CN209397622U - A kind of Guan Ji for Pipe installing - Google Patents
A kind of Guan Ji for Pipe installing Download PDFInfo
- Publication number
- CN209397622U CN209397622U CN201822170344.3U CN201822170344U CN209397622U CN 209397622 U CN209397622 U CN 209397622U CN 201822170344 U CN201822170344 U CN 201822170344U CN 209397622 U CN209397622 U CN 209397622U
- Authority
- CN
- China
- Prior art keywords
- arc groove
- guan
- tube coupling
- pipe base
- prefabricated pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000008878 coupling Effects 0.000 claims abstract description 34
- 238000010168 coupling process Methods 0.000 claims abstract description 34
- 238000005859 coupling reaction Methods 0.000 claims abstract description 34
- 239000011440 grout Substances 0.000 claims description 20
- 230000003014 reinforcing effect Effects 0.000 claims description 8
- 210000002421 cell wall Anatomy 0.000 claims description 3
- 239000008267 milk Substances 0.000 claims description 3
- 210000004080 milk Anatomy 0.000 claims description 3
- 235000013336 milk Nutrition 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 3
- 239000004744 fabric Substances 0.000 claims description 2
- 238000000034 method Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a kind of Guan Ji for Pipe installing, comprising: prefabricated pipe base forms match with the outer circle wall of tube coupling and along the arc groove of the tube coupling being axially distributed thereon;It is at least a pair of for adjusting the elevation fine adjustment block of gap size between the tube coupling outer circle wall and the arc groove, it is symmetrically plugged on the prefabricated pipe base, and the adjustment hole for running through and being connected to the arc groove for the elevation fine adjustment block is formed on the prefabricated pipe base;And the restraint zone that the prefabricated pipe base and the tube coupling are tightened together;Wherein, formed in the elevation fine adjustment block one with the outer circle wall of the tube coupling against the straight plane of inclination.The Guan Ji for being used for Pipe installing has the advantages that structure is simple, lifting is convenient.
Description
Technical field
The utility model relates to pipe of concrete base technical fields, the more particularly, to Guan Ji of Pipe installing.
Background technique
The installation of road pipeline at present uses two methods: first is that using cast-in-place Guan Ji, the method for rear pipe laying;
Second is that prefabricated Guan Ji is hung in foundation trench, then again hang in pipeline in foundation trench and is installed to the method on Guan Ji.Method one
Although the method for cast-in-place Guan Ji can achieve the purpose that supporting pipeline in, still have following problem: cast-in-place pipe base needs
Formwork supporting plate at the construction field (site), armored concrete also needs to arrange reinforcing bar, thus increases the workload of construction site, the duration compared with
It is long.In method two after first installing pipe base pipe laying method, increase the number of lifting, work efficiency is relatively low, and in pipeline
The Guan Ji that damages is easy during lifting, in addition, whole installation process is implemented in foundation trench, increase worker working strength and
Security risk coefficient, therefore, it is necessary to study a kind of Guan Ji for Pipe installing.
Utility model content
Shortcoming present in view of the above technology, the utility model provide it is a kind of be easy to lift for pipeline pacify
The Guan Ji of dress.
The technical scheme adopted by the utility model to solve the technical problem is as follows: a kind of Guan Ji for Pipe installing, packet
Include: prefabricated pipe base forms match with the outer circle wall of tube coupling and along the arc groove of the tube coupling being axially distributed thereon;Extremely
It is few a pair of for adjusting the elevation fine adjustment block of gap size between the tube coupling outer circle wall and the arc groove, symmetrically plug
On the prefabricated pipe base, is formed on the prefabricated pipe base and run through for the elevation fine adjustment block and be connected to the arc groove
Adjustment hole;And the restraint zone that the prefabricated pipe base and the tube coupling are tightened together;Wherein, in the elevation fine adjustment block
Form one with the outer circle wall of the tube coupling against the straight plane of inclination.
Preferably, dead ring is fixedly installed on the prefabricated pipe base, the dead ring is located at the opposite of the arc groove
Two sides, the restraint zone are arranged on the prefabricated pipe base by the dead ring.
Preferably, the quantity of the elevation fine adjustment block is set as 4, and the elevation fine adjustment block is symmetricly set on the arc two-by-two
The two sides of shape slot.
Preferably, the elevation fine adjustment block is square long cylinder, and the adjustment hole is square hole.
Preferably, it is formed on the arc cell wall of the arc groove convenient for being in the milk between the tube coupling and the arc groove
Grout groove, the grout groove along the tube coupling circumferencial direction be distributed.
Preferably, be fixedly installed on the one end of the prefabricated pipe base several reinforcing rods, on opposite the other end at
Type has a pair of of grout hole, wherein the reinforcing rod is symmetrically distributed in the two sides of the arc groove, and the grout hole is symmetrically distributed in
The two sides of the arc groove also offer the preformed hole being connected to the grout hole on the prefabricated pipe base vertically, described reserved
Hole is also symmetrically distributed in the two sides of the arc groove.
Preferably, one is also formed on the end of the grout hole for accommodating the annular groove of sealing joint strip.
Preferably, the groove depth of the annular groove is 5mm.
The utility model compared with prior art, the beneficial effect is that: it is provided by the utility model for Pipe installing
Guan Ji can be by prefabricated pipe base and tube coupling together by once lifting by fastening band connection between prefabricated pipe base and tube coupling
Hang in foundation trench, have the advantages that structure is simple, lifting is convenient, and can be avoided in hoisting process tube coupling and prefabricated pipe base it
Between collision, effectively protect tube coupling and prefabricated pipe base;Elevation fine adjustment block on prefabricated pipe base can adjust tube coupling excircle
Gap size between wall and arc groove, effectively raises construction precision;Hollow tube sheet can effectively mitigate prefabricated pipe base
Self weight, effectively saved resource.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the main view direction of the Guan Ji described in the utility model for Pipe installing;
Fig. 2 is the structural schematic diagram of the side-looking direction of the Guan Ji described in the utility model for Pipe installing;
Fig. 3 is the structural schematic diagram of the overlook direction of the Guan Ji described in the utility model for Pipe installing;
Fig. 4 is the positional diagram between the prefabricated pipe base of the utility model and tube coupling;
Fig. 5 is the structural schematic diagram of the elevation fine adjustment block of the utility model.
In figure: 10, prefabricated pipe base;11, arc groove;111, grout groove;12, adjustment hole;13, grout hole;131, annular is recessed
Slot;14, reinforcing rod;15, preformed hole;20, restraint zone;30, dead ring;40, elevation fine adjustment block;41, straight plane is tilted;50, it manages
Section;60, hollow tube sheet;70, hanging ring.
Specific embodiment
The following describes the utility model in further detail with reference to the accompanying drawings, to enable those skilled in the art referring to explanation
Book text can be implemented accordingly.
As shown in Figures 1 to 5, the utility model provides a kind of Guan Ji for Pipe installing, comprising: prefabricated pipe base
10, it forms matched with the outer circle wall of tube coupling 50 and along the arc groove 11 of the tube coupling 50 being axially distributed thereon;At least
A pair is symmetrical for adjusting the elevation fine adjustment block 40 of gap size between 50 outer circle wall of tube coupling and the arc groove 11
Be plugged on the prefabricated pipe base 10, formed on the prefabricated pipe base 10 for the elevation fine adjustment block 40 run through and with the arc
The adjustment hole 12 that shape slot 11 is connected to;And the restraint zone 20 that the prefabricated pipe base 10 and the tube coupling 50 are tightened together;
Wherein, formed in the elevation fine adjustment block 40 one with the outer circle wall of the tube coupling 50 against the straight plane 41 of inclination.
As an embodiment of this programme, as shown in Figure 1, being fixedly installed dead ring 30, institute on the prefabricated pipe base 10
The opposite two sides that dead ring 30 is located at the arc groove 11 are stated, the restraint zone 20 is arranged by the dead ring 30 described pre-
On tubulation base 10, specifically, one end of the restraint zone 20 ties up on dead ring 30 described in side, the other end bypasses the tube coupling
It is tied up to after 50 on dead ring 30 described in the other side, it, can will be described after the prefabricated pipe base 10 and the tube coupling 50 are embedded to foundation trench
Restraint zone 20 is taken off from the dead ring 30 to realize recycling.
As an embodiment of this programme, as depicted in figs. 1 and 2, the quantity of the elevation fine adjustment block 40 is set as 4, institute
State the two sides that elevation fine adjustment block 40 is symmetricly set on the arc groove 11 two-by-two.
As an embodiment of this programme, as depicted in figs. 1 and 2, the elevation fine adjustment block 40 is square long cylinder, described
Adjustment hole 12 is square hole.
As an embodiment of this programme, as shown in figure 3, being formed on the arc cell wall of the arc groove 11 convenient in institute
State the grout groove 111 being in the milk between tube coupling 50 and the arc groove 11, the grout groove 111 along the tube coupling 50 circumference side
To distribution.
As an embodiment of this programme, as shown in Figures 2 and 3, it is fixedly installed on the one end of the prefabricated pipe base 10
There are several reinforcing rods 14, form a pair of of grout hole 13 on opposite the other end, wherein the reinforcing rod 14 is symmetrically distributed in
The two sides of the arc groove 11, the grout hole 13 are symmetrically distributed in the two sides of the arc groove 11, on the prefabricated pipe base 10
The preformed hole 15 being connected to the grout hole 13 is also offered vertically, and the preformed hole 15 is also symmetrically distributed in the arc groove 11
Two sides.
As an embodiment of this programme, as shown in Fig. 2, also forming one on the end of the grout hole 13 for accommodating
The annular groove 131 of sealing joint strip.
As an embodiment of this programme, the groove depth of the annular groove 131 is 5mm.
As an embodiment of this programme, as shown in Fig. 2, being also preset on the prefabricated pipe base 10 several along its axial direction point
The hollow tube sheet 60 of cloth.
As an embodiment of this programme, hanging ring 70 is further fixedly arranged on the prefabricated pipe base 10.
Although the embodiments of the present invention have been disclosed as above, it is not limited in institute in specification and embodiments
Column use, it can be applied to various fields suitable for the present invention completely, for those skilled in the art, can
Easily realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, this is practical
It is novel to be not limited to specific details and legend shown and described herein.
Claims (8)
1. a kind of Guan Ji for Pipe installing characterized by comprising
Prefabricated pipe base (10) forms match with the outer circle wall of tube coupling (50) and along the axial direction of the tube coupling (50) point thereon
The arc groove (11) of cloth;
At least a pair of elevation for adjusting gap size between the tube coupling (50) outer circle wall and the arc groove (11) is micro-
Adjustable block (40) is symmetrically plugged on the prefabricated pipe base (10), is formed on the prefabricated pipe base (10) micro- for the elevation
The adjustment hole (12) that adjustable block (40) runs through and is connected to the arc groove (11);And
So that the restraint zone (20) that the prefabricated pipe base (10) and the tube coupling (50) tighten together;
Wherein, formed on the elevation fine adjustment block (40) one with the outer circle wall of the tube coupling (50) against the straight plane of inclination
(41).
2. being used for the Guan Ji of Pipe installing as described in claim 1, which is characterized in that fixation is set on the prefabricated pipe base (10)
It is equipped with dead ring (30), the dead ring (30) is located at the opposite two sides of the arc groove (11), and the restraint zone (20) passes through
The dead ring (30) is arranged on the prefabricated pipe base (10).
3. being used for the Guan Ji of Pipe installing as described in claim 1, which is characterized in that the quantity of the elevation fine adjustment block (40)
4 are set as, the elevation fine adjustment block (40) is symmetricly set on the two sides of the arc groove (11) two-by-two.
4. being used for the Guan Ji of Pipe installing as described in claim 1, which is characterized in that the elevation fine adjustment block (40) is square
Long cylinder, the adjustment hole (12) are square hole.
5. being used for the Guan Ji of Pipe installing as described in claim 1, which is characterized in that the arc cell wall of the arc groove (11)
On form convenient for the grout groove (111) that is in the milk between the tube coupling (50) and the arc groove (11), the grout groove
(111) it is distributed along the circumferencial direction of the tube coupling (50).
6. being used for the Guan Ji of Pipe installing as described in claim 1, which is characterized in that the one end of the prefabricated pipe base (10)
On be fixedly installed several reinforcing rods (14), form a pair of of grout hole (13) on opposite the other end, wherein the reinforcing bar
Item (14) is symmetrically distributed in the two sides of the arc groove (11), and the grout hole (13) is symmetrically distributed in the arc groove (11)
Two sides also offer the preformed hole (15) being connected to the grout hole (13) on the prefabricated pipe base (10) vertically, described reserved
Hole (15) is also symmetrically distributed in the two sides of the arc groove (11).
7. being used for the Guan Ji of Pipe installing as claimed in claim 6, which is characterized in that on the end of the grout hole (13) also
One is formed for accommodating the annular groove (131) of sealing joint strip.
8. being used for the Guan Ji of Pipe installing as claimed in claim 7, which is characterized in that the groove depth of the annular groove (131)
For 5mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822170344.3U CN209397622U (en) | 2018-12-24 | 2018-12-24 | A kind of Guan Ji for Pipe installing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822170344.3U CN209397622U (en) | 2018-12-24 | 2018-12-24 | A kind of Guan Ji for Pipe installing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209397622U true CN209397622U (en) | 2019-09-17 |
Family
ID=67895764
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822170344.3U Expired - Fee Related CN209397622U (en) | 2018-12-24 | 2018-12-24 | A kind of Guan Ji for Pipe installing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209397622U (en) |
-
2018
- 2018-12-24 CN CN201822170344.3U patent/CN209397622U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209397622U (en) | A kind of Guan Ji for Pipe installing | |
CN206874969U (en) | Concrete pump pipe fixing device | |
CN106149744A (en) | Pile foundation steel bar cage skeletal support device and construction method | |
CN206971689U (en) | Support operating platform that is detachable and recycling | |
CN201627200U (en) | Blockage-slurry strengthening earth anchor | |
CN209397623U (en) | A kind of Guan Ji of water supply drainage pipeline | |
CN204038921U (en) | Super High tower crane wall-attaching equipment | |
CN207435906U (en) | For the bracket of bridge construction | |
CN206360720U (en) | A kind of novel flexible filling isolation barricade | |
CN202467152U (en) | Clamp type embedded part structure of shape steel overhanging scaffold | |
CN206071075U (en) | A kind of Steel Structure Installation line-up clamp | |
CN205975610U (en) | Insert precast pile anchor clamps | |
CN107152026B (en) | A kind of the mud jacking pipe support and its distribution method of steel-pipe pile | |
CN103498685A (en) | Retaining and protecting device for pressure relief windows of base plate and two edges of extremely soft rock roadway | |
CN209780303U (en) | Face limit guard bar and face limit protective screen | |
CN207314348U (en) | A kind of fixed structure of flare template | |
CN201217249Y (en) | Prestressed concrete side-assist press enhancement type precast pile steel form | |
CN211973565U (en) | City utility tunnel dowel steel fixing device | |
CN102720288A (en) | Method for connecting solderless curtain wall dry pendant | |
CN205476507U (en) | Inside pump line fixing device of jacking platform | |
CN204825954U (en) | A subassembly for being directed at hoop prestressing force is applyed to basic connection of fan | |
CN204326495U (en) | A kind of structure of tool-type anchored end of Overhanging Outside Scaffold section steel beam | |
CN214091025U (en) | Concrete wall straightness controlling means that draws to one side that hangs down | |
CN105114707B (en) | The fixed structure of roofing equipment pipe | |
CN107352386A (en) | The simple lifting tool and its application method of steel structural roof combined hanging |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190917 |
|
CF01 | Termination of patent right due to non-payment of annual fee |