CN209369065U - A kind of shower house waterproofing node - Google Patents
A kind of shower house waterproofing node Download PDFInfo
- Publication number
- CN209369065U CN209369065U CN201822152283.8U CN201822152283U CN209369065U CN 209369065 U CN209369065 U CN 209369065U CN 201822152283 U CN201822152283 U CN 201822152283U CN 209369065 U CN209369065 U CN 209369065U
- Authority
- CN
- China
- Prior art keywords
- bar
- floor
- sealing rod
- water
- concrete sealing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model relates to a kind of shower house waterproofing nodes comprising floor and wall;Concrete sealing rod and the cement mortar screeding layer positioned at concrete sealing rod two sides are poured on floor, are adhesive with floor tile above cement mortar screeding layer;It is socketed with water bar outside concrete sealing rod, connection structure is had additional between water bar and floor;Connection structure includes bar planting slot, vertical bar and transverse bar;Bar planting slot is evenly equipped with multiple along straight line, and a vertical bar is inserted in each bar planting slot;Vertical bar bottom is vertically and fixedly provided with connection steel disc;All vertical bars are connected as entirety by transverse bar;Slab surfaces are formed with rough surface, and rough surface corresponds to concrete sealing rod bottom;The polyurethane water-proof layer for the oversite concrete sealing rod having additional between floor and floor tile, water bar are located above polyurethane water-proof layer.The utility model is welded to connect steel disc in vertical bar bottom, improves the bonding strength between vertical bar and bar planting slot, between concrete sealing rod and floor.
Description
Technical field
The utility model relates to the waterproof technique fields of shower house, more particularly, to a kind of shower house waterproofing node.
Background technique
The edge of shower house can be arranged water bar and the space in shower house and the space inside lavatory is made to carry out rent, from
And prevent the case where who is oozed out from shower house when the bathing in shower house appearance.
Authorization Notice No. is that the Chinese patent of CN206205169U discloses a kind of shower house water bar installation node, is belonged to
Construction engineering technical field comprising water bar, the enabling being mounted on above water bar and the limit being mounted below water bar
Mechanism, the position-limit mechanism include several uniformly distributed bar plantings and round steel, in the equal insert structure layer in bar planting bottom, bar planting top
Portion's height is all the same, is welded to connect at the top of bar planting with round steel, is equipped on the outside of bar planting and round steel matched with water bar bottom groove
Flange, three face of flange are wrapped up using waterproof layer;The water bar is mounted on flange, and ecto-entad is arranged in water bar top surface
Tilt down the gradient, the enabling is mounted on above water bar, and the lower edge of enabling is equipped with the water bar top surface gradient to matching
Sealing strip.
Prior art among the above has the following deficiencies: that bar planting is inserted between structure sheaf, since bar planting is usually adopted
Cause the connection between water bar and structure sheaf strong so the bonding strength between bar planting and structure sheaf is insufficient with plain steel-bar
Degree is insufficient, so that waterproof effect be caused to decline.
Summary of the invention
The purpose of the utility model is to provide a kind of shower house waterproofing nodes, can be improved between water bar and structure sheaf
Bonding strength, to improve waterproof effect.
The foregoing invention purpose of the utility model has the technical scheme that
Including building original structure, the wall that the building original structure includes floor and is perpendicularly fixed on the floor;Institute
It states and is provided with concrete sealing rod on floor, the two sides of the concrete sealing rod are provided with cement mortar screeding layer, and described
Cement mortar screeding layer is fixedly arranged above floor tile;Water bar is socketed with outside the concrete sealing rod;The water bar with
Connection structure is had additional between floor;The connection structure includes the bar planting slot being opened on floor, is inserted in the bar planting slot
Interior vertical bar and the transverse bar being fixed at the top of the vertical bar;The bar planting slot be evenly equipped with along straight line it is multiple, and described in each
A vertical vertical bar is inserted in bar planting slot;One end of the vertical bar towards bar planting slot slot bottom is vertically and fixedly provided with connection steel
Piece, gluing cooperates between the vertical bar and bar planting slot inner wall;All vertical bars are connected as entirety by the transverse bar;The slab surfaces
It is formed with rough surface, and concrete sealing rod bottom corresponds to the rough surface setting;It is added between the floor and floor tile
There is polyurethane water-proof layer, the polyurethane water-proof layer covers the concrete sealing rod setting, and the water bar is positioned at described
Above polyurethane water-proof layer.
By using above-mentioned technical proposal, since vertical bar bottom is fixed with connection steel disc, in work progress, first in bar planting slot
Then the vertical bar for being welded with connection steel disc is inserted into bar planting slot by interior spreading glue.Connection steel disc can increase vertical bar and plant
Contact area between muscle slot enhances the waterproof effect of water-proof strip to improve the bonding strength between vertical bar and bar planting slot.Slightly
The setting of matte can increase the mechanical snap power between concrete sealing rod and floor, to improve concrete sealing rod and building
Structural integrity between plate enhances the waterproof effect of water-proof strip.
Wherein, in practice of construction, water bar uses quartz and natural marble, so that waterproof, hydrophobic effect are improved,
Reduce water directly to contact with concrete sealing rod.
The utility model is further arranged to: link slot, and the end of the concrete sealing rod are offered on the wall
Portion is inserted into the link slot.
By using above-mentioned technical proposal, the connection integrity between concrete sealing rod and wall is improved, to mention
The high anti-bending strength of concrete sealing rod, and concrete sealing rod, floor and wall is made to form entirety, improve waterproof
Effect.
The utility model is further arranged to: the link slot corresponds to the side of concrete sealing rod end inserted with more
Dowel, the dowel is in horizontally disposed;The dowel is fixed on far from one end of link slot close to dowel setting
In vertical bar.
By using above-mentioned technical proposal, the bonding strength between concrete sealing rod and wall is further improved.By
The effect of tension is played inside concrete sealing rod in vertical bar and transverse bar, and dowel is set in wall and is coupled with most
In close vertical bar, the bending resistance and tensile strength of the part that concrete sealing rod is located inside wall can be improved.
The utility model is further arranged to: the dowel uses screw-thread steel.
By using above-mentioned technical proposal, the machinery between dowel and wall, dowel and concrete sealing rod is improved
Bite force, so that the connection between concrete sealing rod and wall is stronger.
The utility model is further arranged to: building screed-coat, institute are had additional between the floor and polyurethane water-proof layer
Building screed-coat end is stated to fix with the concrete sealing rod.
By using above-mentioned technical proposal, the setting for building screed-coat can be to the seam between floor and concrete sealing rod
Gap is filled, to further increase the bonding strength between concrete sealing rod and floor.
The utility model is further arranged to: clay filled layer is had additional between the water bar and polyurethane water-proof layer;
Filling irrigating sealant is formed between the floor tile and polyurethane water-proof layer, the clay filled layer extends in filling irrigating sealant.
By using above-mentioned technical proposal, clay is the pureed plastic solid for having very strong bond properties, is had preferable
Sealing effect, can be improved the sealing structure between water bar and polyurethane water-proof layer.Due to usually making inside shower house
With hot water, floor tile is caused to will appear the case where expanding with heat and contract with cold, the setting of filling irrigating sealant can give the space of floor tile deformation.
The utility model is further arranged to: the water bar bottom is pushed against in the upper surface of the floor tile, and the gear
The side of water bar towards concrete sealing rod is flushed with one end of floor tile towards concrete sealing rod.
By using above-mentioned technical proposal, avoid the generation of vertical connecting sewing, thus improve water bar and floor tile it
Between connection sealing.
The utility model is further arranged to: the junction of the marginal position of the water bar and the wall has additional cloud
Stone glue filled layer.
By using above-mentioned technical proposal, the leakproofness and bonding strength between water bar and wall are improved.
In conclusion the advantageous effects of the utility model are as follows:
1. the bonding strength between vertical bar and bar planting slot is improved, to increase by being welded to connect steel disc in vertical bar bottom
Strong bonding strength between concrete sealing rod and floor, to improve the waterproof effect of concrete sealing rod;
2. concrete sealing rod is extend into wall, and be arranged between wall and concrete sealing rod dowel into
Row is fixed, and the sealing effect between concrete sealing rod and wall is improved, to improve waterproof effect.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model.
Fig. 2 is A-A sectional view in Fig. 1.
In figure, 1, building original structure;11, floor;111, rough surface;12, wall;2, concrete sealing rod;21, cement bonded sand
Starch screed-coat;3, connection structure;31, bar planting slot;32, vertical bar;321, steel disc is connected;33, transverse bar;4, link slot;41, it connects
Muscle;5, screed-coat is built;6, polyurethane water-proof layer;7, alite paste binder course;71, floor tile;711, filling irrigating sealant;8, clay is filled
Layer;9, water bar;91, cloud stone glue filled layer;10, sliding door.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
It referring to Fig.1, is a kind of shower house waterproofing node disclosed by the utility model, including building original structure 1, the building
Original structure 1 includes floor 11 and the wall 12 being perpendicularly fixed on the floor 11.
11 upper surface of floor is provided with vertical concrete sealing rod 2, and the both ends of concrete sealing rod 2 and wall 12 connect
It connects.Connection structure 3 is provided between concrete sealing rod 2 and floor 11, connection structure 3 includes bar planting slot 31, vertical bar 32 and cross
It is the round steel of 6mm that muscle 33, vertical bar 32 and transverse bar 33, which select diameter,.
Bar planting slot 31 is uniformly opened in 11 upper surface of floor, and bar planting slot 31 along the length direction of concrete sealing rod 2
Between spaced set.Vertical bar 32 is vertically inserted into inside bar planting slot 31, and the bottom of vertical bar 32 is welded with connection steel disc
321.When construction, the foul in bar planting slot 31 is removed first with tools such as air guns, then in 31 inside spreading glue of bar planting slot,
One end that connection steel disc 321 is welded in vertical bar 32 is inserted into bar planting slot 31 again.
Transverse bar 33 is fixed on the top of vertical bar 32, and all vertical bars 32 are connected as entirety.
In order to increase the bonding strength between concrete sealing rod 2 and floor 11, concrete sealing rod 2 is corresponded on floor 11
Position be formed with rough surface 111, to improve the mechanical snap power between concrete sealing rod 2 and floor 11.
In order to improve the bonding strength between concrete sealing rod 2 and wall 12, concrete sealing rod 2 is corresponded on wall 12
Position offer link slot 4, the depth that opens up of link slot 4 is 20mm.The one of corresponding 2 end of concrete sealing rod of link slot 4
Lateral edge has been horizontally inserted into more dowels 41, is fixed between dowel 41 and wall 12 by gluing.Dowel 41 selects screw thread
Steel, to improve the bonding strength between dowel 41 and wall 12, dowel 41 and concrete sealing rod 2.Dowel 41 is remote
One end from link slot 4 is fixed in the vertical bar 32 that dowel 41 is arranged.
In conjunction with Fig. 1-2, the two sides of concrete sealing rod 2 are equipped with building screed-coat 5, to further increase concrete sealing
Bonding strength between item 2 and floor 11.The top of building screed-coat 5 is equipped with polyurethane water-proof layer 6, polyurethane water-proof layer 6
The surface of oversite concrete sealing rod 2.And it is located above the polyurethane water-proof layer 6 of 2 two sides of concrete sealing rod and is equipped with cement
Mortar levelling layer 21 can protect polyurethane water-proof layer 6, while improve surface smoothness.Then it is looked in cement mortar
Alite paste is smeared on leveling 21, is formed alite paste binder course 7, then floor tile 71 is layed on alite paste binder course 7, so that ground
Brick 71 and cement mortar screeding layer 21 are fixed.
Floor tile 71 is formed with filling irrigating sealant 711 towards between the end and polyurethane water-proof layer 6 of concrete sealing rod 2.Floor tile
After 71 are laid with, in 6 external application clay of polyurethane water-proof layer, clay filled layer 8 is formed, clay filled layer 8, which extends to, to be filled out
It fills in seam 711.Then water bar 9 is arranged outside clay filled layer 8,9 bottom of water bar is pushed against in the upper surface of floor tile 71.So
Cloud stone glue filled layer 91 is formed using the embedding reality of cloud stone glue in the position at 9 edge of water bar and the junction of wall 12 afterwards.
The top of water bar 9 can install the structures such as the sliding door 10 of shower house.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this
The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical
Within novel protection scope.
Claims (8)
1. a kind of shower house waterproofing node, including building original structure (1), the building original structure (1) includes floor (11) and hangs down
The wall (12) being directly fixed on the floor (11);Concrete sealing rod (2), the coagulation are provided on the floor (11)
The two sides of native sealing rod (2) are provided with cement mortar screeding layer (21), and the top of the cement mortar screeding layer (21) is fixed
There are floor tile (71);Water bar (9) are socketed with outside the concrete sealing rod (2);It is characterized by: the water bar (9) with
Connection structure (3) are had additional between floor (11);The connection structure (3) includes the bar planting slot being opened on floor (11)
(31), the vertical bar (32) being inserted in the bar planting slot (31) and the transverse bar (33) being fixed at the top of the vertical bar (32);Institute
State bar planting slot (31) be evenly equipped with along straight line it is multiple, and each described bar planting slot (31) in be inserted with a vertical vertical bar
(32);One end of the vertical bar (32) towards bar planting slot (31) slot bottom is vertically and fixedly provided with connection steel disc (321), the vertical bar (32)
Gluing cooperates between bar planting slot (31) inner wall;All vertical bars (32) are connected as entirety by the transverse bar (33);The floor
(11) surface is formed with rough surface (111), and the concrete sealing rod (2) bottom corresponds to the rough surface (111) setting;Institute
It states and is had additional between floor (11) and floor tile (71) polyurethane water-proof layer (6), the polyurethane water-proof layer (6) covers the coagulation
Native sealing rod (2) setting, and the water bar (9) is located above the polyurethane water-proof layer (6).
2. a kind of shower house waterproofing node according to claim 1, it is characterised in that: the company of offering on the wall (12)
Access slot (4), and the end of the concrete sealing rod (2) is inserted into the link slot (4).
3. a kind of shower house waterproofing node according to claim 2, it is characterised in that: the corresponding coagulation of the link slot (4)
The side of native sealing rod (2) end is inserted with more dowels (41), and the dowel (41) is in horizontally disposed;The dowel
(41) one end far from link slot (4) is fixed in the vertical bar (32) of dowel (41) setting.
4. a kind of shower house waterproofing node according to claim 3, it is characterised in that: the dowel (41) uses screw thread
Steel.
5. a kind of shower house waterproofing node according to claim 1, it is characterised in that: the floor (11) and polyurethane are anti-
Building screed-coat (5) is had additional between water layer (6), the building screed-coat (5) end and the concrete sealing rod (2) are solid
It is fixed.
6. a kind of shower house waterproofing node according to claim 1 or 5, it is characterised in that: the water bar (9) and poly- ammonia
Clay filled layer (8) are had additional between ester waterproof layer (6);It is formed with and fills out between the floor tile (71) and polyurethane water-proof layer (6)
It fills seam (711), the clay filled layer (8) extends in filling irrigating sealant (711).
7. a kind of shower house waterproofing node according to claim 6, it is characterised in that: water bar (9) bottom pushes against
In the upper surface of the floor tile (71), and side and floor tile (71) direction of the water bar (9) towards concrete sealing rod (2)
One end of concrete sealing rod (2) flushes.
8. a kind of shower house waterproofing node according to claim 1, it is characterised in that: the margin location of the water bar (9)
It sets and has additional cloud stone glue filled layer (91) with the junction of the wall (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822152283.8U CN209369065U (en) | 2018-12-20 | 2018-12-20 | A kind of shower house waterproofing node |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822152283.8U CN209369065U (en) | 2018-12-20 | 2018-12-20 | A kind of shower house waterproofing node |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209369065U true CN209369065U (en) | 2019-09-10 |
Family
ID=67829927
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822152283.8U Active CN209369065U (en) | 2018-12-20 | 2018-12-20 | A kind of shower house waterproofing node |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209369065U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113914487A (en) * | 2021-10-20 | 2022-01-11 | 安徽四建控股集团有限公司 | Construction method for cast-in-place reinforced concrete water bar of shower room |
-
2018
- 2018-12-20 CN CN201822152283.8U patent/CN209369065U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113914487A (en) * | 2021-10-20 | 2022-01-11 | 安徽四建控股集团有限公司 | Construction method for cast-in-place reinforced concrete water bar of shower room |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105696706B (en) | A kind of plug-in type assembled house | |
CN106677440A (en) | Roofing parapet water-floating structure and construction method thereof | |
CN100396860C (en) | Concrete building combined with heat insulating framework and its construction method | |
CN104652668B (en) | Armored integrated wall and construction method thereof | |
CN105951998B (en) | A kind of integrated assembled type dwelling house system and its construction method | |
CN104032888A (en) | Integrally prefabricated multifunctional composite external wall panel and industrial building external wall | |
CN106013509A (en) | Dry-method construction method for high-performance autolaved aerated concrete block wall | |
CN102444233A (en) | Multifunctional assembling and pouring type templated block, use method and use thereof | |
CN105604237A (en) | Composite wallboard | |
CN209369065U (en) | A kind of shower house waterproofing node | |
CN108560949A (en) | Adobe wall alien invasion ruggedized construction and adobe wall alien invasion reinforcement means | |
CN205822476U (en) | The waterproof case of the plug-in wall of a kind of PC and in-situ layer handing-over and cast-in-situ wall thereof | |
CN108884675A (en) | Convenient for the external insulation integrated thermal-insulation block system and its construction method of dry method decoration | |
CN205976150U (en) | Side fascia installation node | |
CN110397180A (en) | A kind of construction technology of exterior wall | |
CN105863085A (en) | External wall panel waterproof joint | |
CN205369681U (en) | Composite wallboard | |
CN206205166U (en) | It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure | |
CN113027046B (en) | Roof heat insulation construction method | |
US4455793A (en) | Prefabricated building block and civil building composed of a plurality of such blocks assembled together | |
CN105369991A (en) | Construction method of zero-stress seam width self-adaptation type roof reserved seam waterproof system | |
CN105971155A (en) | Installation joint for outer wallboards | |
KR100722237B1 (en) | Waterproof hummock of waterproof layer in outer wall of structure and manufacturing method and constructing method thereof | |
CN203947671U (en) | Integral prefabricated multi-functional compound external wall panel and industrialized building exterior wall | |
CN210658785U (en) | Embedded light wallboard steel construction building structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |