CN209369223U - A kind of hall's hyperboloid stone material dry suspending structure - Google Patents
A kind of hall's hyperboloid stone material dry suspending structure Download PDFInfo
- Publication number
- CN209369223U CN209369223U CN201821782032.1U CN201821782032U CN209369223U CN 209369223 U CN209369223 U CN 209369223U CN 201821782032 U CN201821782032 U CN 201821782032U CN 209369223 U CN209369223 U CN 209369223U
- Authority
- CN
- China
- Prior art keywords
- stone material
- track
- connect
- hall
- stone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model relates to a kind of hall's hyperboloid stone material dry suspending structures, including angle steel, fixing piece, orbital member, stone material choose part and hanging piece for stone, the angle steel is connect with orbital member, orbital member includes the first track and the second track, and the first track is located above the second track, the first track and the setting of the second orbital spacing, stone material is chosen part and is connect with the first track, and hanging piece for stone is connect with the second track.For a kind of hall's hyperboloid stone material dry suspending structure of the utility model without scene fluting, construction is existing without cutting, reduces construction site dust pollution, eliminates component environment pollution hidden trouble;In addition, improving the efficiency of stone material installation, cost has been saved;And professional's operation is not needed, popular construction improves speed of application, is conducive to standardized work.
Description
Technical field
The utility model relates to building decoration technology field, in particular to a kind of hall's hyperboloid stone material dry suspending structure.
Background technique
At present in installing construction field, reinforcing bar mainly is done with fashioned iron to the cladding installation base keel construction of stone material
Frame, live stone material are manually slotted, and are manually carried out Field Installed Accessories, are connect with steelframe, artificial construction's low efficiency, live slotted ring
Border is seriously polluted.Now with the improvement of people's living condition, and haze is increasingly severe, and country carries out construction industry
Limitation, therefore, it is necessary to avoid stone material fluting pollution on the environment.
Utility model content
In order to solve problems in the prior art, provide one kind can reduce construction site environmental pollution to the utility model,
Improve stone material installation effectiveness, lower-cost hall's hyperboloid stone material dry suspending structure.
Specific technical solution is as follows: a kind of hall's hyperboloid stone material dry suspending structure, including angle steel, fixing piece, orbital member, stone
Material chooses part and hanging piece for stone, and the angle steel is connect with orbital member, and orbital member includes the first track and the second track, the first track position
Above the second track, the first track and the setting of the second orbital spacing, stone material chooses part and connect with the first track, hanging piece for stone and the
The connection of two tracks.
The following are the attached technical schemes of the utility model.
Preferably, first track and the second track are vertically arranged.
Preferably, it includes the first mounting groove and the first clamping groove, the first mounting groove and first that the stone material, which chooses part,
Track connection, the notch of the first clamping groove is upward, and the first clamping groove is connect with stone material.
Preferably, the hanging piece for stone includes the second mounting groove and the second clamping groove, the second mounting groove and second
Track connection, the notch of the second clamping groove is downward, and the second clamping groove is connect with stone material.
Preferably, the angle steel is fixed on wall cylindrical surface by setscrew.
Preferably, the stone material is chosen part and hanging piece for stone and is connect by binder with stone material.
Preferably, the orbital member has hollow-out parts, and hollow-out parts side is equipped with adjutage, adjutage and the first rail
Road is generally aligned in the same plane, and adjutage end is equipped with hook part, and hook part is towards hollow-out parts.
The technical effect of the utility model: a kind of hall's hyperboloid stone material dry suspending structure of the utility model is opened without scene
Slot, construction is existing without cutting, reduces construction site dust pollution, eliminates component environment pollution hidden trouble;In addition, improving stone material
The efficiency of installation, has saved cost;And professional's operation is not needed, popular construction improves speed of application, is conducive to standard
It is turned into industry.
Detailed description of the invention
Fig. 1 is a kind of schematic diagram of hall's hyperboloid stone material dry suspending structure of the utility model embodiment.
Fig. 2 is the schematic diagram of the orbital member of the utility model embodiment.
Fig. 3 is that the stone material of the utility model embodiment chooses the schematic diagram of part.
Fig. 4 is the schematic diagram of the hanging piece for stone of the utility model embodiment.
Fig. 5 is the schematic diagram of the stone material of the utility model embodiment.
Specific embodiment
In the following, being further described in conjunction with substantive distinguishing features and advantage of the example to the utility model, but this is practical new
Type is not limited to listed embodiment.
As shown in Figures 1 to 5, a kind of hall's hyperboloid stone material dry suspending structure of the present embodiment includes angle steel 1, fixing piece 2,
Orbital member 3, stone material choose part 4 and hanging piece for stone 5, and the angle steel 1 is connect with orbital member 3.Orbital member 3 includes the first track 31 and the
Two tracks 32, the first track 31 are located at the top of the second track 32, the first track and the setting of the second orbital spacing, stone material choose part 4 with
The connection of first track 31, hanging piece for stone 5 are connect with the second track 32.In above-mentioned technical proposal, stone material 6 respectively with hanging piece for stone and
Stone material chooses part connection, then chooses part by stone material again and connect with the first track, and hanging piece for stone is connect with the second track, so that
The connection that stone material slots and chooses part with hanging piece for stone, stone material can be completed the process in back court, need to only connect installation at the construction field (site)
, avoid and carry out stone material fluting generation dust pollution at the scene.In the present embodiment, fixing piece 2 is bolt.
In the present embodiment, first track 31 and the second track 32 are vertically arranged, to make stone material and the first, second rail
It can be vertical after road connection.
In the present embodiment, it includes the first mounting groove 41 and the first clamping groove 42 that the stone material, which chooses part 4, the first mounting groove 41 with
The connection of first track 31, upwards, the first clamping groove 32 is connect the notch 421 of the first clamping groove 42 with stone material 6.Pass through above-mentioned technology
Scheme can be attached support to stone material by the first side 422 of the first clamping groove.
In the present embodiment, the hanging piece for stone 5 includes the second mounting groove 51 and the second clamping groove 52, the second mounting groove 51 with
The connection of second track 32, downwards, the second clamping groove 51 is connect the notch 521 of the second clamping groove 52 with stone material 8.Pass through above-mentioned technology
Scheme can be attached support to stone material by the second side 522 of the second clamping groove.
In the present embodiment, the angle steel 1 is crossed setscrew 7 and is fixed on wall cylindrical surface 9, consequently facilitating angle steel is fixed.
In the present embodiment, the stone material is chosen part 4 and hanging piece for stone 5 and is connect by binder 10 with stone material, to make to connect
It is more firm.
In the present embodiment, the orbital member 3 has hollow-out parts 33, and 33 side of hollow-out parts is equipped with adjutage 34, adjutage 34
It is generally aligned in the same plane with the first track 31,34 end of adjutage is equipped with hook part 341, and hook part is towards hollow-out parts.Pass through above-mentioned technology
Scheme, keel can be threaded through in hollow-out parts, thus reinforcement structure stability.
A kind of construction method of hall's hyperboloid stone material dry suspending structure of the present embodiment is as follows: 1, according to design drawing, inspection
Facade flatness is looked into, suitable combination is selected, surveying setting-out marks the position of keel and wall cylindrical surface drilling point;2, lead to
It crosses expansion bolt or angle steel is fixed on wall cylindrical surface by chemical anchor bolts, the spacing of keel is determined according to the size of stone material typesetting;3,
The orbital member 3 customized is fixed on above angle steel by fixing piece 2 after the completion of angle steel is fixed;4, stone material completes the process in factory
Afterwards, plate face walkthrough is carried out in factory, under the premise of there is no problem, according to the spacing of the first, second track of on-site customization, in factory
Customization stone material chooses part 4 and hanging piece for stone 5, bonds finished product by adhesive special 10 and stone material 8;5, whether each position connection is checked
Stone material is pressed design requirement, successively slides into mounting groove from the side of the first, second track, be finally completed whole plate metope by fastening
Stone material assembling.
For a kind of hall's hyperboloid stone material dry suspending structure of the present embodiment without scene fluting, construction is existing without cutting, reduces
Construction site dust pollution eliminates component environment pollution hidden trouble;In addition, improving the efficiency of stone material installation, cost has been saved;
And professional's operation is not needed, popular construction improves speed of application, is conducive to standardized work.
It should be pointed out that above-mentioned preferred embodiment is only to illustrate the technical ideas and features of the present invention, purpose
It is to enable those skilled in the art to understand the contents of the present invention and implement them accordingly, this reality can not be limited with this
With novel protection scope.All equivalent change or modifications according to made by the spirit of the present invention essence, should all cover in this reality
Within novel protection scope.
Claims (7)
1. a kind of hall's hyperboloid stone material dry suspending structure, which is characterized in that including angle steel, fixing piece, orbital member, stone material choose part and
Hanging piece for stone, the angle steel are connect with orbital member, and orbital member includes the first track and the second track, and the first track is located at the second rail
Above road, the first track and the setting of the second orbital spacing, stone material are chosen part and are connect with the first track, and hanging piece for stone and the second track connect
It connects.
2. hall's hyperboloid stone material dry suspending structure according to claim 1, which is characterized in that first track and second
Track is vertically arranged.
3. hall's hyperboloid stone material dry suspending structure according to claim 1, which is characterized in that it includes that the stone material, which chooses part,
One mounting groove and the first clamping groove, the first mounting groove are connect with the first track, and the notch of the first clamping groove is upward, the first clamping groove
It is connect with stone material.
4. hall's hyperboloid stone material dry suspending structure according to claim 1, which is characterized in that the hanging piece for stone includes the
Two mounting grooves and the second clamping groove, the second mounting groove are connect with the second track, and the notch of the second clamping groove is downward, the second clamping groove
It is connect with stone material.
5. hall's hyperboloid stone material dry suspending structure according to claim 1, which is characterized in that the angle steel passes through expanding screw
Silk is fixed on wall cylindrical surface.
6. hall's hyperboloid stone material dry suspending structure according to claim 1, which is characterized in that the stone material chooses part and stone material
Pendant is connect by binder with stone material.
7. hall's hyperboloid stone material dry suspending structure according to claim 1, which is characterized in that the orbital member has hollow out
Portion, hollow-out parts side are equipped with adjutage, and adjutage is generally aligned in the same plane with the first track, and adjutage end is equipped with hook part, hook part
Towards hollow-out parts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821782032.1U CN209369223U (en) | 2018-10-31 | 2018-10-31 | A kind of hall's hyperboloid stone material dry suspending structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821782032.1U CN209369223U (en) | 2018-10-31 | 2018-10-31 | A kind of hall's hyperboloid stone material dry suspending structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209369223U true CN209369223U (en) | 2019-09-10 |
Family
ID=67835420
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821782032.1U Active CN209369223U (en) | 2018-10-31 | 2018-10-31 | A kind of hall's hyperboloid stone material dry suspending structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209369223U (en) |
-
2018
- 2018-10-31 CN CN201821782032.1U patent/CN209369223U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202882307U (en) | Decoration system of dry-hanging resin wall surface | |
CN112554489A (en) | Freely-leveled wallboard mounting structure and mounting method thereof | |
CN207469649U (en) | One kind can adjust, dismountable integrated wall Modularized installing structure | |
CN209369223U (en) | A kind of hall's hyperboloid stone material dry suspending structure | |
CN206625432U (en) | Adjustable type lightgage steel joist | |
CN203008371U (en) | Cast-in-place concrete stand suspended mold installation structure | |
CN210947282U (en) | Mounting structure of assembled fossil fragments partition wall | |
CN202586247U (en) | An adjustable lightning belt support | |
CN213741688U (en) | Heat insulation structure convenient for replacing outer decorative surface layer | |
CN204189388U (en) | A kind of modularization fast-assembling finished door head | |
CN104318860A (en) | Modularization fast mounted finished product door head and installation technology thereof | |
CN213204597U (en) | Stone curtain wall at cornice closing-in opening of inclined roof | |
CN206815604U (en) | Assembly type curtain wall aluminum alloy adjusts structure | |
CN102400507A (en) | Decoration line system for back-bolt curtain wall | |
CN214034548U (en) | Steel plate clamping piece | |
CN216840175U (en) | A novel keel structure for building engineering | |
CN216076270U (en) | Civil engineering main part construction quick assembly disassembly template equipment | |
CN210967301U (en) | Plate cutting device for building model | |
CN210421761U (en) | Assembly type novel adjustable dry hanging assembly | |
CN213358338U (en) | Bridge is decorated and is used molding plate | |
CN220521701U (en) | Curtain veneer and fossil fragments connection structure | |
CN219671820U (en) | Assembled balance type keel suspended ceiling | |
CN205558307U (en) | Installation of large -scale marble TV wall is with balanced slide rail | |
CN202359708U (en) | Decorative moulding system of back-bolt curtain wall | |
CN206722182U (en) | Thick china adjuster |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |