CN209398434U - A kind of upper-soft lower-hard ground tunnel excavation support structure - Google Patents

A kind of upper-soft lower-hard ground tunnel excavation support structure Download PDF

Info

Publication number
CN209398434U
CN209398434U CN201920058155.9U CN201920058155U CN209398434U CN 209398434 U CN209398434 U CN 209398434U CN 201920058155 U CN201920058155 U CN 201920058155U CN 209398434 U CN209398434 U CN 209398434U
Authority
CN
China
Prior art keywords
arch
shaped steel
tunnel
steel frame
ledge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920058155.9U
Other languages
Chinese (zh)
Inventor
常春章
华敬华
杨保全
张海霞
曾来仕
杨成达
赵坤
殷倩倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN201920058155.9U priority Critical patent/CN209398434U/en
Application granted granted Critical
Publication of CN209398434U publication Critical patent/CN209398434U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of upper-soft lower-hard ground tunnel excavation support structures, belong to technical field of tunnel construction.A kind of upper-soft lower-hard ground tunnel excavation support structure, it is characterized in that: including ledge and tunnel lower layer solid rock, the ledge is by multiple arch-shaped steel frames, several ductules and shotcrete layer composition, the arch-shaped steel frame is sequentially arranged and links together along tunnel direction, the arch angle of the arch-shaped steel frame is fixed on tunnel lower layer solid rock after expanding, the ductule is arranged in arch crown part and squeezes into the soft stratum of tunnel top and its tail portion welds together with the arch-shaped steel frame, the arch-shaped steel frame is wrapped in inside and forms big arch springing at arch springing position by the shotcrete layer.Ledge structural strength in the utility model is high, and the arch springing of ledge is supported on two sides and stablizes on basement rock, and ledge load can be transferred to lower layer's firm ground, can resist jointly load with massif, it is ensured that construction safety, and construction efficiency can be improved.

Description

A kind of upper-soft lower-hard ground tunnel excavation support structure
Technical field
The utility model relates to a kind of tunnel excavation support structure, especially a kind of tunnel applied to upper-soft lower-hard ground Excavation supporting structure, belongs to technical field of tunnel construction.
Background technique
First branch ledge method is a kind of new metro station construction technology, is suitable for upper-soft lower-hard ground, is lid digging technology Development eliminates arch angle beam compared with two lining ledge law technologies, reduces working procedure and material utilization amount.And upper-soft lower-hard ground tunnel Supporting construction mostly uses oval cyclization just branch, and the method for partial excavation supporting, construction efficiency is low, and safe pressure is big.By subway The principle of the first branch ledge method in station is applied to upper-soft lower-hard ground tunnel support, studies a kind of new supporting construction and construction method Tunnel excavation problem can preferably be solved.
Summary of the invention
In view of the above defects of the prior art, the utility model provides a kind of suitable for upper-soft lower-hard ground Tunnel excavation support structure.
The utility model adopts the following technical scheme that realize: a kind of upper-soft lower-hard ground tunnel excavation support knot Structure, it is characterized in that: include ledge and tunnel lower layer solid rock, the ledge by multiple arch-shaped steel frames, several ductules and Shotcrete layer composition, the arch-shaped steel frame are sequentially arranged and link together along tunnel direction, the arch of the arch-shaped steel frame Angle is fixed on tunnel lower layer solid rock after expanding, and the ductule is arranged in arch crown part and squeezes into tunnel top flabbily In layer and its tail portion welds together with the arch-shaped steel frame, and the arch-shaped steel frame is wrapped in interior by the shotcrete layer Portion simultaneously forms big arch springing at arch springing position.
Ledge structural strength in the utility model is high, and the arch springing of ledge is supported on two sides and stablizes on basement rock, ledge load It can be transferred to lower layer's firm ground, load can be resisted jointly with massif, it is ensured that construction safety.
Further, to improve the stability of arch-shaped steel frame and guaranteeing the stability and structural strength of big arch springing position, Arch springing position is welded with dowel and each arch-shaped steel frame is connected as entirety.Dowel can be used as in concrete after concrete consolidation It sets muscle and improves structural strength.
Further, double layer bar, the injection coagulation are provided on the outside of the arch springing position of the arch-shaped steel frame Soil layer wraps up the double layer bar.Double layer bar can guarantee the big thickness concrete density of injection, while double layer bar exists The built-in reinforcing bar that can be used as concrete structure after concrete consolidation, can be improved the structural strength at big arch springing position, to improve arch The overall structural strength of lid is conducive to vault load through first branch ledge and is transferred to basement rock, and massif is under the support of ledge from figure At rock-steady structure.
Just branch ledge uses pilot tunnel small area excavation construction to the utility model, can reduce massif disturbance, and immediate support guarantees The globality and stability of country rock.
The beneficial effects of the utility model are: the utility model, which uses, thickeies big arch springing mode, by branch structure branch at the beginning of arch Support is stablized on basement rock in two sides, and the ledge structural strength of formation is high, and massif itself forms rock-steady structure, arch under the support of ledge Lid load can be transferred to lower layer's firm ground, can resist jointly load with massif, it is ensured that construction safety, under the protection of ledge When carrying out lower part Excavation Blasting, it is greatly improved the safety of construction.And the utility model is easy for construction, utilizes this reality Construction efficiency height is greatly improved with novel.
Detailed description of the invention
Fig. 1 is the schematic cross-sectional view of the tunnel excavation support structure in specific embodiment of the present invention.
In figure, 1, tunnel top soft stratum, 2, arch-shaped steel frame, 3, anchor pole, 4, big arch springing, 5, the hard rock of tunnel lower layer Stone, 6, ductule, 7, double layer bar.
Specific embodiment
The utility model is further described below by non-limiting embodiment and in conjunction with attached drawing:
As shown in the picture, a kind of upper-soft lower-hard ground tunnel excavation support structure comprising ledge and tunnel lower layer are hard Rock 5.The ledge is made of multiple arch-shaped steel frames 2, several ductules 6 and shotcrete layer, 2 edge of arch-shaped steel frame Tunnel direction is sequentially arranged and is linked together by dowel, and the arch angle of the arch-shaped steel frame 2 is fixed under tunnel after expanding On layer solid rock 5, the ductule 6 is arranged in arch crown part and squeezes into tunnel top soft stratum 1, and its tail portion with The arch-shaped steel frame 2 welds together, and the arch-shaped steel frame 2 is wrapped in inside and at arch springing position by the shotcrete layer Form big arch springing 4.
To improve the stability of arch-shaped steel frame and guaranteeing the stability and structural strength of big arch springing position, preferably in arch feet Position is welded to connect muscle and each arch-shaped steel frame 2 is connected as entirety.
To guarantee to spray big thickness concrete density and improving the structural strength at big arch springing position, in the present embodiment, Double layer bar 7 is provided on the outside of the arch springing position of the arch-shaped steel frame 2, the shotcrete layer wraps up the double steel bar Net 7.
Upper-soft lower-hard ground tunnel excavation construction method using above-mentioned tunnel excavation support structure is: including walking as follows It is rapid: (1) under conditions of weak blast, just branch button arch construction to be carried out using small pilot tunnel form: first carrying out the excavation construction of pilot tunnel, leads Country rock is closed to its gunite concrete after wide open digging, then sets up arch-shaped steel frame 2,2 arch angle of arch-shaped steel frame expansion rear support is existed On the solid rock 5 of two sides, and anchor pole 3, ductule 6 are set, the setting of anchor pole 3 passes through arch-shaped steel frame 2 in arch springing position, anchor pole 3 Squeeze into surrounding formation, arch-shaped steel frame 2 is anchored at surrounding formation by anchor pole 3, and it is soft that ductule 6 in keystone squeezes into tunnel top In weak stratum 1, tail portion welds together with arch-shaped steel frame 2, is anchored at tunnel top soft stratum 1 in ductule 6 after slip casting It is interior, ledge then is formed in 2 position gunite concrete of arch-shaped steel frame, the arch springing position of the ledge forms big arch springing 4;(2) exist Carry out tunnel lower part Excavation Blasting under the protection of ledge, sequence of excavation are the sequence of two sides behind first centre.
To guarantee to spray big thickness concrete density and improving the structural strength at big arch springing position, it is preferable that injection coagulation Double layer bar 7 is arranged in outside before native at the arch springing position of arch-shaped steel frame 2.When gunite concrete, double layer bar 7 be can guarantee The density of big thickness concrete is sprayed, and double layer bar can be used as the built-in steel of concrete structure after concrete consolidation Muscle can be improved the structural strength at big arch springing position, improve the overall structural strength of ledge.
Other parts in the present embodiment are the prior art, and details are not described herein.

Claims (3)

1. a kind of upper-soft lower-hard ground tunnel excavation support structure, it is characterized in that: including ledge and tunnel lower layer solid rock (5), the ledge is made of multiple arch-shaped steel frames (2), several ductules (6) and shotcrete layer, the arch-shaped steel frame (2) it is sequentially arranged and links together along tunnel direction, the arch angle of the arch-shaped steel frame (2) is fixed on tunnel lower layer heavily fortified point after expanding On hard rock (5), the ductule (6) setting is in arch crown part and squeezes into tunnel top soft stratum (1) and its tail portion Weld together with the arch-shaped steel frame (2), the arch-shaped steel frame (2) is wrapped in inside and encircleed by the shotcrete layer Foot position forms big arch springing (4).
2. upper-soft lower-hard ground tunnel excavation support structure according to claim 1, it is characterized in that: being welded at arch springing position There is dowel that each arch-shaped steel frame (2) is connected as entirety.
3. upper-soft lower-hard ground tunnel excavation support structure according to claim 1 or 2, it is characterized in that: in the arch Double layer bar (7) are provided on the outside of the arch springing position of steelframe (2), the shotcrete layer wraps up the double layer bar (7)。
CN201920058155.9U 2019-01-14 2019-01-14 A kind of upper-soft lower-hard ground tunnel excavation support structure Active CN209398434U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920058155.9U CN209398434U (en) 2019-01-14 2019-01-14 A kind of upper-soft lower-hard ground tunnel excavation support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920058155.9U CN209398434U (en) 2019-01-14 2019-01-14 A kind of upper-soft lower-hard ground tunnel excavation support structure

Publications (1)

Publication Number Publication Date
CN209398434U true CN209398434U (en) 2019-09-17

Family

ID=67898410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920058155.9U Active CN209398434U (en) 2019-01-14 2019-01-14 A kind of upper-soft lower-hard ground tunnel excavation support structure

Country Status (1)

Country Link
CN (1) CN209398434U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109578027A (en) * 2019-01-14 2019-04-05 中铁十局集团有限公司 Upper-soft lower-hard ground tunnel excavation support structure and tunnel excavation construction method
CN114673528A (en) * 2022-03-28 2022-06-28 中国电建集团成都勘测设计研究院有限公司 Tunnel top cavity supporting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109578027A (en) * 2019-01-14 2019-04-05 中铁十局集团有限公司 Upper-soft lower-hard ground tunnel excavation support structure and tunnel excavation construction method
CN114673528A (en) * 2022-03-28 2022-06-28 中国电建集团成都勘测设计研究院有限公司 Tunnel top cavity supporting method
CN114673528B (en) * 2022-03-28 2023-04-28 中国电建集团成都勘测设计研究院有限公司 Tunnel top cavity supporting method

Similar Documents

Publication Publication Date Title
CN109578027A (en) Upper-soft lower-hard ground tunnel excavation support structure and tunnel excavation construction method
CN108412542B (en) A kind of wide lane digging gangue paste body filling of high seam is at lane method
CN106703814B (en) Tunneling subway station hole pile construction method
CN106761778B (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN109209398B (en) Pass through that high angle is inverse to rush rich water richness sand tomography tunnel excavation method
CN102155232B (en) Construction method of large-span asymmetrical double-arch railway tunnel under terrain bias pressure condition
CN108798702B (en) Supporting method for large-section soft rock large-deformation tunnel
CN209398434U (en) A kind of upper-soft lower-hard ground tunnel excavation support structure
SE1750913A1 (en) Method for constructing extra-large variable cross section tunnel
CN209179761U (en) Pass through that high angle is inverse to rush rich water richness sand tomography supporting and protecting system of tunnel
CN102758642A (en) Long-span tunnel overlapping carrying arch structure for upper-soft and lower-hard stratum and construction method thereof
CN203729308U (en) Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall
CN107143358A (en) Opposite-pulling anchor cable structure for controlling tunnel bias deformation and construction method thereof
CN104405411A (en) Oversized variable cross section tunnel supporting structure
CN110258536A (en) Opposite-pulling anchor cable structure for reducing bias load and construction method
CN106996299A (en) Control the steel floral tube pile retaining structure and its construction method of tunnel biased deformation
CN109914422A (en) A kind of steel pipe and soil nailing combined type foundation pit supporting construction and construction method
CN107237638A (en) Both wired concealed tunneling structure and its construction method are worn under a kind of
CN109209443A (en) A kind of construction method of breaking surrounding rock tunnel structure
CN109931077A (en) Support system and its construction method for Segment rehabilitation
CN104632228B (en) Main track entering construction method for cross aisle and cross aisle
CN109538236A (en) A kind of tunnel structure and tunnel construction method
CN202991054U (en) Novel mine tunnel supporting structure
CN107034905A (en) Control the combination retaining structure and its construction method of biased deformation
CN206785400U (en) A kind of buffer-type high intensity mine support system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant