CN209443579U - A kind of steel construction greenhouse for contaminated soil remediation - Google Patents

A kind of steel construction greenhouse for contaminated soil remediation Download PDF

Info

Publication number
CN209443579U
CN209443579U CN201822088061.4U CN201822088061U CN209443579U CN 209443579 U CN209443579 U CN 209443579U CN 201822088061 U CN201822088061 U CN 201822088061U CN 209443579 U CN209443579 U CN 209443579U
Authority
CN
China
Prior art keywords
steel
bent
frame bracing
greenhouse
framed bent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822088061.4U
Other languages
Chinese (zh)
Inventor
田靓
刘原甫
张辉胜
徐诗琦
唐小龙
文天放
焦婕
赵颖
刘更生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China City Environment Protection Engineering Ltd
Original Assignee
China City Environment Protection Engineering Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China City Environment Protection Engineering Ltd filed Critical China City Environment Protection Engineering Ltd
Priority to CN201822088061.4U priority Critical patent/CN209443579U/en
Application granted granted Critical
Publication of CN209443579U publication Critical patent/CN209443579U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Greenhouses (AREA)

Abstract

The utility model relates to a kind of steel construction greenhouses for contaminated soil remediation, including the parallel steel bent-frame bracing structure of spaced apart two rows along the longitudinal direction, two rows of parallel steel bent-frame bracing symmetrical configuration settings, the bottom end of each steel bent-frame bracing structure is fixedly connected with foundation structure, a steel framed bent beam structure is respectively connected between two symmetrical steel bent-frame bracing structures, the both ends of the steel framed bent beam structure are fixedly connected with the top of the steel bent-frame bracing structure at left and right sides of it respectively, constitute greenhouse framework;The side fixing seal film of the greenhouse framework, pass through sealing film sealing, the fixed sunlight board in the bottom of the greenhouse framework, it is sealed by sunlight board, gas sampling pipeline is equipped in the greenhouse framework, the gas sampling pipeline is equipped with pumping window, and the gas sampling pipeline stretches out outside greenhouse framework to be connect with exhaust treatment system.Which increase operating space is repaired, the disengaging of daily big machinery is met, and repairing effect is good.

Description

A kind of steel construction greenhouse for contaminated soil remediation
Technical field
The utility model relates to contaminated soil environment remediation engineering fields, and in particular to a kind of for contaminated soil remediation Steel construction greenhouse.
Background technique
The soil contamination problem in China is increasingly prominent in recent years, with a series of promulgation of associated documents such as " soil ten ", Soil remediation work will be managed by further regulation and standardization.Wherein " secondary pollution prevention and control " have become the weight of soil remediation A ring, the fugitive dust generated during soil remediation are wanted, volatility toxic gas seriously affects the normal life of surrounding resident.From most The just extensive outdoor foundation for being disposed into reparation greenhouse, contaminated soil remediation carrying out horizontal is constantly promoted, but also faces many ask Topic.Greenhouse is repaired in order to guarantee structural strength and stability, increases canopy inner column big machinery is caused to cannot be introduced into and operated, Some small devices only can be used, greatly reduce the utilization rate of greenhouse;The light transmittance of greenhouse is too poor, and construction in canopy is caused to need volume Outer increase light;The leakproofness of greenhouse is poor, without cleaner, leads to fugitive dust and volatility release of toxic gas, or even stifled Activated carbon adsorption device is filled in, exhaust treatment system is caused to can not operate normally.
Summary of the invention
The purpose of the utility model is to overcome the defects of the prior art, provide a kind of steel for contaminated soil remediation Structure greenhouse meets the disengaging of daily big machinery, and repairing effect is good which increase operating space is repaired.
The utility model is realized in this way: it is big that the utility model provides a kind of steel construction for contaminated soil remediation Canopy, the parallel steel bent-frame bracing structure of the two rows including arranging along the longitudinal direction, every row's steel bent-frame bracing structure includes multiple Every the steel bent-frame bracing structure of arrangement, two rows of parallel steel bent-frame bracing symmetrical configuration settings, each steel bent-frame bracing structural vertical Setting, the bottom end of each steel bent-frame bracing structure are fixedly connected with foundation structure, between two symmetrical steel bent-frame bracing structures Be connected with a steel framed bent beam structure, the both ends of the steel framed bent beam structure respectively with the steel bent-frame bracing knot at left and right sides of it The top of structure is fixedly connected, and constitutes greenhouse framework;The side fixing seal film of the greenhouse framework passes through sealing film sealing, institute The fixed sunlight board in bottom for stating greenhouse framework, is sealed by sunlight board, gas sampling pipeline is equipped in the greenhouse framework, described Gas sampling pipeline is equipped with pumping window, and the gas sampling pipeline stretches out outside greenhouse framework to be connect with exhaust treatment system.
Further, the steel construction greenhouse for contaminated soil remediation of the utility model further includes steel framed bent stringer knot Structure, the steel framed bent beam structure include left steel framed bent crossbeam and right steel framed bent crossbeam, the left end of the left steel framed bent crossbeam with The top of steel bent-frame bracing structure on the left of it is fixedly connected, and the right end and steel framed bent longitudinal beam structure of left steel framed bent crossbeam are fixed to be connected It connects, the left end of right steel framed bent crossbeam is fixedly connected with steel framed bent longitudinal beam structure, the right end of right steel framed bent crossbeam and the steel on the right side of it The top of bent-frame bracing structure is fixedly connected, and steel framed bent beam structure is made to form inverted V type structure;The left steel framed bent crossbeam and the right side Steel framed bent crossbeam includes about two parallel steel columns, is connected between two steel columns by several dowels, from left to right or Adjacent two dowel and steel column constitute triangle from right to left;The steel framed bent longitudinal beam structure includes about two parallel steel Column is connected by several dowels between two steel columns, and adjacent two dowel and steel column constitute three from front to back or from back to front It is angular.
Further, the lower end of two steel framed bent beam structures of head and the tail is equipped with multiple steel bent-frame bracings along the longitudinal direction Structure, along the longitudinal direction the two of the head and the tail steel framed bent beam structure upper end with multiple steel bent-frame bracing structures of its lower end respectively It is fixedly connected, the bottom end of steel bent-frame bracing structure is fixedly connected with foundation structure;Two steel framed bents of head and the tail are horizontal along the longitudinal direction The adjacent steel framed bent beam structure of the two of girder construction lower end is connected with the first dowel;The both ends of first dowel are set respectively There is the connector with fixation hole, adjacent two steel bent-frame bracing structure is equipped with the corresponding connector with fixation hole, connects with first The connector for connecing muscle is corresponding.
Further, the steel bent-frame bracing structure includes two or so parallel steel columns, if passing through between two steel columns Dry dowel connection, adjacent two dowel and steel column constitute triangle from top to bottom or from top to bottom;The steel bent-frame bracing knot Every steel column bottom end of structure is equipped with fixing seat, and the fixed seat ring circumferencial direction is equipped with multiple fixation holes, is used for and ground base junction Structure is bolted to connection;The foundation structure includes two parallel steel columns for being located at four sides, two parallel steel Fixation hole is respectively equipped on column, it is corresponding with the fixation hole of two fixing seats of steel bent-frame bracing structure lower end respectively.
Further, the second connection is connected between two adjacent steel bent-frame bracing structures at left and right sides of the greenhouse Muscle;The both ends of second dowel are respectively equipped with the connector with fixation hole, and adjacent two steel bent-frame bracing structure is equipped with pair The connector with fixation hole answered, it is corresponding with the connector of the second dowel.
Further, the second dowel, institute are connected between two adjacent steel bent-frame bracing structures on the left of the greenhouse It states and is connected with the second dowel between two adjacent steel bent-frame bracing structures on the right side of greenhouse.
Further, reinforcing rib is connected between steel bent-frame bracing structure and steel framed bent beam structure;The reinforcing rib Both ends are respectively equipped with the connector with fixation hole, the upper end of the steel bent-frame bracing structure and the left and right of steel framed bent beam structure Both ends are respectively equipped with the connector with fixation hole, corresponding with the connector of reinforcing rib.
Further, the top of the greenhouse framework is fixed with several stringers along longitudinal direction, is used to support sunlight board.
Further, the front side of the greenhouse or/and rear side are equipped with automatic shutter.Automatic rolling door passes through steel structure support It is fixed on doorframe, automatic switch is realized by remote-control motor.
Further, the exhaust treatment system includes bag filter, activated carbon adsorption device, bag filter into Port is connect with gas sampling pipeline, and the gas outlet of bag filter and the air inlet of activated carbon adsorption device connect, active carbon The gas outlet of adsorbent equipment is connected through the air inlet of blower and chimney.
Further, greenhouse inner top is equipped with spray equipment;It seals film and uses polyester fiber film.
Compared with prior art, the utility model has the following beneficial effects: being used for Polluted Soil due to the utility model The steel construction greenhouse of earth reparation includes the two rows of parallel steel bent-frame bracing structures arranged along the longitudinal direction, every row's steel bent-frame bracing Structure includes multiple spaced apart steel bent-frame bracing structures, two rows of parallel steel bent-frame bracing symmetrical configuration settings, each steel row Frame support structure is vertically arranged, and the bottom end of each steel bent-frame bracing structure is fixedly connected with foundation structure, two symmetrical steel framed bents A steel framed bent beam structure is respectively connected between support construction, the both ends of the steel framed bent beam structure are respectively and at left and right sides of it The top of steel bent-frame bracing structure be fixedly connected, constitute greenhouse framework;It is all made of at the top of the greenhouse of the utility model with side Stable steel bent-frame bracing structure;And steel bent-frame bracing structure uses triangle steel structure, the symmetrical 2 steel framed bent branch of side elevation Support structure and top are in that the steel framed bent beam structure of inverted V type connects and composes stable structures alone, are made in canopy using the above structure It ensure that the strength and stability of greenhouse in the case where not setting up column, i.e., utmostly reduce setting up for canopy inner column, Automatically-controlled door is set up simultaneously, increases and repairs operating space, meet the disengaging of daily big machinery.
The fixed sunlight board in the bottom of the greenhouse framework, is sealed by sunlight board, and the light transmittance of greenhouse is good, nothing of constructing in canopy Light need to additionally be increased, save energy, direct sunlight is increased by top sunlight board shape and improves workshop temperature.
The side fixing seal film of the greenhouse framework, by sealing film sealing, sealing film uses polyester fiber film, sealing Property is good.
Gas sampling pipeline is equipped in the greenhouse framework of the utility model, the gas sampling pipeline is equipped with pumping window, The gas sampling pipeline stretches out outside greenhouse framework to be connect with exhaust treatment system.Using the above structure, exhaust gas is by being laid in Gas sampling pipeline in workshop enters exhaust treatment system after collecting, and initially enters bag filter dedusting, enters back into activity Charcoal adsorbent equipment is discharged into chimney through blower after processing is up to standard, eventually enters into atmosphere.It is discharged into after exhaust treatment system is up to standard Tail gas in atmosphere will not cause secondary pollution problem to surrounding enviroment.And with containing volatile organic matter inside greenhouse Gas is persistently taken away (during reparation, greenhouse journey air-tight state makes take a breath twice within greenhouse 1 hour by exhaust gas processing device), Since greenhouse has good airtightness (greenhouse is air-tight state when pumping), air pressure can be lower in canopy, and then build micro- negative The repairing environment of pressure, is greatly improved repairing effect.
The utility model can prevent the secondary pollution in repair process from occurring, and by sunlight and tiny structure environment into One step promotes repairing effect greatly to save rehabilitation cost under efficient treatment effect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the steel construction greenhouse for contaminated soil remediation of the utility model;
Fig. 2 is the front-end view of the steel construction greenhouse for contaminated soil remediation of the utility model;
Fig. 3 is that the structure of frame one embodiment of the steel construction greenhouse for contaminated soil remediation of the utility model is shown It is intended to;
Fig. 4 is the structure for another embodiment of the frame of steel construction greenhouse of contaminated soil remediation of the utility model Schematic diagram;
Fig. 5 is the portion the P schematic diagram of Fig. 4;
Fig. 6 is the structural schematic diagram of the exhaust treatment system of the utility model.
In attached drawing, 1 is sunlight board, and 2 be steel framed bent beam structure, and 21 be left steel framed bent crossbeam, and 22 be right steel framed bent crossbeam, 3 be steel framed bent longitudinal beam structure, and 4 be steel bent-frame bracing structure, and 5 be the second dowel, and 6 be fixing seat, and 7 be connector, and 8 be first Dowel, 9 be stringer, and 10 be automatic shutter, and 11 be foundation structure, and 12 be bag filter, and 13 be activated carbon adsorption device, 14 be chimney.
Specific embodiment
The technical scheme in the utility model embodiment is clearly and completely described below, it is clear that described reality Applying example is only the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, All other embodiment obtained by those of ordinary skill in the art without making creative efforts, belongs to this reality With novel protected range.
Referring to Fig. 1 to Fig. 6, the utility model provides a kind of steel construction greenhouse for contaminated soil remediation, including along vertical The parallel steel bent-frame bracing structure 4 of the two rows arranged to direction, every row's steel bent-frame bracing structure includes multiple spaced apart steel Bent-frame bracing structure, two rows of parallel steel bent-frame bracing symmetrical configuration settings, each steel bent-frame bracing structural vertical setting, each steel row The bottom end of frame support structure is fixedly connected with foundation structure 11, is respectively connected with a steel between two symmetrical steel bent-frame bracing structures Framed bent beam structure, the both ends of the steel framed bent beam structure 2 top with the steel bent-frame bracing structure at left and right sides of it respectively It is fixedly connected, constitutes greenhouse framework;The side fixing seal film of the greenhouse framework passes through sealing film sealing, the greenhouse frame The fixed sunlight board in the bottom of frame, is sealed by sunlight board 1, and gas sampling pipeline is equipped in the greenhouse framework, and the exhaust gas is received Collect pipeline and be equipped with pumping window, the gas sampling pipeline stretches out outside greenhouse framework to be connect with exhaust treatment system.The present embodiment The periphery of greenhouse a steel bent-frame bracing structure can be set up at interval of 6m, certainly, this spacing can according to need adjustment. The left side or/and right side of greenhouse is arranged in the gas sampling pipeline, and extends longitudinally, and gas sampling pipeline is longitudinally spaced Several pumping windows are set.The gas sampling Pipe installing of the present embodiment is set in the middle top of two side elevations of greenhouse at interval of 12m There is pumping window, the ventilation opening seamless connection of pipeline and exhaust treatment system in workshop.Sealing film can pass through rope and greenhouse It is fixedly connected on the outside of frame.The present embodiment sealing film can be fixedly connected by rope with each steel bent-frame bracing structure.
Further, the steel construction greenhouse for contaminated soil remediation of the utility model further includes steel framed bent stringer knot Structure, the steel framed bent beam structure include left steel framed bent crossbeam 21 and right steel framed bent crossbeam 22, a left side for the left steel framed bent crossbeam End is fixedly connected with the top of the steel bent-frame bracing structure on the left of it, the right end and steel framed bent longitudinal beam structure 3 of left steel framed bent crossbeam It is fixedly connected, the left end of right steel framed bent crossbeam is fixedly connected with steel framed bent longitudinal beam structure, the right end of right steel framed bent crossbeam and its right side The top of the steel bent-frame bracing structure of side is fixedly connected, and steel framed bent beam structure is made to form inverted V type structure;The left steel framed bent is horizontal Beam and right steel framed bent the crossbeam steel column that include about two parallel are connected between two steel columns by several dowels, from a left side To right or from right to left adjacent two dowel and steel column constitute triangle;The steel framed bent longitudinal beam structure includes about two parallel Steel column, connected by several dowels between two steel columns, from front to back or from back to front adjacent two dowel and steel column structure At triangle.Steel bent frame structure is mainly welded by steel column is triangular in shape.Four side elevations of greenhouse are set up at interval of 6m One Steel bent frame structure is the important component of connection top steel construction and foundation structure.
Further, the lower end of two steel framed bent beam structures of head and the tail is equipped with multiple steel bent-frame bracings along the longitudinal direction Structure, along the longitudinal direction the two of the head and the tail steel framed bent beam structure upper end with multiple steel bent-frame bracing structures of its lower end respectively It is fixedly connected, the bottom end of steel bent-frame bracing structure is fixedly connected with foundation structure;Two steel framed bents of head and the tail are horizontal along the longitudinal direction The adjacent steel framed bent beam structure of the two of girder construction lower end is connected with the first dowel;The both ends of first dowel are set respectively There is the connector 7 with fixation hole, adjacent two steel bent-frame bracing structure is equipped with the corresponding connector with fixation hole, connects with first The connector for connecing muscle 8 is corresponding.Certainly, it can also be fixed by the way of welding between the first dowel and steel framed bent beam structure Connection.
Further, the steel bent-frame bracing structure includes two or so parallel steel columns, if passing through between two steel columns Dry dowel connection, adjacent two dowel and steel column constitute triangle from top to bottom or from top to bottom;The steel bent-frame bracing knot Every steel column bottom end of structure is equipped with fixing seat 6, and the fixed seat ring circumferencial direction is equipped with multiple fixation holes, is used for and ground base junction Structure is bolted to connection;The foundation structure includes two parallel steel columns for being located at four sides, two parallel steel Fixation hole is respectively equipped on column, it is corresponding with the fixation hole of two fixing seats of steel bent-frame bracing structure lower end respectively.Pre-embedded bolt is The important component of steel bent-frame bracing structure and foundation structure is connected, every group of steel bent-frame bracing structure connect pre-buried with foundation structure Bolt shares 4, and by the cup dolly of steel bent-frame bracing structure, firmly bolt is tight with greenhouse basis, that is, foundation structure.Some Foundation structure does not illustrate.
Further, the second connection is connected between two adjacent steel bent-frame bracing structures at left and right sides of the greenhouse Muscle 5;The both ends of second dowel 5 are respectively equipped with the connector with fixation hole, and adjacent two steel bent-frame bracing structure is equipped with The corresponding connector with fixation hole, it is corresponding with the connector of the second dowel.Certainly, the second dowel and steel bent-frame bracing knot It can also be fixedly connected by the way of welding between structure.
Further, the second dowel, institute are connected between two adjacent steel bent-frame bracing structures on the left of the greenhouse It states and is connected with the second dowel between two adjacent steel bent-frame bracing structures on the right side of greenhouse.
Further, reinforcing rib is connected between steel bent-frame bracing structure and steel framed bent beam structure;The reinforcing rib Both ends are respectively equipped with the connector with fixation hole, the upper end of the steel bent-frame bracing structure and the left and right of steel framed bent beam structure Both ends are respectively equipped with the connector with fixation hole, corresponding with the connector of reinforcing rib.Certainly, reinforcing rib and steel bent-frame bracing knot It can also be fixedly connected by the way of welding between structure, steel framed bent beam structure.
Further, the top of the greenhouse framework is fixed with several stringers 9 along longitudinal direction, is used to support sunlight board.
Further, the front side of the greenhouse or/and rear side are equipped with automatic shutter 10.Four fans can be set in the present embodiment Automatic shutter.Automatic shutter is a kind of shutter door, can pass through lower switch on remote control.
Further, the exhaust treatment system includes bag filter 12, activated carbon adsorption device 13, bag filter Air inlet connect with gas sampling pipeline, the air inlet of the gas outlet of bag filter and activated carbon adsorption device connects, living The gas outlet of property charcoal adsorbent equipment is connect through blower with the air inlet of chimney 14.
Further, greenhouse inner top is equipped with spray equipment;It seals film and uses polyester fiber film.
The metope polyester fiber film high using the good toughness of durability, the ceiling sunlight board covering good using translucency, crossbeam The ventilation shaft of spray piping and exhaust gas processing device is set.
A kind of steel construction tiny structure sunlight greenhouse for soil remediation of utility model.It is mainly used for the pre- of contaminated soil The closed operation of processing and repair process.Main body greenhouse span reaches 32m, and the high 10m of cornice utmostly reduces canopy inner column It sets up, while setting up the automatically-controlled door of four 6m high, increase and repair operating space, meet the disengaging of daily big machinery. Increase direct sunlight by top sunlight board shape and improve workshop temperature, secondly vent gas treatment and spray equipment handle fugitive dust and give up Gas, and the environment of a tiny structure is created, repairing effect is greatly improved.
Vent gas treatment principle: exhaust gas enters vent gas treatment system after collecting by the gas sampling pipeline being laid in greenhouse System, initially enters bag filter dedusting, enters back into activated carbon adsorption device, is discharged into chimney through blower after processing is up to standard, finally Into atmosphere.The tail gas being discharged into atmosphere after exhaust treatment system is up to standard will not cause secondary pollution to surrounding enviroment Problem.
Organic polluted soil is transported to salvage shop, crushing and screening after repairing medicament, the fugitive dust one generated at this time is added Sedimentation is drenched by being sprayed for spray equipment in part, and a part is sent through exhaust pipe to bag filter dedusting.Mix the dirt finished Dye soil enters curing period, and sunlight improves temperature of shed through the sunlight board at the top of greenhouse, and the spray equipment in greenhouse can be feeding Protect soil moisturizing.Soil treatment and the organic matter of maintenance processes volatilization can be adsorbed by exhaust gas processing device, vent gas treatment Device can build the repairing environment of tiny structure also for workshop, accelerate volatile organic compound desorption, prevent pernicious gas loss.
The utility model is further described combined with specific embodiments below:
It will be transported to salvage shop containing petroleum hydrocarbon contaminated soil, the pre-treatment medicaments of 4%-10% are added, it is screened broken It after bucket processing one time, conserves 7 days, turns over throwing 1 time daily, while spraying moisturizing maintenance.During maintenance, greenhouse internal-external temperature difference highest can Up to 20 DEG C or more, soil maximum temperature is up to 42 DEG C.Greenhouse petroleum hydrocarbon concentration from initial 3000mg/kg be down to 1000mg/kg with Under, meet the requirement of relevant criterion.In addition, also demonstrating the gas chromatographies such as benzene, toluene, ortho-xylene and chlorobenzene, pass through It can be up to standard after greenhouse processing and maintenance.
The greenhouse that the utility model uses is with secondary pollution for secondary pollution problem during soil remediation The closing salvage shop of prevention and control and repair function, guarantee processing, control effect be good, at low cost and facilitate operation.
The utility model is not limited to the above embodiment, it should be understood that those skilled in the art are without creativeness Labour, which according to the present utility model can conceive, makes many modifications and variations.Therefore, all technician in the art It is available to pass through logical analysis, reasoning, or a limited experiment on the basis of existing technology according to the design of the utility model Technical solution, all should be within the scope of protection determined by the claims.

Claims (10)

1. a kind of steel construction greenhouse for contaminated soil remediation, it is characterised in that: the two rows including arranging along the longitudinal direction are flat Capable steel bent-frame bracing structure, every row's steel bent-frame bracing structure include multiple spaced apart steel bent-frame bracing structures, Liang Paiping Capable steel bent-frame bracing symmetrical configuration setting, each steel bent-frame bracing structural vertical setting, the bottom end of each steel bent-frame bracing structure with Foundation structure is fixedly connected, and is respectively connected with a steel framed bent beam structure, the steel between two symmetrical steel bent-frame bracing structures The both ends of framed bent beam structure are fixedly connected with the top of the steel bent-frame bracing structure at left and right sides of it respectively, constitute greenhouse frame Frame;The side fixing seal film of the greenhouse framework, by sealing film sealing, sunlight board is fixed in the bottom of the greenhouse framework, It is sealed by sunlight board, gas sampling pipeline is equipped in the greenhouse framework, the gas sampling pipeline is equipped with pumping window, institute It states and is connect outside gas sampling pipeline stretching greenhouse framework with exhaust treatment system.
2. the steel construction greenhouse according to claim 1 for contaminated soil remediation, it is characterised in that: further include steel framed bent Longitudinal beam structure, the steel framed bent beam structure include left steel framed bent crossbeam and right steel framed bent crossbeam, the left steel framed bent crossbeam Left end is fixedly connected with the top of the steel bent-frame bracing structure on the left of it, the right end and steel framed bent longitudinal beam structure of left steel framed bent crossbeam It is fixedly connected, the left end of right steel framed bent crossbeam is fixedly connected with steel framed bent longitudinal beam structure, the right end of right steel framed bent crossbeam and its right side The top of the steel bent-frame bracing structure of side is fixedly connected, and steel framed bent beam structure is made to form inverted V type structure;The left steel framed bent is horizontal Beam and right steel framed bent the crossbeam steel column that include about two parallel are connected between two steel columns by several dowels, from a left side To right or from right to left adjacent two dowel and steel column constitute triangle;The steel framed bent longitudinal beam structure includes about two parallel Steel column, connected by several dowels between two steel columns, from front to back or from back to front adjacent two dowel and steel column structure At triangle.
3. the steel construction greenhouse according to claim 1 for contaminated soil remediation, it is characterised in that: first along the longitudinal direction The lower end of two steel framed bent beam structures of tail is equipped with multiple steel bent-frame bracing structures, and the two of head and the tail steel is arranged along the longitudinal direction Frame beam structure is fixedly connected with the upper end of multiple steel bent-frame bracing structures of its lower end respectively, the bottom end of steel bent-frame bracing structure It is fixedly connected with foundation structure;Two adjacent steel framed bent crossbeams of two steel framed bent beam structure lower ends of head and the tail along the longitudinal direction Structure is connected with the first dowel;The both ends of first dowel are respectively equipped with the connector with fixation hole, adjacent two steel row Frame support structure is equipped with the corresponding connector with fixation hole, corresponding with the connector of the first dowel.
4. the steel construction greenhouse according to claim 1 or 3 for contaminated soil remediation, it is characterised in that: the steel row Frame support structure includes two or so parallel steel columns, is connected between two steel columns by several dowels, from top to bottom or from Adjacent two dowel of top to bottm and steel column constitute triangle;Every steel column bottom end of the steel bent-frame bracing structure is equipped with fixation Seat, the fixed seat ring circumferencial direction is equipped with multiple fixation holes, for being bolted to connection with foundation structure;The ground Structure includes two parallel steel columns for being located at four sides, is respectively equipped with fixation hole on two parallel steel columns, respectively with steel The fixation hole of two fixing seats of bent-frame bracing structure lower end is corresponding.
5. the steel construction greenhouse according to claim 1 for contaminated soil remediation, it is characterised in that: described greenhouse or so The second dowel is connected between two adjacent steel bent-frame bracing structures of two sides;The both ends of second dowel are set respectively There is the connector with fixation hole, adjacent two steel bent-frame bracing structure is equipped with the corresponding connector with fixation hole, connects with second The connector for connecing muscle is corresponding.
6. the steel construction greenhouse according to claim 1 for contaminated soil remediation, it is characterised in that: steel bent-frame bracing knot Reinforcing rib is connected between structure and steel framed bent beam structure;The both ends of the reinforcing rib are respectively equipped with the connector with fixation hole, The upper end of the steel bent-frame bracing structure and the left and right ends of steel framed bent beam structure are respectively equipped with the connector with fixation hole, It is corresponding with the connector of reinforcing rib.
7. the steel construction greenhouse according to claim 1 for contaminated soil remediation, it is characterised in that: the greenhouse framework Top be fixed with several stringers along longitudinal direction, be used to support sunlight board.
8. the steel construction greenhouse according to claim 1 for contaminated soil remediation, it is characterised in that: before the greenhouse Side or/and rear side are equipped with automatic shutter.
9. the steel construction greenhouse according to claim 1 for contaminated soil remediation, it is characterised in that: the vent gas treatment System includes bag filter, activated carbon adsorption device, and the air inlet of bag filter is connect with gas sampling pipeline, and cloth bag removes The air inlet of the gas outlet of dirt device and activated carbon adsorption device connects, and the gas outlet of activated carbon adsorption device is through blower and chimney Air inlet connection.
10. the steel construction greenhouse according to claim 1 for contaminated soil remediation, it is characterised in that: greenhouse inner top Equipped with spray equipment;It seals film and uses polyester fiber film.
CN201822088061.4U 2018-12-12 2018-12-12 A kind of steel construction greenhouse for contaminated soil remediation Active CN209443579U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822088061.4U CN209443579U (en) 2018-12-12 2018-12-12 A kind of steel construction greenhouse for contaminated soil remediation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822088061.4U CN209443579U (en) 2018-12-12 2018-12-12 A kind of steel construction greenhouse for contaminated soil remediation

Publications (1)

Publication Number Publication Date
CN209443579U true CN209443579U (en) 2019-09-27

Family

ID=68013716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822088061.4U Active CN209443579U (en) 2018-12-12 2018-12-12 A kind of steel construction greenhouse for contaminated soil remediation

Country Status (1)

Country Link
CN (1) CN209443579U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469207A (en) * 2018-12-12 2019-03-15 中冶南方都市环保工程技术股份有限公司 A kind of steel construction greenhouse for contaminated soil remediation
CN113445793A (en) * 2020-03-25 2021-09-28 中国石油化工股份有限公司 Detachable closed enclosure structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469207A (en) * 2018-12-12 2019-03-15 中冶南方都市环保工程技术股份有限公司 A kind of steel construction greenhouse for contaminated soil remediation
CN113445793A (en) * 2020-03-25 2021-09-28 中国石油化工股份有限公司 Detachable closed enclosure structure

Similar Documents

Publication Publication Date Title
CN209443579U (en) A kind of steel construction greenhouse for contaminated soil remediation
DE102018008259A1 (en) Filter systems for suspended particles with particle sizes from 400 pm to ≤500 μm and their use
CN104500123B (en) A kind of distance tunnel construction phase quick ventilation and exhaust device and method
CN102513343B (en) Treatment system for repairing organics-contaminated soil
CN105749712B (en) A kind of combined jet japanning room
CN104088380A (en) Rotating type plant wall body suitable for multi-story or high-rise buildings
CN107185341A (en) A kind of efficiently building dust arrester
CN103759385A (en) Air purification system and air purification method
CN107327152A (en) A kind of curtain wall robot and control method for easily realizing wall adsorption
CN109469207A (en) A kind of steel construction greenhouse for contaminated soil remediation
CN108672478A (en) A kind of closed greenhouse of negative pressure and its building method and restorative procedure applied to penetrating odor site remediation
CN101761246A (en) Building with low-carbon ecological and anti-disaster structure
CN202539177U (en) Treatment system for repairing organic contaminated soil
CN202315671U (en) Exhaust gas centralized-control water curtain washing tower processing system
CN109224716A (en) A kind of construction bare area anti-fugitive dust intelligent spraying platform
CN208162274U (en) A kind of closed greenhouse applied to contaminated site reparation
CN205654246U (en) Peculiar smell treatment facility sealing overhaul door
CN205046878U (en) A remove room for excavating rubbish mountain
CN212593574U (en) Occupational health safety is with gas defense ventilation unit
CN110340099B (en) Closed waste gas collecting and treating system for abandoned landfill
CN208320374U (en) Integrate the paint spray booth of gas sampling processing
CN207392420U (en) A kind for the treatment of tank is capped deodorization seal closure
CN102989623B (en) Suspension type automatic lifting type spraying and baking integrated house
CN220834803U (en) Building carbon emission adsorption equipment
CN105089001B (en) Treatment method of PM2.5 in suburban areas of Beijing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant