CN209384678U CN201821860297.9U CN201821860297U CN209384678U CN 209384678 U CN209384678 U CN 209384678U CN 201821860297 U CN201821860297 U CN 201821860297U CN 209384678 U CN209384678 U CN 209384678U
Authority
CN
China
Prior art keywords
steel plate
main body
plate main
shoulder pole
retaining ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821860297.9U
Other languages
Chinese (zh)
Inventor
孔德忠
刘强
王希友
张海涛
张志勇
李彦杰
张志军
李晓强
施磊
邹云
赵磊
张忠明
蔡建桢
吴英昊
樊建伟
薛腾飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
City Construction Development Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
City Construction Development Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd, City Construction Development Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201821860297.9U priority Critical patent/CN209384678U/en
Application granted granted Critical
Publication of CN209384678U publication Critical patent/CN209384678U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses shoulder pole stocks, including steel plate main body, filling concrete mouth is equipped in the middle part of the steel plate main body, the steel plate main body lower face is equipped with several retaining rings around the filling concrete mouth, the retaining ring length is equal with pre-embedded anchoring bolts reach, the retaining ring internal diameter is equal with pre-embedded anchoring bolts diameter, and the steel plate main body upper face two sides are respectively provided with two parallel load supports;It is formed using steel plate and steel-pipe welding; it can be adjusted according to different size of bolt group; prefabricated stock in advance; when installation, it in the secondary insertion retaining ring of bolt, will prevent bolt top from swinging effectively to screw thread protection; simultaneously; bolt group deviation and thread damage caused by avoiding because of concrete impact force, it is easy to install and disassemble, save the duration.

Description

Shoulder pole stock
Technical field
The utility model relates to architectural engineering construction technique fields, it particularly relates to shoulder pole stock.
Background technique
Currently, construction site steel construction embedding anchor bolts are positioned using conventional steel sheet mold, bolt and the pre- cavity preparation of steel plate Precision not can guarantee, and cause gap larger, and be easy to lead to steel plate die shift because of the impact of concrete in casting concrete. Bolt-center deviation, adjacent bolt centre deviation, bolt group center and orientation axis deviation, bolt difference in height is caused not to meet Standard criterion influences the installation quality of pre-embedded anchoring bolts, causes economic loss caused by subsequent steel column installation secondary treatment.
Utility model content
For above-mentioned technical problem in the related technology, the utility model proposes shoulder pole stocks, can overcome the prior art Above-mentioned deficiency.
To realize the above-mentioned technical purpose, the technical solution of the utility model is achieved in that
Shoulder pole stock, including steel plate main body, are equipped with filling concrete mouth in the middle part of the steel plate main body, under the steel plate main body Plate face is equipped with several retaining rings around the filling concrete mouth, and the retaining ring length is equal with pre-embedded anchoring bolts reach, institute It is equal with pre-embedded anchoring bolts diameter to state retaining ring internal diameter, the steel plate main body upper face two sides are respectively provided with two parallel load supports.
Further, the steel plate main body with a thickness of 10mm.
Further, the diameter of the filling concrete mouth is 500mm.
Further, the load support is fixedly connected with steel plate main body by being fully welded.
Further, load support be outer diameter be 48.3mm, thickness of pipe wall 3.6mm steel pipe.
Further, the steel plate main body and retaining ring are welded and fixed along the retaining ring outer wall with steel plate main body.
The utility model has the beneficial effects that the utility model shoulder pole stock, is formed using steel plate and steel-pipe welding, it can basis Different size of bolt group is adjusted, in advance prefabricated stock, when installation, by the secondary insertion retaining ring of bolt, is prevented on bolt Portion is swung effectively to screw thread protection, meanwhile, bolt group deviation and thread damage caused by avoiding because of concrete impact force, installation It is convenient to dismantle, and saves the duration.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only the utility model Some embodiments for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other attached drawings.
Fig. 1 is the main view of the shoulder pole stock according to the utility model embodiment;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the bottom view of Fig. 1.
In figure:
1, steel plate main body;2, filling concrete mouth;3, retaining ring;4, load support.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art's every other embodiment obtained, all belongs to In the range of the utility model protection.
As shown in Figure 1-3, the shoulder pole stock according to the utility model embodiment, including steel plate main body 1), the steel Filling concrete mouth 2 is equipped in the middle part of plate main body 1,1 lower face of steel plate main body is equipped with several buttons around the filling concrete mouth 2 Set 3,3 length of retaining ring is equal with pre-embedded anchoring bolts reach, 3 internal diameter of retaining ring and pre-embedded anchoring bolts diameter phase Two parallel load supports 4 are respectively provided with Deng, 1 upper face two sides of steel plate main body.
In the present embodiment, the steel plate main body 1 with a thickness of 10mm.
In the present embodiment, the diameter of the filling concrete mouth 2 is 500mm.
In the present embodiment, the load support 4 is fixedly connected with steel plate main body 1 by being fully welded.
In the present embodiment, the load support 4 be outer diameter be 48.3mm, thickness of pipe wall 3.6mm steel pipe.
In the present embodiment, the steel plate main body 1 weld along 3 outer wall of retaining ring and steel plate main body 1 solid with retaining ring 3 It is fixed.
In order to facilitate the above-mentioned technical proposal for understanding the utility model, below by way of practical new to this in specifically used mode The above-mentioned technical proposal of type is described in detail.
When specifically used, include the next steps:
(1) it is required according to construction drawing, at pre-embedded anchoring bolts, axis unwrapping wire positioning need to be carried out, mark it to determine Axial location and absolute altitude;By calculating, the base for post template that the has installed bolt group cross centre line suitable for reading that draws is drawn Indicate (i.e. bolt shoulder pole stock cross centre line), the preliminary installation site as bolt installation.
(2) it after being determined according to design drawing bolt absolute altitude, coordinate, is determined in advance according to bolt group position where calculating bolt Steel plate position where retaining ring, welds prefabricated (retaining ring outside weldings, inside are answered lossless and smooth) in advance, and bolt insertion has been made Combine closely to steel plate bottom and therewith in good shoulder pole stock retaining ring, bottom be welded and fixed stirrup (stirrup nominal diameter is suitable >= 14mm, welding position is within the scope of the 10cm of root) it is welded with all bolts in bolt group, frame body is welded in taking-up, uses For waste steel bar from column muscle and fixed stirrup oblique pull welding (axial location and absolute altitude where guaranteeing bolt group), brace preferably exceeds institute It welds two angle point foundation bolt 20mm-50mm and guarantees to be less than foundation columns back gauge.
(3) it is uniformly smeared at bolt thread using waste used oil, is tightly wrapped up using plastic film, wrap up number of plies 6- 12 layers.
(4) the shoulder pole stock made is installed, in the secondary insertion retaining ring of bolt, prevents bolt top from swinging.Using Steel tube fastener is vertically connect with load support, and opposite direction is connect with steel pipe at foundation columns reinforcing template, to adjust shoulder pole stock place Axial location.
(5) according to the mark line of base for post template drawn bolt group cross centre line suitable for reading and bolt shoulder pole stock cross Four line of center line is overlapped two-by-two, is corrected again by axial location where shoulder pole stock with cross searching line position, and fastener steps up, Fixed shoulder pole stock.
(6) from filling concrete mouth casting concrete, vibrating spear and bolt or shoulder pole stock are avoided in concrete vibrating Directly contact, in case therefore reason causes stock to be displaced.Before concrete initial set, handed over bolt shoulder pole stock central point and axis Point corrects (because of concreting, wooden model version slight change, therefore not selecting column mould cross centre line) again, reaches correct, Meet design requirement.
(7) after concrete final set, shoulder pole stock is removed, winds plastic film with adhesive tape to protect bolt thread.
In conclusion the utility model shoulder pole stock, is formed using steel plate and steel-pipe welding, it can be according to different size of spiral shell Bolt group is adjusted, in advance prefabricated stock, when installation, in the secondary insertion retaining ring of bolt, will prevent bolt top from swinging effectively right Screw thread protection, meanwhile, bolt group deviation and thread damage caused by avoiding because of concrete impact force are easy to install and disassemble, section Save the duration.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (6)

1. shoulder pole stock, which is characterized in that including steel plate main body (1), filling concrete mouth is equipped in the middle part of the steel plate main body (1) (2), steel plate main body (1) lower face is equipped with several retaining rings (3) around the filling concrete mouth (2), retaining ring (3) length Equal with pre-embedded anchoring bolts reach, retaining ring (3) internal diameter is equal with pre-embedded anchoring bolts diameter, the steel plate main body (1) upper face two sides are respectively provided with two parallel load supports (4).
2. shoulder pole stock according to claim 1, which is characterized in that the steel plate main body (1) with a thickness of 10mm.
3. shoulder pole stock according to claim 1, which is characterized in that the diameter of the filling concrete mouth (2) is 500mm。
4. shoulder pole stock according to claim 1, which is characterized in that the load support (4) is with steel plate main body (1) by being fully welded It is fixedly connected.
5. shoulder pole stock according to claim 1, which is characterized in that load support (4) be outer diameter be 48.3mm, thickness of pipe wall 3.6mm steel pipe.
6. shoulder pole stock according to claim 1, which is characterized in that the steel plate main body (1) and retaining ring (3) are buckled along described Set (3) outer wall is welded and fixed with steel plate main body (1).
CN201821860297.9U 2018-11-13 2018-11-13 Shoulder pole stock Expired - Fee Related CN209384678U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821860297.9U CN209384678U (en) 2018-11-13 2018-11-13 Shoulder pole stock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821860297.9U CN209384678U (en) 2018-11-13 2018-11-13 Shoulder pole stock

Publications (1)

Publication Number Publication Date
CN209384678U true CN209384678U (en) 2019-09-13

Family

ID=67864274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821860297.9U Expired - Fee Related CN209384678U (en) 2018-11-13 2018-11-13 Shoulder pole stock

Country Status (1)

Country Link
CN (1) CN209384678U (en)

Similar Documents

Publication Publication Date Title
CN104141318B (en) A kind of Large-diameter Steel tubing string suspension column construction method of installation
CN108678218A (en) Assembly concrete shear wall and its method of construction based on multipurpose thin-wall steel tube
CN103821280A (en) Construction method for steel tube confined concrete composite columns
CN111379359A (en) Building 3D printed wall column structure and construction method thereof
CN111676993A (en) Special construction method for constructing basement foundation by inserting steel structure
CN201377141Y (en) Reinforcing steel bar positioning clamp of reinforced concrete column
CN103061503B (en) A kind of ring beam template
CN209384678U (en) Shoulder pole stock
CN204343319U (en) Cableway pipe patten pre-embedded anchoring bolts jig
CN214832864U (en) Raft steel column base support
CN106930308A (en) Pile tube and cushion cap attachment structure
CN110158953A (en) Round silo thickness platform plate holes internal model bracing means and its construction method
CN216304401U (en) Prefabricated pier of sectional type
CN214005382U (en) Bridge bent cap staple bolt formwork system
CN211313434U (en) Positioner of independent basis embedded column base crab-bolt
CN204876084U (en) Steel column foot crab -bolt fixed bolster
CN209469540U (en) The lower tower segments of concrete tower and concrete tower with it
CN211200709U (en) Laminated beam connecting structure in fabricated building
CN209323555U (en) The moment connection structure and foundation structure of railroad bridge large-diameter tubular pile and cushion cap
CN203475413U (en) Pile foundation steel reinforcement cage structure
CN105735138A (en) Construction method for steel-concrete joint section of bridge
CN207003653U (en) A kind of ladder type section tubular turret structure
CN205618307U (en) Connection structure between a concrete tower section of thick bamboo and head tower section of thick bamboo
CN110130391A (en) Isolated footing pre-embedded bolt mounting structure and method
CN209636868U (en) A kind of post-poured strip of outer shear wall of basement is constructed the quick mounting device of cover board in advance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190913

CF01 Termination of patent right due to non-payment of annual fee