CN205917545U - Condact rail installation frock - Google Patents

Condact rail installation frock Download PDF

Info

Publication number
CN205917545U
CN205917545U CN201620922879.XU CN201620922879U CN205917545U CN 205917545 U CN205917545 U CN 205917545U CN 201620922879 U CN201620922879 U CN 201620922879U CN 205917545 U CN205917545 U CN 205917545U
Authority
CN
China
Prior art keywords
conductor rail
base
guided way
mounting tool
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620922879.XU
Other languages
Chinese (zh)
Inventor
汤振亚
苏春生
饶胜斌
张新柳
梁朋刚
徐少平
何十美
何巍
郝玉峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201620922879.XU priority Critical patent/CN205917545U/en
Application granted granted Critical
Publication of CN205917545U publication Critical patent/CN205917545U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a condact rail installation frock, including guided way (5), setting base (4), condact rail support (8) and setting condact rail anchor clamps (2) in condact rail support (8) below of setting on base (4) on guided way (5). The beneficial effects of the utility model are that: the utility model discloses a set up the effect that the guided way can play the direction, make the orbit of guided way and the shape phase -match of condact rail to this is favorable to the be brought into contact rail to be installed according to the orbit that meets the requirements, thereby has improved construction precision and efficiency of construction.

Description

A kind of conductor rail mounting tool
Technical field
This utility model is related to track construction, specifically, is a kind of conductor rail mounting tool.
Background technology
Traction contact net generally adopts contact net and two kinds of forms of conductor rail (commonly referred to as three rails), and overhead contact line is to use Electric pressure higher (dc1500/750v) and output is larger is developed rapidly, 20th century China's nineties Shanghai, Guangzhou Subway is all using this kind of form.Conductor rail is with its low cost of manufacture, reliability is high and landscape is well also adopted in a lot of rail lines With China Beijing, Tianjin Underground are exactly to adopt conductor rail system.
At present, conductor rail is many meets material using steel aluminum, and it is to pass through mechanical means and aluminium alloy extrusions by stainless steel band In conjunction with conductor rail, so that rustless steel is stuck on aluminium alloy extrusions using special structure, so it does not coming off, prior art condition Under, for the installation of conductor rail.
Utility model content
The purpose of this utility model is to provide that a kind of structure is simple, can improve efficiency of construction and the connecing of construction precision Rail-engaging mounting tool.
This utility model is achieved through the following technical solutions: a kind of conductor rail mounting tool, including guided way, is arranged on and leads To the base on rail, the conductor rail support that is arranged on base and be arranged on the conductor rail fixture below conductor rail support.
It is provided with chute, base is slidably connected with guided way by chute below described base.
Described conductor rail support is horizontally disposed beam structure, and conductor rail fixture is arranged on conductor rail support following table Face.
It is provided with vertical supports between described conductor rail support and base.
Described vertical supports respectively with conductor rail support, tube chamber welds with base.
It is provided with reinforcement between described conductor rail support and vertical supports.
It is provided with anti-tilt structure below described base.
Described anti-tilt structure is l type support, the side that the opening of anti-tilt structure is located towards guided way, Anti-inclining Structure is located at the same side of guided way with conductor rail fixture.
Described conductor rail fixture includes two gripping blocks.
Described base is provided with balancing weight, and balancing weight and conductor rail fixture are located at the both sides of guided way respectively.
This utility model compared with prior art, has advantages below and a beneficial effect:
(1) this utility model passes through to arrange the effect that guided way can play guiding, makes track and the conductor rail of guided way Mating shapes, be conducive to making conductor rail install according to satisfactory track with this, thus improve construction precision and Efficiency of construction;
(2) this utility model passes through to arrange chute, it is possible to increase the installation of base, positioning precision, is being led by making base Slide on rail and also can keep precision, be conducive to improving construction precision with this;
(3) this utility model passes through vertical supports, is conducive to meeting different locations by the height adjusting vertical supports Construction demand, is easy to be constructed at acclive local or turning;
(4) this utility model is conducive to conductor rail support, tube chamber welds with base improving being connected by force by making vertical supports respectively Degree and integral rigidity of the present utility model;
(5) this utility model is conducive to improving the overall rigid and counter-bending change of this utility model by arranging reinforcement Shape ability, improves robustness of the present utility model;
(6) this utility model is conducive to making this utility model keep flat in work progress by arranging anti-tilt structure Weighing apparatus, is conducive to improving construction precision;
(7) this utility model passes through to arrange balancing weight, is conducive to making this utility model keep balancing in work progress, with This can improve construction precision.
Brief description
Fig. 1 is a kind of structural representation of conductor rail mounting tool;
Fig. 2 is the scheme of installation of balancing weight;
Fig. 3 is the structural representation shown in embodiment 7;
Fig. 4 is the structural representation shown in embodiment 8;
Wherein 1 conductor rail, 2 conductor rail fixtures, 3 reinforcements, 4 bases, 5 guided ways, 6 anti-tilts Structure, 7 vertical supports, 8 conductor rail supports, 9 balancing weights, 10 rotating shafts, 11 connecting rods, 12 pinch wheels.
Specific embodiment
With reference to embodiment, this utility model is described in further detail, but embodiment of the present utility model is not It is limited to this.
Embodiment 1:
As shown in figure 1, in the present embodiment, a kind of conductor rail mounting tool, including guided way 5, it is arranged on guided way 5 Base 4, the conductor rail support 8 being arranged on base 4 and the conductor rail fixture 2 being arranged on conductor rail support 8 lower section, guided way 5 Base 4 can be played with guiding, the effect supporting, with this you=that passes through guided way raising construction precision and efficiency, pass through Using conductor rail fixture 2 clamped contact rail 1 in order to make conductor rail fixture 2 fixing in order to construct, described conductor rail fixture 2 wraps Include two gripping blocks, this utility model can two or more be used cooperatively, to improve the connection of conductor rail fixture 2 Intensity.
Embodiment 2:
As shown in figure 1, on the basis of embodiment 1, in the present embodiment, being provided with chute, base 4 below described base 4 It is slidably connected with guided way 5 by chute, by arranging chute, it is possible to increase the installation of base 4, positioning precision, by making bottom Seat 4 also can keep precision after sliding on guided way 5, is conducive to improving construction precision with this.
Embodiment 3:
As shown in Figure 1 and Figure 2, on the basis of embodiment 1, in the present embodiment, described conductor rail support 8 sets for level The beam structure put, conductor rail fixture 2 is arranged on conductor rail support 8 lower surface, between described conductor rail support 8 and base 4 It is provided with vertical supports 7, vertical supports 7 are welded with conductor rail support 8, base 4 respectively, by vertical supports 7, be conducive to passing through The height of adjustment vertical supports 7 meets the construction demand in different locations, is easy to be constructed at acclive local or turning, It is welded with beneficial to improving bonding strength and of the present utility model respectively with conductor rail support 8, base 4 by making vertical supports 7 Integral rigidity.
Embodiment 4:
On the basis of embodiment 3, in the present embodiment, between described conductor rail support 8 and vertical supports 7, it is provided with reinforcement Muscle 3, is conducive to improving the overall rigid and counter-bending deformability of this utility model by arranging reinforcement 3, improves this The robustness of utility model.
Embodiment 5:
As shown in Figure 1 and Figure 2, on the basis of embodiment 1, in the present embodiment, below described base 4, it is provided with Anti-inclining Structure 6, described anti-tilt structure 6 is l type support, the side that the opening of anti-tilt structure 6 is located towards guided way 5, anti-dumping Biassed fabric 6 is located at the same side of guided way 5 with conductor rail fixture 2, contacts with guided way 5 by using anti-tilt structure 6, can Form fulcrum in order to play the effect of support in contact position, the function of Anti-inclining is capable of with this, by arranging Anti-inclining Structure 6 is conducive to making this utility model keep balance in work progress, is conducive to improving construction precision.
Embodiment 6:
As shown in Fig. 2 on the basis of embodiment 1, in the present embodiment, described base 4 is provided with balancing weight 9, counterweight Block 9 and conductor rail fixture 2 are located at the both sides of guided way 5 respectively, are conducive to making this reality in work progress by arranging balancing weight 9 With new holding balance, construction precision can be improved with this, and prevent this utility model from deforming.
Embodiment 7:
As shown in figure 3, on the basis of embodiment 1, in the present embodiment, described conductor rail fixture 2 includes two rotating shafts 10 and the pinch wheels 12 that are rotatably arranged in rotating shaft 10, by using pinch wheels 12, conductor rail 1 is clamped so that contacting Rail 1 is easy to load and unload.
Embodiment 8:
As shown in figure 4, on the basis of embodiment 1, in the present embodiment, being provided with two between two conductor rail supports 8 Connecting rod 11, is conducive to making two conductor rail support 8 keeping parallelisms by using connecting rod 11, it is to avoid two conductor rail supports 8 On conductor rail fixture 2 stagger and lead to conductor rail 1 shape occur deviation, construction precision can be improved with this.
The above, be only preferred embodiment of the present utility model, and not this utility model is done with any pro forma limit System, every any simple modification above example made according to technical spirit of the present utility model, equivalent variations, each fall within Within protection domain of the present utility model.

Claims (10)

1. a kind of conductor rail mounting tool it is characterised in that: include guided way (5), be arranged on guided way (5) base (4), The conductor rail support (8) that is arranged on base (4) and be arranged on the conductor rail fixture (2) below conductor rail support (8).
2. a kind of conductor rail mounting tool according to claim 1 it is characterised in that: be provided with below described base (4) Chute, base (4) is slidably connected with guided way (5) by chute.
3. a kind of conductor rail mounting tool according to claim 1 it is characterised in that: described conductor rail support (8) is Horizontally disposed beam structure, conductor rail fixture (2) is arranged on conductor rail support (8) lower surface.
4. a kind of conductor rail mounting tool according to claim 3 it is characterised in that: described conductor rail support (8) with It is provided with vertical supports (7) between base (4).
5. a kind of conductor rail mounting tool according to claim 4 it is characterised in that: described vertical supports (7) are respectively With conductor rail support (8), base (4) welding.
6. a kind of conductor rail mounting tool according to claim 4 it is characterised in that: described conductor rail support (8) with It is provided with reinforcement (3) between vertical supports (7).
7. a kind of conductor rail mounting tool according to claim 1 it is characterised in that: be provided with below described base (4) Anti-tilt structure (6).
8. a kind of conductor rail mounting tool according to claim 7 it is characterised in that: described anti-tilt structure (6) be l Type support, the side that the opening of anti-tilt structure (6) is located towards guided way (5), anti-tilt structure (6) and conductor rail fixture (2) it is located at the same side of guided way (5).
9. a kind of conductor rail mounting tool according to claim 1 it is characterised in that: described conductor rail fixture (2) bag Include two gripping blocks.
10. a kind of conductor rail mounting tool according to claim 1 it is characterised in that: described base (4) is provided with joins Pouring weight (9), balancing weight (9) and conductor rail fixture (2) are located at the both sides of guided way (5) respectively.
CN201620922879.XU 2016-08-23 2016-08-23 Condact rail installation frock Expired - Fee Related CN205917545U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620922879.XU CN205917545U (en) 2016-08-23 2016-08-23 Condact rail installation frock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620922879.XU CN205917545U (en) 2016-08-23 2016-08-23 Condact rail installation frock

Publications (1)

Publication Number Publication Date
CN205917545U true CN205917545U (en) 2017-02-01

Family

ID=57871600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620922879.XU Expired - Fee Related CN205917545U (en) 2016-08-23 2016-08-23 Condact rail installation frock

Country Status (1)

Country Link
CN (1) CN205917545U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107433882A (en) * 2017-07-07 2017-12-05 中国电建集团铁路建设有限公司 The Rapid locating tool and positioning construction method of subway contact rail floor installation position
CN109204345A (en) * 2017-06-30 2019-01-15 比亚迪股份有限公司 Rail engineering automobile
CN111663376A (en) * 2020-06-04 2020-09-15 安徽博晟亿电力科技有限公司 Railway track sleeper butt joint device and implementation method thereof
CN112779827A (en) * 2020-12-31 2021-05-11 中车浦镇庞巴迪运输系统有限公司 Method and tool for installing rubber wheel rail guide rail
CN113859280A (en) * 2021-11-12 2021-12-31 杭州中车车辆有限公司 Straddle type monorail engineering vehicle with replaceable contact rail

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109204345A (en) * 2017-06-30 2019-01-15 比亚迪股份有限公司 Rail engineering automobile
CN107433882A (en) * 2017-07-07 2017-12-05 中国电建集团铁路建设有限公司 The Rapid locating tool and positioning construction method of subway contact rail floor installation position
CN111663376A (en) * 2020-06-04 2020-09-15 安徽博晟亿电力科技有限公司 Railway track sleeper butt joint device and implementation method thereof
CN111663376B (en) * 2020-06-04 2022-01-28 安徽博晟亿电力科技有限公司 Railway track sleeper butt joint device and implementation method thereof
CN112779827A (en) * 2020-12-31 2021-05-11 中车浦镇庞巴迪运输系统有限公司 Method and tool for installing rubber wheel rail guide rail
CN113859280A (en) * 2021-11-12 2021-12-31 杭州中车车辆有限公司 Straddle type monorail engineering vehicle with replaceable contact rail

Similar Documents

Publication Publication Date Title
CN205917545U (en) Condact rail installation frock
CN201343385Y (en) Concentrated driving finished product checking crane
CN202454435U (en) Multistage joint iron core stacking table
CN206360457U (en) A kind of cable Special electric line bar automatic installation apparatus
CN203076831U (en) Flexible welding fixture of end plate of wagon balance
CN103801873B (en) Weighbridge end plate flexible welding clamp
CN208310789U (en) A kind of integrated bracket for tunnel pre-buried channel flow
CN208352853U (en) Flexible direct current converter valve module apparatus for examination and repair
CN103273052A (en) Method and device for rapidly transferring hanging type casting bogie
CN209416558U (en) A kind of cloud rail wheel is heavy and clamps force measuring device
CN209338039U (en) A kind of pipeline maintenance frame based on urban construction
CN207811171U (en) Lifting device and production and processing system
CN207312996U (en) A kind of high aerial rail road lifting gear
CN202498325U (en) Welding device for main chord member and connecting pieces of tower body standard knot
CN208345706U (en) A kind of saddle fork support for pipeline lifting
CN217913617U (en) Positioning welding fixture
CN206590511U (en) A kind of magazine apparatus for placing
CN207086632U (en) A kind of tubing bending machine easy to use
CN201834640U (en) Tensioning device of elevator speed limiter
CN205901172U (en) Nearly pole of transmission line overhauls corridor hanger device
CN209038959U (en) A kind of aluminium wheel blank tower hoisting machine
CN204728210U (en) Ballast support board migration device
CN209886358U (en) Adjustable smoke exhaust pipe device for testing diesel generating set
CN204845598U (en) Busbar support insulator
CN217807205U (en) Horizontal walking vertical guide mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170201

Termination date: 20210823

CF01 Termination of patent right due to non-payment of annual fee