Muscle positioning tool, the position-adjustable of the location hole on such positioning tool, therefore the prefabricated molds of different size can be suitable for
Tool, applicability are preferable.
In order to solve the above technical problems, it includes by gold the utility model proposes a kind of construction reinforcing steel bars of wallboards positioning tool
Belong to positioning plate made of material, is provided with several spaced grout holes along its length on positioning plate and for basic steel
The first positioning hole of muscle insertion, the corresponding first positioning hole of each grout hole, the first positioning hole setting is can be along positioning
On the movable block that board width direction slidably reciprocates, the sliding slot to slidably reciprocate for movable block, sliding slot are offered on the positioning plate
Two sidewalls on offer limit slot respectively, the two sides of the movable block have the limit convex to match with limit slot shape
Platform, in limit slot, the side of sliding slot offers one and arranges the 2nd location hole positive stop lug boss, has connection on the movable block
Portion offers through-hole on interconnecting piece, and the second location hole is connect with through-hole by bolt.
After adopting the above structure, compared with prior art, the utility model has the advantage that
By the position of mobile movable block to which the position of first positioning hole to be adjusted in the utility model, to make
Obtaining tooling can be suitable on the prefabricated mould of different size, specifically when adjusting, first extract the bolt in through-hole, release
Then the positioning of movable block adjusts position of the movable block in sliding slot, since the positive stop lug boss on movable block is embedded in chute wall
On limit slot in so that movable block can only move back and forth along the width direction of positioning plate, after being moved to position appropriate,
Bolt is inserted into through-hole and second location hole, movable block is positioned, to complete the adjusting of first positioning hole position.
As an improvement, further including the baffle for covering grout hole, the edge of the grout hole is fixed with to be inserted into for baffle
Socket, in this way, after the completion of grouting can grout hole be closed, prevent sundries from falling into.
As an improvement, movable block upper end is connected with abutment sleeve, the centre bore and first positioning hole of abutment sleeve are concentric
It is arranged, the clamp system for clamping reinforcement foundation is provided on the abutment sleeve, the clamp system includes clamp clip, clamps
Bar, spring, clamping bar quantity is three and is uniformly distributed along the circumferential direction of abutment sleeve, is offered on the side wall of the abutment sleeve
For the mounting hole that clamping bar moves back and forth, one end of the clamping bar is inserted into the inside of abutment sleeve by mounting hole, described
Spring pocket is on clamping bar, and clamping bar inner end connects clamp clip, and spring one end and clamp clip are against the other end and abutment sleeve
Inner wall lean, in this way, clamp clip can the elastic force of spring effect under clamp reinforcement foundation, further fixed, and
And since spring has certain elastic force range, makes it possible to the reinforcement foundation suitable for different thicknesses, further increase tooling
Applicability.
As an improvement, the outer end of clamping bar is equipped with pull handle, in this way, being convenient for staff when being inserted into reinforcement foundation
Clamping bar is pulled open, so that clamp clip be driven to be displaced outwardly, is inserted into reinforcement foundation.
As an improvement, the diameter of abutment sleeve centre bore is greater than the diameter of first positioning hole.
As an improvement, clamp clip is arc-like sheet made of rubber material, in such manner, it is possible to play anti-skidding effect.
As an improvement, the upper surface of positioning plate is connected with knob, in this way, being convenient for people's Mobile tool.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model construction reinforcing steel bars of wallboards positioning tool.
Fig. 2 is the structural schematic diagram of movable block in the utility model.
Fig. 3 is the half sectional view of movable block in the utility model.
Fig. 4 is the structural schematic diagram of socket in the utility model.
As shown in the figure, 1, positioning plate, 2, grout hole, 3, first positioning hole, 4, movable block, 5, sliding slot, 6, positive stop lug boss, 7,
Second location hole, 8, interconnecting piece, 9, through-hole, 10, socket, 11, baffle, 12, abutment sleeve, 13, clamp clip, 14, clamping bar,
15, spring, 16, pull handle, 17, knob.
Specific embodiment
The utility model is described in further detail below:
The utility model provides a kind of construction reinforcing steel bars of wallboards positioning tool, it includes positioning plate 1 made of metal,
Several spaced grout holes 2 along its length and the first positioning for reinforcement foundation insertion are provided on positioning plate 1
Hole 3, the corresponding first positioning hole 3 of each grout hole 2, the setting of first positioning hole 3 can come along 1 width direction of positioning plate
It returns on the movable block 4 of sliding, the sliding slot 5 to slidably reciprocate for movable block 4, the two sidewalls of sliding slot 5 is offered on the positioning plate 1
Upper to offer limit slot respectively, the two sides of the movable block 4 have the positive stop lug boss 6 to match with limit slot shape, limit
In limit slot, the side of sliding slot 5 offers one and arranges the 2nd location hole 7 boss 6, has interconnecting piece on the movable block 4
8, through-hole 9 is offered on interconnecting piece 8, and the second location hole 7 is connect with through-hole 9 by bolt.Pass through shifting in the utility model
The position of dynamic movable block 4 is to which the position of first positioning hole 3 to be adjusted, so that tooling can be suitable for different size
Prefabricated mould on, specifically adjust when, first by through-hole 9 bolt extract, release movable block 4 positioning, then adjust
Position of the movable block 4 in sliding slot 5 makes since the positive stop lug boss 6 on movable block 4 is in the limit slot on 5 side wall of sliding slot
Obtaining movable block 4 can only move back and forth along the width direction of positioning plate 1, after being moved to position appropriate, bolt is inserted into logical
In hole 9 and second location hole 7, movable block 4 is positioned, to complete the adjusting of 3 position of first positioning hole.
It further include the baffle 11 for covering grout hole 2 in the present embodiment, the edge of the grout hole 2 is fixed with for gear
Plate 11 be inserted into socket 10, in this way, after the completion of grouting can grout hole 2 be closed, prevent sundries from falling into.
In the present embodiment, 4 upper end of movable block is connected with abutment sleeve 12, the centre bore and first positioning hole of abutment sleeve 12
3 concentric settings, the clamp system for clamping reinforcement foundation is provided on the abutment sleeve 12, and the clamp system includes folder
Tight piece 13, clamping bar 14, spring 15,14 quantity of clamping bar is three and is uniformly distributed along the circumferential direction of abutment sleeve 12, described fixed
The mounting hole moved back and forth for clamping bar 14 is offered on the side wall of position sleeve 12, one end of the clamping bar 14 passes through mounting hole
It is inserted into the inside of abutment sleeve 12, the spring 15 is sleeved on clamping bar 14, and 14 inner end of clamping bar connects clamp clip 13, bullet
15 one end of spring and clamp clip 13 are against the inner wall of the other end and abutment sleeve 12 leans, in this way, clamp clip 13 can be in spring 15
Elastic force effect under clamp reinforcement foundation, further fixed, and due to spring 15 have certain elastic force range, make
The reinforcement foundation that can be suitable for different thicknesses is obtained, the applicability of tooling is further increased.
In the present embodiment, the outer end of clamping bar 14 is equipped with pull handle 16, in this way, being convenient for work when being inserted into reinforcement foundation
Make personnel to pull open clamping bar 14, so that clamp clip 13 be driven to be displaced outwardly, is inserted into reinforcement foundation.
In the present embodiment, the diameter of 12 centre bore of abutment sleeve is greater than the diameter of first positioning hole 3.
In the present embodiment, clamp clip 13 is arc-like sheet made of rubber material, in such manner, it is possible to play anti-skidding effect.
In the present embodiment, the upper surface of positioning plate 1 is connected with knob 17, in this way, being convenient for people's Mobile tool.
In the present embodiment, the sliding slot 5 it is open at one end, in this way, it is more convenient to load and unload movable block 4.
The above description is only a preferred embodiment of the present invention, thus it is all according to construction described in present patent application range,
The equivalent change or modification that feature and principle are done, is included in the scope of the utility model patent application.
Claims (7)
1. reinforcing steel bars of wallboards positioning tool of constructing, it includes positioning plate made of metal, is provided on positioning plate along its length
Spend spaced several grout holes in direction and the first positioning hole for reinforcement foundation insertion, corresponding one of each grout hole the
A positioning hole, which is characterized in that the first positioning hole be arranged in can along the movable block that positioning plate width direction slidably reciprocates,
The sliding slot to slidably reciprocate for movable block is offered on the positioning plate, offers limit slot respectively on the two sidewalls of sliding slot,
The two sides of the movable block have the positive stop lug boss to match with limit slot shape, and positive stop lug boss is in limit slot, sliding slot
Side offer one and arrange the 2nd location hole, there is interconnecting piece on the movable block, offer through-hole on interconnecting piece, described second
Location hole is connect with through-hole by bolt.
2. construction reinforcing steel bars of wallboards positioning tool according to claim 1, which is characterized in that further include for covering grout hole
Baffle, the edge of the grout hole be fixed with for baffle insertion socket.
3. construction reinforcing steel bars of wallboards positioning tool according to claim 1, which is characterized in that movable block upper end is connected with positioning
Sleeve, the centre bore of abutment sleeve and first positioning hole concentric setting are provided with for clamping basic steel on the abutment sleeve
The clamp system of muscle, the clamp system include clamp clip, clamping bar, spring, and clamping bar quantity is three and along abutment sleeve
Circumferential direction be uniformly distributed, the mounting hole moved back and forth for clamping bar, the clamping bar are offered on the side wall of the abutment sleeve
One end the inside of abutment sleeve is inserted by mounting hole, the spring pocket is on clamping bar, clamping bar inner end connection folder
Tight piece, spring one end and clamp clip are against the inner wall of the other end and abutment sleeve leans.
4. construction reinforcing steel bars of wallboards positioning tool according to claim 3, which is characterized in that the outer end of clamping bar, which is equipped with, to be pulled
Handle.
5. construction reinforcing steel bars of wallboards positioning tool according to claim 3, which is characterized in that the diameter of abutment sleeve centre bore
Greater than the diameter of first positioning hole.
6. construction reinforcing steel bars of wallboards positioning tool according to claim 3, which is characterized in that clamp clip is made of rubber material
Arc-like sheet.
7. construction reinforcing steel bars of wallboards positioning tool according to claim 1, which is characterized in that the upper surface of positioning plate is connected with
Knob.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821704623.7U CN209466455U (en) | 2018-10-19 | 2018-10-19 | Construction reinforcing steel bars of wallboards positioning tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821704623.7U CN209466455U (en) | 2018-10-19 | 2018-10-19 | Construction reinforcing steel bars of wallboards positioning tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209466455U true CN209466455U (en) | 2019-10-08 |
Family
ID=68086253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821704623.7U Active CN209466455U (en) | 2018-10-19 | 2018-10-19 | Construction reinforcing steel bars of wallboards positioning tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209466455U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110962218A (en) * | 2019-12-20 | 2020-04-07 | 江西金凯新型墙板科技有限公司 | Mould is used in production of light partition plate |
CN112976285A (en) * | 2021-02-26 | 2021-06-18 | 李慧宏 | Manufacturing method of assembled composite floor slab |
CN116408881A (en) * | 2023-03-23 | 2023-07-11 | 惠州市正品木业有限公司 | Building composite board shaping processing equipment |
-
2018
- 2018-10-19 CN CN201821704623.7U patent/CN209466455U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110962218A (en) * | 2019-12-20 | 2020-04-07 | 江西金凯新型墙板科技有限公司 | Mould is used in production of light partition plate |
CN110962218B (en) * | 2019-12-20 | 2021-02-09 | 江西金凯新型墙板科技有限公司 | Mould is used in production of light partition plate |
CN112976285A (en) * | 2021-02-26 | 2021-06-18 | 李慧宏 | Manufacturing method of assembled composite floor slab |
CN116408881A (en) * | 2023-03-23 | 2023-07-11 | 惠州市正品木业有限公司 | Building composite board shaping processing equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209466455U (en) | Construction reinforcing steel bars of wallboards positioning tool | |
EP2253777B1 (en) | Profile rail system for covering at least the edge of a lining | |
CN104264593B (en) | The pre-stress stretching method of a kind of Near Surface Mounted muscle reinforcing and device | |
CN203769342U (en) | Rigid self-locking pre-stress carbon fiber plate anchoring system | |
CN106639305B (en) | Slidable lifting type constructional column steel formwork and construction method thereof | |
CN106564121B (en) | Precast concrete mold hydraulic ejection mechanism | |
CN208039826U (en) | A kind of adjustable clamping hoop type strenthening member of square cross section column type mould | |
CN209309473U (en) | The support device of Super High concrete pump pipe | |
CN208501927U (en) | It is a kind of for assemble building and can adjust be poured thickness pre-buried insulation board system | |
CN215564155U (en) | Dowel bar fixing device at construction joint of factory floor | |
CN110318539A (en) | A kind of high efficiente callback equipment for building mould | |
CN209114621U (en) | A kind of T-type connection structure of building top and building wall board | |
CN202450788U (en) | Multifunctional brick clip | |
CN212583033U (en) | Polymer building wallboard with fire-retardant function | |
CN201411869Y (en) | Combined T-type steel bar mounting device for architectural decoration component | |
CN215564068U (en) | Wallboard connecting structure | |
CN215407443U (en) | Building construction template of convenient equipment | |
CN204626974U (en) | A kind of construction formwork retention mechanism | |
CN216646054U (en) | Connecting structure for full-automatic anti-bending machine | |
CN219711044U (en) | Reinforcing steel bar positioning structure | |
CN220081445U (en) | Automatic rebound top die device for positioning tunnel secondary lining embedded part | |
CN221608831U (en) | Building engineering foundation reinforcing apparatus | |
CN204983176U (en) | Prefabricated plate is connecting piece for amalgamation | |
CN206870116U (en) | Cage bar positioning tool for concrete prefabricated element mould | |
CN220251530U (en) | Cement compressive and fracture-resistant integrated machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 314400 No. 188, Jiuli Road, Wanghai street, Haiyan County, Jiaxing City, Zhejiang Province Patentee after: Jinxiao New Materials Technology (Zhejiang) Co.,Ltd. Country or region after: China Address before: 314300 No.8, Jiuli Road, industrial zone, Yuantong street, Haiyan County, Jiaxing City, Zhejiang Province Patentee before: JINXIAO CONSTRUCTION TECHNOLOGY Co.,Ltd. Country or region before: China |