CN209636868U - A kind of post-poured strip of outer shear wall of basement is constructed the quick mounting device of cover board in advance - Google Patents

A kind of post-poured strip of outer shear wall of basement is constructed the quick mounting device of cover board in advance Download PDF

Info

Publication number
CN209636868U
CN209636868U CN201920175193.2U CN201920175193U CN209636868U CN 209636868 U CN209636868 U CN 209636868U CN 201920175193 U CN201920175193 U CN 201920175193U CN 209636868 U CN209636868 U CN 209636868U
Authority
CN
China
Prior art keywords
post
cover board
nut
cast strip
screw arbor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920175193.2U
Other languages
Chinese (zh)
Inventor
孙江
李洪宾
王玉宝
吕从友
王毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jingzhi Construction Ltd By Share Ltd
Original Assignee
Shandong Jingzhi Construction Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jingzhi Construction Ltd By Share Ltd filed Critical Shandong Jingzhi Construction Ltd By Share Ltd
Priority to CN201920175193.2U priority Critical patent/CN209636868U/en
Application granted granted Critical
Publication of CN209636868U publication Critical patent/CN209636868U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

It constructs the quick mounting device of cover board the utility model discloses a kind of post-poured strip of outer shear wall of basement, including post-cast strip cover board and the fixed device of the Screw arbor with nut at both-ends being connect with post-cast strip cover board, one end of Screw arbor with nut at both-ends is cast in the cover board of post-cast strip in advance;Screw arbor with nut at both-ends is cast in one end in the cover board of post-cast strip with Screw arbor with nut at both-ends anchorage head, and the Screw arbor with nut at both-ends anchorage head is to have threaded portion with the vertically disposed anchoring cross bar of Screw arbor with nut at both-ends, the other end of the Screw arbor with nut at both-ends.

Description

A kind of post-poured strip of outer shear wall of basement is constructed the quick mounting device of cover board in advance
Technical field
It does not pour to need to do in advance after waterproof backfills the utility model relates to all post-poured strip of outer shear wall of basement and pour The advanced construction cover board mounting technique of band is a kind of efficient, quick, safe, inexpensive mounting device.
Background technique
In the new institute's second phase project construction in the People's Hospital, Anqiu City North, because of much 20,000 square metres of underground monolayer area, week The post-cast strip quantity for enclosing shear wall is more.Traditional post-poured strip of outer shear wall of basement way are as follows: after the completion of main body, cut outside basement Power wall post-cast strip could supporting module, casting concrete, paving waterproof layer and backfill, the shortcomings that this way: because etc. main bodys it is complete It just can be carried out subsequent handling construction after portion completes, interval time is longer, process is various, higher cost, causes foundation pit timely Backfill influences the safety and spaciousness degree of duration and construction site.
Summary of the invention
The purpose of this utility model be the shortcomings that overcoming the construction method at traditional post-cast strip position research and develop it is a kind of it is advanced, Efficiently, post-poured strip of outer shear wall of basement mounting device fast, safe, inexpensive, in order to achieve the above objectives, the utility model The technical solution adopted is as follows:
A kind of post-poured strip of outer shear wall of basement is constructed the quick mounting device of cover board in advance, including is connect with post-cast strip cover board Screw arbor with nut at both-ends, one end of Screw arbor with nut at both-ends is cast in the cover board of post-cast strip by post-cast strip cover board;Screw arbor with nut at both-ends is cast in post-cast strip There is Screw arbor with nut at both-ends to anchor end for one end in cover board, and Screw arbor with nut at both-ends anchoring end is and the vertically disposed anchor of Screw arbor with nut at both-ends Gu the other end of cross bar, the Screw arbor with nut at both-ends has threaded portion.
It further include post-cast strip inner side template, Screw arbor with nut at both-ends passes through post-cast strip inner side template.
It further include mountain type card, feed screw nut is connect by tight two seamless steel pipes of mountain type clip with threaded portion.
The cross section of post-cast strip cover board is trapezoidal.
Consist of two parts, first is that there is the plane cover board of oblique triangle on both sides, second is that screw rod reinforces bolt, this programme is used Remaining concrete is poured as material after casting concrete, and post-cast strip is successively installed from below to up during the installation process, Pre-buried good bolt is fixed in post-cast strip steel bar, top molding, bolt screw rod end mountain type card and steel pipe are in turn mounted to It is fixed on the outside of template, can satisfy do waterproof requirement in advance through the above scheme.
The utility model in the new institute's second phase project in the People's Hospital, Anqiu City North all outer shear wall of basement into Application of having gone has high-efficient feature compared with traditional post-cast strip way, can be in advance to post-cast strip position waterproof and outside Foundation pit backfill is constructed, and the generation of the danger sources such as foundation pit collapse has been prevented, and can largely reduce construction cost, and will Duration shifts to an earlier date and keeps construction site more spacious.
Detailed description of the invention
Fig. 1 is horizontal sectional drawing after the installation of the utility model post-cast strip cover board;
Fig. 2 is the structural schematic diagram of the utility model post-cast strip cover board;
Fig. 3 is the structural schematic diagram of the utility model attachment device;
Fig. 4 is to be connected and fixed a schematic diagram on the inside of the cover board of the utility model post-cast strip;
Fig. 5 is arrangement schematic diagram on the outside of the cover board of the utility model post-cast strip;
In figure:
1, left wall;2, right wall;3, post-cast strip cover board;4, Screw arbor with nut at both-ends anchors end;5, Screw arbor with nut at both-ends;6, seamless steel Pipe;7, mountain type card;8, feed screw nut;9, post-cast strip inner side template;10, shear force wall reinforcing steel bar network;51, end is anchored;52;Screw thread Portion.
Specific embodiment
Embodiment, as shown in attached drawing 1, attached drawing 2 and attached drawing 3, post-poured strip of outer shear wall of basement cover board of constructing in advance is quick Mounting device, including the Screw arbor with nut at both-ends 5 connecting with post-cast strip cover board 3, one end of Screw arbor with nut at both-ends 5 is cast in by post-cast strip cover board 3 In post-cast strip cover board 3;Screw arbor with nut at both-ends 5 is cast in one end in post-cast strip cover board 3 and anchors end 4 with Screw arbor with nut at both-ends, described right Drawing screw rod anchoring end 4 is to have spiral shell with the vertically disposed anchoring end 51 of Screw arbor with nut at both-ends 5, the other end of the Screw arbor with nut at both-ends 5 Line portion 52.
It further include post-cast strip inner side template 9, Screw arbor with nut at both-ends 5 passes through post-cast strip inner side template 9.
It further include mountain type card 7, feed screw nut 8 clamps two seamless steel pipes 6 by mountain type card 7 and 52 screw thread of threaded portion connects It connects.
Such as attached drawing 4, post-cast strip cover board 3 is stamped on the top of left wall 1 and right wall 2, and left wall 1 and 2 lower part of right wall are set It is equipped with post-cast strip inner side template 9, is connected and fixed on the inside of the cover board of post-cast strip a little such as attached drawing 4, it is a little screw rod spiral shell that inside, which is connected and fixed, Female 8 positions.
As shown in Fig. 5, it is covered in post-cast strip cover board 3 on left wall 1 and right wall 2;The cross section of post-cast strip cover board 3 To be trapezoidal, shear force wall reinforcing steel bar network 10 is provided in the wall.
Post-cast strip cover board 3 consists of two parts, first is that there is the plane cover board of oblique triangle on both sides, second is that Screw arbor with nut at both-ends reinforces spiral shell Bolt composition, this programme use the remaining concrete after casting concrete to pour as material, and post-cast strip is in installation process In once mounting from below to up, pre-buried good Screw arbor with nut at both-ends mountain type is fixed to the reinforcing steel pipe for being scheduled on post-cast strip inner side template On, it is in turn mounted to top molding, can satisfy the requirement done waterproof in advance and backfill foundation pit through the above scheme.
The length of post-cast strip cover board 3 be it is 1.2 meters long, width be it is 0.6 meter wide, by Fig. 1 screw rod stretch out post-cast strip on the outside of Outside template, it is fixed in the inner side template of post-cast strip with mountain type card, 48 seamless steel pipe of diameter and feed screw nut, then feed screw nut Tighten, abut against concrete cover on the outside of shear wall, inside is reinforced, and so on complete remaining cover board installation it is straight At the top of to post-cast strip.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic It is equivalently replaced.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (4)

  1. The quick mounting device of cover board 1. a kind of post-poured strip of outer shear wall of basement is constructed in advance, including even with post-cast strip cover board (3) The Screw arbor with nut at both-ends (5) connect, it is characterised in that: one end of Screw arbor with nut at both-ends (5) is cast in post-cast strip cover board by post-cast strip cover board (3) (3) in;Screw arbor with nut at both-ends (5) is cast in one end in post-cast strip cover board (3) with Screw arbor with nut at both-ends anchoring end (4), described pair of drawing Screw rod anchors end (4) With threaded portion (52).
  2. The quick mounting device of cover board 2. a kind of post-poured strip of outer shear wall of basement as described in claim 1 is constructed in advance, it is special Sign is: further including post-cast strip inner side template (9), Screw arbor with nut at both-ends (5) passes through post-cast strip inner side template (9).
  3. The quick mounting device of cover board 3. a kind of post-poured strip of outer shear wall of basement as claimed in claim 2 is constructed in advance, it is special Sign is: further including mountain type card (7), feed screw nut (8) clamps two seamless steel pipes (6) and threaded portion by mountain type card (7) (52) it is threadedly coupled.
  4. The quick mounting device of cover board 4. a kind of post-poured strip of outer shear wall of basement as claimed in claim 2 is constructed in advance, it is special Sign is: the cross section of post-cast strip cover board (3) is trapezoidal.
CN201920175193.2U 2019-01-31 2019-01-31 A kind of post-poured strip of outer shear wall of basement is constructed the quick mounting device of cover board in advance Active CN209636868U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920175193.2U CN209636868U (en) 2019-01-31 2019-01-31 A kind of post-poured strip of outer shear wall of basement is constructed the quick mounting device of cover board in advance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920175193.2U CN209636868U (en) 2019-01-31 2019-01-31 A kind of post-poured strip of outer shear wall of basement is constructed the quick mounting device of cover board in advance

Publications (1)

Publication Number Publication Date
CN209636868U true CN209636868U (en) 2019-11-15

Family

ID=68492883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920175193.2U Active CN209636868U (en) 2019-01-31 2019-01-31 A kind of post-poured strip of outer shear wall of basement is constructed the quick mounting device of cover board in advance

Country Status (1)

Country Link
CN (1) CN209636868U (en)

Similar Documents

Publication Publication Date Title
CN206625254U (en) The guidance system of cast-in-place piping lane sliding system
CN200985564Y (en) TT-type built-in autospasy type anchorage
CN103088842A (en) Rubble retaining wall reinforced single-face pattern plate support system and construction method
CN107524471A (en) A kind of tunnel end plugging construction method
CN113216252A (en) Expansion joint reinforcing device and method for multi-section continuous casting of underground pipe gallery
CN207063522U (en) A kind of frame column high-supported formwork
CN203129203U (en) Rubble retaining wall reinforcing single-face formwork supporting system
CN214293702U (en) Convenient bellows positioning device for prefabricated box girder
CN205604547U (en) Anti GBF tubular construction that floats
CN209636868U (en) A kind of post-poured strip of outer shear wall of basement is constructed the quick mounting device of cover board in advance
CN217713886U (en) Comprehensive utilization platform in ultra-long distance small-diameter tunnel
CN108396783A (en) A kind of pre- closure grouting devices and methods therefor of basement roof pouring after settlement
CN106320184A (en) Novel fabricated bridge construction method
CN109853730A (en) A kind of novel precast reinforced concrete frame joint and its method of construction
CN206800981U (en) A kind of detachable builder's jack retainer ring
CN205532624U (en) Ground system is synthesized in reinforced concrete pipe piece tunnel
CN213449469U (en) Single-face template vertical mold reinforcing combined structure
CN206204992U (en) Detachable waterproof node structure between prefabricated comprehensive pipe gallery joints
CN206205012U (en) A kind of SMW engineering methods stake inclinometer pipe installation aiding device
CN211114443U (en) Reinforcing bar pre-embedding auxiliary device
CN210857183U (en) Porous grouting device
CN104727275B (en) Method for application of concrete work expansion joint vertical water sealing structure fixing element
CN208533863U (en) A kind of prefabricated girder of armored concrete
CN207211189U (en) The underground pipe gallery of enhanced 3D printing
CN205976108U (en) Double-sided prefabricated core filling wall structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant