CN209440066U - A kind of clamping device on offshore oil and gas process units crane dead man wirerope - Google Patents
A kind of clamping device on offshore oil and gas process units crane dead man wirerope Download PDFInfo
- Publication number
- CN209440066U CN209440066U CN201822125650.5U CN201822125650U CN209440066U CN 209440066 U CN209440066 U CN 209440066U CN 201822125650 U CN201822125650 U CN 201822125650U CN 209440066 U CN209440066 U CN 209440066U
- Authority
- CN
- China
- Prior art keywords
- wirerope
- crane
- clamping body
- dead man
- clamping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses the clamping devices on a kind of offshore oil and gas process units crane dead man wirerope, including damping spring seat, damping spring, fastening screw, enhance friction plate, fishbolt, clamping body, lift ring and fastening screw gasket, the clamping body is rectangular parallelepiped structure made of cast steel pours, and is internally provided with the cylindrical space of setting, and the opening of cylindrical space is towards the bottom side of clamping body, the side of clamping body is equipped with fishbolt, and fishbolt one end level enters in cylindrical space in the middle part of clamping body.The utility model can avoid crane dead man wirerope dead line head and carry out pulling dead line head wirerope by manpower when in " A " type frame for be installed to high more than ten meters of crane, it is mounted on the lifting ring of crane hoisting machine outer circle to fully rely on and passes through ropes wirerope, the problems such as labor intensive, operational safety are poor, construction efficiency is low is avoided, the demand for development in wisdom oil field is more met.
Description
Technical field
The utility model relates to the crane technical fields of offshore oil and gas process units, relate more specifically to a kind of offshore oil and gas
Clamping device on process units crane dead man wirerope.
Background technique
Offshore oil and gas process units is stood among sea like an isolated island, and material supply, makes a trip at personnel's transhipment
Equal operations must be completed frequently by platform crane, in addition to be chronically at salt fog, moisture and sunlight sudden and violent for offshore platform crane
In the adverse circumstances of solarization, crane rope is highly prone to electrochemical corrosion caused by saliferous moisture and other impurities, chemistry corruption
Erosion and the influence of fatigue wear.To causing crane rope comdemning period short, the problems such as frequency of more change steel rope is higher.
Therefore crane rope periodic maintenance is replaced, keeps its functional, the tragedy of car crash is avoided to occur, shown
It obtains particularly important.Especially crane is up to the dead line head of crane dead man wirerope in more than ten meters of A type frame in replacement, it is necessary to according to
By manpower by the rope made of hemp by the dead line head pulling to A type frame for weighing hundred jin, not only labor efficiency is low, and labor intensity is high, and
Poor safety performance etc..Although the dead man wirerope dead line head in replacement crane A type frame is the basic work of field device maintenance maintenance
Make, but be even more that more stringent requirements are proposed to paving assistant engineer tool, challenge is proposed to special maintenance work, to ensure the steady of crane
It is fixed reliable.
When replacing crane dead man wirerope, roller side is easy practical loop wheel machine dead man roller and carries out promoting dragging wirerope,
And after crane " A " type frame side then utilizes the rope made of hemp to bundle wirerope, it is pulled using manpower.It will cause various problems in this way:
1, operational security is poor, and over one hundred jin of the crane dead man wirerope dead line head of weighing is pulled to tens meters of high cranes
In A type frame, it is desirable that operating personnel must be in fine weather and crane high-altitude drive all one's effort, while requiring operating personnel in operation
Process hand cannot have skidding to be possible to accomplish;
2, labor efficiency is low, and over one hundred jin of the crane dead man dead line head of weighing is pulled in tens meters high of crane A type frame,
It generally requires that 5, platform between twenty and fifty strength is concentrated to expend the time of 4 hours to complete;
3, large labor intensity, over one hundred jin of the crane dead man dead line head of weighing fully rely on manpower and pull to tens meters high
In crane A type frame, large labor intensity.
4, the confidence that labourer establishes wisdom oil field is reduced, with the arrival in wisdom oil field, carries out crane dead man steel
The installation of cord dead line head fully relies on manpower, reduces the confidence that platform operations personnel establish wisdom oil field, has hit new person
The confidence of traditional gas industries is added.
5, the awkward situation for causing Modern platform operation to live at the mercy of the elements installs crane dead man especially at the South Sea that There are billows three feet high even if there is no wind
Dead line head has to wait for fine weather, restores to wait the equal urgent work that makes a trip in the poor environment crane gin pole wirerope of weather
When industry, it is but unable to the predicament of operation.
6, to operator, more stringent requirements are proposed for quality at heart, especially the feelings fewer in number of wellhead platform operation at sea
Under condition, by crane dead man dead line head fully rely on manpower pull in tens meters high of crane A type frame, need to coordinate probably it is high,
The high operator of quality at heart.
Utility model content
The utility model to solve the deficiencies in the prior art, provides a kind of offshore oil and gas process units crane dead man wirerope
On clamping device, have install easily, avoid the problems such as labor intensive, operational safety are poor, construction efficiency is low.
The utility model is achieved through the following technical solutions:
A kind of clamping device on offshore oil and gas process units crane dead man wirerope, including damping spring seat, damping bullet
Spring, fastening screw enhance friction plate, fishbolt, and clamping body lifts ring and fastening screw gasket, and the clamping body is casting
Rectangular parallelepiped structure made of steel pours is made, the cylindrical space of setting is internally provided with, the opening direction of cylindrical space clamps
The bottom side of body, the side of clamping body are equipped with fishbolt, and fishbolt one end level enters cylindrical shape in the middle part of clamping body
In space, enhancing friction plate, the clamping body top side are equipped with by rivet on the inner sidewall in space in the cylindrical shape
The lifting ring of ellipse is installed by shock absorber part, shock absorber part is equipped with 2, is separately positioned on the two sides of lifting ring.
The shock absorber part, including damping spring seat, damping spring and fastening screw, described fastening screw one end pass through
Lifting ring is fixed on clamping body, is arranged with damping bullet between the fastening screw gasket on the inside of the nut of the other end and lifting ring
Spring.
The fishbolt is equipped with two, wherein one is played clamping action in elevator machine cylinder outer circle for holding out against, separately
An outer bolt is hollow bolt, and core is equipped with speed detector.
The clamping body and lifting ring are by cast steel moulding by casting.
The outer surface of the enhancing friction plate is that sawtooth pattern increases the high-strength rubber that rubs.
Utility model has the advantages that
1. present apparatus structure is simple, safe ready is reliable, and component is less to be easy assembling at the scene.
2. simple to operate, most 2 people can operate completion, can greatly save labour turnover.
3. labor efficiency is high, the operation of 4 hours is originally needed, 1 hour is only needed to can be completed using this tool;
4. clamping force is reliable, the tool is firm to be clamped in crane dead man steel wire rope winch outer circle, by nonmetallic
Enhancing friction plate increase clamping resistance, prevent hoist engine from causing the tool and hoist engine to skid in rotation process, cause thing
Therefore.
5. run smoothly, by testing the speed bolt and feed back crane hoisting machine revolving speed in the fastening screw on clamping body, prevent
Only hoist engine operating exceeds the speed limit and causes accident;
6. tension uniform is carried out 14 hoist engine of buffer crane dead man wirerope and is opened suddenly by the damping spring on lifting ring
Dynamic impact force, so that the rope made of hemp uniform force being connected with lifting ring.
7. improving the mechanization of crane dead man wirerope dead line head installation, intelligence, facilitate the foundation in wisdom oil field.
Detailed description of the invention
Using attached drawing, the utility model is described in further detail, but the embodiment in attached drawing is not constituted to the utility model
Any restrictions for those of ordinary skill in the art without creative efforts, can also be according to following attached
Figure obtains other attached drawings.
Fig. 1 is the front view of the utility model;
Fig. 2 is the side view of the utility model;
Fig. 3 is the top view of the utility model;
Fig. 4 is the use schematic diagram of the utility model.
In figure: 1 damping spring seat, 2 damping springs, 3 fastening screws, 4 enhancing friction plates, 5 fishbolts, 6 clamping bodies, 7
Lift ring, 8 fastening screw gaskets, 9 elevator machine cylinders, 10 wirerope dead line heads, 11 crane A type frame, 12 ropes made of hemp, the rolling of 13 cranes
Cylinder, 14 dead man wirerope, 15 driving lever steel wire directive wheels.
Specific embodiment
Attached drawing only for illustration, should not be understood as limiting the present invention;In order to more preferably illustrate this implementation
Example, the certain components of attached drawing have omission, zoom in or out, and do not represent the size of actual product;For those skilled in the art
For, the omitting of some known structures and their instructions in the attached drawings are understandable.Positional relationship is described in attached drawing to be only used for
Exemplary illustration should not be understood as the limitation to this patent.
As shown in Figures 1 to 3, the clamping device on a kind of offshore oil and gas process units crane dead man wirerope, including damping
Spring base 1, damping spring 2, fastening screw 3 enhance friction plate 4, fishbolt 5, and clamping body 6 lifts ring 7 and fastening screw pad
Piece 8, the clamping body 6 are rectangular parallelepiped structure made of cast steel pours, and are internally provided with the cylindrical space of setting, cylinder
The opening in shape space is equipped with fishbolt 5 towards the bottom side of clamping body 6, the side of clamping body 6, and 5 one end level of fishbolt is passed through
It wears and is entered in cylindrical space in the middle part of clamping body 6, increasing is equipped with by rivet on the inner sidewall in space in the cylindrical shape
Strong friction plate 4, enhancing friction plate 4 can enhance its chucking power on elevator machine cylinder 9, firmly fasten elevator machine cylinder 9
Outer circle prevents clamping force excessive by nonmetallic enhancing friction plate 4, leads to the clamping deformation of 9 outer circle of elevator machine cylinder, has folder
It holds and convenient disassembly, the advantages that clamping force is big, 6 top side of clamping body is equipped with the lifting ring 7 of ellipse by shock absorber part,
Shock absorber part is equipped with 2, is separately positioned on the two sides of lifting ring 7, it is unexpected that shock absorber part is used to 14 winches of buffer crane dead man wirerope
The impact force of starting to ensure 12 smooth running of the rope made of hemp of clamping tool traction, while avoiding impact force is excessive from causing the rope made of hemp
12 fractures or damage crane dead man wirerope 14, promote the application security of entire tool.
The shock absorber part, including damping spring seat 1, damping spring 2 and fastening screw 3, described 3 one end of fastening screw
It is fixed on clamping body 6 across lifting ring 7, is arranged between the fastening screw gasket 8 on the inside of the nut of the other end and lifting ring 7
Damping spring 2.
The fishbolt 5 is equipped with two, wherein one is played main clamping in 9 outer circle of elevator machine cylinder for holding out against
Effect, in addition a bolt is hollow bolt, and core is equipped with speed detector, prevents crane hoisting machine revolving speed too fast, lead
Operating personnel is caused to be too late to dodge and injured, to improve the safety of entire clamping device, reliable and automaticity.
The clamping body 6 and lifting ring 7 are by cast steel moulding by casting.
The outer surface of the enhancing friction plate 4 is that sawtooth pattern increases the high-strength rubber that rubs.
The working principle of the utility model is:
By torque wrench, the pretightning force of the fastening screw 3 on damping spring 2 is adjusted, is adjusted and then by clamping body
6 are placed in 14 elevator machine cylinder of crane dead man wirerope, 9 outer circle, and elevator machine cylinder 9 is placed in 6 cylindrical space of clamping body,
By the collective effect of fastening bolt 5 and enhancing friction plate 4,14 elevator machine cylinder 9 of crane dead man wirerope is firmly fastened
Outer circle;Dead man wirerope dead line head 10 is connect with the rope made of hemp 12, and the rope made of hemp 12 is connected with dead man wirerope 14, and the rope made of hemp 12, which is wound around, to be dialled
On bar steel wire directive wheel 15, crane dead man wirerope dead line head 10 is tied up on lifting ring 7, hanging for crane self power source is passed through
Vehicle roller 13 drives clamping device rotation, and by slowly starting crane, the hoist engine dead man wirerope 14 on crane drives clamping
Lifting ring 7 on tool drags the rope made of hemp 12, and the rope made of hemp 12 pulls the high crane A type of 10 to more than ten meters of head of crane dead man wirerope dead line
On frame 11, to avoid pulling on dead man wirerope dead line head 10 to crane A type frame 11 using manpower, it is able to solve crane dead man
Wirerope dead line head 10 fully relies on manpower when installing crane A type frame 11, time-consuming and laborious, under labor efficiency, safety
And the problems such as poor reliability, have the advantages that safe and reliable, high-efficient, more meets the requirement of intelligent oil field development, in crane
Dead man wirerope dead line head 10 after the installation is completed, can be removed in case successive stage or subsequent replacement crane dead man wirerope again
It is reused when dead line head 10, neither influences the routine use of crane dead man hoist engine, and the waste of tool is avoided to economize on resources,
As shown in Figure 4.
Above-mentioned to elaborate many details in order to fully understand the utility model, still, the utility model can be with
Implemented using other than the one described here other modes, it is thus impossible to be interpreted as to scope of protection of the utility model
Limitation.
In short, although the utility model lists above-mentioned preferred embodiment, although it should be noted that the skill of this field
Art personnel can carry out various change and remodeling, unless such change and modification deviate from the scope of the utility model, otherwise
It should be construed as being included in the protection scope of the utility model.
Claims (5)
1. the clamping device on a kind of offshore oil and gas process units crane dead man wirerope, it is characterised in that: including damping spring
Seat (1), damping spring (2), fastening screw (3), enhance friction plate (4), fishbolt (5), clamping body (6), lift ring (7) and
Fastening screw gasket (8), the clamping body (6) are rectangular parallelepiped structure made of cast steel pours, and are internally provided with setting
Cylindrical space, for the opening of cylindrical space towards the bottom side of clamping body (6), the side of clamping body (6) is equipped with fishbolt
(5), fishbolt (5) one end level enters in cylindrical space in the middle part of clamping body (6), space in the cylindrical shape
Inner sidewall on by rivet be equipped with enhancing friction plate (4), the clamping body (6) top side is equipped with ellipse by shock absorber part
The lifting ring (7) of shape, shock absorber part are equipped with 2, are separately positioned on the two sides of lifting ring (7).
2. the clamping device on a kind of offshore oil and gas process units crane dead man wirerope according to claim 1, special
Sign is: the shock absorber part, including damping spring seat (1), damping spring (2) and fastening screw (3), the fastening screw
(3) one end passes through lifting ring (7) and is fixed on clamping body (6), the fastening screw gasket (8) on the inside of the nut of the other end and lifting
Damping spring (2) are arranged between ring (7).
3. the clamping device on a kind of offshore oil and gas process units crane dead man wirerope according to claim 1, special
Sign is: the fishbolt (5) is equipped with two, wherein one is played clamping work for holding out against in elevator machine cylinder (9) outer circle
With in addition a bolt is hollow bolt, and core is equipped with speed detector.
4. the clamping device on a kind of offshore oil and gas process units crane dead man wirerope according to claim 1, special
Sign is: the clamping body (6) and lifting ring (7) are by cast steel moulding by casting.
5. the clamping device on a kind of offshore oil and gas process units crane dead man wirerope according to claim 1, special
Sign is: the outer surface of enhancing friction plate (4) is sawtooth pattern.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822125650.5U CN209440066U (en) | 2018-12-18 | 2018-12-18 | A kind of clamping device on offshore oil and gas process units crane dead man wirerope |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822125650.5U CN209440066U (en) | 2018-12-18 | 2018-12-18 | A kind of clamping device on offshore oil and gas process units crane dead man wirerope |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209440066U true CN209440066U (en) | 2019-09-27 |
Family
ID=68014509
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822125650.5U Active CN209440066U (en) | 2018-12-18 | 2018-12-18 | A kind of clamping device on offshore oil and gas process units crane dead man wirerope |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209440066U (en) |
-
2018
- 2018-12-18 CN CN201822125650.5U patent/CN209440066U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201321354Y (en) | Telescopic arm crane and ratchet wheel locking device thereof | |
CN100519396C (en) | Gin pole integrated dismounting method for tower crane | |
CN200954987Y (en) | Horizontal grinder internal lining plate mounting suspension device | |
CN202390113U (en) | Hoisting and demounting device attached to tower crane for building | |
CN205222535U (en) | Dismounting device of tower machine balancing weight piece | |
CN203269442U (en) | Auxiliary suspension device for electric hoist | |
CN209440066U (en) | A kind of clamping device on offshore oil and gas process units crane dead man wirerope | |
CN104942564B (en) | A kind of offshore vessel carries the installation method of the large-tonnage bearing pin on jib-type crane arm support | |
CN201737639U (en) | Integral inverted hoist | |
CN103264966A (en) | Self-hoisting device and method of dismounting member of tower crane | |
CN201330377Y (en) | Suspension rope towing device | |
CN201317648Y (en) | Vehicle well cover lifting device | |
CN201999679U (en) | Automatic reciprocating and looping system of electric block | |
CN205590168U (en) | Overturning lifting device | |
CN110697605B (en) | Brake device of cylinder brake type bailing winch | |
CN103213899A (en) | Auxiliary grinding wheel hoisting device | |
CN201809046U (en) | Hoisting device | |
CN107487724A (en) | A kind of the large-scale floating crane arm support erecting device and installation method of non-loop wheel machine auxiliary | |
CN205346692U (en) | Swing arm tower machine of supporting multiple mounting means becomes width of cloth pulley yoke | |
CN202156893U (en) | Separated winding drum of windlass | |
CN201999603U (en) | Torsion stress releasing device for hoisting ropes of elevators | |
CN201857225U (en) | Hoisting device for bridge crane frame | |
CN206038199U (en) | Static load testing arrangement for winch | |
CN203126636U (en) | Binding dragline excavator | |
CN205662284U (en) | Two poles become platform ground jack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |