CN209384052U - One kind borders on the river section ground - Google Patents
One kind borders on the river section ground Download PDFInfo
- Publication number
- CN209384052U CN209384052U CN201822132853.7U CN201822132853U CN209384052U CN 209384052 U CN209384052 U CN 209384052U CN 201822132853 U CN201822132853 U CN 201822132853U CN 209384052 U CN209384052 U CN 209384052U
- Authority
- CN
- China
- Prior art keywords
- river
- borders
- section ground
- roadbed
- embankment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
It borders on the river section ground the utility model discloses one kind.The section ground that borders on the river includes roadbed, borders on the river side equipped with Support in roadbed, is equipped with bed course at the top of Support, the embankment protection, barricade, roadbed slope foot being sequentially arranged from direction of bordering on the river to roadbed direction are provided at the top of bed course;The embankment protection and barricade extend each along riverbank.The ground of the utility model has the characteristics that easy for construction, comprehensive treatment effect is good, stability is high.
Description
Technical field
It borders on the river section ground the utility model relates to one kind, is particularly suitable for cut-fill subgrades with bordering on the river weak soil section
Base processing and protection against erosion processing, it is specifically a kind of to prevent from roadbed side slope to be washed emptying, differential settlement is reduced, raising partly fills out half
Dig a kind of processing technique of subgrade stability.
Background technique
The roadbed that borders on the river is easy to happen slope wash under the long term of water flow, and slope foot is emptied, semi-filling and semi-excavating weak soil section
Under the action of differential settlement, easily leads to crevice of roadbed deformation or even roadbed collapses, construction and operation to highway bring huge
Big risk.
Currently, mortar rubble masonry pavement is generally set in highway immerseable embankment, it is soft soil roadbed that cement mixing pile is mostly used to handle.
Mortar rubble masonry pavement is generally possible to be effectively prevented immersion slope erosion, and cement mixing pile also has soft soil foundation preferably
Effect.But for cut-fill subgrades in the weak soil section ground that borders on the river, even if the two joins together not can effectively solve
The phenomenon that side slope slope foot under extreme condition washes away, and empties, and differential settlement leads to roadbed settlement, collapsing.
It is excavation cutting on the right side of certain highway section, left side is filled-up ground and has invaded river embankment range, the river embankment
Ordinary water level is 2.2 ~ 2.4m, which closes on platform fosse, and be the main water passage of platform fosse, and fill toe is in long-term flow action
Lower presence, which is washed, empties slope foot risk.River embankment range is soft soil roadbed, the reachable 10m in weak soil depth part.Since the section is
Semi-filling and semi-excavating paragraph, and exist deeper soft soil roadbed below the embankment region of part, sliding is easily generated, crevice of roadbed is caused,
It even collapses, brings serious security risk.
Therefore it needs to design one kind and can effectively solve extreme condition slope foot and wash away and draw foot and settlement of subgrade can be inhibited
Lead to the sloughing that cracks, improves the comprehensive treatment technique of subgrade stability.
Utility model content
Weak soil section basement process is being bordered on the river and anti-(river water, seawater, lake water) washes away place to solve cut-fill subgrades
The problem of reason, the one kind that the utility model is intended to provide border on the river section ground, which has easy for construction, comprehensive treatment effect
Well, the features such as stability is high.
To achieve the goals above, the technical scheme adopted by the utility model is
One kind borders on the river section ground, including roadbed, is structurally characterized in that, borders on the river side equipped with Support in roadbed, is propping up
Support area top be equipped with bed course, be provided at the top of bed course the embankment protection being sequentially arranged from direction of bordering on the river to roadbed direction,
Barricade, roadbed slope foot;The embankment protection and barricade extend each along riverbank.
As a result, by setting Support, and embankment protection, barricade and roadbed slope are set on the bed course at the top of Support
Foot, to guarantee the secured and protection against erosion ability of ground.
Embodiment according to the present utility model can also make further optimization to the utility model, and the following are after optimization
The technical solution of formation:
Preferably, the cement mixing pile that the Support is vertically arranged by more is formed.It is highly preferred that more cement mixings
Stake is arranged at blossom type.
In order to improve the protective capacities of embankment, the side that the embankment protection borders on the river forms slope surface, the top of the embankment protection
Portion is equipped with gutter.
Preferably, the paving that the slope surface of the embankment protection is equipped with concrete cushion and is laid on concrete cushion
Paste layer.In this way, embankment protection can prevent river (sea, lake) water from washing away.
The slope foot of embankment protection is burst across equipped with stone masonry spats at the slope foot of the embankment protection in order to prevent.
In order to improve the integral strength and bearing capacity of roadbed, the top surface of the bed course is equipped with geotechnical grid.The geotechnique
Cell compartment is the two-way Grafting type earth lattice of two layers of monoblock type.
Preferably, the elevation of top surface of the embankment protection is greater than a-hundred-year water level plus the sum of hammed water height.
In order to preferably improve barricade protection against erosion ability, prevent roadbed from being washed away, the barricade is embankment formula barricade.Bed course
Upper setting embankment formula barricade, barricade wall bottom are to adapt to blotter, flat slope are set as, after barricade performs, it should be noted that wall is forward and backward right
Balance is claimed to banket.
Best, the utility model handles ground using cement mixing pile, one layer of blotter of stake top making.
The utility model includes three key technologies:
First is that berm with superloading is arranged on the outside of barricade, prevents from washing away, can also enhance roadbed overall stability.It is adopted on the outside of barricade
It is reinforced with berm with superloading, berm with superloading slope surface is implemented by immerseable embankment scheme.
Second is that the wall bottom of embankment formula barricade is arranged to flat slope to adapt to bed course.
Third is that the working procedure of barricade, symmetrical refilling is constructed before wall, after wall, guarantees barricade stability.
Compared with prior art, the utility model has the beneficial effects that
The ground of the utility model has many advantages, such as that easy for construction, Comprehensive Treatment effect is good, stability is high, has preferable
Promotional value.
Detailed description of the invention
Fig. 1 is the protection of the utility model one embodiment, basement process standard section figure;
Fig. 2 is immerseable embankment protection slope foot and cement mixing pile, blotter junction enlarged drawing in Fig. 1;
Fig. 3 is barricade in Fig. 1, blotter, cement mixing pile junction enlarged drawing.
In figure
1- roadbed;2- barricade;3- embankment protection;31- paving layer;32- concrete layer;33- stone masonry spats;4- boundary marker;
5- bed course;51- geotechnical grid;6-;The gutter 7-.
Specific embodiment
The utility model is described in detail below with reference to attached drawing and in conjunction with the embodiments.It should be noted that not conflicting
In the case where, the feature in the embodiments of the present invention and embodiment can be combined with each other.For sake of convenience, hereinafter such as
There is "upper", "lower", "left", "right" printed words, only indicates consistent with the upper and lower, left and right direction of attached drawing itself, not to structure
Play restriction effect.
One kind borders on the river section ground, as shown in Figure 1-3, including roadbed 1, borders on the river side equipped with Support in roadbed 1, is propping up
The top for supportting area is equipped with (rubble) bed course 5, is disposed at the top of (rubble) bed course 5 from direction of bordering on the river to 1 direction of roadbed
The embankment protection 3 of arrangement, barricade 2, roadbed 1 slope foot.The embankment protection 3 and barricade 2 extend each along riverbank.Wherein roadbed
1 slope foot is arranged in side of bordering on the river.
As shown in Figure 1, ground is handled using cement mixing pile 6, and cement mixing pile 6 is flat by taking certain certain section of high speed as an example
Height is 8m, blossom type arrangement, stake spacing 1.3m.Barricade top making 50cm blotter 5, the top of blotter 5 setting embankment
The outside of formula barricade 2, the high 4m of average wall of embankment formula barricade 2, embankment formula barricade 2 is reinforced using berm with superloading, berm with superloading slope
Face by immerseable embankment protection 3 scheme implement (with a thickness of 10cm the solid hexagonal block paving layer 31+ of C25 with a thickness of 5cm C15
Stone masonry spats 33 is arranged in micro aggregate concrete bed course 32, lower part), gutter 7 is set on berm with superloading, and gutter 7 is risen
Journey is higher than the a-hundred-year+50cm hammed water height of platform fosse, i.e., elevation is at least 4.64m.
Fig. 2 is enlarged drawing at A in Fig. 1, i.e. the slope foot and cement mixing pile 6,5 knot of blotter of immerseable embankment protection 3
Enlarged drawing at conjunction is mainly solved the problems, such as follows by the design:
1) slope protection lower part setting spats can whole slope stability;
2) after spats and blotter 5 overlap, lower part handles globality and reinforces, and also tunable is soft soil roadbed uneven heavy
Drop.
Fig. 3 is the partial enlarged view in Fig. 1 at B, i.e. barricade, blotter 5,6 junction enlarged drawing of cement mixing pile.It is logical
The total bearing capacity that making blotter 5 can be improved to ground 1 is crossed, setting two layers of geotechnical grid 51 in the top of blotter 5 is reinforced
Integral strength and the plate body effect of roadbed, prevent settlement of subgrade from generating reflection crack.By the way that embankment formula barricade is arranged
2, it resists destabilization of roadbed and generates sliding.
Referring to Fig. 1, Fig. 2, Fig. 3, soft soil foundation 1 is handled using cement mixing pile 6 first, is guaranteed outside slope foot at least
There is a campshed, one layer of blotter 5 of stake top making after processing is two-way high-strength in two layers of monoblock type of top surface making of blotter 5
Grafting type earth lattice to improve 1 bearing capacity of ground, while can also play the role of coordinating inter-pile soil and pile body deformation.
Embankment formula barricade 2 is performed on blotter 5, after embankment formula barricade 2 performs, it should be noted that the forward and backward symmetrical balance of wall
Banket, purpose be it is reinforcing road bed, play the role of resist embankment section roadbed glide because of differential settlement.
It is reinforced on the outside of barricade using berm with superloading, berm slope surface is implemented by immerseable embankment scheme, and immerseable embankment uses 10cm
The C15 micro aggregate concrete bed course 32 of the 5cm of the thick solid hexagonal block paving layer 31+ thickness of C25 protects, and stone masonry is arranged in lower part
Spats 33, the elevation of immerseable embankment protection 3 are that the a-hundred-year water level of platform fosse adds 50cm hammed water high.
The content that above-described embodiment illustrates should be understood as that these embodiments are only used for being illustrated more clearly that the utility model,
Rather than limitation the scope of the utility model, after having read the utility model, those skilled in the art are practical new to this
The modification of the various equivalent forms of type each falls within the application range as defined in the appended claims.
Claims (10)
- The section ground 1. one kind borders on the river, including roadbed (1), which is characterized in that side is bordered on the river equipped with Support in roadbed (1), The top of Support is equipped with bed course (5), is provided at the top of bed course (5) from direction is bordered on the river and is sequentially arranged to roadbed (1) direction Embankment protection (3), barricade (2), roadbed (1) slope foot;The embankment protection (3) and barricade (2) extend each along riverbank.
- 2. the section ground according to claim 1 that borders on the river, which is characterized in that the water that the Support is vertically arranged by more Mud mixing pile (6) formation.
- 3. the section ground according to claim 2 that borders on the river, which is characterized in that more cement mixing piles (6) are at blossom type cloth It sets.
- 4. the section ground according to claim 1 that borders on the river, which is characterized in that the side shape that the embankment protection (3) is bordered on the river At slope surface, the top of the embankment protection (3) is equipped with gutter (7).
- 5. the section ground according to claim 4 that borders on the river, which is characterized in that in the slope surface of the embankment protection (3) Equipped with concrete cushion (32) and the paving layer (31) being laid on concrete cushion (32).
- 6. the section ground according to claim 4 that borders on the river, which is characterized in that be equipped at the slope foot of the embankment protection (3) Stone masonry spats (33).
- 7. the section ground according to claim 1 to 6 that borders on the river, which is characterized in that the top surface of the bed course (5) Equipped with geotechnical grid (51).
- 8. the section ground according to claim 7 that borders on the river, which is characterized in that the geotechnical grid (51) is two layers of monoblock type Two-way Grafting type earth lattice.
- 9. the section ground according to claim 1 to 6 that borders on the river, which is characterized in that the embankment protection (3) Elevation of top surface is greater than a-hundred-year water level plus the sum of hammed water height.
- 10. the section ground according to claim 1 to 6 that borders on the river, which is characterized in that the barricade (2) is embankment Formula barricade.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822132853.7U CN209384052U (en) | 2018-12-19 | 2018-12-19 | One kind borders on the river section ground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822132853.7U CN209384052U (en) | 2018-12-19 | 2018-12-19 | One kind borders on the river section ground |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209384052U true CN209384052U (en) | 2019-09-13 |
Family
ID=67872350
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822132853.7U Active CN209384052U (en) | 2018-12-19 | 2018-12-19 | One kind borders on the river section ground |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209384052U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111501662A (en) * | 2020-01-19 | 2020-08-07 | 浙江广川工程咨询有限公司 | Soft soil foundation dyke structure |
CN112301953A (en) * | 2020-11-25 | 2021-02-02 | 廊坊中达水利工程有限公司 | Construction method for river course slope protection slope toe by cement soil mixing pile |
CN114484075A (en) * | 2020-10-23 | 2022-05-13 | 中国石油天然气股份有限公司 | Pipeline protection device |
-
2018
- 2018-12-19 CN CN201822132853.7U patent/CN209384052U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111501662A (en) * | 2020-01-19 | 2020-08-07 | 浙江广川工程咨询有限公司 | Soft soil foundation dyke structure |
CN114484075A (en) * | 2020-10-23 | 2022-05-13 | 中国石油天然气股份有限公司 | Pipeline protection device |
CN112301953A (en) * | 2020-11-25 | 2021-02-02 | 廊坊中达水利工程有限公司 | Construction method for river course slope protection slope toe by cement soil mixing pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209384052U (en) | One kind borders on the river section ground | |
CN106930231B (en) | A kind of construction method applied to engineering flood bank reinforcing of passing the flood period | |
CN103981876B (en) | For deep soft foundation river course be close to combined member and the construction method that river embankment is built together | |
CN108385707A (en) | It is a kind of basic for the rigid-flexible mechanical arm of Deep Thick Soft Ground Area sluice and pumping plant | |
CN111335100A (en) | Embankment structure suitable for coastal region and construction method thereof | |
CN102234995B (en) | Ecological overtopping dam and construction method thereof | |
CN207228101U (en) | A kind of sand compaction pile for being used in the soft soil foundation of deep water off-lying sea reinforce vertical type shore protection | |
CN208039220U (en) | A kind of old roadbed develops the base formation of stake reinforcing in column hammer | |
CN107794816B (en) | Embankment combined roadbed structure and construction method | |
CN110295573A (en) | Adapt to the channel revetment project post-evaluation structure of construction time severe hydrometeorological condition | |
CN202430682U (en) | Permeable jetty | |
CN213571767U (en) | Ecological reinforced structure of river course shore protection | |
CN204703176U (en) | Steel concrete open caisson is cheated in hole in soft clay area | |
CN210507517U (en) | Combined member suitable for retaining wall heightening | |
CN209958345U (en) | Cement-soil mixing pile composite foundation for reinforcing revetment | |
CN106087941B (en) | The method for processing foundation of big thickness lattice cement soil padding wall in weak soil | |
CN208533285U (en) | Short linkage section is excavated without slope light road bank structure after the deep first precompressed of ultra-soft soil | |
CN207405640U (en) | Stake film is combined cofferdam with soil | |
CN220908437U (en) | High-strength impervious cofferdam structure | |
CN209194456U (en) | Antiseepage landslide-proofing bank protection structure | |
CN211596696U (en) | Intercepting ditch for drainage of loess landslide earth surface | |
CN109267541A (en) | A kind of hybrid revetment structure | |
CN214784131U (en) | Soil and rockfill toe reinforced structure on soft foundation | |
CN210684601U (en) | Sluice draws port retaining wall outward | |
CN217419193U (en) | Prevent ecological gutter of jam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |