CN209397510U - A kind of large span steel truss flexible arch bridge arch rib Integral type hydraulic lifting constructing device - Google Patents

A kind of large span steel truss flexible arch bridge arch rib Integral type hydraulic lifting constructing device Download PDF

Info

Publication number
CN209397510U
CN209397510U CN201822153666.7U CN201822153666U CN209397510U CN 209397510 U CN209397510 U CN 209397510U CN 201822153666 U CN201822153666 U CN 201822153666U CN 209397510 U CN209397510 U CN 209397510U
Authority
CN
China
Prior art keywords
hydraulic lifting
integral type
steel
large span
strand wires
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822153666.7U
Other languages
Chinese (zh)
Inventor
朱东明
王员根
李慧明
李正兵
向华
黄行裕
梁辉
张延辉
夏朝鹃
杨志明
郭成
曾宪攀
郑奕
闵理
李锋
罗亚容
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Jiujiang Bridge Engineering Co Ltd
Original Assignee
China Railway Jiujiang Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Jiujiang Bridge Engineering Co Ltd filed Critical China Railway Jiujiang Bridge Engineering Co Ltd
Priority to CN201822153666.7U priority Critical patent/CN209397510U/en
Application granted granted Critical
Publication of CN209397510U publication Critical patent/CN209397510U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of large span steel truss flexible arch bridge arch rib Integral type hydraulic lifting constructing device, including the promotion pylon being mounted on steel bridge, the promotion pylon upper end is fixedly installed with promotion platform, it promotes platform upper end and is fixedly installed with hydraulic lifting device, the hydraulic lifting device upper sleeve through is equipped with steel strand wires, and the lower end of steel strand wires is connected with the suspender for lifting member.The device is due to using Integral type hydraulic lifting, it solves the problems, such as to set up the rapid construction of large span steel truss flexible arch bridge in typhoon zone, low with low in cost, short construction period, security risk, it is unrestricted that equipment expands flexible lifting weight, span, height and area;Have many advantages, such as that stress is clear simultaneously, promote that steady, line type control is good, closure and simple in place to being elevated for structure.

Description

A kind of large span steel truss flexible arch bridge arch rib Integral type hydraulic lifting constructing device
Technical field
The utility model relates to a kind of large span steel truss flexible arch bridge arch rib Integral type hydraulic lifting constructing devices.
Background technique
Long Span Steel Arch Bridges erection method mostly uses cable-hoisting construction, free cantilever erection, rack construction, rotator construction at present Deng, these methods have reached its maturity, and various construction technologies respectively have its reasonability, but construction area topography it is flat, across water channel When region busy and high-incidence for typhoon, conventional construction technology economy and safety are poor.Therefore to the bridge of the type Construction technology is put forward new requirements.
Utility model content
Its purpose of the utility model, which is that, provides a kind of large span steel truss flexible arch bridge arch rib Integral type hydraulic lifting construction Device, solve it is flat, busy across water channel and when setting up Long Span Steel Arch Bridges for the high-incidence region of typhoon in construction area topography, The poor problem of conventional construction technology economy and safety.
It adopts the technical scheme that achieve the above object, a kind of large span steel truss flexible arch bridge arch rib integrated hydraulic mentions Constructing device is risen, including the promotion pylon being mounted on steel bridge, the promotion pylon upper end is fixedly installed with promotion platform, is promoted Platform upper end is fixedly installed with hydraulic lifting device, and the hydraulic lifting device upper sleeve through is equipped with steel strand wires, under steel strand wires End is connected with the suspender for lifting member.
Beneficial effect
The utility model has the following advantages that compared with prior art.
The utility model has the advantages that due to use Integral type hydraulic lifting, thus solve typhoon zone set up greatly across Spend the rapid construction problem of steel truss flexible arch bridge;Low with low in cost, short construction period, security risk, equipment is expanded flexible Lifting weight, span, height and area are unrestricted;Simultaneously to be elevated for structure have stress is clear, it is steady to be promoted, Line type control is good, closure and it is in place simple the advantages that.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawing.
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model structural side view;
Fig. 3 is the working principle of hydraulic lifting device in the utility model;
Fig. 4 is that steel strand wires promote status diagram in the utility model;
Fig. 5 is that steel strand wires decline status diagram in the utility model;
As shown in the figure: 1. promote pylon, and 2. promote platform, and 3. hydraulic lifting devices, 4. steel strand wires oil cylinders, 5. hang Have, 6. steel bridges, anchor on 33., 32. lift cylinders, 31. cast anchor.
Specific embodiment
With reference to the accompanying drawing, the utility model is further described.
The present apparatus includes the promotion pylon 1 being mounted on steel bridge 6, and as shown in Figure 1-Figure 3,1 upper end of promotion pylon is solid Dingan County promotes 2 upper end of platform and is fixedly installed with hydraulic lifting device 3, wear on the hydraulic lifting device 3 equipped with platform 2 is promoted Set is equipped with steel strand wires 4, and the lower end of steel strand wires 4 is connected with the suspender 5 for lifting member.
The hydraulic lifting device 3 includes being fixed on the lift cylinder 32 promoted on platform 2 and casting anchor 31, and casting anchor 31 is located at The lower end of lift cylinder 32 is fixed with the upper anchor 33 that can be moved up and down with piston rod on the piston rod of the lift cylinder 32, The upper anchor 33, lift cylinder 32, casting anchor 31 is sleeved on steel strand wires 4.
In the utility model, the pylon 1 that promoted is installed on the steel bridge 6 set up, is promoted platform 2 and is mounted on promotion pylon 1 top, hydraulic lifting device 3, which is placed on, to be promoted on platform 2, and steel strand wires 4 penetrate hydraulic lifting device 3, the connection of 4 lower end of steel strand wires Suspender 5, suspender is fixed on the component to be promoted;The working principle of the hydraulic lifting device 3 is that lift cylinder 32 casts anchor 31 together with lift cylinder 32 bracket be fixed on promoted platform 2 on, upper anchor 33 is then fixed on the piston rod of lift cylinder 32, energy It is enough to move up and down with piston rod;As shown in fig. 4-5, the original state of lift cylinder 32 is that upper anchor 33 is tight, casts anchor 31 tightly, is mentioned The whole contracting cylinders of oil-lifting jar 32;When casting anchor, 31 pines, upper anchor 33 are tight, and lift cylinder 32 can hold steel strand wires 4 under the arm and rise a distance;Promote oil After cylinder 32 stretches cylinder in place, 31 are tightly casted anchor, anchor 33 on pine carries out contracting cylinder, can return to initial position and be promoted next time;On the contrary Action process the decline of weight then may be implemented.
In the specific implementation, in the flexible arch rib erection process of the Long Span Railway Steel Truss beam bridge in a certain typhoon zone, Using the hydraulic CONTROLLED INTEGRAL LIFT TECHNOLOGY of the utility model, it is disposable it is whole promoted in place, promote that tonnage is big, short construction period, It avoids the problem of typhoon period is constructed;Integral type hydraulic lifting Construction Techniques for Erection has low in cost, short construction period, safety Risk is low, and it is unrestricted that equipment expands flexible lifting weight, span, height and area;While having to being elevated for structure Have the advantages that stress is clear, promote that steady, line type control is good, closure and in place simple.It has been obtained in housing construction Extensive utilization.It is also used in steel box-girder and highway steel arch bridge at present in field of bridge construction, but in rail iron Still belong to the first time utilization in Arch Bridge Construction.

Claims (2)

1. a kind of large span steel truss flexible arch bridge arch rib Integral type hydraulic lifting constructing device, including being mounted on mentioning on steel bridge (6) It rises pylon (1), which is characterized in that promotion pylon (1) upper end, which is fixedly installed with, promotes platform (2), promotes platform (2) upper end It is fixedly installed with hydraulic lifting device (3), hydraulic lifting device (3) upper sleeve through is equipped with steel strand wires (4), steel strand wires (4) Lower end be connected with the suspender (5) for lifting member.
2. a kind of large span steel truss flexible arch bridge arch rib Integral type hydraulic lifting constructing device according to claim 1, special Sign is that the hydraulic lifting device (3) includes being fixed on the lift cylinder (32) promoted on platform (2) and casting anchor (31), under Anchor (31) is located at the lower end of lift cylinder (32), be fixed on the piston rod of the lift cylinder (32) can be with piston rod above and below Movement upper anchor (33), the upper anchor (33), lift cylinder (32), cast anchor (31) be sleeved on steel strand wires (4).
CN201822153666.7U 2018-12-21 2018-12-21 A kind of large span steel truss flexible arch bridge arch rib Integral type hydraulic lifting constructing device Active CN209397510U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822153666.7U CN209397510U (en) 2018-12-21 2018-12-21 A kind of large span steel truss flexible arch bridge arch rib Integral type hydraulic lifting constructing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822153666.7U CN209397510U (en) 2018-12-21 2018-12-21 A kind of large span steel truss flexible arch bridge arch rib Integral type hydraulic lifting constructing device

Publications (1)

Publication Number Publication Date
CN209397510U true CN209397510U (en) 2019-09-17

Family

ID=67895552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822153666.7U Active CN209397510U (en) 2018-12-21 2018-12-21 A kind of large span steel truss flexible arch bridge arch rib Integral type hydraulic lifting constructing device

Country Status (1)

Country Link
CN (1) CN209397510U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457620A (en) * 2018-12-21 2019-03-12 中铁九桥工程有限公司 A kind of large span steel truss flexible arch bridge arch rib Integral type hydraulic lifting construction system
CN116142964A (en) * 2023-02-20 2023-05-23 浙江巨马游艺机有限公司 Hydraulic synchronous vertical lifting device for main shaft of large ferris wheel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457620A (en) * 2018-12-21 2019-03-12 中铁九桥工程有限公司 A kind of large span steel truss flexible arch bridge arch rib Integral type hydraulic lifting construction system
CN116142964A (en) * 2023-02-20 2023-05-23 浙江巨马游艺机有限公司 Hydraulic synchronous vertical lifting device for main shaft of large ferris wheel

Similar Documents

Publication Publication Date Title
CN101476294B (en) Mounting method for underbeam segment of large-stride steel box girder stayed-cable bridge
CN101725115B (en) Fixed hoisting bracket device for pushing steel box girder and construction method thereof
CN209397510U (en) A kind of large span steel truss flexible arch bridge arch rib Integral type hydraulic lifting constructing device
CN209468695U (en) A kind of no truss overhanging type corrugated steel web cantilever bridge construction hanging frame device
CN108360385B (en) Steel box girder hoisting limiting and buffering construction method
CN104594206A (en) Suspended type dragging anchor socket and method for steel trussed beam longitudinal displacement
CN206279438U (en) A kind of short tower steel truss girder cable-stayed bridge of steel
CN206800215U (en) Bridge incremental launching Bridge Erector
CN203129025U (en) Suspension fixing device for hanging basket
CN208501523U (en) It is a kind of novel for setting up the Bridge Erector for spelling wide beam
CN203715115U (en) Supporting point structure for self-hoisting system of portal crane
CN108557645B (en) Steel box girder hoisting limiting buffer device
CN109457620A (en) A kind of large span steel truss flexible arch bridge arch rib Integral type hydraulic lifting construction system
CN207078935U (en) A kind of portable full circle swinging mast loop wheel machine anchor
CN206352387U (en) A kind of deformable hoistway operation steel platform of automatic climbing formula
CN205636519U (en) Hydraulic pre -compression construction device for cantilever suspension basket
CN204715216U (en) A kind of Arch Bridge Construction platform structure
CN209323393U (en) A kind of drag-line bridge king-tower side plane repairing nacelle construction structure
CN203962555U (en) A kind of hydraulic pressure creep machine
CN111119470A (en) Full-automatic hydraulic walking dragging mold
CN217870059U (en) Descending type walking hanging basket
CN203048416U (en) Transverse beam structure of shore crane
CN207646609U (en) A kind of mobile formwork middle cross beam system that stress is controllable
CN211817957U (en) Full-automatic hydraulic walking dragging mold
CN215854863U (en) Hydraulic lifting device for inverted cone shell water tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant