CN209429569U - A kind of construction safety protection canopy - Google Patents
A kind of construction safety protection canopy Download PDFInfo
- Publication number
- CN209429569U CN209429569U CN201822015530.XU CN201822015530U CN209429569U CN 209429569 U CN209429569 U CN 209429569U CN 201822015530 U CN201822015530 U CN 201822015530U CN 209429569 U CN209429569 U CN 209429569U
- Authority
- CN
- China
- Prior art keywords
- oeuveres
- bors
- steel pipe
- pipe post
- protection canopy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides a kind of construction safety protection canopy, including armored concrete ground beam, distribution beam and steel plate;Frame basis uses the hand-dug pile foundation, and is connected at the top of the hand-dug pile foundation using the armored concrete ground beam, and armored concrete ground top surface of the beam pre-embedded anchoring bolts;The ceiling structurally welds the distribution beam using I12a I-steel, and is connected between the distribution beam and the Bailey beam stringer using U-bolt, U-shaped card.Protection canopy designed by the utility model is compared with traditional protecting canopy frame mounting means, reduce cumbersome installation steps, installation operation is simple, lead to the problem of being easy holiday mounting structure because of excessively cumbersome installation steps to reduce, to avoid the security risk in operation process, the problems such as can be shortened protection canopy simultaneously and remove the time, avoiding demolishing process lifting difficult.
Description
Technical field
The invention belongs to constructing devices, construction protection technical field, and more specifically, in particular to a kind of construction safety is anti-
Protect canopy.
Background technique
Construction need across railway, it is across construction of the highway when, work progress construction material or tool and other items are from height in order to prevent
Sky falls, and injures lower section pedestrian or influences railway operation, it will usually security protection frame be arranged below construction area, prevent high-altitude
Fall object.
Based on above-mentioned, the inventors discovered that, below existing construction area set by the protection canopy installation exercise time it is long, material and
The dosages such as artificial are big, bothersome laborious;Protecting canopy frame installation process needs interim envelope road, and traffic impact pressure is big;After construction
It removes, top architecture construction finishes, and causes to remove lifting operation difficulty, no job space.
Then, in view of this, being studied improvement for existing structure and missing, a kind of construction safety protection is provided
Canopy, to achieve the purpose that with more more practical value.
Summary of the invention
In order to solve the above technical problem, the present invention provides a kind of construction safety protection canopies, to solve below existing construction area
The set protection canopy installation exercise time is long, and material and the dosages such as artificial are big, bothersome laborious;Protecting canopy frame installation process needs
Interim envelope road, traffic impact pressure are big;It is removed after construction, top architecture construction finishes, and causes dismounting lifting operation tired
Difficulty, no job space problem.
The purpose and effect of construction safety protection canopy of the present invention, are reached by technological means in detail below:
A kind of construction safety protection canopy, including it is armored concrete ground beam, hand-dug pile foundation, standard steel pipe post, double
Spell I45a bearing beam, track, Bailey beam stringer, wheel mechanism out of shape, ceiling construction, distribution beam and steel plate;Described in frame basis uses
Hand-dug pile foundation, and connected at the top of the hand-dug pile foundation using the armored concrete ground beam, and the reinforcing bar
Concrete ground top surface of the beam pre-embedded anchoring bolts;Protecting canopy frame passes through one layer of scissors via use standard steel pipe between each other
The standard steel pipe post for supportting composition interconnected is constituted, fall under the standard steel pipe post frame basis it is pre-buried on;
The column top of the standard steel pipe post is welded with the steel plate, and the column of the steel plate and the standard steel pipe post it
Between also weld reinforcing rib;The column top setting of the standard steel pipe post is via described in Two bors d's oeuveres I45a I-shaped gooseneck composition
Two bors d's oeuveres I45a bearing beam, and the Two bors d's oeuveres I45a bearing beam is mutually welded with the steel plate, and Two bors d's oeuveres I45a I-shaped gooseneck and the steel
Plate uses and is fully welded measure;The Two bors d's oeuveres I45a I-shaped gooseneck of the Two bors d's oeuveres I45a bearing beam is provided with the rail using P50 rail
Road;The Bailey beam stringer is using beret slice and using 45#, 90# flower window connection, and the Bailey beam stringer passes through U-bolt
It reinforces on the Two bors d's oeuveres I45a I-shaped gooseneck of the Two bors d's oeuveres I45a bearing beam;The wheel mechanism out of shape is fixed on institute using buckle-type
On the lower boom for stating Bailey beam stringer, and the wheel mechanism out of shape is slidably matched with the track;The ceiling structurally welds
Using the distribution beam of I12a I-steel, and U-bolt, U-shaped card are used between the distribution beam and the Bailey beam stringer
Connection.
Further, the track is welded between the Two bors d's oeuveres I45a bearing beam by the two sides that length together with every 1m is 10cm
Seam mutually welds.
Further, the wheel mechanism out of shape of unilateral traveling is combined using 1 follower and 1 driving wheel, and according to
Anti-electric booth structure feature, driving wheel is uniformly placed on small mileage and surveys, and limiting device is arranged.
Further, the two sides of the ceiling construction respectively set one of cable rope, and the system is fixed in one end of cable rope
At the top of formula steel pipe post, the other end is fixed on concrete block using connection buckle, and concrete block and the standard steel pipe post
Distance within the scope of 3-6m.
Compared with prior art, the invention has the following beneficial effects:
Protection canopy designed by the present invention reduces cumbersome installation step compared with traditional protecting canopy frame mounting means
Suddenly, installation operation is simple, so that reducing causes to be easy asking for holiday mounting structure because of excessively cumbersome installation steps
Topic to avoid the security risk in operation process, while can be shortened protection canopy and remove the time, avoids demolishing process lifting difficult
The problems such as.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is Bailey beam stringer schematic view of the front view of the invention.
Fig. 3 is Bailey beam stringer side structure schematic view of the invention.
Fig. 4 is standard steel pipe post structural schematic diagram of the invention.
In figure, the corresponding relationship of component names and accompanying drawing number are as follows:
1- armored concrete ground beam, 2- hand-dug pile foundation, 3- standard steel pipe post, 4- Two bors d's oeuveres I45a bearing beam, 5- rail
Road, 6- Bailey beam stringer, 7- wheel mechanism out of shape, 8- ceiling construction, 9- distribution beam, 10- steel plate.
Specific embodiment
Embodiments of the present invention are described in further detail with reference to the accompanying drawings and examples.Following embodiment is used for
Illustrate the present invention, but cannot be used to limit the scope of the invention.
In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more;Term " on ",
The orientation or positional relationship of the instructions such as "lower", "left", "right", "inner", "outside", " front end ", " rear end ", " head ", " tail portion " is
It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark
Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair
Limitation of the invention.In addition, term " first ", " second ", " third " etc. are used for description purposes only, and should not be understood as instruction or
Imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " connected " " connects
Connect " it shall be understood in a broad sense, for example, it may be being fixedly connected, it may be a detachable connection, or be integrally connected;It can be machine
Tool connection, is also possible to be electrically connected;It can be directly connected, it can also be indirectly connected through an intermediary.For this field
For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Embodiment:
As shown in attached drawing 1 to attached drawing 4:
The present invention provides a kind of construction safety protection canopy, including armored concrete ground beam 1, hand-dug pile foundation 2, standard
Steel pipe post 3, Two bors d's oeuveres I45a bearing beam 4, track 5, Bailey beam stringer 6, wheel mechanism 7 out of shape, ceiling construction 8, distribution beam 9 and steel plate
10;Frame basis uses the hand-dug pile foundation 2, and the reinforced concrete is used at the top of the hand-dug pile foundation 2
Soil beam 1 connects, and 1 top surface pre-embedded anchoring bolts of the armored concrete ground beam;Protecting canopy frame via use standard steel pipe, and
It is made up of between each other the standard steel pipe post 3 of one layer of bridging composition interconnected, the standard steel pipe is vertical
Fallen under column 3 frame basis it is pre-buried on;The column top of the standard steel pipe post 3 is welded with the steel plate 10, and the steel
Reinforcing rib is also welded between plate 10 and the column of the standard steel pipe post 3;The column top of the standard steel pipe post 3 is arranged
Via the Two bors d's oeuveres I45a bearing beam 4 that Two bors d's oeuveres I45a I-shaped gooseneck forms, and the Two bors d's oeuveres I45a bearing beam 4 and the steel plate 10
It mutually welds, and Two bors d's oeuveres I45a I-shaped gooseneck and the steel plate 10 use and be fully welded measure;The Two bors d's oeuveres of the Two bors d's oeuveres I45a bearing beam 4
I45a I-shaped gooseneck is provided with the track 5 using P50 rail;The Bailey beam stringer 6 is using beret slice and uses
45#, 90# flower window connection, and the Bailey beam stringer 6 is reinforced by U-bolt in the Two bors d's oeuveres I45a of the Two bors d's oeuveres I45a bearing beam 4
On I-shaped gooseneck;The wheel mechanism 7 out of shape is fixed on the lower boom of the Bailey beam stringer 6 using buckle-type, and described
Wheel mechanism 7 out of shape is slidably matched with the track 5;Welding uses the distribution beam of I12a I-steel on the ceiling construction 8
9, and connected between the distribution beam 9 and the Bailey beam stringer 6 using U-bolt, U-shaped card.
Wherein, the track 5 between the Two bors d's oeuveres I45a bearing beam 4 by every 1m together with length be 10cm two side welds
It mutually welds, to guarantee frame moving process overall stability.
Wherein, the wheel mechanism 7 out of shape of unilateral traveling is combined using 1 follower and 1 driving wheel, and according to anti-electric
Booth structure feature, driving wheel is uniformly placed on small mileage and surveys, and limiting device is arranged.
Wherein, the two sides of the ceiling construction 8 respectively set one of cable rope, and the standard steel is fixed in one end of cable rope
3 top of tube column, the other end are fixed on concrete block using connection buckle, and concrete block and the standard steel pipe post 3
Distance enhances its overall stability within the scope of 3-6m, increases the horizontal loadings abilities such as anti-natural wind, train percolation wave.
The embodiment of the present invention is given for the purpose of illustration and description, and is not exhaustively or by this to send out
It is bright to be limited to disclosed form.Many modifications and variations are obvious for the ordinary skill in the art.Choosing
Selecting and describe embodiment is and to make those skilled in the art to more preferably illustrate the principle of the present invention and practical application
It will be appreciated that the present invention is to design various embodiments suitable for specific applications with various modifications.
Claims (4)
1. a kind of construction safety protection canopy, it is characterised in that: the construction safety protection canopy includes armored concrete ground beam, excavated by manual work
Hole pile foundation, standard steel pipe post, Two bors d's oeuveres I45a bearing beam, track, Bailey beam stringer, wheel mechanism out of shape, ceiling construction, distribution beam
And steel plate;Frame basis uses the hand-dug pile foundation, and mixed using the reinforcing bar at the top of the hand-dug pile foundation
Solidifying soil beam connection, and armored concrete ground top surface of the beam pre-embedded anchoring bolts;Protecting canopy frame via use standard steel pipe, and
It is made up of between each other the standard steel pipe post of one layer of bridging composition interconnected, the standard steel pipe post
Under fall within frame basis it is pre-buried on;The column top of the standard steel pipe post is welded with the steel plate, and the steel plate and institute
It states and also welds reinforcing rib between the column of standard steel pipe post;The column top of the standard steel pipe post is arranged via Two bors d's oeuveres
The Two bors d's oeuveres I45a bearing beam of I45a I-shaped gooseneck composition, and the Two bors d's oeuveres I45a bearing beam is mutually welded with the steel plate, and double
It spells I45a I-shaped gooseneck and the steel plate uses and is fully welded measure;The Two bors d's oeuveres I45a I-shaped gooseneck of the Two bors d's oeuveres I45a bearing beam is set
It is equipped with the track using P50 rail;The Bailey beam stringer is connected using beret slice and using 45#, 90# flower window, and institute
Bailey beam stringer is stated to reinforce by U-bolt on the Two bors d's oeuveres I45a I-shaped gooseneck of the Two bors d's oeuveres I45a bearing beam;It is described out of shape
Wheel mechanism is fixed on the lower boom of the Bailey beam stringer using buckle-type, and the wheel mechanism out of shape and the track slide
Cooperation;The ceiling structurally welds the distribution beam using I12a I-steel, and the distribution beam and the Bailey beam are vertical
It is connected between beam using U-bolt, U-shaped card.
2. construction safety protection canopy as described in claim 1, it is characterised in that: between the track and the Two bors d's oeuveres I45a bearing beam
It is mutually welded by two side welds that one of length of every 1m is 10cm.
3. construction safety protection canopy as described in claim 1, it is characterised in that: the wheel mechanism out of shape of unilateral traveling uses 1
A follower and 1 driving wheel combination, and according to anti-electric booth structure feature, driving wheel is uniformly placed on small mileage and surveys, and is arranged
Limiting device.
4. construction safety protection canopy as described in claim 1, it is characterised in that: the two sides of the ceiling construction are respectively set pulls wind together
Rope, and one end of cable rope is fixed at the top of the standard steel pipe post, the other end is fixed on concrete block using connection buckle,
And concrete block at a distance from the standard steel pipe post within the scope of 3-6m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822015530.XU CN209429569U (en) | 2018-11-27 | 2018-11-27 | A kind of construction safety protection canopy |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822015530.XU CN209429569U (en) | 2018-11-27 | 2018-11-27 | A kind of construction safety protection canopy |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209429569U true CN209429569U (en) | 2019-09-24 |
Family
ID=67970569
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822015530.XU Active CN209429569U (en) | 2018-11-27 | 2018-11-27 | A kind of construction safety protection canopy |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209429569U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109457988A (en) * | 2018-11-27 | 2019-03-12 | 中铁十四局集团第工程发展有限公司 | A kind of construction safety protection canopy |
-
2018
- 2018-11-27 CN CN201822015530.XU patent/CN209429569U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109457988A (en) * | 2018-11-27 | 2019-03-12 | 中铁十四局集团第工程发展有限公司 | A kind of construction safety protection canopy |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105908960B (en) | Scaffold for large space construction | |
CN107178031A (en) | A kind of unit assembled prestressing force Multidirectional displacement bridge expansion device and installation method | |
CN109252445A (en) | Cast-in-situ Beam assembled Large Diameter Pipeline steel pipe support structure and its construction method | |
CN105952133A (en) | Suspended large-span reinforced concrete structure construction steel platform and construction method | |
CN209429569U (en) | A kind of construction safety protection canopy | |
CN101575914A (en) | Retractable unit horizontal hard protection | |
CN210134353U (en) | Bracket type hoop bracket for bent cap construction | |
CN109457988A (en) | A kind of construction safety protection canopy | |
CN215210544U (en) | Bridge curtain board construction protection device for existing tramcar crossing highway | |
CN207405485U (en) | A kind of intelligence system for bridge machinery | |
CN108517795A (en) | Railroad bridge protecting canopy frame structure and its construction method | |
CN109162723A (en) | A kind of more pilot tunnel tunnel temporary steel support Demolition Construction methods of big cross section | |
CN205205685U (en) | Span wire pier is function portal device at most | |
CN204212054U (en) | Check and construction operation platform at the bottom of a kind of removable row's formula flexible pier continuous girder bridge bridge | |
CN208039306U (en) | A kind of construction unicom system at new subway line station and building up station | |
CN102913007B (en) | Steel reinforcement processing shed and construction method therefor | |
CN212611900U (en) | Oblique leg steel trestle structure | |
CN211947968U (en) | Integral assembling type construction platform for high-altitude pier column construction | |
CN205063454U (en) | Steel construction stereo garage lane of traveling | |
CN203020404U (en) | Vehicle with operating platform | |
CN206986736U (en) | A kind of box girder bridge transverse prestress construction mobile closed formula platform | |
CN205711585U (en) | Anti-for massif slope type buried pipeline buries frame | |
CN109338952A (en) | A kind of freeway guardrail device of the anti-fall vehicle of crashworthiness anti-rollover | |
CN102444094B (en) | Method for improving reinforcing and anti-dazzle facilities of wave-form beam guardrail of central partition zone of expressway | |
CN217479995U (en) | Cantilever beam hanging basket construction assembled safety platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |