CN206157900U - Connecting piece for tower - Google Patents

Connecting piece for tower Download PDF

Info

Publication number
CN206157900U
CN206157900U CN201620378372.2U CN201620378372U CN206157900U CN 206157900 U CN206157900 U CN 206157900U CN 201620378372 U CN201620378372 U CN 201620378372U CN 206157900 U CN206157900 U CN 206157900U
Authority
CN
China
Prior art keywords
pipe
high building
brace
positioning
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620378372.2U
Other languages
Chinese (zh)
Inventor
罗昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Non-Home Owned Land Human Settlement (Chongqing) Technology Co., Ltd.
Original Assignee
Chongqing Hao Setang Architectural Design Advisory Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Hao Setang Architectural Design Advisory Co Ltd filed Critical Chongqing Hao Setang Architectural Design Advisory Co Ltd
Priority to CN201620378372.2U priority Critical patent/CN206157900U/en
Application granted granted Critical
Publication of CN206157900U publication Critical patent/CN206157900U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a connecting piece for tower in the log cabin building field, including an installation pipe and two registration arms, the both ends of installation pipe and registration arm all are equipped with the opening, two the equal fixed connection of registration arm is at the same tip of installation pipe. The vertical setting of installation pipe, every the registration arm all inclines to set up, every contained angle between registration arm and the installation pipe is 150, two contained angles between the registration arm and is 60. The connection of cross -brace, stand can be accomplished in the cartridge cooperation that guan yuzhu is passed through to this scheme, makes the connection of the inside cross -brace of log cabin tower, stand simpler, and labour saving and time saving has more solved present log cabin tower and has adopted and bind the connection timber structure, a little less than the tie point joint strength, can not the high -speed joint, and result in the installation to be dismantled and expend that the manpower is many, long problem expends time in.

Description

A kind of high building connector
Technical field
The utility model is related to log cabin building field, and in particular to a kind of high building connector.
Background technology
Log cabin is global leisure, household main product.Its design-build has evolved to a high level.Wood Room is attractive in appearance using lines, and color and luster is built by soft pine, and its feature is cool in summer and warm in winter, and moisturizing is heat-insulated.The Rational function division of log cabin, Various family structure is considered in carefulness, is adapted to different age people and is lived, and can meet the various design styles of developer and consumption The individual needs of person.In order to make full use of the roof space, people to select to build high building on roof when log cabin is built, to expand The use space of log cabin, there is provided more using space, possesses preferably using enjoyment.The high building of log cabin generally includes many and erects To the column for arranging, the top of column arranges multiple inclined cross-braces, gathers together to form high building at the top of cross-brace Pointed pinnacle of a pagoda structure.
The construction of log cabin high building needs to consider its whether easy disassembly that at present both at home and abroad the structure of log cabin high building is adopted mostly Then flitch or round log are bound to couple together one by one to be formed by round log or flitch as raw material by steel nail, screw, rivet etc. High building framework, process of binding needs artificial position one by one to carry out, and this often takes considerable time and manpower.If can be by high building module Change, building high building in the form of the assembly of multiple modules will then be substantially improved the efficiency of construction of high building.Because high building is usually point Top shape, the high building bound is high to the positioning requirements of flitch or round log, once easily to produce positioning crooked for careless manipulation so that nail High building Form and position error after dress is big, structural instability, and profile is unsightly.This causes the requirement to operator higher, needs to expend Cost culture professional, it is relatively costly.And only a connection, connection are carried out by nail between the high building bound its timber structure Intensity is weaker, and force structure is unstable, discontinuity, for a long time during outdoor exposure use nail fatiguability, get rusty, The connection effect of timber structure will be substantially reduced, potential safety hazard will be also easy to produce, the security performance during high building Long-Time Service will be obtained not To guarantee.
Furthermore high building is used as the part outside log cabin main body, different people is different to the use demand of high building, when need not When conveniently to dismantle, think the used time can conveniently install be people demand.The high building bound can only integrally carry when needing to move or Person is transported to appointed place after high building is thoroughly dismantled, and also integrally to carry when needing or be bound one by one.But high building is followed closely In order that timber structure is more firm during dress, hangnail is often set on nail or smearing fastening agent makes nail be securely fixed in wood In side, this causes the connecting portion for generally requiring to destroy flitch in dismounting just can complete so that unloading process needs to expend big Amount manpower and time, time cost is high, inconvenient.
Now there is presently no preferable scheme can solve the problem that as why not realized using binding between the timber structure of high building inside Connection also ensure that the Stability Analysis of Structures of high building, little this difficult problem of Form and position error simultaneously.
Utility model content
The utility model is intended to provide a kind of high building connector, and to realize that log cabin high building does not adopt to bind inner timber is completed Connection between structure.
To reach above-mentioned purpose, basic technology scheme of the present utility model is as follows:A kind of high building connector, including one The two ends of installing pipe and two positioning pipes, the installing pipe and positioning pipe are equipped with opening, and two positioning pipe fixations connect It is connected on the same one end of installing pipe.The installing pipe is vertically arranged, and each described positioning pipe is obliquely installed, each described positioning Angle between pipe and installing pipe is 150 °, and the angle between two positioning pipes is 60, and the inside of installing pipe and positioning pipe is equal It is provided with limiting plate.
The principle and advantage of this programme be:In practical application, connector will be inserted at the top of column when high building is built In the opening of installing pipe free end, the bottom of cross-brace is inserted in the opening of positioning pipe free end.Using installing pipe, positioning Pipe is fixed come the grafting for realizing column and cross-brace, and installing pipe, positioning pipe sleeve are connected on into column and cross-brace each outside end An overall part of the force as connection in part, compared to carrying out connecting the lifting surface area that increases junction with nail.Install Angle between pipe and positioning pipe is set to 150 °, and the angle between two positioning pipes is 60 °, between such column and cross-brace Angle also be 150 °, the angle between two cross-braces of arbitrary neighborhood is 60 °, and between two neighboring cross-brace isosceles are formed Triangular structure, if there is object to fall at the top of high building during high building use, the stress of each cross-brace is reduced to original power Half, the power that each column is subject to is also reduced by the half of original stress, the stress of high building timber structure evenly, cross-brace with Bonding strength between column is higher, and force structure is more stable, and outward appearance is more attractive in appearance.And the requirement to operating personnel is low, Ordinary person can complete to install, it is not necessary to cross-brace, column are bound using steel nail, screw, rivet etc., is not in bind The connection that causes is weak, positioning deflection, time-consuming, complex operation the problems such as, will not be because of cross-brace, vertical during Long-Time Service Post Joint failure and produce potential safety hazard, the security performance during high building Long-Time Service obtains reliable guarantee, operates simpler Singly, the time of consuming and manpower are less.High building timber structure column and diagonal brace are realized by the installing pipe and positioning pipe that are fixedly connected The connection of post, evenly, structure is more stable for the stress for making timber structure by the angle of specific setting between installing pipe and positioning pipe, The Form and position error that connection is produced is reduced by the connector shaped so that the frame structure of high building is more stable, and profile is more beautiful See succinct.To sum up, this programme coordinates the connection that can complete cross-brace, column by the inserting between cross-brace, column and pipe, Make the bonding strength of log cabin high building inside cross-brace, column higher, limiting plate is set the end of cross-brace and column is limited Position, support and protection, allow cross-brace and column using more reliable and more stable, connect simpler reliability, more time saving and energy saving, solution Existing log cabin high building of having determined is weak using connection cross-brace, column, tie point bonding strength is bound, it is impossible to quick connection, causes peace Assembly and disassembly unload labor intensive it is many, consuming time length problem.
Preferred version one, based on scheme a kind of improvement, the installing pipe and positioning pipe are seamless rectangular steel tube. The convenient column and cross-brace for adopting flitch as high building is so set, and the scope of application is wider.
Preferred version two, based on scheme a kind of improvement, the installing pipe and positioning pipe are seamless round steel pipe. The convenient column and cross-brace for adopting round log as high building is so set, and the scope of application is wider.
Preferred version three, preferably one or preferred version two a kind of improvement, each described positioning pipe passes through Welding is fixed with installing pipe.Welding can connect as one positioning pipe and installing pipe, positioning pipe is securely attached to In installing pipe, make the connection of beam column more reliable and more stable when actually used.
Preferred version four, preferably one or preferred version two a kind of improvement, the positioning pipe and installing pipe are It is integrally formed.It is integrally formed and causes the globality of connector more preferable, positioning pipe is more preferable with the mechanical property of installing pipe, log cabin high building Connection between column and cross-brace is more reliable and more stable.
Description of the drawings
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is the side view of the utility model embodiment.
Specific embodiment
The utility model is described in further detail below by specific embodiment:
Reference in Figure of description includes:Installing pipe 1, positioning pipe 2.
Embodiment is basic as shown in accompanying drawing 1, Fig. 2:A kind of high building connector, including an installing pipe 1 and two positioning The two ends of pipe 2, installing pipe 1 and positioning pipe 2 are equipped with opening, and two positioning pipes 2 are welded on the same one end of installing pipe 1. The installing pipe 1 is vertically arranged, and each described positioning pipe 2 is obliquely installed, between each described positioning pipe 2 and installing pipe 1 Angle is 150 °, and the angle between two positioning pipes 2 is 60 °.Installing pipe 1 and positioning pipe 2 are seamless side in the present embodiment Shape steel pipe, can also be seamless round steel pipe, square steel tube with seam, round steel pipe with seam etc., seamless rectangular steel tube for this programme The convenient column and cross-brace for adopting flitch as high building, the turret structure corner angle of composition become apparent from, more attractive.Installing pipe 1 with Connection between positioning pipe 2 can also be using the mode such as being integrally formed, and the form of welding is convenient to be spliced by multiple common pipe materials Shaping, without being used alone equipment production is integrally formed, and cost is relatively low.
In the present embodiment, in practical application, connector installing pipe 1 will be inserted at the top of column when high building is built freely In the opening at end, the bottom of cross-brace is inserted in the opening of the free end of positioning pipe 2.Using installing pipe 1, positioning pipe 2 come real The grafting of existing column and cross-brace is fixed, and installing pipe 1, positioning pipe 2 are socketed in into the part of column and cross-brace each outside end As the part of the force of connection, the lifting surface area of junction is increased;Angle between installing pipe 1 and positioning pipe 2 is set to 150 °, the angle between two positioning pipes 2 is 60 °, and the angle between such column and cross-brace is also 150 °, arbitrary neighborhood two Angle between individual cross-brace is 60 °, isosceles triangular structure is formed between two neighboring cross-brace, during high building use If there is object to fall at the top of high building, the stress of each cross-brace is reduced to the half of original power, the power that each column is subject to The half of original stress is reduced to, evenly, the bonding strength between cross-brace and column is higher, receives for the stress of high building timber structure Power structure is more stable, and outward appearance is more attractive in appearance.And the requirement to operating personnel is low, ordinary person can complete to install, and be not required to Cross-brace, column are bound using steel nail, screw, rivet etc., be not in bind the weak connection that causes, positioning deflection, Time-consuming, complex operation the problems such as, during Long-Time Service will not because of cross-brace, column Joint failure and produce safety it is hidden Suffer from, the security performance during high building Long-Time Service obtains reliable guarantee, operation is simpler, the time of consuming and manpower are more It is few.The connection of high building timber structure column and cross-brace is realized by the installing pipe 1 that is fixedly connected and positioning pipe 2, by installing pipe 1 The angle of specific setting makes the stress of timber structure evenly and positioning pipe 2 between, and structure is more stable, is subtracted by the connector shaped The Form and position error that little connection is produced so that the frame structure of high building is more stable, profile is more attractive in appearance succinct.To sum up, this programme The connection that cross-brace, column can be completed is coordinated by the inserting between cross-brace, column and pipe, log cabin high building inside diagonal brace is made Post, column bonding strength it is higher, connect simpler reliability, it is more time saving and energy saving, solve existing log cabin high building using nail Load connects cross-brace, column, and tie point bonding strength is weak, it is impossible to quick connection, when causing many installing/dismounting labor intensives, consuming Between long problem.
Above-described is only embodiment of the present utility model, the general knowledge such as known concrete structure and/or characteristic in scheme Here does not make excessive description.It should be pointed out that for a person skilled in the art, before without departing from the utility model structure Put, some deformations and improvement can also be made, these should also be considered as protection domain of the present utility model, and these are all without shadow Ring effect and practical applicability that the utility model is implemented.This application claims protection domain should be with its claim Appearance is defined, and specific embodiment in specification etc. records the content that can be used for explaining claim.

Claims (5)

1. a kind of high building connector, it is characterised in that including an installing pipe and two positioning pipes, the installing pipe and positioning The two ends of pipe are equipped with opening, and two positioning pipes are fixedly connected with the same one end in installing pipe;The installing pipe is vertical Arrange, each described positioning pipe is obliquely installed, the angle between each described positioning pipe and installing pipe is 150 °, two fixed Angle between the pipe of position is 60 °, and the inside of the installing pipe and positioning pipe is equipped with limiting plate.
2. high building connector according to claim 1, it is characterised in that:The installing pipe and positioning pipe are seamless side Shape steel pipe.
3. high building connector according to claim 1, it is characterised in that:The installing pipe and positioning pipe are seamless circular Shape steel pipe.
4. the high building connector according to Claims 2 or 3, it is characterised in that:Each described positioning pipe is by welding Fix with installing pipe.
5. the high building connector according to Claims 2 or 3, it is characterised in that:The positioning pipe and installing pipe are integrated Shaping.
CN201620378372.2U 2016-04-29 2016-04-29 Connecting piece for tower Expired - Fee Related CN206157900U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620378372.2U CN206157900U (en) 2016-04-29 2016-04-29 Connecting piece for tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620378372.2U CN206157900U (en) 2016-04-29 2016-04-29 Connecting piece for tower

Publications (1)

Publication Number Publication Date
CN206157900U true CN206157900U (en) 2017-05-10

Family

ID=58646169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620378372.2U Expired - Fee Related CN206157900U (en) 2016-04-29 2016-04-29 Connecting piece for tower

Country Status (1)

Country Link
CN (1) CN206157900U (en)

Similar Documents

Publication Publication Date Title
CN202831626U (en) Double-wall corrugated pipe for collocation structure of cylindrical template
CN206157900U (en) Connecting piece for tower
CN201865401U (en) Large-size retractable awning
CN206438626U (en) A kind of connector of roof truss beam
CN206503432U (en) A kind of exoskeletal Peng Ding tarpaulin tensioning apparatus
CN203716290U (en) Sunshine room
CN202738542U (en) Greenhouse support body
CN206360115U (en) The structural connection of bottom girder post
CN205369637U (en) Tent
CN112196117B (en) Assembled building unit body and tectosome
CN205242628U (en) Plug -in type activity board house
CN209397734U (en) One kind is integrated to use beam column connection part structure
CN207879032U (en) A kind of yurt inclusion texture
CN204920117U (en) Take floor fossil fragments of main muscle
CN204409105U (en) The booth of a kind of steel skeleton and warming plate composition
CN206693450U (en) A kind of attachment structure of prefabricated hollow wall board and column
CN204899112U (en) Composite construction's T shape switching fossil fragments
CN215253417U (en) Skeleton connection structure of removal vacation room
CN206888570U (en) A kind of yurt
CN204876081U (en) Compound fossil fragments convenient to right angle is connected
CN204782233U (en) Vertex of a cone shape covering or awning on a car, boat, etc. room
CN212656386U (en) Sunshine room frame of girder dock
CN204609454U (en) A kind of pipe fitting joint structure of awning
CN220979018U (en) Room type tent convenient to build and good in stability
CN206341657U (en) A kind of greenhouse being arranged on container and and its connection component

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190827

Address after: 401220 No. 1 Wenyuan Avenue, Changshou District, Chongqing, 32 buildings 1-1 and 2-1

Patentee after: Non-Home Owned Land Human Settlement (Chongqing) Technology Co., Ltd.

Address before: 401121 Yubei District Chongqing Longxi Street Flower Garden Road, No. 1, building 1, unit 5 1-21-1

Patentee before: Chongqing Hao Setang architectural design Advisory Co., Ltd

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170510

Termination date: 20200429

CF01 Termination of patent right due to non-payment of annual fee