CN209457356U - A kind of Construction of Civil Engineering scaffold - Google Patents

A kind of Construction of Civil Engineering scaffold Download PDF

Info

Publication number
CN209457356U
CN209457356U CN201822054525.XU CN201822054525U CN209457356U CN 209457356 U CN209457356 U CN 209457356U CN 201822054525 U CN201822054525 U CN 201822054525U CN 209457356 U CN209457356 U CN 209457356U
Authority
CN
China
Prior art keywords
rectangular frame
girt
construction
upright bar
civil engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822054525.XU
Other languages
Chinese (zh)
Inventor
纪联彬
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Dinghong Construction Co Ltd
Original Assignee
Fujian Dinghong Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Dinghong Construction Co Ltd filed Critical Fujian Dinghong Construction Co Ltd
Priority to CN201822054525.XU priority Critical patent/CN209457356U/en
Application granted granted Critical
Publication of CN209457356U publication Critical patent/CN209457356U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of Construction of Civil Engineering scaffolds, including frame body, the frame body includes upright bar, girt, steel pedal and ladder, there are four the upright bar is set, the girt includes horizontal strut and is fixed at the U-shaped card slot that horizontal strut left and right ends are mutually clamped with the disk in upright bar, first through hole in the U-shaped card slot is spirally connected by screw rod and fastening nut with the second through-hole on disk, the steel pedal includes rectangular frame, horizontal pedal and fixed symmetrical on the inside of rectangular frame are set to four hooks that rectangular frame left and right ends are mutually mounted with girt, the inverted U-shaped card slot of the ladder bottom end is mutually clamped with the right end of the rectangular frame of its bottom, the C-shaped hook and the right end of the rectangular frame at the top of it of one end mutually mount at the top of the ladder.The utility model is easy to disassemble and stability is good.

Description

A kind of Construction of Civil Engineering scaffold
Technical field
The utility model belongs to technical field of civil engineering, and in particular to a kind of Construction of Civil Engineering scaffold.
Background technique
Scaffold (scaffold) refers to that construction site is worker operation and solves vertically and horizontally to transport and set up various Bracket.The generic term of architecture field refers to and is used in exterior wall, interior decoration or the higher ground that can not directly construct of layer height on construction site Side.It is plainly exactly to build a framework mainly for construction personnel works or the maintenance of perimeter security net and high-altitude installation component etc. up and down, Scaffold making material usually has: bamboo and wood, steel pipe or synthetic material etc..Some engineerings are also with scaffold when template use, furthermore It is also used extensively in departments such as advertising, municipal administration, traffic road bridge, mines.
Connection between traditional scaffold upper pright stanchion and horizontal strut be operator bundled by wirerope item or It being welded, the binding of wirerope item is not only time-consuming and laborious, and safety stability coefficient is low, the scaffold being welded into, although It is easily manufactured, but the gravity being subject to is smaller, when carrying operator and construction material, due to biggish Gravity Problem, It is likely to strut disconnected the phenomenon that falling occur, likewise, safety coefficient is low, and pedal and ladder on the scaffold of existing technology It is welding, it is dangerous.
Summary of the invention
The purpose of this utility model is to provide a kind of Construction of Civil Engineering scaffolds, to solve in above-mentioned background technique The problem of proposition.
To achieve the above object, the utility model provides the following technical solutions: a kind of Construction of Civil Engineering scaffold, packet Including frame body, the frame body includes upright bar, girt, steel pedal and ladder, there are four the upright bar is set, the girt It is spaced substantially equidistant between two neighboring upright bar, is equipped between vertical two girts disposed in parallel from top to bottom Vertical inclination pull rod, the girt include horizontal strut and the circle that is fixed in horizontal strut left and right ends and upright bar The U-shaped card slot that disk is mutually clamped, the first through hole in the U-shaped card slot are logical by second on screw rod and fastening nut and disk Hole is spirally connected, and the steel pedal includes that rectangular frame, the horizontal pedal on the inside of rectangular frame and fixed symmetrical are set to rectangle Four hooks that frame left and right ends are mutually mounted with girt, inverted U-shaped card slot and its bottom of the ladder bottom end The right end of rectangular frame is mutually clamped, and the C-shaped hook and the right end of the rectangular frame at the top of it of one end mutually mount at the top of the ladder, The lateral surface of the frame body top steel pedal is equipped with guardrail, and the left side of the steel pedal of the frame body bottommost is equipped with entrance.
This setting girt is after being mutually clamped by the U-shaped card slot at both ends with the disk in upright bar, to pass through screw rod And fastening nut and disk are spirally connected fixation, and it is not only easy for installation, and supporting & stablizing performance is good, and secured performance is good, improves The safety of worker operation, steel pedal are by being mounted on girt, and easy for installation, one end of ladder passes through card The form connect is connected on the rectangular frame on the steel pedal of bottom, and the other end passes through C-shaped hook and the rectangular frame at the top of it It mutually mounts, easy for installation, scaffold is that socket joint is spirally connected the locking knot that is spirally connected of shape disk buckle frame, disk and screw rod and fastening nut Structure design, it is not only easy for installation, system unit can be combined into an entirety, uniaxial force feature, allow frame body system more Securely and reliably, it can be achieved that the fast construction and dismounting of frame body, cost of labor is low, and without scattered accessory, material wastage rate is small.
Preferably, the bottom of the upright bar is bolted with adjustable base.
Preferably, the vertical equidistant lateral surface for being fixed at upright bar of the disk, the disk and girt are horizontal It is symmetrical arranged.
Preferably, the both ends of the vertical inclination pull rod are spirally connected by bolt and girt.
Preferably, the hook of the rectangular frame left and right ends is mutually mounted with laterally setting girt.
Preferably, the lateral surface of the rear and front end on the right side of the rectangular frame is equipped with and inverted U-shaped card slot and C-shaped hook The postive stop baffle being used in combination, sets that there are four postive stop baffles, and four postive stop baffles point on each rectangular frame Not She Yu inverted U-shaped card slot and C-shaped hook the left and right sides.
Preferably, it is not provided with vertically tilting pull rod between two girts of the entrance upper and lower ends.
The technical effect and advantage of the utility model: the Construction of Civil Engineering scaffold, girt are by two After the U-shaped card slot at end is mutually clamped with the disk in upright bar, it is spirally connected fixation by screw rod and fastening nut and disk, is not only pacified Dress is convenient, and supporting & stablizing performance is good, and secured performance is good, improves the safety of worker operation, and steel pedal is hung by hook It is connected on girt, easy for installation, the rectangle on steel pedal that one end of ladder is connected in bottom by way of clamping On frame, the other end is linked up with by C-shaped and is mutually mounted with the rectangular frame at the top of it, easy for installation, and scaffold is spirally connected shape for socket joint The locking mechanism design that is spirally connected of disk buckle frame, disk and screw rod and fastening nut, it is not only easy for installation, it can be by system unit It is combined into an entirety, uniaxial force feature makes frame body system more safe and reliable, it can be achieved that the fast construction of frame body and tearing open It removes, cost of labor is low, and without scattered accessory, material wastage rate is small.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is enlarged drawing at the A of the utility model;
Fig. 3 is the structural schematic diagram of the utility model U-shaped card slot;
Fig. 4 is the structural schematic diagram of the utility model steel pedal;
Fig. 5 is the structural schematic diagram of the utility model ladder.
In figure: 1 frame body, 2 upright bars, 3 girts, 4 steel pedals, 5 ladders, 6 vertical inclination pull rods, 7 adjustable bases, 8 water Flat strut, 9 disks, 10 U-shaped card slots, 11 first through hole, 12 screw rods, 13 fastening nuts, 14 second through-holes, 15 rectangular frames, 16 Horizontal pedal, 17 hooks, 18 inverted U-shaped card slots, 19 C-shapeds hook, 20 guardrails, 21 postive stop baffles, 22 entrances.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of Construction of Civil Engineering scaffold as shown in Figs. 1-5, including frame body 1, described Frame body 1 includes upright bar 2, girt 3, steel pedal 4 and ladder 5, and there are four the upright bar 2 is set, the girt 3 is from upper It is spaced substantially equidistant between two neighboring upright bar 2, is equipped between vertical two girts 3 disposed in parallel perpendicular under To inclination pull rod 6, the girt 3 includes horizontal strut 8 and is fixed in 8 left and right ends of horizontal strut and upright bar 2 The clamping of 9 phase of disk U-shaped card slot 10, the first through hole 11 in the U-shaped card slot 10 passes through screw rod 12 and fastening nut 13 It is spirally connected with the second through-hole 14 on disk 9, the steel pedal 4 includes rectangular frame 15, the level set on 15 inside of rectangular frame Pedal 16 and fixed symmetrical are set to four hooks 17 that 15 left and right ends of rectangular frame are mounted with 3 phase of girt, described to climb The inverted U-shaped card slot 18 and the right end of the rectangular frame 15 of its bottom of terraced 5 bottom ends are mutually clamped, the C of described 5 top one end of ladder Shape hook 19 and the right end of the rectangular frame 15 at the top of it mutually mount, and the lateral surface of the 1 top steel pedal 4 of frame body is equipped with shield The left side on column 20, the steel pedal 4 of 1 bottommost of frame body is equipped with entrance 22.
Specifically, the bottom of the upright bar 2 is bolted with adjustable base 7.
Specifically, the vertical equidistant lateral surface for being fixed at upright bar 2 of disk 9, the disk 9 and girt 3 Horizontal symmetrical setting.
Specifically, the both ends of the vertical inclination pull rod 6 are spirally connected by bolt with girt 3.
Specifically, the hook 17 of 15 left and right ends of rectangular frame is mounted with laterally setting 3 phase of girt.
Specifically, the lateral surface of the rear and front end on 15 right side of rectangular frame is equipped with and inverted U-shaped card slot 18 and C-shaped 19 postive stop baffles 21 that are used in combination of hook, set that there are four postive stop baffles 21, and four institutes on each rectangular frame 15 State the left and right sides that postive stop baffle 21 is respectively arranged on inverted U-shaped card slot 18 and C-shaped hook 19.
Specifically, being not provided with vertically tilting pull rod 6 between two girts 3 of 22 upper and lower ends of entrance.
The Construction of Civil Engineering scaffold, girt 3 are the circles in U-shaped card slot 10 and upright bar 2 by both ends After the clamping of 9 phase of disk, it is spirally connected fixation by screw rod 12 and fastening nut 13 and disk 9, it is not only easy for installation, and support steady Qualitative energy is good, and secured performance is good, improves the safety of worker operation, and steel pedal 4 is mounted on girt 3 by hook 17 , it is easy for installation, it is another on the rectangular frame 15 on steel pedal 4 that one end of ladder 5 is connected in bottom by way of clamping End is by C-shaped hook 19 and 15 phase of the rectangular frame mounting at the top of it, and easy for installation, scaffold is spirally connected shape disk buckle frame for socket joint, The locking mechanism design that is spirally connected of disk 9 and screw rod 12 and fastening nut 13, it is not only easy for installation, it can be by system unit group Synthesize an entirety, uniaxial force feature, make frame body system more safe and reliable, it can be achieved that frame body fast construction and dismounting, Cost of labor is low, and without scattered accessory, material wastage rate is small.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic It is equivalently replaced, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (7)

1. a kind of Construction of Civil Engineering scaffold, including frame body (1), it is characterised in that: the frame body (1) include upright bar (2), Girt (3), steel pedal (4) and ladder (5), there are four the upright bar (2) sets, the girt (3) is from top to bottom It is spaced substantially equidistant and is set between two neighboring upright bar (2), be equipped between vertical two girts (3) disposed in parallel perpendicular To inclination pull rod (6), the girt (3) include horizontal strut (8) and be fixed at horizontal strut (8) left and right ends with The U-shaped card slot (10) that disk (9) in upright bar (2) is mutually clamped, the first through hole (11) on the U-shaped card slot (10) pass through screw rod (12) and fastening nut (13) is spirally connected with the second through-hole (14) on disk (9), and the steel pedal (4) includes rectangular frame (15), be set to rectangular frame (15) on the inside of horizontal pedal (16) and fixed symmetrical be set to rectangular frame (15) left and right ends with Four hooks (17) that girt (3) mutually mounts, inverted U-shaped card slot (18) and its bottom of ladder (5) bottom end The right end of rectangular frame (15) is mutually clamped, the C-shaped hook (19) and the rectangular frame at the top of it of one end at the top of the ladder (5) (15) right end mutually mounts, and the lateral surface of frame body (1) the top steel pedal (4) is equipped with guardrail (20), and the frame body (1) is most The left side of the steel pedal (4) of bottom is equipped with entrance (22).
2. a kind of Construction of Civil Engineering scaffold according to claim 1, it is characterised in that: the bottom of the upright bar (2) Portion is bolted with adjustable base (7).
3. a kind of Construction of Civil Engineering scaffold according to claim 1, it is characterised in that: the disk (9) is vertical The equidistant lateral surface for being fixed at upright bar (2), the disk (9) and girt (3) horizontal symmetrical are arranged.
4. a kind of Construction of Civil Engineering scaffold according to claim 1, it is characterised in that: the vertical inclination pull rod (6) both ends are spirally connected by bolt with girt (3).
5. a kind of Construction of Civil Engineering scaffold according to claim 1, it is characterised in that: the rectangular frame (15) The hook (17) of left and right ends is mutually mounted with laterally setting girt (3).
6. a kind of Construction of Civil Engineering scaffold according to claim 1, it is characterised in that: the rectangular frame (15) The lateral surface of the rear and front end on right side is equipped with the limiting block being used in combination with inverted U-shaped card slot (18) and C-shaped hook (19) Plate (21), sets that there are four postive stop baffle (21) on each rectangular frame (15), and four postive stop baffles (21) are respectively Set on the left and right sides of inverted U-shaped card slot (18) and C-shaped hook (19).
7. a kind of Construction of Civil Engineering scaffold according to claim 1, it is characterised in that: the entrance (22) is up and down It is not provided with vertically tilting pull rod (6) between two girts (3) at both ends.
CN201822054525.XU 2019-07-04 2019-07-04 A kind of Construction of Civil Engineering scaffold Expired - Fee Related CN209457356U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822054525.XU CN209457356U (en) 2019-07-04 2019-07-04 A kind of Construction of Civil Engineering scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822054525.XU CN209457356U (en) 2019-07-04 2019-07-04 A kind of Construction of Civil Engineering scaffold

Publications (1)

Publication Number Publication Date
CN209457356U true CN209457356U (en) 2019-10-01

Family

ID=68038962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822054525.XU Expired - Fee Related CN209457356U (en) 2019-07-04 2019-07-04 A kind of Construction of Civil Engineering scaffold

Country Status (1)

Country Link
CN (1) CN209457356U (en)

Similar Documents

Publication Publication Date Title
CN214786179U (en) Instrument formula level safety net of encorbelmenting
CN209457356U (en) A kind of Construction of Civil Engineering scaffold
CN112267661A (en) Climbing frame convenient to adjust for construction industry
CN201148726Y (en) Independent hanging scaffold super large operating platform
CN205936370U (en) Module cat ladder that can disassemble
CN210508494U (en) Combined fairway
CN213268781U (en) Adjustable nodal pattern building support
CN211058272U (en) Flower basket type overhanging scaffold
CN211473316U (en) Climbing frame net and mounting bracket system thereof
CN210636781U (en) Hanging flower basket of safety support for building
CN219431313U (en) Floor type double-row scaffold
CN207110399U (en) A kind of construction site scaffold
CN213555003U (en) Safety belt hanging support
CN205677224U (en) A kind of scaffold being readily disassembled
CN209443739U (en) A kind of architectural engineering scaffold
CN215858956U (en) Scaffold frame that security performance is high
CN215857211U (en) Bailey bridge builds with tubular steel landing stage railing
CN212866968U (en) Scaffold convenient to safety net is hung and is established
CN219604147U (en) Multifunctional maintenance hanging basket
CN215948837U (en) Scaffold convenient to workman climbs
CN218406331U (en) Anti-tilting scaffold
CN213927597U (en) Rail guard is used in high-rise construction of building engineering
CN221073640U (en) Support that high altitude construction constructor was prevented falling
CN213774374U (en) Support for installing reinforcing steel bars
CN211114943U (en) A high outer wall protector of security for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191001

Termination date: 20200704