CN109403189A - Suspension device for Construction of Cement Stabilized Macadam - Google Patents
Suspension device for Construction of Cement Stabilized Macadam Download PDFInfo
- Publication number
- CN109403189A CN109403189A CN201811316898.8A CN201811316898A CN109403189A CN 109403189 A CN109403189 A CN 109403189A CN 201811316898 A CN201811316898 A CN 201811316898A CN 109403189 A CN109403189 A CN 109403189A
- Authority
- CN
- China
- Prior art keywords
- plate
- strut
- positioning
- steel plate
- channel steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004568 cement Substances 0.000 title claims abstract description 39
- 238000010276 construction Methods 0.000 title claims abstract description 29
- 239000000725 suspension Substances 0.000 title claims abstract description 24
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 68
- 239000010959 steel Substances 0.000 claims abstract description 68
- 238000010586 diagram Methods 0.000 description 6
- 230000001681 protective effect Effects 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 230000006641 stabilisation Effects 0.000 description 3
- 238000011105 stabilization Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/50—Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
- E01C19/502—Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/50—Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
- E01C19/502—Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
- E01C19/504—Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes adapted to, or provided with, means to maintain reinforcing or load transfer elements in a required position
Abstract
The present invention discloses the suspension device for Construction of Cement Stabilized Macadam, including the first supporting channel steel plate, second supporting channel steel plate, first supporting mechanism, second supporting mechanism and upper protection mechanism, the side of first supporting channel steel plate is connected with the first connecting plate, first supporting mechanism includes the first strut and the first positioning pin, first strut is connected on the inner wall of the first supporting channel steel plate: the second supporting mechanism includes the second strut component, third strut component and the second positioning pin, the inner end of first supporting channel steel plate is equipped with the first pillar component, the inner end of second supporting channel steel plate is equipped with the second pillar component;Upper protection mechanism includes the first scale plate and two first baffles, and two first baffles are connected to the second supporting channel steel plate upper end;First scale plate is connected between two first baffles.The suspension device can be to safer, effective and stable supporting to cement stabilized macadam road surface, and is applicable to the supporting on the road surface of different height, structure novel, creative high.
Description
Technical field
The present invention relates to engineering machinery fields, and in particular to the suspension device for Construction of Cement Stabilized Macadam.
Background technique
Cement stabilized macadam is to make aggregate with graded broken stone, using a certain number of cementitious materials and enough mortar volumes
The gap of filler aggregate paves compacting by embedded squeezing principle.Conventional Construction of Cement Stabilized Macadam has the following problems: first is that cement
The road surface of stabilization gravel construction two sides does not have template support, linear not straight;Second is that the road surface of Construction of Cement Stabilized Macadam two sides
Edge cannot effectively be compacted, be easy turned-down edge;Third is that the sloping state of the edge on the road surface of Construction of Cement Stabilized Macadam two sides,
Cause the waste of material.In the prior art, there is also the transportation problem of support template, common support template needs higher rigid
Degree requires, and thickness is thicker.And for the cement macadam paving of higher caliper, the height of support template is higher, and support template is not
A variety of types are only needed, and heavier on the whole, it is time-consuming and laborious when manual handling, worker can be also accidentally pounded sometimes.
Summary of the invention
The purpose of the present invention is to provide the suspension device for Construction of Cement Stabilized Macadam, which can be to water
Safer, effective and stable supporting on cement-stabilizing broken stone road surface, and practicability is stronger, is applicable to the road surface of different height
Supporting, structure novel is creative high.
To achieve the goals above, the technical solution of use is the present invention:
For the suspension device of Construction of Cement Stabilized Macadam, including the first supporting channel steel plate, the second supporting channel steel plate, first
Supporting mechanism, the second supporting mechanism and upper protection mechanism, the side of the first supporting channel steel plate are connected with the first connecting plate, and first
Support mechanism includes the first strut and the first positioning pin, and the first strut is connected on the inner wall of the first supporting channel steel plate, the first strut
Inside it is provided with the first positioning pin;
Second supporting mechanism includes the second strut component, third strut component and the second positioning pin, the first supporting channel steel plate
Inner end be equipped with the first pillar component, the inner end of the second supporting channel steel plate is equipped with the second pillar component;The one of second strut component
End is connected with the first pillar component, and the other end is connected with the second positioning pin;One end of third strut component and the second pillar component
It is connected, the other end is connected with the second positioning pin;
Upper protection mechanism includes the first scale plate and two first baffles, and what two first baffles were parallel to each other be connected to the
Two supporting channel steel plate upper ends;The lower part of first scale plate is connected between two first baffles, and by multiple first bolts with
First baffle is connected.
Preferably, the first supporting channel steel plate includes the first upper cross plate, vertical plate and the first lower cross plate in first, in first
Vertical plate is connected between the first upper cross plate and the first lower cross plate, and vertical plate welds in the first strut and first;
Second supporting channel steel plate includes vertical plate and the second lower cross plate in the second upper cross plate, second, and vertical plate is connected in second
Between second upper cross plate and the second lower cross plate.
Preferably, first strut is square rod-shaped, and multiple first struts hole, the first positioning are offered on the first strut
Pin is across the first strut hole.
Preferably, the second strut component includes first sleeve, the second strut and the second casing, first sleeve and second
Casing is connected to the both ends of the second strut;Third strut component includes third casing, third strut and Quadruplet pipe, third
Casing and Quadruplet pipe are connected to the both ends of third strut.
Preferably, the first pillar component includes the first positioning upper tube, the first positioning down tube and the first strut, and first is fixed
On the lower end surface of first upper cross plate of position upper tube connection, the first positioning down tube is connected on the upper surface of the first lower cross plate, and first
Casing is located between the first positioning upper tube and the first positioning down tube;
Second pillar component includes the second positioning upper tube and the second positioning down tube, and the second positioning upper tube is connected on second horizontal
On the lower end surface of plate, the second positioning down tube is connected on the upper surface of the second lower cross plate, and third casing is located at the second positioning upper tube
And second positioning down tube between.
Preferably, first positioning pin, the second positioning pin and the first strut are in round bar shape;First strut is from top to bottom
Sequentially pass through the second upper cross plate, second positioning upper tube, third casing, second positioning down tube, the second lower cross plate, the first upper cross plate,
First positioning upper tube, first sleeve and the first positioning down tube, the lower end surface of the first strut connects with the first lower cross plate;Second positioning
Pin is across the second casing and Quadruplet pipe.
Preferably, first connecting plate is in U-shape plate, the right part of the first connecting plate in the first supporting channel steel plate
Left part is connected, the inner wall welding of the outer wall of the first connecting plate and the first supporting channel steel plate, offers on the first connecting plate multiple
First connection screw thread hole offers the second connection screw thread hole on the right part of the first supporting channel steel plate.
Preferably, there are three first struts, the first pillar component and the second pillar component have two groups, every two
One group of first pillar component is provided between one strut, two group of second pillar component is evenly arranged on the inside of the second supporting channel steel plate.
Preferably, multiple third connection screw thread holes are offered on the first baffle;First scale plate includes second baffle
With lower card adapter plate, lower card adapter plate is connected between two first baffles and connects with second baffle, and second baffle is connected to down
The upper end of card adapter plate, second baffle are connected to the upper end of first baffle.
Preferably, the first baffle rectangular plate is provided with scale on the side end face of the first scale plate.
The beneficial effects of the present invention are:
The above-mentioned suspension device for Construction of Cement Stabilized Macadam, places it in need the stabilization gravel that lays cement when in use
The two sides on road surface.When the thickness of cement stabilized macadam for needing to spread than it is relatively thin when, use the first supporting channel steel plate, the first support machine
Structure and the second supporting mechanism.When the thickness of cement stabilized macadam for needing to spread is thicker, the first supporting channel steel plate and second
Protecting groove steel plate uses.When needing to control the thickness of measurement cement stabilized macadam, the first scale plate is installed.This hair
The bright suspension device for Construction of Cement Stabilized Macadam, protection effect and stability are more preferable, and disassembled for transport is convenient, structure novel,
It is creative high.
Detailed description of the invention
Fig. 1 is the suspension device structure overall structure diagram for Construction of Cement Stabilized Macadam.
Fig. 2 is the first supporting channel steel plate, the first supporting mechanism and the second supporting mechanism attachment structure schematic diagram.
Fig. 3 is the second supporting channel steel plate overall structure diagram.
Fig. 4 is the first supporting channel steel plate and the first supporting mechanism attachment structure schematic diagram.
Fig. 5 is the first scale plate overall structure diagram.
Fig. 6 is the second supporting mechanism overall structure diagram.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawing:
In conjunction with Fig. 1 to Fig. 6, for the suspension device of Construction of Cement Stabilized Macadam, including the first supporting channel steel plate 1, second
The side of supporting channel steel plate 2, the first supporting mechanism 3, the second supporting mechanism 4 and upper protection mechanism 5, the first supporting channel steel plate 1 connects
It is connected to the first connecting plate 6.
First supporting mechanism 3 includes the first strut 31 and the first positioning pin 32, and the first strut 31 is connected to first protecting groove
The inner wall of steel plate 1 is provided with the first positioning pin 32 in first strut 31.Second supporting mechanism 4 includes the second strut component 41, the
The inside of three strut components 42 and the second positioning pin 43, the first supporting channel steel plate 1 is provided with the first pillar component 7, the second supporting
The inside of channel steel plate 2 is provided with the second pillar component 8.
One end of second strut component 41 is connected with the first pillar component 7, the other end and second of the second strut component 41
Positioning pin 43 is connected.One end of third strut component 42 is connected with the second pillar component 8, the other end of third strut component 42 with
Second positioning pin 43 is connected.
Upper protection mechanism 5 includes the first scale plate 51 and two first baffles 52, what two first baffles 52 were parallel to each other
It is connected to the upper end of the second supporting channel steel plate 2, the lower part of the first scale plate 51 is connected between two first baffles 52, and is passed through
Multiple first bolts and first baffle 52 are connected.
First supporting channel steel plate 1 includes vertical plate 12 and the first lower cross plate 13 in the first upper cross plate 11, first, vertical plate in first
12 are connected between the first upper cross plate 11 and the first lower cross plate 13, the inner wall welding of vertical plate 12 in the first strut 31 and first.The
Two supporting channel steel plates 2 include vertical plate 22 and the second lower cross plate 23 in the second upper cross plate 21, second, and vertical plate 22 is connected to the in second
Between two upper cross plates 21 and the second lower cross plate 22.
First positioning pin 32 have it is multiple, the first strut 31 be square it is rod-shaped, offered on the first strut 32 it is multiple first support
Rod aperture 311, the first positioning pin 32 pass through the first strut hole 311.It can when stress is smaller according to the needs of construction supporting intensity
One the first positioning pin 32 of grafting in one of them in multiple first struts hole 311.It, can be multiple when stress is larger
Multiple first positioning pins 32 of grafting in one strut hole 311.But one first positioning can only be inserted in each first strut hole 311
The lower part of pin 32, the first positioning pin 32 is inserted into ground.
Second strut component 41 includes first sleeve 411, the second strut 412 and the second casing 413,411 He of first sleeve
Second casing 413 is connected to the both ends of the second strut 412.Third strut component 42 includes third casing 421, third strut
422 and Quadruplet pipe 423, third casing 421 and Quadruplet pipe 423 are connected to the both ends of third strut 422.
First pillar component 7 includes that the first positioning upper tube 71, first positions down tube 72 and the first strut 73, and first positions
On the lower end surface for the first upper cross plate 11 that pipe 71 connects, the first positioning down tube 72 is connected on the upper surface of the first lower cross plate 13,
First sleeve 411 is located between the first positioning upper tube 71 and the first positioning down tube 72.
Second pillar component 8 includes the second positioning upper tube 81 and the second positioning down tube 82, and the second positioning upper tube 81 is connected to
On the lower end surface of second upper cross plate 21, the second positioning down tube 82 is connected on the upper surface of the second lower cross plate 23, third casing 421
It is located between the second positioning upper tube 81 and the second positioning down tube 82.
First positioning pin 32, the second positioning pin 43 and the first strut 73 are in round bar shape, and the first positioning pin 32 and second is fixed
The head of position pin 43 is in a circular table shape.When connection is used for the suspension device of Construction of Cement Stabilized Macadam, the first strut 73 is from upper
The second upper cross plate 21, second positioning upper tube 81 is sequentially passed through under, third casing 421, second positions down tube 82, the second lower cross plate
23, the first upper cross plate 11, first positioning upper tube 71, first sleeve 411 and the first positioning down tube 72, the lower end surface of the first strut 73
Connect with the first lower cross plate 13.Above-mentioned first upper cross plate 11, the second upper cross plate 21 and the second lower cross plate 23 are offered for
The hole that one strut 73 passes through.
After first supporting channel steel plate 1 and the second supporting channel steel plate 2 are by the thrust of ecto-entad, thrust is firstly applied to
On one supporting channel steel plate 1 and the second supporting channel steel plate 2, then thrust passes to the first pillar component 7 and the second pillar component 8,
Since the first pillar component 7 and the second pillar component 8 are positioned by the first strut 73, then part power can pass through the first strut 73
The first lower cross plate 13 is transmitted, the first lower cross plate 13 can be stronger, so that the first supporting channel steel plate 1 is more stable.
Also, the first supporting channel steel plate 1, the second supporting channel steel plate 2, the first pillar component 7 and the second pillar in the present invention
The connection type of component 8, is not bolted, and disassembly installation is very convenient, and in the case where guaranteeing connection support, also mentions
High whole stability.
Second positioning pin 43 passes through the second casing 413 and Quadruplet pipe 423, and the second positioning pin 43 is inserted into soil when in use
In.Also, when the position of the first supporting channel steel plate 1 of mobile fine tuning and the second supporting channel steel plate 2, only the first positioning pin need to be extracted
32, the first supporting channel steel plate 1 and the second supporting channel steel plate 2 are pushed, mobile alignment is more convenient.
First connecting plate 6 is in U-shape plate, the right part of the first connecting plate 6 and the left part phase in the first supporting channel steel plate 1
Even, the inner wall of the outer wall of the first connecting plate 6 and the first supporting channel steel plate 6 welds, and multiple first are offered on the first connecting plate 6 and is connected
Threaded hole 61 is connect, offers the second connection screw thread hole 62 on the right part of the first supporting channel steel plate 1.
The effect of first connecting plate 6 is exactly the interconnection for multiple protective devices, only need to be by the of this protective device
One connecting plate 6 is connect with the right part of the first supporting channel steel plate 6 in next protective device, can be conveniently connected and fixed, and
First connecting plate 6 is located at the inside of the first supporting channel steel plate 1, and after two or more protective devices are connected with each other, first connects
Fishplate bar 6 will not influence the end face flatness of Construction of Cement Stabilized Macadam, and structure is more practical simple.
There are three first struts 31, and the first pillar component 7 and the second pillar component 8 have two groups, the first strut of every two
One group of first pillar component 7 is provided between 31, two group of second pillar component 8 is evenly arranged on the inside of the second supporting channel steel plate 2.
Multiple third connection screw thread holes 53 are offered on first baffle 52, the first scale plate 51 includes 511 He of second baffle
Lower card adapter plate 512, lower card adapter plate 512 are connected between two first baffles 52 and connect with second baffle 52, second baffle
511 are connected to the upper end of lower card adapter plate 512, and second baffle 511 is connected to the upper end of first baffle 52.First baffle 52 is in rectangular
Shape plate is provided with scale on the side end face of the first scale plate 51.
The above-mentioned suspension device for Construction of Cement Stabilized Macadam, places it in need the stabilization gravel that lays cement when in use
The two sides on road surface.When the thickness of cement stabilized macadam for needing to spread than it is relatively thin when, use the first supporting channel steel plate 1, first to support
Mechanism 3 and the second supporting mechanism 4.When the thickness of cement stabilized macadam for needing to spread is thicker, the first supporting channel steel plate 1 and the
Two supporting channel steel plates 2 use.When needing to control the thickness of measurement cement stabilized macadam, the first scale plate 51 is installed i.e.
It can.The present invention is used for the suspension device of Construction of Cement Stabilized Macadam, and protection effect and stability are more preferable, and disassembled for transport is convenient, knot
Structure is novel, creative high.
Certainly, the above description is not a limitation of the present invention, and the present invention is also not limited to the example above, this technology neck
The variations, modifications, additions or substitutions that the technical staff in domain is made within the essential scope of the present invention also should belong to of the invention
Protection scope.
Claims (10)
1. being used for the suspension device of Construction of Cement Stabilized Macadam, which is characterized in that including the first supporting channel steel plate, second protecting groove
The side of steel plate, the first supporting mechanism, the second supporting mechanism and upper protection mechanism, the first supporting channel steel plate is connected with the first connection
Plate, the first supporting mechanism include the first strut and the first positioning pin, and the first strut is connected on the inner wall of the first supporting channel steel plate,
The first positioning pin is provided in first strut;
Second supporting mechanism include the second strut component, third strut component and the second positioning pin, the first supporting channel steel plate it is interior
End is equipped with the first pillar component, and the inner end of the second supporting channel steel plate is equipped with the second pillar component;One end of second strut component with
First pillar component is connected, and the other end is connected with the second positioning pin;One end of third strut component is connected with the second pillar component,
The other end is connected with the second positioning pin;
Upper protection mechanism includes the first scale plate and two first baffles, and what two first baffles were parallel to each other is connected to second
Protecting groove steel plate upper end;The lower part of first scale plate is connected between two first baffles, and passes through multiple first bolts and first
Baffle is connected.
2. the suspension device according to claim 1 for Construction of Cement Stabilized Macadam, which is characterized in that described first
Protecting groove steel plate includes the first upper cross plate, vertical plate and the first lower cross plate in first, and vertical plate is connected to the first upper cross plate and the in first
Between one lower cross plate, vertical plate is welded in the first strut and first;
Second supporting channel steel plate includes vertical plate and the second lower cross plate in the second upper cross plate, second, and vertical plate is connected to second in second
Between upper cross plate and the second lower cross plate.
3. the suspension device according to claim 2 for Construction of Cement Stabilized Macadam, which is characterized in that first support
Bar is square rod-shaped, offers multiple first struts hole on the first strut, the first positioning pin passes through the first strut hole.
4. the suspension device according to claim 2 for Construction of Cement Stabilized Macadam, which is characterized in that second support
Bar assembly includes first sleeve, the second strut and the second casing, and first sleeve and the second casing are connected to the second strut
Both ends;Third strut component includes third casing, third strut and Quadruplet pipe, and third casing and Quadruplet pipe are connected to
The both ends of third strut.
5. the suspension device according to claim 4 for Construction of Cement Stabilized Macadam, which is characterized in that first shield
Tube assembly includes the first positioning upper tube, the first positioning down tube and the first strut, and first positions the first upper cross plate of upper tube connection
On lower end surface, the first positioning down tube is connected on the upper surface of the first lower cross plate, and first sleeve is located at the first positioning upper tube and the
Between one positioning down tube;
Second pillar component includes the second positioning upper tube and the second positioning down tube, and the second positioning upper tube is connected to the second upper cross plate
On lower end surface, the second positioning down tube is connected on the upper surface of the second lower cross plate, and third casing is located at the second positioning upper tube and the
Between two positioning down tubes.
6. the suspension device according to claim 5 for Construction of Cement Stabilized Macadam, which is characterized in that described first is fixed
Position pin, the second positioning pin and the first strut are in round bar shape;First strut sequentially passes through the second upper cross plate, second fixed from top to bottom
Position upper tube, third casing, the second positioning down tube, the second lower cross plate, the first upper cross plate, the first positioning upper tube, first sleeve and the
One positioning down tube, the lower end surface of the first strut connects with the first lower cross plate;Second positioning pin passes through the second casing and Quadruplet pipe.
7. the suspension device according to claim 1 for Construction of Cement Stabilized Macadam, which is characterized in that described first connects
Fishplate bar is in U-shape plate, and the right part of the first connecting plate is connected in the left part of the first supporting channel steel plate, the first connecting plate it is outer
The inner wall of wall and the first supporting channel steel plate welds, and offers multiple first connection screw thread holes, first protecting groove on the first connecting plate
The second connection screw thread hole is offered on the right part of steel plate.
8. the suspension device according to claim 1 for Construction of Cement Stabilized Macadam, which is characterized in that first support
There are three bars, and the first pillar component and the second pillar component have two groups, is provided with one group first between the first strut of every two
Pillar component, two group of second pillar component are evenly arranged on the inside of the second supporting channel steel plate.
9. the suspension device according to claim 1 for Construction of Cement Stabilized Macadam, which is characterized in that the first gear
Multiple third connection screw thread holes are offered on plate;First scale plate includes second baffle and lower card adapter plate, and lower card adapter plate is connected to
Connect between two first baffles and with second baffle, second baffle is connected to the upper end of lower card adapter plate, second baffle clamping
In the upper end of first baffle.
10. the suspension device according to claim 1 for Construction of Cement Stabilized Macadam, which is characterized in that described first
Baffle rectangular plate is provided with scale on the side end face of the first scale plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811316898.8A CN109403189A (en) | 2018-11-07 | 2018-11-07 | Suspension device for Construction of Cement Stabilized Macadam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811316898.8A CN109403189A (en) | 2018-11-07 | 2018-11-07 | Suspension device for Construction of Cement Stabilized Macadam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109403189A true CN109403189A (en) | 2019-03-01 |
Family
ID=65471884
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811316898.8A Pending CN109403189A (en) | 2018-11-07 | 2018-11-07 | Suspension device for Construction of Cement Stabilized Macadam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109403189A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20210095485A1 (en) * | 2019-09-30 | 2021-04-01 | Carrol Distributing & Construction Supply, Inc. | Quick curb bracket |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103510450A (en) * | 2012-06-21 | 2014-01-15 | 五冶集团上海有限公司 | Support for supporting template of highway cement stabilizing layer and using method thereof |
CN204224968U (en) * | 2014-10-12 | 2015-03-25 | 贵州路桥集团有限公司 | Road surface heavy thickness basic unit edge formwork-support |
CN205115970U (en) * | 2015-10-27 | 2016-03-30 | 四川省场道工程有限公司 | Cement concrete way face mould board and braced system in way engineering of airport field |
KR20170001392A (en) * | 2015-06-26 | 2017-01-04 | 주식회사 우진기전 | Height-adjustable Steel Mould |
CN206512569U (en) * | 2017-03-01 | 2017-09-22 | 三峡大学 | Concrete road surface steel form |
WO2018055323A1 (en) * | 2016-09-20 | 2018-03-29 | Fast-Form Systems Ltd | Road form work |
CN207862732U (en) * | 2018-02-11 | 2018-09-14 | 李秋 | A kind of adjustable for height concrete construction mold |
CN209428908U (en) * | 2018-11-07 | 2019-09-24 | 中交一航局第四工程有限公司 | Suspension device for Construction of Cement Stabilized Macadam |
-
2018
- 2018-11-07 CN CN201811316898.8A patent/CN109403189A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103510450A (en) * | 2012-06-21 | 2014-01-15 | 五冶集团上海有限公司 | Support for supporting template of highway cement stabilizing layer and using method thereof |
CN204224968U (en) * | 2014-10-12 | 2015-03-25 | 贵州路桥集团有限公司 | Road surface heavy thickness basic unit edge formwork-support |
KR20170001392A (en) * | 2015-06-26 | 2017-01-04 | 주식회사 우진기전 | Height-adjustable Steel Mould |
CN205115970U (en) * | 2015-10-27 | 2016-03-30 | 四川省场道工程有限公司 | Cement concrete way face mould board and braced system in way engineering of airport field |
WO2018055323A1 (en) * | 2016-09-20 | 2018-03-29 | Fast-Form Systems Ltd | Road form work |
CN206512569U (en) * | 2017-03-01 | 2017-09-22 | 三峡大学 | Concrete road surface steel form |
CN207862732U (en) * | 2018-02-11 | 2018-09-14 | 李秋 | A kind of adjustable for height concrete construction mold |
CN209428908U (en) * | 2018-11-07 | 2019-09-24 | 中交一航局第四工程有限公司 | Suspension device for Construction of Cement Stabilized Macadam |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20210095485A1 (en) * | 2019-09-30 | 2021-04-01 | Carrol Distributing & Construction Supply, Inc. | Quick curb bracket |
US11802382B2 (en) * | 2019-09-30 | 2023-10-31 | Tuf-N-Lite, LLC | Quick curb bracket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10449699B2 (en) | Concrete forming systems and methods | |
CN108680416B (en) | Grouting frame for steel bar sleeve connection test for grouting of various defects and construction method | |
US3219308A (en) | Form locator | |
CN103352476B (en) | Large-scale bolt high-precision pre-burying construction method | |
CN103470041B (en) | The cast-in-place concrete beam template steel pipe support precompressed construction method that adopts loose sand to load | |
CN209428908U (en) | Suspension device for Construction of Cement Stabilized Macadam | |
CN109403189A (en) | Suspension device for Construction of Cement Stabilized Macadam | |
CN207144966U (en) | Steel arch-shelf connects plate positioning device | |
CN207987781U (en) | A kind of assembled cantilever bracket for bridge cast-in-place construction | |
CN205063187U (en) | Bar reinforcement positioning device | |
CN204370827U (en) | Face frontier defense guard fence | |
CN103195079B (en) | Installing type template, installing type template group and complete installing type plate device | |
CN206752852U (en) | A kind of batter post bar reinforcement positioning device | |
CN205135109U (en) | Novel special rail of being under construction | |
CN209428907U (en) | A kind of new supporting structure for Construction of Cement Stabilized Macadam | |
CN204266194U (en) | Fender post construction reinforcing cage installation structure below a kind of high-voltage line | |
CN208310044U (en) | A kind of keel positioning device of polygon column | |
CN207484443U (en) | A kind of settlement monitoring device | |
CN207513144U (en) | A kind of steel fixes scaffold base device | |
CN104389441B (en) | A kind of framework support system | |
CN206317048U (en) | A kind of reinforcing bar storage support | |
CN204418024U (en) | Concrete case beam bracing members and steel form special equipment device | |
CN204299207U (en) | A kind of frame supported system | |
CN206000188U (en) | Rim of a cup basis steel column installs perpendicularity adjustment holding device | |
CN211691454U (en) | Groove type embedded part |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 300450 No. 173, No. 2 Road, Tanggu Xingang, Binhai New Area, Tianjin Applicant after: Civil Aviation Airport Construction Engineering Co., Ltd Address before: 300450 No. 173, No. 2 Road, Tanggu Xingang, Binhai New Area, Tianjin Applicant before: No.4 Engineering Company Ltd. of CCCC |