- CN111379359A CN111379359A CN202010185670.0A CN202010185670A CN111379359A CN 111379359 A CN111379359 A CN 111379359A CN 202010185670 A CN202010185670 A CN 202010185670A CN 111379359 A CN111379359 A CN 111379359A
- Authority
- CN
- China
- Prior art keywords
- printing
- wall body
- steel bar
- printed
- steel bars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/64—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
- E04B2/68—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete made by filling-up wall cavities
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B33—ADDITIVE MANUFACTURING TECHNOLOGY
- B33Y—ADDITIVE MANUFACTURING, i.e. MANUFACTURING OF THREE-DIMENSIONAL [3-D] OBJECTS BY ADDITIVE DEPOSITION, ADDITIVE AGGLOMERATION OR ADDITIVE LAYERING, e.g. BY 3-D PRINTING, STEREOLITHOGRAPHY OR SELECTIVE LASER SINTERING
- B33Y10/00—Processes of additive manufacturing
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B33—ADDITIVE MANUFACTURING TECHNOLOGY
- B33Y—ADDITIVE MANUFACTURING, i.e. MANUFACTURING OF THREE-DIMENSIONAL [3-D] OBJECTS BY ADDITIVE DEPOSITION, ADDITIVE AGGLOMERATION OR ADDITIVE LAYERING, e.g. BY 3-D PRINTING, STEREOLITHOGRAPHY OR SELECTIVE LASER SINTERING
- B33Y80/00—Products made by additive manufacturing
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (9)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911108571 | 2019-11-13 | ||
CN2019111085716 | 2019-11-13 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111379359A true CN111379359A (en) | 2020-07-07 |
Family
ID=71221520
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010185670.0A Pending CN111379359A (en) | 2019-11-13 | 2020-03-17 | Building 3D printed wall column structure and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111379359A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113047417A (en) * | 2021-01-28 | 2021-06-29 | 清华大学 | 3D printing assembly type box structure and connecting method thereof |
CN114033041A (en) * | 2021-11-08 | 2022-02-11 | 欢颜创新科技(杭州)有限公司 | House construction method and house |
CN114108841A (en) * | 2021-11-12 | 2022-03-01 | 哈尔滨工业大学 | 3D printed concrete constructional column bottom vertical steel bar anchoring member and construction method |
US11572692B2 (en) * | 2020-07-30 | 2023-02-07 | Icon Technology, Inc. | Extrudable building material wall structure and method |
NL2032649B1 (en) * | 2022-07-31 | 2024-02-06 | Cybe Construction Bv | Method for manufacturing a module for a building using 3D concrete printing |
-
2020
- 2020-03-17 CN CN202010185670.0A patent/CN111379359A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11572692B2 (en) * | 2020-07-30 | 2023-02-07 | Icon Technology, Inc. | Extrudable building material wall structure and method |
CN113047417A (en) * | 2021-01-28 | 2021-06-29 | 清华大学 | 3D printing assembly type box structure and connecting method thereof |
CN114033041A (en) * | 2021-11-08 | 2022-02-11 | 欢颜创新科技(杭州)有限公司 | House construction method and house |
CN114033041B (en) * | 2021-11-08 | 2023-10-13 | 欢颜创新科技(杭州)有限公司 | House construction method and house |
CN114108841A (en) * | 2021-11-12 | 2022-03-01 | 哈尔滨工业大学 | 3D printed concrete constructional column bottom vertical steel bar anchoring member and construction method |
NL2032649B1 (en) * | 2022-07-31 | 2024-02-06 | Cybe Construction Bv | Method for manufacturing a module for a building using 3D concrete printing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111379359A (en) | Building 3D printed wall column structure and construction method thereof | |
CN105625570B (en) | A kind of prefabricated beam column attachment means and preparation method thereof | |
CN103790265B (en) | A kind of prefabricated assembled steel tube concrete core pillar is put more energy into the making assembly method of shear wall | |
CN106968381B (en) | Assembled prefabricated shear wall and superimposed sheet node connected by combined grouting sleeve | |
CN111379360A (en) | On-site 3D printed wall column structure and construction method thereof | |
CN107130791A (en) | Combining aluminum alloy mould plate is used for the construction method of assembly concrete precast construction | |
CN106193286B (en) | The production method of assembling frame beam based on 3D printing | |
CN206267422U (en) | A kind of assembly concrete superposed column | |
CN109267585B (en) | Assembled prismatic table type foundation and column structure and assembling method | |
CN110056085A (en) | Can quick assembling FRP profile bean column node | |
CN210459769U (en) | Prefabricated hollow column and assembled concrete column | |
CN109208823B (en) | Quick-assembly built-in steel box type concrete filled steel tube column and production process thereof | |
CN104948202B (en) | The rapid-result assembled prefabricated components of a kind of tunnel mid-board | |
CN202299142U (en) | T-shaped bar for controlling positions and floating of hollow pipe | |
CN211873406U (en) | Precast concrete hollow wall structure | |
CN104908150B (en) | A kind of piping shaft making template and the method based on factorial praluction piping shaft | |
CN211080767U (en) | Superposed beam, superposed beam and cast-in-place column connecting node | |
CN206707004U (en) | Assembled architecture dry type bean column node | |
CN213572376U (en) | Prefabricated post, prefabricated beam overlap joint node | |
CN102409846B (en) | Hollow floor slab template for building and assembling method thereof | |
CN105822023A (en) | Prefabricated shear-resistant connecting part for rammed-earth wall, molding method of prefabricated shear-resistant connecting part and rammed-earth wall | |
CN217557810U (en) | Core area newly-added concrete column structure of original concrete beam column | |
CN219604686U (en) | Hollow steel skeleton prefabricated column with built-in combined metal template | |
CN219820130U (en) | Prefabricated forming device of concrete column reinforcement cage and factory forming form-removal-free hollow column | |
CN215166455U (en) | Low, multi-layer fully prefabricated assembled concrete structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: No. 3, courtyard No. 5, diazepam Road, Chaoyang District, Beijing Applicant after: CHINA STATE CONSTRUCTION ENGINEERING Corp.,Ltd. Applicant after: ZHONGJIAN ENGINEERING RESEARCH INSTITUTE Co.,Ltd. Applicant after: China Construction Second Engineering Bureau sunshine Intelligent Manufacturing Co., Ltd Address before: No. 3, courtyard No. 5, diazepam Road, Chaoyang District, Beijing Applicant before: CHINA STATE CONSTRUCTION ENGINEERING Corp.,Ltd. Applicant before: ZHONGJIAN ENGINEERING RESEARCH INSTITUTE Co.,Ltd. Applicant before: CHINA CONSTRUCTION SECOND BUREAU GUANGDONG CONSTRUCTION BASE Co.,Ltd. |