CN209385814U - A kind of assembled overlength flexible pipe line support jig - Google Patents
A kind of assembled overlength flexible pipe line support jig Download PDFInfo
- Publication number
- CN209385814U CN209385814U CN201821910184.5U CN201821910184U CN209385814U CN 209385814 U CN209385814 U CN 209385814U CN 201821910184 U CN201821910184 U CN 201821910184U CN 209385814 U CN209385814 U CN 209385814U
- Authority
- CN
- China
- Prior art keywords
- support
- steel
- channel steel
- flexible pipe
- pipe line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a kind of assembled overlength flexible pipe line support jigs, including main support, the two sides of main support are respectively arranged with left support and right support, assembled connection type is used between main support and left and right bracket, the moulding bed uses overlength flexible pipe line in the CONTROLLED INTEGRAL LIFT TECHNOLOGY of moulding bed over-assemble, pass through the Synchronous lifting of electric block, single group is promoted, the a series of actions such as single-point promotion, cooperate the compound use of the various structures in the moulding bed, it can smoothly realize the integral hoisting of overlength flexible pipe line, for the construction that is in full swing of exhibition room electromechanical pipeline, technology barrier is cleared away, solid foundation is established.
Description
Technical field
The utility model relates to high-altitude electromechanical pipeline mounting technique field, specially a kind of assembled overlength flexible pipe line branch
Support frame.
Background technique
With the development of construction industry, conference and exhibition center gradually develops to ultra-high ultra-large, high-altitude, overlength, flexible electromechanical pipeline
The mounting technique Cheng Wei Qi problem to be solved of system.Currently, integral, the common promotion using electromechanical pipeline and support jig group
Method can effectively solve this problem.Support jig has not only acted as the work of stress load-bearing as the temporary structure in construction
With, and played the effect of the Deformation control in overlength flexible pipe line integral hoisting.It is especially big, rigid to smoke controlling air hose volume
It spends for pipeline small, that deformation is big, the design of support jig is undoubtedly a vital ring during pipeline integral hoisting.Cause
This, is badly in need of carrying out innovative design to the support jig of overlength flexible pipe line, guarantees construction safety and pipeline installation accuracy.
Utility model content
The purpose of this utility model is to provide a kind of assembled overlength flexible pipe line support jigs, to solve above-mentioned background
Itd is proposed in technology as overlength flexible pipe line high-altitude installation difficulty is big, installation risk is high, deforms big, common moulding bed in installation process
The problems such as circulation difficulty.
To achieve the above object, the utility model provides the following technical solutions: a kind of assembled overlength flexible pipe line support
Moulding bed, including main support, the two sides of the main support are respectively arranged with left support and right support, main support and left support and right branch
Assembled connection type is used between frame, and the upper and lower of main support, left support and right support is provided with channel steel and lower slot
Steel, and be connected between the upper channel steel and lower channel steel in main support by the first support frame, in the left support and right support
Upper channel steel and lower channel steel between be connected with each other by the second support frame, and be provided with fixed plate on upper channel steel and lower channel steel,
The right support is connected by thick steel plate with extension, and the composition structure of extension is identical as right support, and extension
Height is successively successively decreased from right to left.
Preferably, the height of the main support is greater than the height of left support and right support, and the height of left support and right support
Degree tapers off state from main support to two sides, and the lower end surface of main support, left support and right support is located at same level
On.
Preferably, the upper channel steel and lower channel steel are spliced by the channel steel that length is 6m, and surface both is at 3m
It is provided with the thick steel plate of 1 10mm, and is connected by connector at upper channel steel and the segmentation of lower channel steel.
Preferably, first support frame includes tilt distribution and cross one another first brace and the second brace, and
It is welded to each other at the center of first brace and the second brace.
Preferably, second support frame includes the supporting steel of vertical distribution and the bracket of symmetrical supporting steel two sides
Steel, and supporting steel and 2 bracket steel pass through fixed plate and are connected with upper channel steel and lower channel steel.
Preferably, the connector includes the junction steel plate and high-strength bolt of 8mm thickness, and junction steel plate passes through high-strength bolt
It is connected with the surface of upper channel steel or lower channel steel.
Compared with prior art, the utility model has the beneficial effects that the assembled overlength flexible pipe line support jig, is adopted
With overlength flexible pipe line in the CONTROLLED INTEGRAL LIFT TECHNOLOGY of moulding bed over-assemble, promoted by the Synchronous lifting of electric block, single group, single-point
The a series of actions such as promotion, cooperate the compound use of the various structures in the moulding bed, can smoothly realize overlength flexible pipe line
Lifting, solve the significant technology issues of large-scale museum high-altitude overlength flexibility electromechanical pipeline integral hoisting, still belong to first at home
Wound, lifting smoothly complete, and are the construction that is in full swing of exhibition room electromechanical pipeline, have cleared away technology barrier, established solid base
Plinth.
Detailed description of the invention
Fig. 1 is the utility model main bracket structure schematic diagram;
Fig. 2 is the utility model left support structural schematic diagram;
Fig. 3 is the utility model right support structural schematic diagram;
Fig. 4 is the utility model connector positive structure diagram;
Fig. 5 is the utility model connector side structure schematic view.
In figure: 1, main support;2, left support;3, right support;4, upper channel steel;5, lower channel steel;6, the first support frame;61,
One brace;62, the second brace;7, the second support frame;71, supporting steel;72, bracket steel;8, fixed plate;9, connector;91, high-strength
Bolt;92, junction steel plate;10, thick steel plate;11, extension.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-5 is please referred to, the utility model provides a kind of technical solution: assembled overlength flexible pipe line support jig, packet
Include main support 1, left support 2, right support 3, upper channel steel 4, lower channel steel 5, the first support frame 6, the first brace 61, the second brace 62,
Second support frame 7, supporting steel 71, bracket steel 72, fixed plate 8, connector 9, high-strength bolt 91, junction steel plate 92, thick steel plate 10
With extension 11, the two sides of main support 1 are respectively arranged with left support 2 and right support 3, main support 1 and left support 2 and right support 3
Between use assembled connection type, and the upper and lower of main support 1, left support 2 and right support 3 be provided with channel steel 4 and under
Channel steel 5, and be connected between the upper channel steel 4 and lower channel steel 5 in main support 1 by the first support frame 6, left support 2 and right branch
It is connected with each other between upper channel steel 4 and lower channel steel 5 in frame 3 by the second support frame 7, and is respectively provided on upper channel steel 4 and lower channel steel 5
There is fixed plate 8, right support 3 is connected by thick steel plate 10 with extension 11, and the composition structure of extension 11 and 3 phase of right support
Together, and the height of extension 11 is successively successively decreased from right to left.
The height of main support 1 is greater than the height of left support 2 and right support 3, and the height of left support 2 and right support 3 is from master
It tapers off state at bracket 1 to two sides, and the lower end surface of main support 1, left support 2 and right support 3 is located in same level,
During practical set, centered on main support 1, synchronous to assemble left support 2 and right support 3 simultaneously to two sides, three is common
The arcuate structure of the moulding bed upper surface of composition can be good at the installation condition for agreeing with air hose, and it is more reasonable to design.
Upper channel steel 4 and lower channel steel 5 are spliced by the channel steel that length is 6m, and surface both is provided with 1 at 3m
The thick steel plate 10 of a 10mm, and pass through connector 9 at upper channel steel 4 and the segmentation of lower channel steel 5 and be connected, connector 9 includes
The junction steel plate 92 and high-strength bolt 91 of 8mm thickness, junction steel plate 92 pass through the table of high-strength bolt 91 and upper channel steel 4 or lower channel steel 5
Face is connected, and connection is more fixed, and convenient for whole assembly.
First support frame 6 includes tilt distribution and cross one another first brace 61 and the second brace 62, and first is oblique
It is welded to each other at the center of bar 61 and the second brace 62, the second support frame 7 includes the supporting steel 71 of vertical distribution and symmetrically divides
The bracket steel 72 of 71 two sides of cloth supporting steel, and supporting steel 71 and 2 bracket steel 72 passes through fixed plate 8 and upper channel steel 4 and lower slot
Steel 5 is connected, and using a variety of supporting structures, cooperates stress point distribution of the air hose in hoisting process, can make the entirety of the moulding bed
It is more reasonable to be distributed, and carries out firm support to the air hose of high weight.
Working principle: first by the first support frame 6 the first brace 61 and the second brace 62 be mounted in main support 1
Designated position after the completion of the integral installation of main support 1, can synchronize to two sides while assemble left support 2 and right support 3, three is total
With the arcuate structure of the moulding bed upper surface of composition, it can be good at the installation condition for agreeing with air hose, the effect of connector 9 is for connecting
Connect main support 1 and left support 2 and right support 3, it is ensured that the intensity and overall stability of support jig.
Installation process: smoke exhaust pipe caliber is φ 1800mm in exhibition room, is connected using angle steel flange;Mounting bracket, which uses, embraces
Hoop, dog-ear are answered straight, and anchor ear should be close to and banding air hose.After being unloaded air hose from automobile using fork truck, it is transported on air hose moulding bed
It carries out air hose assembly and air hose air port is installed.When assembled, the connection bolt of flange should be tightened uniformly, and nut should be in the same side.Wind
For pipe in connection, interface answers dislocation-free, and flange padding is without fracture, distortionless, and in middle position, bolt and air hose material pair
It answers.It is fixed on support jig after the completion of air hose is assembled, air hose is promoted as a whole with support jig, promoted to installation
Behind position, connecting bracket, air hose is in place, and moulding bed is removed.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of assembled overlength flexible pipe line support jig, including main support (1), it is characterised in that: the main support (1)
Two sides are respectively arranged with left support (2) and right support (3), using dress between main support (1) and left support (2) and right support (3)
Upper and lower with formula connection type, and main support (1), left support (2) and right support (3) is provided with channel steel (4) and lower slot
Steel (5), and be connected between the upper channel steel (4) and lower channel steel (5) in main support (1) by the first support frame (6), the left side
It is connected with each other between upper channel steel (4) and lower channel steel (5) in bracket (2) and right support (3) by the second support frame (7), and on
It is provided with fixed plate (8) on channel steel (4) and lower channel steel (5), the right support (3) passes through thick steel plate (10) and extension (11)
It is connected, and the composition structure of extension (11) is identical as right support (3), and the height of extension (11) is successively passed from right to left
Subtract.
2. a kind of assembled overlength flexible pipe line support jig according to claim 1, it is characterised in that: the main support
(1) height is greater than the height of left support (2) and right support (3), and the height of left support (2) and right support (3) is from main support
(1) it tapers off state to two sides, it is consistent with the radian of overlength flexible pipe line, and main support (1), left support (2) He Youzhi
The lower end surface of frame (3) is located in same level.
3. a kind of assembled overlength flexible pipe line support jig according to claim 1, it is characterised in that: the upper channel steel
(4) it is spliced with lower channel steel (5) by the channel steel that length is 6m, surface both is provided with the thickness of 1 10mm at 3m
Steel plate (10), and pass through connector (9) at upper channel steel (4) and the segmentation of lower channel steel (5) and be connected.
4. a kind of assembled overlength flexible pipe line support jig according to claim 1, it is characterised in that: described first
Support (6) includes tilt distribution and cross one another first brace (61) and the second brace (62), and the first brace (61) and
It is welded to each other at the center of second brace (62).
5. a kind of assembled overlength flexible pipe line support jig according to claim 1, it is characterised in that: described second
Support (7) includes the supporting steel (71) of vertical distribution and the bracket steel (72) of symmetrical supporting steel (71) two sides, and is supported
Steel (71) and 2 bracket steel (72) are connected by fixed plate (8) with upper channel steel (4) and lower channel steel (5).
6. a kind of assembled overlength flexible pipe line support jig according to claim 3, it is characterised in that: the connector
(9) include 8mm thickness junction steel plate (92) and high-strength bolt (91), junction steel plate (92) pass through high-strength bolt (91) and upper slot
The surface of steel (4) or lower channel steel (5) is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821910184.5U CN209385814U (en) | 2018-11-20 | 2018-11-20 | A kind of assembled overlength flexible pipe line support jig |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821910184.5U CN209385814U (en) | 2018-11-20 | 2018-11-20 | A kind of assembled overlength flexible pipe line support jig |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209385814U true CN209385814U (en) | 2019-09-13 |
Family
ID=67865007
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821910184.5U Active CN209385814U (en) | 2018-11-20 | 2018-11-20 | A kind of assembled overlength flexible pipe line support jig |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209385814U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115419750A (en) * | 2022-10-13 | 2022-12-02 | 中安华力建设集团有限公司 | Integral prefabrication assembly construction method for complex joints of basement pipelines |
-
2018
- 2018-11-20 CN CN201821910184.5U patent/CN209385814U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115419750A (en) * | 2022-10-13 | 2022-12-02 | 中安华力建设集团有限公司 | Integral prefabrication assembly construction method for complex joints of basement pipelines |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209385814U (en) | A kind of assembled overlength flexible pipe line support jig | |
CN205917545U (en) | Condact rail installation frock | |
CN203808537U (en) | Steel column butt-joint plane position correcting device | |
CN106378578B (en) | A kind of pipe fitting spot welding fixture (SWFX) | |
CN212599995U (en) | Welding installation equipment for hot-melt welded pipe | |
CN206263522U (en) | A kind of pipe fitting spot welding fixture (SWFX) | |
CN106239020A (en) | A kind of novel pipe fitting welder | |
CN208815896U (en) | A kind of constructional form fixing apparatus | |
CN209052284U (en) | Multi-layered board hoisting machine | |
CN209524163U (en) | Beam-column combined fixing support structure for horizontally laying heavy pipelines side by side | |
CN205046848U (en) | Gate -type steel sheet mould holder | |
CN212535698U (en) | Negative ring canal piece fixing device | |
CN211596431U (en) | Railway bridge pad stone construction operation protector | |
CN212718424U (en) | Assembled process pipeline support | |
CN209294561U (en) | A kind of piping lane support system | |
CN203669408U (en) | Lifting adjustable supporting frame | |
CN211569862U (en) | Prefabricated hoist and mount piece of building convenient to dismouting | |
CN208117117U (en) | A kind of fixing tool guaranteeing the true flange welding size of supporting leg | |
CN209703555U (en) | A kind of novel piping lane support system | |
CN107575646A (en) | New suspension and support for large-scale pipeline | |
CN209685121U (en) | A kind of suspender with the main hanging beam of truss-like | |
CN207243227U (en) | A kind of shaped steel fast hoisting pine hook device | |
CN206998116U (en) | A kind of ship stern post welding equipment device | |
CN218828927U (en) | Anti-drop's power pipeline support | |
CN211470515U (en) | Large-scale unit stator collector ring integral hoisting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |