CN209397734U - One kind is integrated to use beam column connection part structure - Google Patents

One kind is integrated to use beam column connection part structure Download PDF

Info

Publication number
CN209397734U
CN209397734U CN201620378380.7U CN201620378380U CN209397734U CN 209397734 U CN209397734 U CN 209397734U CN 201620378380 U CN201620378380 U CN 201620378380U CN 209397734 U CN209397734 U CN 209397734U
Authority
CN
China
Prior art keywords
pipe
positioning
column
log cabin
collar tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620378380.7U
Other languages
Chinese (zh)
Inventor
罗昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing non housing assembly construction technology Co., Ltd
Original Assignee
Chongqing Hao Setang Architectural Design Advisory Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Hao Setang Architectural Design Advisory Co Ltd filed Critical Chongqing Hao Setang Architectural Design Advisory Co Ltd
Priority to CN201620378380.7U priority Critical patent/CN209397734U/en
Application granted granted Critical
Publication of CN209397734U publication Critical patent/CN209397734U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses the integrated beam column connection part structure of one kind in log cabin building field, including an installing pipe and two positioning pipes, the both ends of installing pipe and positioning pipe are equipped with the opening of rectangle, and two positioning pipes are fixedly connected in one end of installing pipe;Each positioning pipe is mutually perpendicular to installing pipe, and the angle between two positioning pipes is right angle.The connection of collar tie beam, column can be completed by the inserting cooperation of Guan Yuzhu for this programme, keep log cabin inside modules collar tie beam, the connection of column simpler, it is more time saving and energy saving, it solves existing log cabin use and binds connection collar tie beam, column, tie point bonding strength is weak, it cannot quickly connect, lead to the problem of installing and dismounting labor intensive is more, consuming time is long.

Description

One kind is integrated to use beam column connection part structure
Technical field
The utility model relates to log cabin building fields, and in particular to one kind is integrated to use beam column connection part structure.
Background technique
Log cabin is global leisure, household main product.Its design-build has evolved to a high level.Wood Room is beautiful using lines, and the soft pine of color is built, and feature is cool in summer and warm in winter, and moisturizing is heat-insulated.Light-duty wooden is because of its wood knot The characteristics of structure, internal structure flexible arrangement, on the plank base of structure outer, can be used different ornament materials enrich it is outer vertical Face;The indoor design of log cabin is comfortably applicable in natural health as principle;Rational function division, family of the carefulness in view of multiplicity Structure is suitble to different age people to live, can meet the individual needs of developer's a variety of design styles and consumer.
The construction of log cabin need to consider its whether easy disassembly, the structure of log cabin mostly uses greatly round log or wood both at home and abroad at present Then log cabin collar tie beam, column are bound to connect one by one to form wood by Fang Zuowei collar tie beam, column by steel nail, screw, rivet etc. Room frame, process of binding need artificial position one by one to carry out, this often takes considerable time and manpower.If can be by log cabin module Change, builds the efficiency of construction that log cabin will be then substantially improved in log cabin in the form of multiple module assembly.The log cabin bound to flitch or The positioning requirements of round log are high, once careless manipulation easily generates positioning skew, so that the log cabin structural instability after binding.This So that needing Expenses Cost culture professional, higher cost to the more demanding of operator.And the log cabin bound its column A connection is only carried out by nail between collar tie beam, bonding strength is weaker, and force structure is unstable, discontinuity, for a long time Nail fatiguability in use process gets rusty, and will substantially reduce to the connection effect of collar tie beam and column, and easily there is security risk, wood Security performance in room long-term use process cannot ensure.Furthermore the log cabin bound can only integrally be carried when needing mobile or It is transported to designated place after log cabin is thoroughly dismantled and binds flitch one by one again again, but in order to make log cabin structure when log cabin is bound The stronger hangnail or smearing fastening agent of being often arranged on nail is securely fixed in nail in flitch, this dismantling When generally require destroy flitch connecting portion could complete so that disassembly process needs to expend a large amount of manpowers and time, time It is with high costs, it is inconvenient.If log cabin modularization is connected to form single functional module with collar tie beam, column in advance, building Each functional module need to only be carried out to simple positioning assembly when making log cabin can build up the log cabin of perfect in shape and function, a small number of modules it Between the assembled Form and position error generated will be substantially less that several flitches bind the Form and position error of generation so that the structure of log cabin is more steady It is fixed.Only need to carry out the handling between module when using modularization assemble or disassembly log cabin, operational sequence is compared to binding Few, operation is simpler, and the time needed for disassembly process also will substantially shorten, and can be realized the fast mounting-dismounting of log cabin, after disassembly Module is also more convenient transport, keeps the dismounting of log cabin more convenient.
But now there is presently no preferable scheme be able to solve as why not realized using binding inside modules collar tie beam, The stable structure connected while also ensuring module between column, this small problem of Form and position error.
Utility model content
The utility model is intended to provide a kind of integrated beam column connection part structure, completes mould to realize that log cabin does not use to bind Connection between block built in beam, column.
In order to achieve the above objectives, the basic technology scheme of the utility model is as follows: one kind is integrated to use beam column connection part structure, Including an installing pipe and two positioning pipes, the both ends of the installing pipe and positioning pipe are equipped with opening, two positioning pipes It is fixedly connected in the same end of installing pipe;Each positioning pipe is mutually perpendicular to installing pipe, between two positioning pipes Angle be right angle;The end of column is inserted into the opening of connector installation tube end, and the end of log cabin collar tie beam is inserted into In the opening for positioning tube end.
The principle and advantage of this programme are: in practical application, the end of column being inserted into connector when building log cabin In the opening for installing tube end, the end of log cabin collar tie beam is inserted into the opening of positioning tube end.Using installing pipe, positioning pipe Realize that column and collar tie beam are plugged and fixed, using installing pipe, positioning pipe be socketed in column and collar tie beam respectively the part outside end as The part of the force of tie point increases the forced area of tie point, and more evenly, bonding strength is higher for stress, and force structure is more Stablize.And the requirement to operator is low, installation can be completed in ordinary person, do not need using steel nail, screw, rivet etc. come Bind collar tie beam, column, there is no binding caused by connection is weak, positioning deflection, the problems such as time-consuming, complicated for operation, for a long time It will not be because of collar tie beam, column Joint failure and safety there are security risk, in log cabin long-term use process in use process Reliable guarantee can be obtained, operation is simpler, and the time of consuming and manpower are less.Pass through the installing pipe and positioning pipe being fixedly connected The connection for realizing log cabin column and collar tie beam is guaranteed between column and collar tie beam by the installing pipe and positioning pipe that are mutually perpendicular to arrangement Angle between angle and adjacent two collar tie beams is right angle, reduces the morpheme that connection generates by the connector of sizing and misses Difference, so that the frame structure of log cabin is more stable, shape is more beautiful succinct.To sum up, this programme passes through collar tie beam, column and pipe Between inserting cooperation the connection of collar tie beam, column can be completed, keep log cabin inside modules collar tie beam, the bonding strength of column higher, even Connect it is simpler reliable, it is more time saving and energy saving, solve existing log cabin using connection collar tie beam, column is bound, tie point connection is strong It spends weak, cannot quickly connect, lead to the problem of installing and dismounting labor intensive is more, consuming time is long.
Preferred embodiment one, as a kind of improvement of basic scheme, the installing pipe and positioning pipe are seamless rectangular steel tube. Setting facilitates column and collar tie beam using flitch as log cabin in this way, and the scope of application is wider.
Preferred embodiment two, as a kind of improvement of basic scheme, the installing pipe and positioning pipe are seamless round steel pipe. Setting facilitates column and collar tie beam using round log as log cabin in this way, and the scope of application is wider.
Preferred embodiment three, preferably one or preferred embodiment two a kind of improvement, each positioning pipe passes through It is weldingly fixed on the lateral wall of installing pipe.Positioning pipe and installing pipe can be connected as one by welding, keep positioning pipe firm Solid be connected in installing pipe, make the connection of beam column more reliable and more stable in actual use.
Preferred embodiment four, preferably one or preferred embodiment two a kind of improvement, the positioning pipe and installing pipe are It is integrally formed.It is integrally formed so that the globality of connector is more preferable, the mechanical property of positioning pipe and installing pipe is more preferable, log cabin module The connection of column and collar tie beam is more reliable and more stable.
Detailed description of the invention
Fig. 1 is the main view of the utility model embodiment;
Fig. 2 is the rearview of the utility model embodiment.
Specific embodiment
The utility model is described in further detail below by specific embodiment:
Appended drawing reference in Figure of description includes: installing pipe 1, positioning pipe 2.
Embodiment is basic as shown in attached drawing 1, Fig. 2: one kind is integrated to use beam column connection part structure, including 1 He of installing pipe The both ends of two positioning pipes 2, installing pipe 1 and positioning pipe 2 are openning shape, and two positioning pipes 2 are welded on the same of installing pipe 1 On the lateral wall of end.Each positioning pipe 2 is mutually perpendicular to installing pipe 1, and the angle between two positioning pipes 2 is right angle.This Installing pipe 1 and positioning pipe 2 are seamless rectangular steel tube in embodiment, can also be seamless round steel pipe, band for this programme Square steel tube, round steel pipe with seam etc. are stitched, installing pipe and positioning pipe can also be using integrated moldings.
In the present embodiment, in practical application, the end of column is inserted into 1 end of connector installing pipe when building log cabin Opening in, the end of log cabin collar tie beam is inserted into the opening of 2 end of positioning pipe.It is realized using installing pipe 1, positioning pipe 2 Column and collar tie beam are plugged and fixed, using installing pipe 1, positioning pipe 2 be socketed in column and collar tie beam respectively the part outside end as connection The part of the force of point, increases the forced area of tie point, more evenly, bonding strength is higher for stress, and force structure is more stable. And the requirement to operator is low, and installation can be completed in ordinary person, does not need to bind using steel nail, screw, rivet etc. Collar tie beam, column, there is no binding caused by connection is weak, positioning deflection, the problems such as time-consuming, complicated for operation, be used for a long time In the process will not because of collar tie beam, column Joint failure and there are security risk, the security performance in log cabin long-term use process obtains To reliable guarantee, operation is simpler, and the time of consuming and manpower are less.It is real by the installing pipe 1 and positioning pipe 2 that are fixedly connected The connection of existing log cabin column and collar tie beam is guaranteed between column and collar tie beam by the installing pipe 1 and positioning pipe 2 that are mutually perpendicular to arrangement Angle between angle and adjacent two collar tie beams is right angle, reduces the morpheme that connection generates by the connector of sizing and misses Difference, so that the frame structure of log cabin is more stable, shape is more beautiful succinct.To sum up, the present embodiment passes through collar tie beam, column and pipe Between inserting cooperation the connection of collar tie beam, column can be completed, keep log cabin inside modules collar tie beam, the bonding strength of column higher, Connect it is simpler reliable, it is more time saving and energy saving, it is strong using connection collar tie beam, the connection of column tie point is bound to solve existing log cabin It spends weak, cannot quickly connect, lead to the problem of installing and dismounting labor intensive is more, consuming time is long.
Above-described is only the embodiments of the present invention, the common sense such as well known specific structure and/or characteristic in scheme It does not describe excessively herein.It should be pointed out that for those skilled in the art, before not departing from the utility model structure It puts, several modifications and improvements can also be made, these also should be considered as the protection scope of the utility model, these all will not shadow Ring effect and patent practicability that the utility model is implemented.This application claims protection scope should be in its claim Subject to appearance, the records such as specific embodiment in specification can be used for explaining the content of claim.

Claims (1)

1. one kind is integrated to use beam column connection part structure, which is characterized in that including an installing pipe and two positioning pipes, the installation The both ends of pipe and positioning pipe are equipped with opening, and two positioning pipes are fixedly connected in the same end of installing pipe;Each institute It states positioning pipe to be mutually perpendicular to installing pipe, the angle between two positioning pipes is right angle;The end of column is inserted into connector In the opening for installing tube end, the end of log cabin collar tie beam is inserted into the opening of positioning tube end, the installing pipe and positioning Pipe is seamless round steel pipe, and the positioning pipe and installing pipe are integrally formed.
CN201620378380.7U 2016-04-29 2016-04-29 One kind is integrated to use beam column connection part structure Active CN209397734U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620378380.7U CN209397734U (en) 2016-04-29 2016-04-29 One kind is integrated to use beam column connection part structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620378380.7U CN209397734U (en) 2016-04-29 2016-04-29 One kind is integrated to use beam column connection part structure

Publications (1)

Publication Number Publication Date
CN209397734U true CN209397734U (en) 2019-09-17

Family

ID=67876142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620378380.7U Active CN209397734U (en) 2016-04-29 2016-04-29 One kind is integrated to use beam column connection part structure

Country Status (1)

Country Link
CN (1) CN209397734U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115506480A (en) * 2022-10-08 2022-12-23 安徽富煌钢构股份有限公司 Bottom layer frame of light steel assembled house

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115506480A (en) * 2022-10-08 2022-12-23 安徽富煌钢构股份有限公司 Bottom layer frame of light steel assembled house

Similar Documents

Publication Publication Date Title
CN202636348U (en) Combined photo frame
CN205013461U (en) Tenon fourth of twelve earthly branches and bolt built -up connection's easy dismouting structural element connected node
CN203452187U (en) Gable top structural assembly of wooden house
CN209397734U (en) One kind is integrated to use beam column connection part structure
CN203514530U (en) Plane beam structure assembly of wooden house
CN103243904A (en) Foldable building formwork
CN104499579A (en) Inserting plate type cross grain enhanced wood structure mortise and tenon joint
CN206754086U (en) A kind of bamboo and wood concrete frame joint construction
CN206360115U (en) The structural connection of bottom girder post
CN206438626U (en) A kind of connector of roof truss beam
CN206337559U (en) A kind of prefabricated pile mechanical connecting structure
CN207846652U (en) A kind of integrated house system
CN206693450U (en) A kind of attachment structure of prefabricated hollow wall board and column
CN206157900U (en) Connecting piece for tower
CN104499578B (en) Space free-form surface wood latticed shell assembly type node for through bolt
CN204370574U (en) Inserting plate type cross grain enhanced wood structure mortise and tenon joint
CN203701294U (en) Novel lattice framework connecting piece of raw bamboo building
CN204635489U (en) A kind of novel section bar assembly formula cabinet
CN209066642U (en) A kind of timber building spliced wall connection structure
CN210151994U (en) House building wallboard mounting structure
CN207110239U (en) A kind of strong supporting & stablizing type corner post
CN203066406U (en) Seamless connection piece
CN201198704Y (en) Wood frame of aluminum wood composite door and window
CN205955567U (en) Wood door
CN206529903U (en) A kind of right angle frame structural connection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191030

Address after: Room 901, No. 46, Cuiyu Road, Beibu New District, Chongqing 401120

Patentee after: Chongqing non housing assembly construction technology Co., Ltd

Address before: 401121 Yubei District Chongqing Longxi Street Flower Garden Road, No. 1, building 1, unit 5 1-21-1

Patentee before: Chongqing Hao Setang architectural design Advisory Co., Ltd