CN209428907U - A kind of new supporting structure for Construction of Cement Stabilized Macadam - Google Patents

A kind of new supporting structure for Construction of Cement Stabilized Macadam Download PDF

Info

Publication number
CN209428907U
CN209428907U CN201821824639.1U CN201821824639U CN209428907U CN 209428907 U CN209428907 U CN 209428907U CN 201821824639 U CN201821824639 U CN 201821824639U CN 209428907 U CN209428907 U CN 209428907U
Authority
CN
China
Prior art keywords
plate
channel steel
steel plate
strut
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821824639.1U
Other languages
Chinese (zh)
Inventor
王根叶
杨立志
戴会生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Civil Aviation Airport Construction Engineering Co Ltd
Original Assignee
No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN201821824639.1U priority Critical patent/CN209428907U/en
Application granted granted Critical
Publication of CN209428907U publication Critical patent/CN209428907U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses a kind of new supporting structure for Construction of Cement Stabilized Macadam, including channel steel plate, positioning plate, supporting mechanism, position-limit mechanism and overhead gage, positioning plate is connected with the side end of channel steel plate, overhead gage is connected to the upper end of channel steel plate, supporting mechanism includes the first strut and the first positioning pin, one end of first strut and the inner face of channel steel plate are connected, and the first pin hole are offered on the first strut, the first positioning pin is plugged in the first pin hole;Position-limit mechanism includes the first tube limiting assembly, the first gag lever post, the second strut and the second positioning pin, first tube limiting assembly is connected to the inside of channel steel plate, one end of second strut is connected with first sleeve, first gag lever post passes through the first tube limiting assembly and first sleeve, the other end of second strut is connected with the second casing, and the second positioning pin is plugged in the second casing, which can be to safer, effective and stable supporting to cement stabilized macadam road surface, structure novel, practicability are high.

Description

A kind of new supporting structure for Construction of Cement Stabilized Macadam
Technical field
The utility model relates to engineering machinery fields, and in particular to a kind of New Supporting for Construction of Cement Stabilized Macadam Structure.
Background technique
Cement stabilized macadam is to make aggregate with graded broken stone, using a certain number of cementitious materials and enough mortar volumes The gap of filler aggregate paves compacting by embedded squeezing principle.Conventional Construction of Cement Stabilized Macadam has the following problems: first is that cement The road surface of stabilization gravel construction two sides does not have template support, linear not straight;Second is that the road surface of Construction of Cement Stabilized Macadam two sides Edge cannot effectively be compacted, be easy turned-down edge;Third is that the sloping state of the edge on the road surface of Construction of Cement Stabilized Macadam two sides, Cause the waste of material.
Utility model content
The purpose of this utility model is to provide a kind of new supporting structure for Construction of Cement Stabilized Macadam, the supportings Structure can be to safer, effective and stable supporting to cement stabilized macadam road surface, structure novel, practicability height.
To achieve the goals above, the technical solution of use is the utility model:
A kind of new supporting structure for Construction of Cement Stabilized Macadam, including channel steel plate, positioning plate, supporting mechanism, limit Position mechanism and overhead gage, positioning plate are connected with the side end of channel steel plate, and overhead gage is connected to the upper end of channel steel plate, supporting mechanism packet Include the first strut and the first positioning pin, one end of the first strut and the inner face of channel steel plate are connected, and the is offered on the first strut One pin hole, the first positioning pin are plugged in the first pin hole;Position-limit mechanism includes the first tube limiting assembly, the first gag lever post, second Strut and the second positioning pin, the first tube limiting assembly are connected to the inside of channel steel plate, and one end of the second strut is connected with first set Pipe, the first gag lever post pass through the first tube limiting assembly and first sleeve, and the other end of the second strut is connected with the second casing, and second Positioning pin is plugged in the second casing.
Preferably, the channel steel plate includes upper cross plate, middle vertical plate and lower cross plate, and upper cross plate and lower cross plate are connected to middle vertical plate Upper and lower ends, the inner wall of the first strut and middle vertical plate is connected.
Preferably, first tube limiting assembly includes top tube and down tube, the lower end surface welding of upper tube and upper cross plate, down tube Positioned at the lower section of upper tube, the upper surface of down tube and lower cross plate is welded, and first sleeve adaptation is connected between top tube and down tube, and first Gag lever post sequentially passes through upper tube, first sleeve and down tube from top to bottom.
Preferably, the positioning plate is made of channel steel, and the upper surface of the right part of positioning plate and the lower end surface of upper cross plate are welded It connects, the lower end surface of the right part of positioning plate and the upper surface of lower cross plate are welded.
Preferably, multiple first threaded holes are offered on the left part of the positioning plate, multiple first threaded holes are evenly arranged on On the upper surface and lower end surface of positioning plate;Multiple second threaded holes, multiple second threaded holes are offered on the right part of channel steel plate It is evenly arranged on the upper surface and lower end surface of channel steel plate.
Preferably, the supporting mechanism and position-limit mechanism are provided with two groups, and the first pin hole has multiple.
Preferably, the overhead gage is welded on the upper end of channel steel plate, is provided with graduation mark on the side end face of overhead gage.
The beneficial effects of the utility model are:
The above-mentioned new supporting structure for Construction of Cement Stabilized Macadam, can used aloned, used aloned time slot steel plate connect The side on Construction of Cement Stabilized Macadam road surface is mounted on the first strut, channel steel plate is complete by supporting mechanism and position-limit mechanism It is larger to the lateral pressure of channel steel plate since cement stabilized macadam is during compacting at supporting is stablized, the branch of common strut Shield is difficult to support excessive pressure.So the first pin hole in the utility model is provided with multiple, use according to the actual situation, It is pluggable to have one or more the first positioning pin.And it to meet biggish stress demand, is provided in the utility model new The first tube limiting assembly and the first gag lever post of type, the first tube limiting assembly and channel steel plate 1 weld the rear stability that is connected and increase, the The relative rotation of two struts can be realized by rotation of the first sleeve on the first positioning pin.When multiple supporting mechanisms connect When, the interconnection of two supporting construction head and the tail is realized by positioning plate.And the first threaded hole is evenly arranged on the upper end of positioning plate On face and lower end surface, the second threaded hole is evenly arranged on the upper surface and lower end surface of channel steel plate, ensure that two supporting construction connections Structural strength afterwards.Overhead gage is additionally provided in the utility model, the side of overhead gage is provided with graduation mark, it can be achieved that cement is steady Determine the precise measurement of rubble thickness, overhead gage can also prevent cement stabilized macadam from covering channel steel plate.It is above-mentioned broken for cement stabilizing The new supporting structure of stone construction, can be to safer, effective and stable supporting to cement stabilized macadam road surface, and structure is simple Novelty, practicability are high.
Detailed description of the invention
Fig. 1 is the new supporting structure overall structure diagram for Construction of Cement Stabilized Macadam.
Fig. 2 is channel steel plate and positioning plate attachment structure schematic diagram.
Fig. 3 is channel steel plate overall structure diagram.
Fig. 4 is position-limit mechanism overall structure diagram.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawing:
In conjunction with Fig. 1 to Fig. 4, a kind of new supporting structure for Construction of Cement Stabilized Macadam, including channel steel plate 1, positioning Plate 2, supporting mechanism 3, position-limit mechanism 4 and overhead gage 5, positioning plate 1 are connected with the side end of channel steel plate 2, and overhead gage 5 is connected to slot The upper end of steel plate 1, overhead gage 5 are welded on the upper end of 1 plate of channel steel, 5 rectangular plate of overhead gage, on the side end face of overhead gage 5 It is provided with graduation mark.In the attached drawing of the utility model, the right part of positioning plate 1 is connected with the left part of channel steel plate 2.Channel steel plate 1 wraps Upper cross plate 11, middle vertical plate 12 and lower cross plate 13 are included, upper cross plate 11 and lower cross plate 13 are connected to the upper and lower ends of middle vertical plate 12.
Supporting mechanism 3 includes the first strut 31 and the first positioning pin 32, one end and the inner end of channel steel plate 1 of the first strut 31 Face is connected, and the first pin hole 311 is offered on the first strut 31, the first positioning pin 32 is plugged in the first pin hole 311.First strut 31 is connected with the inner wall of middle vertical plate.
Position-limit mechanism 4 includes the first tube limiting assembly 41, the first gag lever post 42, the second strut 43 and the second positioning pin 44, First tube limiting assembly 41 is connected to the inside of channel steel plate 1.One end of second strut 43 is connected with first sleeve 45, the first limit Bar 42 passes through the first tube limiting assembly 41 and first sleeve 45, and the other end of the second strut 43 is connected with second set of 46 pipe, and second Positioning pin 44 is plugged in the second casing 46.
First tube limiting assembly 41 includes upper tube 411 and down tube 412, and upper tube 411 and the lower end surface of upper cross plate 11 are welded, under Pipe 412 is located at the lower section of upper tube 411, the upper surface welding of down tube 412 and lower cross plate 13.When combining installation, first sleeve 45 Adaptation is connected between upper tube 411 and down tube 412, and then the first gag lever post 42 sequentially passes through upper tube 411, first set from top to bottom Pipe 45 and down tube 412, the lower end surface of the first gag lever post 42 connects with lower cross plate 13 at this time.
Positioning plate 2 in the utility model is made of channel steel, for guarantee positioning plate 2 connection effect, positioning plate 2 The model of channel steel is less than the model of the channel steel of channel steel plate 1.The upper surface of the right part of positioning plate 2 and the lower end surface of upper cross plate 11 Welding, the lower end surface of the right part of positioning plate 2 and the upper surface of lower cross plate 13 are welded.
Multiple first threaded holes 21 are offered on the left part of positioning plate 2, multiple first threaded holes 21 are evenly arranged on positioning plate 2 Upper surface and lower end surface on.Multiple second threaded holes 14 are offered on the right part of channel steel plate 1, multiple second threaded holes 14 are Cloth is on the upper surface and lower end surface of channel steel plate 1.Supporting mechanism 3 and position-limit mechanism 4 in the utility model are provided with two groups, First pin hole 311 has multiple.
The above-mentioned new supporting structure for Construction of Cement Stabilized Macadam, can used aloned, used aloned time slot steel plate 1 connect The side on Construction of Cement Stabilized Macadam road surface is mounted on the first strut 31, channel steel plate 1 passes through supporting mechanism 3 and position-limit mechanism 4, it completes to stablize supporting, since cement stabilized macadam is during compacting, support larger to the lateral pressure of channel steel plate 1, common The supporting of bar is difficult to support excessive pressure.So the first pin hole 311 in the utility model be provided with it is multiple, according to practical feelings The use of condition, it is pluggable to have one or more the first positioning pin 32.
And to meet biggish stress demand, novel the first tube limiting assembly 41 and the are provided in the utility model One gag lever post 42, the first tube limiting assembly 41 are welded the rear stability that is connected with channel steel plate 1 and are increased, the relative rotation of the second strut 43 It can be realized by rotation of the first sleeve 45 on the first positioning pin 322.
When the connection of multiple supporting mechanisms, interconnection (such as attached drawing of two supporting construction head and the tail is realized by positioning plate 2 Shown in 2), and the first threaded hole 21 is evenly arranged on the upper surface and lower end surface of positioning plate 2, and the second threaded hole 14 is evenly arranged on channel steel Structural strength on the upper surface and lower end surface of plate 1, after ensure that two supporting construction connections.It is additionally provided in the utility model Overhead gage 5, the side of overhead gage 5 are provided with graduation mark, and overhead gage 5 prevents cement stabilized macadam from covering channel steel plate 1.It is above-mentioned to be used for The new supporting structure of Construction of Cement Stabilized Macadam, can be to safer, effective and stable branch to cement stabilized macadam road surface Shield, structure is simple and novel, and practicability is high.
Certainly, the above description is not intended to limit the present invention, and the utility model is also not limited to the example above, The variations, modifications, additions or substitutions that those skilled in the art are made in the essential scope of the utility model, are also answered Belong to the protection scope of the utility model.

Claims (7)

1. a kind of new supporting structure for Construction of Cement Stabilized Macadam, which is characterized in that including channel steel plate, positioning plate, branch Support mechanism, position-limit mechanism and overhead gage, positioning plate are connected with the side end of channel steel plate, and overhead gage is connected to the upper end of channel steel plate, Supporting mechanism includes the first strut and the first positioning pin, and one end of the first strut and the inner face of channel steel plate are connected, the first strut On offer the first pin hole, the first positioning pin is plugged in the first pin hole;Position-limit mechanism includes the first tube limiting assembly, the first limit Position bar, the second strut and the second positioning pin, the first tube limiting assembly are connected to the inside of channel steel plate, one end connection of the second strut There is first sleeve, the first gag lever post passes through the first tube limiting assembly and first sleeve, and the other end of the second strut is connected with second Casing, the second positioning pin are plugged in the second casing.
2. a kind of new supporting structure for Construction of Cement Stabilized Macadam according to claim 1, which is characterized in that institute Stating channel steel plate includes upper cross plate, middle vertical plate and lower cross plate, and upper cross plate and lower cross plate are connected to the upper and lower ends of middle vertical plate, the first support The inner wall of bar and middle vertical plate is connected.
3. a kind of new supporting structure for Construction of Cement Stabilized Macadam according to claim 2, which is characterized in that institute Stating the first tube limiting assembly includes top tube and down tube, and the lower end surface of upper tube and upper cross plate is welded, and down tube is located at the lower section of upper tube, under Pipe is welded with the upper surface of lower cross plate, and first sleeve adaptation is connected between top tube and down tube, the first gag lever post from top to bottom according to It is secondary to pass through upper tube, first sleeve and down tube.
4. a kind of new supporting structure for Construction of Cement Stabilized Macadam according to claim 2, which is characterized in that institute It states positioning plate to be made of channel steel, the upper surface of the right part of positioning plate and the lower end surface of upper cross plate are welded, the right part of positioning plate Lower end surface and lower cross plate upper surface weld.
5. a kind of new supporting structure for Construction of Cement Stabilized Macadam according to claim 4, which is characterized in that institute It states and offers multiple first threaded holes on the left part of positioning plate, multiple first threaded holes are evenly arranged on the upper surface of positioning plate under On end face;Multiple second threaded holes are offered on the right part of channel steel plate, multiple second threaded holes are evenly arranged on the upper end of channel steel plate On face and lower end surface.
6. a kind of new supporting structure for Construction of Cement Stabilized Macadam according to claim 1, which is characterized in that institute It states supporting mechanism and position-limit mechanism is provided with two groups, the first pin hole has multiple.
7. a kind of new supporting structure for Construction of Cement Stabilized Macadam according to claim 1, which is characterized in that institute The upper end that overhead gage is welded on channel steel plate is stated, is provided with graduation mark on the side end face of overhead gage.
CN201821824639.1U 2018-11-07 2018-11-07 A kind of new supporting structure for Construction of Cement Stabilized Macadam Active CN209428907U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821824639.1U CN209428907U (en) 2018-11-07 2018-11-07 A kind of new supporting structure for Construction of Cement Stabilized Macadam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821824639.1U CN209428907U (en) 2018-11-07 2018-11-07 A kind of new supporting structure for Construction of Cement Stabilized Macadam

Publications (1)

Publication Number Publication Date
CN209428907U true CN209428907U (en) 2019-09-24

Family

ID=67967307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821824639.1U Active CN209428907U (en) 2018-11-07 2018-11-07 A kind of new supporting structure for Construction of Cement Stabilized Macadam

Country Status (1)

Country Link
CN (1) CN209428907U (en)

Similar Documents

Publication Publication Date Title
CN206646642U (en) A kind of assembled architecture post and column connected node
CN105735468B (en) A kind of attachment structure of steel core concrete column and reinforced beam
CN209428907U (en) A kind of new supporting structure for Construction of Cement Stabilized Macadam
CN204609131U (en) Cushion block of concrete bar protective layer
CN207277691U (en) A kind of concrete column position apparatus for form
CN205637119U (en) Connection structure of steel pipe concrete pillar and reinforced concrete girders
CN209538012U (en) Seam prototype template and casting system are reserved in a kind of assembled bent cap pier stake
CN208293370U (en) A kind of highway bridge concreting steel form
CN209428908U (en) Suspension device for Construction of Cement Stabilized Macadam
CN206859684U (en) A kind of support frame structure of reinforcing template connection
CN204676407U (en) A kind of three arch rib support tie-rod configuration
CN204715747U (en) A kind of floor slab construction seam tool-type side form support
CN210288778U (en) Aerated concrete block filling wall
CN109403189A (en) Suspension device for Construction of Cement Stabilized Macadam
CN209264097U (en) A kind of embedded type sensor mounting groove
CN209083122U (en) A kind of assembly node that rubber support is connect with up-down structure
CN206346201U (en) A kind of sand control alignment system for being used to lay lattice column
CN207761668U (en) A kind of supporting construction of novel tunnel
CN205116027U (en) Arch ring flange tool structure
CN207846658U (en) The modularization node of prefabricated buildings
CN207498935U (en) A kind of civil engineering built pile
CN205088785U (en) Reinforced concrete frame
CN206707736U (en) A kind of tunnel inverted arch full width rapid construction integral mold plate system
CN206686525U (en) The construction husky shovel being conveniently replaceable
CN106245909B (en) A kind of column template encloses support branch protecting assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 300450 No. 173, No. 2 Road, Tanggu Xingang, Binhai New Area, Tianjin

Patentee after: Civil Aviation Airport Construction Engineering Co., Ltd

Address before: 300450 No. 173, No. 2 Road, Tanggu Xingang, Binhai New Area, Tianjin

Patentee before: No.4 Engineering Company Ltd. of CCCC