CN209354129U - A kind of concrete vacation bottom structure of mining with stowing - Google Patents

A kind of concrete vacation bottom structure of mining with stowing Download PDF

Info

Publication number
CN209354129U
CN209354129U CN201821932899.0U CN201821932899U CN209354129U CN 209354129 U CN209354129 U CN 209354129U CN 201821932899 U CN201821932899 U CN 201821932899U CN 209354129 U CN209354129 U CN 209354129U
Authority
CN
China
Prior art keywords
record
copy
concrete
concrete vacation
vacation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821932899.0U
Other languages
Chinese (zh)
Inventor
赵利鼎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luliang University
Original Assignee
Luliang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luliang University filed Critical Luliang University
Priority to CN201821932899.0U priority Critical patent/CN209354129U/en
Application granted granted Critical
Publication of CN209354129U publication Critical patent/CN209354129U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses a kind of concrete vacation bottom structures of mining with stowing, including concrete vacation copy for the record or for reproduction body, the two sides up and down of the concrete vacation copy for the record or for reproduction body are provided with filling well and ore drawing stays well, multiple mounting grooves are offered in the left and right sidewall of the concrete vacation copy for the record or for reproduction body, and multiple mechanism for intensifying are fixedly connected between every two concrete vacation copy for the record or for reproduction body, the mechanism for intensifying includes the reinforcing rod being connected between two concrete vacation copy for the record or for reproduction bodies, and the both ends of reinforcing rod are fixedly connected with the mounting groove inner wall of two concrete vacation copy for the record or for reproduction bodies respectively, the outside fixing sleeve of the reinforcing rod, which is connected to, steps up spring, and the both ends for stepping up spring are fixedly connected with the mounting groove inner wall of two concrete vacation copy for the record or for reproduction bodies respectively, multiple circular opens being connected to up and down are provided on the roof of the concrete vacation copy for the record or for reproduction body, and circular open is correspondingly arranged at the upside that ore drawing stays well.The utility model can be improved the bonding strength between multiple concrete vacation copy for the record or for reproduction bodies, and ore and barren rock is effectively prevent to stay in well from falling to ore drawing in gap.

Description

A kind of concrete vacation bottom structure of mining with stowing
Technical field
The utility model relates to mining technique field more particularly to a kind of concrete vacation bottom structures of mining with stowing.
Background technique
When underground metal mine is that exploitated ore grade is higher, the biggish very thin pole of Value of Ore Deposits tilts vein orebody, Scarps filling mining method is mostly used, avalanche country rock and ore are distinguished in exploitation process, adopts lower ore then through staying well to release, avalanche Barren rock then remain in goaf and filled, support country rock and as actual mining platform.
Traditional method carries out adopting standard by the way of foundation is arranged, and ore and barren rock can fall to ore drawing from gap and stay In well, the quality of mining is influenced, in addition, concrete vacation bottom is mostly overall structure, once damage needs entirety to be modified, is unfavorable for The long-time service of mining, for this purpose, it is proposed that a kind of concrete vacation bottom structure of mining with stowing is set forth above to solve the problems, such as.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and a kind of mining with stowing proposed Concrete vacation bottom structure.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of concrete vacation bottom structure of mining with stowing, including concrete vacation copy for the record or for reproduction body, the two sides up and down of the concrete vacation copy for the record or for reproduction body are all provided with It is equipped with filling well and ore drawing stays well, offer multiple mounting grooves, and every two concrete in the left and right sidewall of the concrete vacation copy for the record or for reproduction body Multiple mechanism for intensifying are fixedly connected between false copy for the record or for reproduction body, the mechanism for intensifying includes being connected between two concrete vacation copy for the record or for reproduction bodies Reinforcing rod, and the both ends of reinforcing rod are fixedly connected with the mounting groove inner wall of two concrete vacation copy for the record or for reproduction bodies respectively, the reinforcing rod Outside fixing sleeve, which is connected to, steps up spring, and the both ends for stepping up spring are fixed with the mounting groove inner wall of two concrete vacation copy for the record or for reproduction bodies connect respectively It connects, multiple circular opens being connected to up and down is provided on the roof of the concrete vacation copy for the record or for reproduction body, and circular open is correspondingly arranged at and puts Mine stays the upside of well, and the upper end of the concrete vacation copy for the record or for reproduction body is rotatably connected to lid corresponding with circular open position.
Preferably, it is provided with top pillar on the upside of the filling well, and offers the opening being connected to filling well, institute on top pillar State the ore saved bit by bit under collapsing between filling well and concrete vacation copy for the record or for reproduction body.
Preferably, the ore drawing stays and is fixedly connected with main pair of reinforcing bar on the downside of well, and is provided with and wears on the downside of main pair of reinforcing bar Arteries and veins tunnel.
Preferably, the people's row drainage courtyard for staying well to be connected to ore drawing is offered on the roof in the tunnel Chuan Mai leads to side, institute The side for stating the tunnel Chuan Mai is provided with drift, and the other side in the tunnel Chuan Mai is provided with fringedrift.
Preferably, the ore drawing stays and is evenly equipped with obturation on the outside of well, and obturation be correspondingly arranged at concrete vacation copy for the record or for reproduction body and It is main to pay between reinforcing bar.
Preferably, the lid is hinged in circular open, and the outer diameter value of lid is greater than the inner diameter values of circular open.
Compared with prior art, the utility model has the following beneficial effects:
1, by being provided with mechanism for intensifying between every two concrete vacation copy for the record or for reproduction body, can be improved multiple concrete vacation copy for the record or for reproduction bodies it Between bonding strength, extend the service life of concrete vacation copy for the record or for reproduction body, in addition, using assembled connection between concrete vacation copy for the record or for reproduction body, once damage It is bad targetedly to replace use.
2, it by being provided with lid in the upper end of concrete vacation copy for the record or for reproduction body, effectively prevent ore and barren rock to fall to from gap and puts Mine is stayed in well, to reduce the case where occurring Luo Kuang from concrete vacation copy for the record or for reproduction body and falling barren rock.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of mining with stowing concrete vacation bottom structure structural schematic diagram;
Fig. 2 is the A-A of Fig. 1 to structure sectional view;
Fig. 3 be the utility model proposes a kind of mining with stowing concrete vacation bottom structure concrete vacation copy for the record or for reproduction body vertical view section view Figure.
In figure: 1 concrete vacation copy for the record or for reproduction body, 2 filling wells, 3 ore drawings stay well, 4 mounting grooves, 5 mechanism for intensifying, 6 reinforcing rods, 7 to step up bullet Spring, 8 circular opens, 9 lids, 10 top pillars, 11 collapse under ore, a 12 main reinforcing bars, 13 tunnels Chuan Mai, the 14 people's row drainage courtyards paid it is logical Side, 15 obturations.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Referring to Fig.1-3, the concrete vacation bottom structure of a kind of mining with stowing, including concrete vacation copy for the record or for reproduction body 1, concrete vacation copy for the record or for reproduction body 1 up and down Two sides are provided with filling well 2 and ore drawing stays well 3, specifically, setting a filling well 2 among mineral building, section is 2 × 2 squares Rice, 80 ° -90 ° of inclination angle, if tube edge, ladder, it belongs to one of extra exit, different according to mineral building length, at least answers in a mineral building It arranges that two ore drawings stay well 3, multiple mounting grooves 4, and every two concrete vacation copy for the record or for reproduction is offered in the left and right sidewall of concrete vacation copy for the record or for reproduction body 1 Multiple mechanism for intensifying 5 are fixedly connected between body 1.
Mechanism for intensifying 5 include be connected to reinforcing rod 6 between two concrete vacation copy for the record or for reproduction bodies 1, and the both ends of reinforcing rod 6 respectively with 4 inner wall of mounting groove of two concrete vacation copy for the record or for reproduction bodies 1 is fixedly connected, and the outside fixing sleeve of reinforcing rod 6, which is connected to, steps up spring 7, and steps up The both ends of spring 7 are fixedly connected with 4 inner wall of mounting groove of two concrete vacation copy for the record or for reproduction bodies 1 respectively, by the way that mechanism for intensifying is arranged, can be incited somebody to action Multiple concrete vacation copy for the record or for reproduction bodies 1 link together, and improve the intensity of connection, facilitate the long-time service of concrete vacation copy for the record or for reproduction body 1.
Wherein, multiple circular opens 8 being connected to up and down are provided on the roof of concrete vacation copy for the record or for reproduction body 1, and circular open 8 is corresponding The upside that ore drawing stays well 3 is set, the upper end of concrete vacation copy for the record or for reproduction body 1 is rotatably connected to lid 9 corresponding with 8 position of circular open, Specifically, lid 9 is hinged in circular open 8, and the outer diameter value of lid 9 is greater than the inner diameter values of circular open 8, is covered by setting Body 9 effectively prevent ore and barren rock to stay in well 3 from ore drawing is fallen in gap, thus reduce concrete vacation copy for the record or for reproduction body 1 fall mine and Fall barren rock.
Wherein, the upside for filling well 2 is provided with top pillar 10, and the opening being connected to filling well 2 is offered on top pillar 10, fills The ore 11 under collapsing is saved bit by bit between well filling 2 and concrete vacation copy for the record or for reproduction body 1, ore drawing stays the downside of well 3 to be fixedly connected with main pair of reinforcing bar 12, Specifically, ore drawing stays the outside of well 3 to be evenly equipped with obturation 15, and obturation 15 is correspondingly arranged at concrete vacation copy for the record or for reproduction body 1 and main Fu Gang Between muscle 12, the main downside for paying reinforcing bar 12 is provided with the tunnel Chuan Mai 13, and i.e. opening one every 15~20 meters wears arteries and veins in the tunnel Chuan Mai, wears Arteries and veins is arranged in mineral building and pillar height circle place, and mineral building and studding share one and wear arteries and veins, and this arrangement form is respectively arranged than mineral building studding It wears arteries and veins and saves for one and adopt quasi- project amount.More specifically, the people for staying well 3 to be connected to ore drawing is offered on the roof in the tunnel Chuan Mai 13 Row drainage courtyard leads to side 14, and the side in the tunnel Chuan Mai 13 is provided with drift, and the other side in the tunnel Chuan Mai 13 is provided with arteries and veins Outer gallery, according to the mine concrete condition, greatly, the annual output of design requirement is also larger for the ore body variation in rock mineral deposit, to adapt to filling The reasonability of pipeline, thus lower wall fringedrift is used, the double entry annular of upper disk reef drift adopts Barebone.
In the utility model, by being provided with mechanism for intensifying 5 between every two concrete vacation copy for the record or for reproduction body 1, specifically, adding Strong bar 6 and under the action of stepping up spring 7, can be improved the bonding strength between multiple concrete vacation copy for the record or for reproduction bodies 1, extends concrete vacation copy for the record or for reproduction body 1 service life, in addition, using assembled connection between concrete vacation copy for the record or for reproduction body 1, once damage can targetedly replace use, and And by being provided with lid 9 in the upper end of concrete vacation copy for the record or for reproduction body 1, it effectively prevent ore and barren rock to fall to ore drawing from gap and stays well In 3, to reduce the case where occurring Luo Kuang from concrete vacation copy for the record or for reproduction body 1 and falling barren rock.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. a kind of concrete vacation bottom structure of mining with stowing, including concrete vacation copy for the record or for reproduction body (1), which is characterized in that the concrete vacation copy for the record or for reproduction body (1) Two sides up and down be provided with filling well (2) and ore drawing stay well (3), opened up in the left and right sidewall of the concrete vacation copy for the record or for reproduction body (1) Have multiple mounting grooves (4), and is fixedly connected to multiple mechanism for intensifying (5), the reinforcing between every two concrete vacation copy for the record or for reproduction body (1) Mechanism (5) include be connected to reinforcing rod (6) between two concrete vacation copy for the record or for reproduction bodies (1), and the both ends of reinforcing rod (6) respectively with two Mounting groove (4) inner wall of concrete vacation copy for the record or for reproduction body (1) is fixedly connected, and the outside fixing sleeve of the reinforcing rod (6), which is connected to, steps up spring (7), and step up the both ends of spring (7) and be fixedly connected respectively with mounting groove (4) inner wall of two concrete vacation copy for the record or for reproduction bodies (1), the concrete Multiple circular opens (8) being connected to up and down are provided on the roof of false copy for the record or for reproduction body (1), and circular open (8) is correspondingly arranged at and puts Mine stays the upside of well (3), and the upper end of the concrete vacation copy for the record or for reproduction body (1) is rotatably connected to lid corresponding with circular open (8) position (9)。
2. a kind of concrete vacation bottom structure of mining with stowing according to claim 1, which is characterized in that filling well (2) Upside is provided with top pillar (10), and the opening being connected to filling well (2), the filling well (2) and concrete are offered on top pillar (10) The ore (11) under collapsing is saved bit by bit between false copy for the record or for reproduction body (1).
3. a kind of concrete vacation bottom structure of mining with stowing according to claim 1, which is characterized in that the ore drawing stays well (3) Downside be fixedly connected with it is main pay reinforcing bar (12), and main pay is provided with the tunnel Chuan Mai (13) on the downside of reinforcing bar (12).
4. a kind of concrete vacation bottom structure of mining with stowing according to claim 3, which is characterized in that the tunnel Chuan Mai (13) Roof on offer stay well (3) to be connected to ore drawing people's row drainage courtyard lead to side (14), the side of the tunnel Chuan Mai (13) It is provided with drift, and the other side of the tunnel Chuan Mai (13) is provided with fringedrift.
5. a kind of concrete vacation bottom structure of mining with stowing according to claim 3, which is characterized in that the ore drawing stays well (3) Outside be evenly equipped with obturation (15), and obturation (15) is correspondingly arranged between concrete vacation copy for the record or for reproduction body (1) He Zhufu reinforcing bar (12).
6. a kind of concrete vacation bottom structure of mining with stowing according to claim 1, which is characterized in that the lid (9) is hinged In circular open (8), and the outer diameter value of lid (9) is greater than the inner diameter values of circular open (8).
CN201821932899.0U 2018-11-22 2018-11-22 A kind of concrete vacation bottom structure of mining with stowing Expired - Fee Related CN209354129U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821932899.0U CN209354129U (en) 2018-11-22 2018-11-22 A kind of concrete vacation bottom structure of mining with stowing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821932899.0U CN209354129U (en) 2018-11-22 2018-11-22 A kind of concrete vacation bottom structure of mining with stowing

Publications (1)

Publication Number Publication Date
CN209354129U true CN209354129U (en) 2019-09-06

Family

ID=67783926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821932899.0U Expired - Fee Related CN209354129U (en) 2018-11-22 2018-11-22 A kind of concrete vacation bottom structure of mining with stowing

Country Status (1)

Country Link
CN (1) CN209354129U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685692A (en) * 2019-11-06 2020-01-14 内蒙古金陶股份有限公司 Frame mining method
CN110700834A (en) * 2019-11-06 2020-01-17 内蒙古金陶股份有限公司 Mining method of thin vein

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685692A (en) * 2019-11-06 2020-01-14 内蒙古金陶股份有限公司 Frame mining method
CN110700834A (en) * 2019-11-06 2020-01-17 内蒙古金陶股份有限公司 Mining method of thin vein
CN110700834B (en) * 2019-11-06 2021-04-30 内蒙古金陶股份有限公司 Mining method of thin vein
CN110685692B (en) * 2019-11-06 2021-05-04 内蒙古金陶股份有限公司 Frame mining method

Similar Documents

Publication Publication Date Title
CN209354129U (en) A kind of concrete vacation bottom structure of mining with stowing
CN107989613A (en) A kind of overlying strata separation layer subregion isolates grouting filling working seam complete extraction method
CN108035715B (en) A kind of unregulated fully mechanized coal mining face just adopts stage isometric tune face method
CN101988388A (en) Filling and supporting hydraulic support with compaction mechanism
CN103244123B (en) High-dipping medium thick ore body mining method
CN103397905A (en) System and method for achieving natural striding, falling and filling of coal beds, flexible roadway protection and complete gob-side entry retaining
CN109667562A (en) Mining body gas well up-down combined universe extraction method
CN105134274B (en) The two post hydraulic support for large-mining height caving coal with three-level top coal recycling device
CN103850252A (en) Openable skirt type steel reinforcement cage of reamed pile
CN205422761U (en) Lower closely coal road supporting construction of coal mine goaf
CN207470183U (en) A kind of ro om -character
CN108979638A (en) Coal cutting roadway wedge shape regenerates wall and the compound gob-side entry retaining method of one-leg shed beam
CN109611061A (en) A method of floating tripping in screen casing
CN208328666U (en) A kind of Extended chemotherapy seat-plate type bridge abutment structure with anchor pole
CN201460939U (en) Filling and timbering hydraulic support with a tamping mechanism
CN110778317A (en) Construction method for ground grouting filling drilling structure in caving zone in mining process
CN207131418U (en) A kind of supporting coal mine underworkings device
CN103603682B (en) A kind of top plate supporting method being applicable to slice drift cemented filling mining
CN109236373A (en) A kind of pervasive coal mine underground reservoir and its method of construction
CN106677806B (en) A kind of tubular type canopy frame support structure for underworkings, tunnel
CN208073506U (en) Coal road compound roof surrounding rock supporting structure
CN109488363A (en) A kind of suction road adopts dynamic circuit connector reason method for determining position and device
CN207499900U (en) The concrete vacation bottom structure of mining with stowing
CN102587977A (en) Four-column and double-swing-beam type gangue filling hydraulic support
CN107859525B (en) A kind of large deformation stope drift active workings replace canopy surrounding rock control method except the lane Mao Kuo

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190906

Termination date: 20201122