A kind of integration emergency Crack Monitoring terminal
Technical field
The utility model relates to a kind of monitoring terminal more particularly to a kind of integration emergency Crack Monitoring terminals.
Background technique
Preceding widely used monitoring terminal for field using when generally consist of the following components: data collector,
The composition such as RTU, sensor, solar controller, colloid storage battery and outfield cabinet, scene carry out a group adjustment to all parts
Examination.Colloid storage battery needs to be embedded in each equipment that underground is connected in cabinet by cabling and cabinet and provides electric power.
China is the country in mountain area more than one, and geological structure complicated geological disaster takes place frequently, and country also pays much attention to geology calamity
Harmful prevention and treatment and improvement, at present to main geological disaster point using monitoring and the mode administered, and it is larger due to investing
Also only the geological disaster point being affected is monitored and is administered.The country has had multiple producers that can provide and has been directed at present
It comes down, the monitoring scheme of avalanche and mud-rock flow, such as the deformation monitoring based on Beidou navigation satellite, deep soils, and
There is a certain amount of application, but since these monitoring devices need to be mounted on field, use is solar powered, in equipment use process
Be primarily present following problems: the installation of 1. equipment is highly professional, needs professional that could install, is not able to satisfy in emergency
Under, the demand quickly built a station;2. equipment is installed on field, there are equipment is stolen and breakoff phenomenon;3. at present geology calamity
The evil generally existing costly problem of automatic monitoring equipment, is limited by funds, it is difficult to which mass promotes and applies, based on current
Status, geological disaster take precautions against natural calamities work mainly by manpower inspection, big, poor in timeliness that there are human inputs, discovery dangerous situation early warning period
Long problem;4. it is higher to the daily maintenance technical requirements for using unit, and maintenance cost is expensive.5. in current main data
Report mode is that timing reports, and data acquisition intervals are inversely proportional with monitoring sensitivity and system power dissipation, because in order to which balance power consumption is past
Toward sensitivity can be sacrificed, cause monitoring data not in time situations such as.
To sum up, existing for landslide, the generally existing following problems of monitoring terminal of avalanche and mud-rock flow: 1. are unable to satisfy
The demand quickly built a station;2. terminal device is easily stolen and destroys;3. equipment is generally costly, it is difficult to promote;4. maintenance cost
It is expensive;5. monitoring data are not in time.
Therefore, for the existing monitoring terminal for landslide, avalanche and mud-rock flow be unable to satisfy the demand quickly built a station,
Terminal device is easily stolen and destroy, equipment it is generally costly, it is difficult to promote, maintenance cost is expensive and monitoring data not in time
The problems such as, become those skilled in the art's technical problem urgently to be resolved.
Utility model content
The utility model is to solve the existing monitoring terminal for landslide, avalanche and mud-rock flow and be unable to satisfy quickly to build a station
Demand, terminal device is easily stolen and destroy, equipment it is generally costly, it is difficult to promote, maintenance cost is expensive and monitoring number
According to not in time the problems such as, provide integration emergency Crack Monitoring terminal.
To achieve the above object, the utility model uses following technical scheme:
Provide a kind of integration emergency Crack Monitoring terminal, comprising:
For acquiring the monitoring terminal 1 of geological disaster monitoring data;
For receiving and storing the data server 2 of the geological disaster monitoring data, the data server 2 and the monitoring
Terminal 1 connects;
For receiving the intelligent terminal 3 of the geological disaster monitoring data of the data server 2, the intelligent terminal 3 is according to institute
It states geological disaster monitoring data and control instruction is sent to the monitoring terminal 1;
The long-range monitoring platform 4 of positioning, the long-range monitoring platform are tracked for the position to the monitoring terminal 1
4 connect to receive the geological disaster monitoring data with the data server 2;And
For the location information of the monitoring terminal 1 to be transferred to the long-range monitoring platform by Beidou communication module 5
4。
Further, the data server 2 is connect with the monitoring terminal 1 by the first communication module 6, and described first
Communication module 6 includes 4G and 3G module.
Further, the intelligent terminal 3 is connect by the second communication module 7 with the monitoring terminal 1, and described second is logical
Interrogating module is bluetooth module or WIFI wireless module.
Further, the long-range monitoring platform 4 passes through cable connection with the data server 2.
Further, the monitoring terminal 1 include data collection and analysis processing module 8, low-power dissipation power supply management module 9,
Wire module 11 is drawn in battery module 10 and crack, and the battery module 10 is connect with the low-power dissipation power supply management module 9, institute
It states low-power dissipation power supply management module 9 to connect with crack traction wire module 11 and data collection and analysis processing module 8 respectively, institute
Crack traction wire module 11 is stated to connect with the data collection and analysis processing module 8.
Further, the battery module 10 is lithium battery module.
Further, the data collection and analysis processing module 8 communicates mould with first communication module 6, second respectively
Block 7 and the connection of Beidou communication module.
Further, the monitoring terminal 1 is equipped with external interface 12, and the top of the monitoring terminal 1 is equipped with two dimensional code 13,
The battery module 10 is equipped in the monitoring terminal 1, the bottom of monitoring 1 side end face of terminal is equipped with the crack draught line
Module 11, the external interface 12 include power supply port, debugging mouth and BD communication port.
Further, the power supply port and solar energy photovoltaic panel or reserve battery cable connection.
The utility model by adopting the above technical scheme, compared with prior art, has the following technical effect that the utility model
The integration emergency Crack Monitoring terminal of offer, Beidou anti-theft tracking: cluster tool BDS satellite positioning tech and sensor technology
Technical intelligence judge the state of equipment it is static in be in it is stolen during, once discovering device is stolen to be started on position
Report, and then alarm and carry out equipment and recover;Terminal integrates high-efficiency solar charging chip, high-performance low-power-consumption hardware platform, knot
It closes intelligent trigger alarm and substantially reduces power consumption;Terminal uses integrated design, and highly integrated data acquisition unit, data transmission are single
Member, intelligent front end data analytical analysis unit and solar powered unit, can effectively reduce cost by Intensive Design, are convenient for
Installation and deployment;Suitable for main geological disaster type: the monitoring of the geological disasters such as avalanche, landslide.
The utility model guarantees frequency acquisition it is also ensured that object state being real-time perception, can be believed according to position
Breath recovers stolen equipment, using two kinds of means of communication depth integrations, mutually standby transmission, it is ensured that data communication link it is reliable and stable,
User can access analysis to data by WEB page or mobile phone terminal browser, realize function in conjunction with intelligent power management system
The very big reduction of consumption supports Bluetooth of mobile phone configuration, gets rid of dependence of the field adjustable to computer.
Detailed description of the invention
Fig. 1 is the work connection schematic diagram of the utility model integration emergency Crack Monitoring terminal;
Fig. 2 is the device structure schematic diagram of the utility model integration emergency Crack Monitoring terminal;
Fig. 3 is the intelligent trigger alert operation flow chart of the utility model integration emergency Crack Monitoring terminal;
Fig. 4 is the Beidou anti-theft tracking work flow diagram of the utility model integration emergency Crack Monitoring terminal;
Fig. 5 is the module relation diagram that terminal is monitored in the utility model integration emergency Crack Monitoring terminal;
Wherein, each appended drawing reference are as follows:
1- monitors terminal, 2- data server, 3- intelligent terminal, the long-range monitoring platform of 4-, 5- Beidou communication module, 6- the
One communication module, the second communication module of 7-, 8- data collection and analysis processing module, 9- low-power dissipation power supply management module, 10- battery
Wire module, 12- external interface, 13- two dimensional code are drawn in module, the crack 11-.
Specific embodiment
The utility model is described in more detail below by specific embodiment, for a better understanding of this reality
With novel, but following embodiments are not intended to limit the scope of the utility model.
As shown in Figure 1, the utility model embodiment provides a kind of integration emergency Crack Monitoring terminal, comprising:
For acquiring the monitoring terminal 1 of geological disaster monitoring data;
For receiving and storing the data server 2 of geological disaster monitoring data, data server 2 is connect with monitoring terminal 1;
The intelligent terminal 3 of the geological disaster monitoring data of server 2 for receiving data, intelligent terminal 3 monitor number according to geological disaster
Control instruction is sent according to monitoring terminal 1;
The long-range monitoring platform 4 of positioning, long-range monitoring platform 4 and data are tracked for the position to monitoring terminal 1
Server 2 is connected to receive geological disaster monitoring data;And
For the location information for monitoring terminal 1 to be transferred to long-range monitoring platform 4 by Beidou communication module 5.
The one aspect of the present embodiment, as shown in Figure 1, data server 2 and monitoring terminal 1 pass through the first communication module 6
Connection, the first communication module 6 includes 4G and 3G module, using two kinds of means of communication depth integrations, mutually standby transmission, it is ensured that data are logical
Interrogate the reliable and stable of link.
The one aspect of the present embodiment, as shown in Figure 1, intelligent terminal 3 is connected by the second communication module 7 and monitoring terminal 1
It connects, the second communication module is bluetooth module or WIFI wireless module.
The one aspect of the present embodiment, as shown in Fig. 2, long-range monitoring platform 4 passes through cable connection with data server 2.
The one aspect of the present embodiment, such as Fig. 3, shown in 4,5, monitoring terminal 1 include data collection and analysis processing module 8,
Wire module 11, battery module 10 and low-power dissipation power supply management are drawn in low-power dissipation power supply management module 9, battery module 10 and crack
Module 9 connects, and wire module 11 is drawn with crack respectively for low-power dissipation power supply management module 9 and data collection and analysis processing module 8 connects
It connects, crack traction wire module 11 is connect with data collection and analysis processing module 8.
The one aspect of the present embodiment, as shown in Figure 1, battery module 10 is lithium battery module.
The one aspect of the present embodiment, as shown in Fig. 2, data collection and analysis processing module 8 respectively with the first communication module
6, the second communication module 7 and the connection of Beidou communication module.
The one aspect of the present embodiment monitors the top of terminal 1 as shown in Fig. 2, monitoring terminal 1 is equipped with external interface 12
It equipped with two dimensional code 13, monitors and is equipped with battery module 10 in terminal 1, the bottom of monitoring 1 side end face of terminal is equipped with crack draught line mould
Block 11, external interface 12 include power supply port, debugging mouth and BD communication port.
The one aspect of the present embodiment, as shown in Fig. 2, power supply port and solar energy photovoltaic panel or reserve battery cable connection.
The utility model, which is unable to satisfy for the existing monitoring terminal for landslide, avalanche and mud-rock flow, quickly builds a station
Demand, terminal device are easily stolen and destroy, equipment it is generally costly, it is difficult to promote, maintenance cost is expensive and monitoring data
Not in time the problems such as, the utility model integration meet an urgent need Crack Monitoring terminal guarantee frequency acquisition it is also ensured that object shape
State is real-time perception, and stolen equipment can be recovered according to location information, mutually standby to transmit using two kinds of means of communication depth integrations,
Ensuring the reliable and stable of data communication link, user can access analysis to data by WEB page or mobile phone terminal browser,
The very big reduction of power consumption is realized in conjunction with intelligent power management system, is supported Bluetooth of mobile phone configuration, is got rid of field adjustable to computer
It relies on.
The specific embodiment of this practical integration emergency Crack Monitoring terminal is described in detail above, but it is
As example, the utility model is not restricted to particular embodiments described above.To those skilled in the art, any
The equivalent modifications and substitution carry out to the utility model are also all among the scope of the utility model.Therefore, this reality is not being departed from
With equal transformation made under novel spirit and scope and modification, should all cover in the scope of the utility model.