CN209353669U - A kind of detachable member being connect for scaffold with construction wall - Google Patents
A kind of detachable member being connect for scaffold with construction wall Download PDFInfo
- Publication number
- CN209353669U CN209353669U CN201822089965.9U CN201822089965U CN209353669U CN 209353669 U CN209353669 U CN 209353669U CN 201822089965 U CN201822089965 U CN 201822089965U CN 209353669 U CN209353669 U CN 209353669U
- Authority
- CN
- China
- Prior art keywords
- wall
- connector
- scaffold
- strip
- clamping bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a kind of detachable members connecting for scaffold with construction wall, scaffold includes a pair of first connector, the detachable member includes being embedded in the intracorporal passive clip assembly of building wall and the active clip assembly with first connector sliding connection, the active clip assembly includes the clamping bar for sliding connection across first connector and therewith, and the clamping bar outer wall is connected with a pair of of strip close to its axisymmetrical of one lateral edge of sleeve;The passive clip assembly includes the ring segment for being embedded in the intracorporal sleeve of building wall and connecting with the sleeve lining, the ring segment offers the slot passed through for the clamping bar and strip, after the clamping bar and the strip pass through the slot and rotate in a circumferential direction along it, the strip is abutted with the ring segment far from the first connector side.The utility model has the advantages that wall-attached supporting seat can be detachably connected on building wall when using scaffold construction.
Description
Technical field
The utility model relates to the technical fields of construction, connect more particularly, to one kind for scaffold and construction wall
The detachable member connect.
Background technique
Attachment type raise scaffold is a kind of outer protective scaffold of skyscraper of rising in recent years, abbreviation climbing frame;Attachment
Climbing and declining power-equipment for formula elevating scaffold mostly uses chain hoister, is commonly called as electric block.
The existing hoisting mechanism for elevating scaffold, the Chinese patent if Authorization Notice No. is CN206753012U are public
It has opened a kind of attachment type raise scaffold and has just hung hoisting mechanism, including the first chain wheel set, the second chain wheel set, third chain wheel set, electricity
Dynamic cucurbit, adjusts flower basket bolt, spring arrangement at attached wall Holder for hanging household utensiles, and first chain wheel set is fixed on lower suspension centre, the second sprocket wheel
Group is fixed on attached wall Holder for hanging household utensiles;The third chain wheel set and attached wall Holder for hanging household utensiles are connected by adjusting flower basket bolt and spring arrangement
It connects, the attached wall Holder for hanging household utensiles is fixed at the structure upper between suspension centre truss and lower suspension centre truss, passes through this hoisting machine
The rising for scaffold in the vertical direction may be implemented in structure.
If prior art among the above, which has the following deficiencies:, is used for architecture storey construction for above-mentioned hanging apparatus
When, when using elevating scaffold, usually attached wall Holder for hanging household utensiles is fixed on construction wall, but will lead to apply in this way
Attached wall Holder for hanging household utensiles is still secured on building wall after work, and the subsequent construction of building wall is impacted.
Utility model content
The purpose of the utility model is to provide the attachment type raise scaffolds that kind is used for construction, its advantage is that using
When scaffold construction, wall-attached supporting seat can be detachably connected on building wall.
One of above-mentioned purpose of utility model of the utility model has the technical scheme that one kind is used for
The detachable member that scaffold is connect with construction wall, scaffold include a pair of first connector, which includes pre-
It is embedded in the intracorporal passive clip assembly of building wall and the active clip assembly with first connector sliding connection, the master
Dynamic clip assembly includes the clamping bar for sliding connection across first connector and therewith, and the clamping bar outer wall is close to sleeve
Its axisymmetrical of one lateral edge is connected with a pair of of strip;
The passive clip assembly includes the annular for being embedded in the intracorporal sleeve of building wall and connecting with the sleeve lining
Piece, the ring segment offer the slot passed through for the clamping bar and strip, and the clamping bar and the strip pass through described
Slot and after rotating in a circumferential direction along it, the strip is abutted with the ring segment far from the first connector side.
By using above-mentioned technical proposal, in use, towards close to sleeve direction push card extension bar, clamping bar drives strip
Towards close to the movement of sleeve direction, up through slot, then rotation is clamped bar, so that strip and ring segment are far from wall-attached supporting seat
Side fits closely, and limits to strip, it is prevented to be detached from sleeve.When needing to dismantle wall-attached supporting seat, rotation
Be clamped bar, so that strip is detached from out of slot, realize being detachably connected for sleeve and wall-attached supporting seat, so realize wall-attached supporting seat with
Construction wall is detachably connected.
The utility model is further arranged to: the clamping bar is also connected with pushing block, the card far from the sleeve side
Spring is also socketed on extension bar, the spring is between first connector and the pushing block, and the spring is pushed away with described
Block is affixed.
It will be pushed away under the action of the spring after pushing pushing block that strip is stuck in slot by using above-mentioned technical proposal
Block is pushed away from sleeve direction, and then strip is contacted more closely with ring segment.
The utility model is further arranged to: on the ring segment internal diameter of slot along close to the first connector direction by
It is cumulative big.
By using above-mentioned technical proposal, it is arranged so that strip and clamping bar more easily pass slot.
The utility model is further arranged to: the ring segment is connected with locating piece far from first connector side,
Described locating piece one end and the cell wall of the socket portion passed through for strip are in the same plane.
By using above-mentioned technical proposal, in use, clamping pipe and strip are passed through slot and rotated, strip and ring segment
It is closely adjacent to far from the first connector side, when extraction after needing to rotate strip, the setting of locating piece allows to
Directly rotation clamping bar, until strip abuts with fixed block, at this point, strip is aligned with slot, directly extraction, disassembly when
It waits more simple and convenient.
The utility model is further arranged to: the ring segment is offered far from first connector side for the card
The accommodation groove that item is placed, the cell wall of the accommodation groove and the locating piece edge are in the same plane, and passed through for strip
Slot and the accommodation groove are in the locating piece two sides.
By using above-mentioned technical proposal, in use, clamping pipe and strip are passed through slot and rotated, until strip is in
In accommodation groove, so further strip is clamped securely, prevents it from being rotated, and then is detached from sleeve;When needing strip
It when extraction, is rotated towards opposite direction, until strip is abutted with fixed block, at this point, strip is aligned with slot, directly extraction is
It can.
The utility model is further arranged to: the disassembly component further includes the reinforcement block in the detachable channel steel,
The reinforcement block is fitted closely with the channel steel inner wall, and the reinforcement block sliding is set on the clamping bar.
By using above-mentioned technical proposal, so set, the intensity of wall-attached supporting seat Yu construction wall junction can be enhanced.
The utility model is further arranged to: the cell wall of the accommodation groove is obliquely installed in the horizontal direction, and far from institute
The first connector side is stated higher than the other side.
By using above-mentioned technical proposal, so set, strip is made to be easier to be caught in accommodation groove or be easier calmly
Set the position-limiting action that will not influence accommodation groove for strip while taking-up in slot.
The utility model is further arranged to: the cell wall of the accommodation groove is in that 150~165 degree of inclinations are set in the horizontal direction
It sets.
In conclusion the advantageous effects of the utility model are as follows:
1, passive clip assembly and the setting realization sleeve of active clip assembly and being detachably connected for wall-attached supporting seat, in turn
Realize being detachably connected for wall-attached supporting seat and construction wall;
2, after strip so that be stuck in slot by the setting of spring by pushing block, under the action of the spring by pushing block towards remote
It is pushed from sleeve direction, and then strip is contacted more closely with ring segment, active clip assembly and sleeve is prevented to be detached from;
3, the setting of locating piece is clamped bar so that when needing to dismantle wall-attached supporting seat directly to rotate, until card
Item is abutted with fixed block, at this point, strip is aligned with slot, is directly extracted, and disassembly when is more simple and convenient;
4, accommodation groove setting so that strip pass through slot back spin go in accommodation groove, can further by strip be clamped jail
Gu preventing it from being rotated, and then it is detached from sleeve.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the connection relationship diagram that construction wall and frame body are embodied in the utility model;
Fig. 3 is the structural schematic diagram that guide rail is embodied in the utility model;
Fig. 4 is the structural schematic diagram that guidance set is embodied in the utility model;
Fig. 5 is the structural schematic diagram that wall-attached supporting seat is embodied in the utility model;
Fig. 6 is the structural schematic diagram that spring is embodied in the utility model;
Fig. 7 is the structural schematic diagram that detachable member is embodied in the utility model;
Fig. 8 is the connection relationship diagram that prefabricated balcony and frame body are embodied in the utility model;
Fig. 9 is the structural schematic diagram that adjustable drawbar is embodied in the utility model.
In figure, 1, frame body;11, main frame;12, support rod;121, guide rail;1211, channel steel is connected;1212, track;13,
Scaffold board;14, sealing plate;141, subplate;142, lapping plate;1421, inclined plate;1422, attachment strap is hanged;15, reinforcing rod;2, hoisting machine
Structure;21, wall-attached supporting seat;211, the first connector;212, the second connector;213, third connector;214, the 4th connector;
215, cavity;216, third directive wheel;22, pendant;23, lifting device;24, electric block;241, cucurbit ontology;242, cucurbit
Chain;25, limit assembly;3, bottom beam is promoted;31, the first channel steel;32, guidance set;321, directive wheel;3211, the first guiding
Wheel;3212, the second directive wheel;322, shaft;323, ontology is taken turns;3231, guide groove;324, bolt;33, partition;4, detachable
Component;41, passive clip assembly;411, sleeve;412, ring segment;4121, accommodation groove;4122, locating piece;413, slot;42,
Active clip assembly;421, it is clamped bar;422, strip;423, pushing block;424, spring;425, reinforcement block;5, removable connector;
51, connection sheet;52, angle steel;53, reinforce wheel;54, reinforced sheet;6, bolt;7, prefabricated balcony;8, stiffener assembly;81, it first hangs
Ring;82, the second hanging ring;83, adjustable drawbar;831, the first hook;832, the second hook;833, first connecting rod;834, second
Connecting rod;835, telescopic rod;9, construction wall.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment 1
Referring to Figures 1 and 2, a kind of attachment type raise scaffold disclosed by the utility model, including outside construction wall 9
The frame body 1 of side and hoisting mechanism 2 for hoisting scaffold, frame body 1 are formed by connecting by several frame body units, and frame body unit includes
Main frame 11 and the support rod 12 being arranged between main frame 11 and construction wall 9 are set between adjacent supports bar 12 in conjunction with Fig. 3
It is equipped with the guide rail 121 in vertical direction setting, hoisting mechanism 2 includes several wall-attached supporting seats 21 and the extension affixed with guide rail 121
Part 22.21 side of wall-attached supporting seat is detachably connected by detachable member 4 with construction wall 9, and the other side is by being detachably connected
Part 5 is detachably connected with guide rail 121.
The lifting device 23 for lifting frame body 1 is provided between pendant 22 and wall-attached supporting seat 21, lifting device 23 includes
The electric block 24 that both ends are connect with wall-attached supporting seat 21 and pendant 22 respectively, electric block 24 include cucurbit ontology 241 and cucurbit
Chain 242 is provided in 1 unit bottom of bottom frame body and promotes bottom beam 3, is promoted to be provided on bottom beam 3 and be worn for cucurbit chain 242
One end of the guidance set 32 crossed, electric block 24 hangs on pendant 22, and 242 other end of cucurbit chain bypasses guidance set 32
Finally it is detachably connected with wall-attached supporting seat 21.Wall-attached supporting seat 21 is also connected with the limit to moving upwards back frame body 1 and being limited
Component 25.
In use, wall-attached supporting seat 21 is detachably connected on construction wall 9, then 24 one end of electric block is hooked on
On pendant 22,242 other end of cucurbit chain sequentially passes through guidance set 32 and is finally hooked on wall-attached supporting seat 21.In electric block
When 24 work, wall-attached supporting seat 21 is fixed with wall, when electric block 24 works winding contraction cucurbit chain 242, electric block
The length of cucurbit chain 242 between 24 and wall-attached supporting seat 21 reduces, and wall-attached supporting seat 21 and electric block 24 and promotion bottom beam 3
The distance between constant, therefore pendant 22 and the length reduction for promoting the cucurbit chain 242 between bottom beam 3, therefore bracket and electronic calabash
Reed 24 is whole to be lifted up, and in the process, electric block 24 is always between support rod 12 and main frame 11, when there is article to fall
When do not fall out on electric block 24, guarantee that in scaffold hoisting process, falling article will not influence electronic calabash
Reed 24 operates, to guarantee that scaffold lifts steady running in the vertical direction.
The setting of detachable member 4 and removable connector 5 is so that wall-attached supporting seat 21 and guide rail 121 and construction wall 9 are equal
It is detachably connected, when needing upward lifting frame 1 after layer construction, wall-attached supporting seat 21 is dismantled, then will
Cucurbit chain 242 is wrapped on one layer of wall-attached supporting seat 21, by changing upper one layer of wall-attached supporting seat 21 and being promoted between bottom beam 3
The length of cucurbit chain 242 rises frame body 1, so that all not needing to dismount from beginning to end electronic in 1 uphill process of frame body
Cucurbit 24, it is only necessary to cucurbit chain 242 is wrapped over the wall-attached supporting seat 21 on the outside of different architecture storeys, and wall-attached supporting seat 21
Be detachably connected so that upper one layer of wall-attached supporting seat 21 will not influence next layer of hoisting process, the setting of limit assembly 25 can
Lifting back frame body 1 is limited with realizing, the purpose for preventing it from falling.
As shown in figure 4, guide rail 121 includes the connection channel steel 1211 in two sides and the rail between connection channel steel 1211
Road 1212.In conjunction with Fig. 4, promoting bottom beam 3 is the first channel steel 31 that a pair of of notch is disposed opposite to each other, and guidance set 32 includes and a pair of the
One channel steel 31 is rotatablely connected several directive wheels 321 passed through for cucurbit chain 242, and directive wheel 321 includes passing through shaft 322 and two
The wheel ontology 323 of side channel steel rotation connection takes turns and offers several guide grooves 3231 rolled for cucurbit chain 242 on ontology 323.
The side that shaft 322 is located remotely from each other is fixed by bolt 324, with prevent that cucurbit chain 242 from rolling in guide groove 3231 when
It waits, takes turns ontology 323 and the dislocation movement of shaft 322, influence the rolling of cucurbit chain 242.
Directive wheel 321 includes the first directive wheel of a pair 3211 and second in channel steel end in 12 two sides of support rod
Directive wheel 3212, the second directive wheel 3212 are between the first directive wheel 3211 and building, the first directive wheel 3211 and second
It is isolated between directive wheel 3212 by partition 33.Cucurbit chain 242 successively coils through the first directive wheel 3211, wall-attached supporting seat 21
It rolls to coil through the second directive wheel 3212 and then loop back to wall-attached supporting seat 21 again afterwards and be hooked on wall-attached supporting seat 21.So set
It sets, is equivalent to 242 multi-cycle half-turn of cucurbit chain, the heavier scaffold of quality can be lifted by crane, and then it is single to increase frame body 1
The quantity of member can simultaneously construct simultaneously to more floors, have important practical significance.
As shown in figure 5, wall-attached supporting seat 21 includes the first connector of a pair 211 being detachably connected with construction wall 9 and place
The second connector 212 between the first connector 211 is connected between first connector 211 and connection channel steel 1211 by third
Fitting 213 connects, and the 4th connector 214, the 4th connector 214 are provided between third connector 213 and the first connector 211
The cavity 215 bypassed for cucurbit chain 242 is formed between the first connector 211, and also logical between a pair of 4th connector 214
It crosses sunpender and is lifted with the third directive wheel 216 bypassed for the cucurbit chain 242, in conjunction with Fig. 3, around the first directive wheel 3211
Cucurbit chain 242 bypass third directive wheel 216 after further around cross the second directive wheel 3212 after pass through cavity 215 hook the 4th connection
On part 214.
Above-mentioned limit assembly 25 is provided between third connector 213 and guide rail 121, the principle of limit assembly 25 can join
Examining application publication number is entitled " a kind of attachment type raise scaffold and its construction party of utility model disclosed in CN107476561A
For the limit assembly 25 that is limited of lifting back frame body 1 in method ", no longer it is described in detail in the utility model.
Removable connector 5 includes in third connector 213 and connecting the connection sheet 51 between channel steel 1211 and setting
The angle steel 52 at connection 1211 notch of channel steel is set, connection sheet 51 extends towards the direction being located remotely from each other and passes through bolt with angle steel 52
6 are detachably connected, and connection sheet 51 and third connector 213 are affixed, and angle steel 52 with to connect channel steel 1211 affixed.
Also abutting in connection channel steel 1211 has reinforcement wheel 53, and reinforcement wheel 53 is affixed by bolt 6 with angle steel 52, reinforces wheel
53 intensity for enhancing angle steel 52 being set with being connect at 1211 connecting node of channel steel.It is set between connection sheet 51 and third connection sheet 51
It is equipped with triangle reinforced sheet 54, reinforced sheet 54 is affixed with connection sheet 51 and abuts with third connection sheet 51, also affixed between angle steel 52
There is triangle reinforced sheet 54, the setting of triangle reinforced sheet 54 increases the intensity of connection sheet 51 and third connector 213 and angle steel 52,
Intensity especially at connecting node.
Fig. 2 is reviewed, detachable member 4 includes that the first connector 211 and building balcony of wall-attached supporting seat 21 is detachable
The bolt 6 of connection.The first connector 211, the second connector 212 and third connector 213 can be set in the utility model
For common connecting plate, it is also possible to channel steel, because channel steel is widely used in construction, and material is easy to get, therefore this implementation
Preferably the first connector 211, the second connector 212 and third connector 213 are channel steel in example.
It is not limited to above scheme, as shown in Figure 6 and Figure 7, detachable member 4 is passive in construction wall 9 including being embedded in
Clip assembly 41 and the active clip assembly 42 connected with the sliding of the first connector 211, active clip assembly 42 and passive card
Being detachably connected between wall-attached supporting seat 21 and construction wall 9 is realized by rotary clamping between connected components 41.
As shown in Figure 6 and Figure 7, passive clip assembly 41 includes being embedded in 9 sleeve 411 of construction wall and being connected to sleeve
Ring segment 412 in 411, sleeve 411 are embedded in construction wall 9 far from 21 one end outwardly convex of wall-attached supporting seat, ring segment 412
Vertical slot 413 is offered, ring segment 412 is in 411 high spot of sleeve.Active clip assembly 42 includes being socketed in the first company
Clamping bar 421 on fitting 211 is clamped bar 421 close to 411 side of sleeve and is fixedly connected with the strip that can be inserted into slot 413
422, bar 421, which is clamped, far from 411 side of sleeve is also connected with pushing block 423.In use, being pushed away towards close to 411 direction of sleeve
Block 423, pushing block 423 drive strip 422 towards close to the movement of 411 direction of sleeve, it is convex to be in sleeve 411 up through slot 413
Position is played, then rotation clamping bar 421, so that strip 422 is fitted closely with ring segment 412 far from 21 side of wall-attached supporting seat, it is right
Strip 422 is limited, it is prevented to be detached from sleeve 411.When needing to dismantle wall-attached supporting seat 21, rotation clamping bar
421, so that strip 422 is detached from out of slot 413, realization sleeve 411 is detachably connected with wall-attached supporting seat 21, and then is realized attached
The rotary clamping of wall support 21 and construction wall 9.
First connector 211 can be detachable channel steel for the detachable channel steel of a pair of of notch opposite to each other, the first connector 211
When, clamping bar 421 passes through detachable channel steel, and pushing block 423 is between detachable channel steel and guide rail 121, and detachable channel steel is remote
From spring 424 is provided between 411 one end of sleeve and detachable channel steel, spring 424 is set on clamping bar 421, spring 424 1
End is affixed with pushing block 423, when pushing pushing block 423 that strip 422 is stuck in slot 413, by pushing block under the action of spring 424
423 push away from 411 direction of sleeve, and then strip 422 is contacted more closely with ring segment 412.
Further, as shown in fig. 7, being offered far from 211 side of the first connector for strip in ring segment 412
422 accommodation grooves 4121 placed, have a certain distance between accommodation groove 4121 and slot 413, in use, bar 421 will be clamped
Slot 413 is passed through with strip 422 and is rotated, until strip 422 is in accommodation groove 4121, is so further blocked strip 422
It connects securely, prevents it from being rotated, and then be detached from sleeve 411.Preferably, in order to not influence accommodation groove 4121 for strip
422 position-limiting action, while strip 422 being made to be easier to be caught in accommodation groove 4121 or be easier to take out of accommodation groove 4121
Out, the cell wall of accommodation groove 4121 is higher than the other side far from 211 side of the first connector, inclines in the horizontal direction in 150~165 degree
Tiltedly setting.
Strip 422 is inserted into slot 413 in order to more convenient, the internal diameter of slot 413 is along close to first on ring segment 412
211 direction of connector is gradually increased.As shown in fig. 7, when dismantling wall-attached supporting seat 21, in order to more easily by strip
422 extract from slot 413, and ring segment 412 is connected with locating piece 4122, locating piece 4122 far from 211 side of the first connector
The cell wall of one end and 413 part of slot passed through for strip 422 is in the same plane, and accommodation groove 4121 is in locating piece 4122
Between slot 413.In use, clamping pipe and strip 422 are passed through slot 413 and rotated, strip 422 and ring segment 412 are remote
It is closely adjacent to from 211 side of the first connector, when extraction after needing to rotate strip 422, the setting of locating piece 4122
Allow to directly rotate clamping bar 421, until strip 422 is abutted with fixed block, at this point, strip 422 is aligned with slot 413,
It directly extracts, disassembly when is more simple and convenient.
For intensity of the enhanced card extension bar 421 in place of detachable channel steel, which further includes in described removable
The reinforcement block (being not drawn into figure) in channel steel is unloaded, reinforcement block is fitted closely with detachable channel steel inner wall, and reinforcement block sliding is set in
It is clamped on bar 421.
Fig. 2 and Fig. 3 are reviewed, which further includes the scaffold board 13 being arranged in below each layer frame body unit, the bottom
Scaffold board 13 be in and promote the lower section of bottom beam 3, scaffold board 13 be between support rod 12 and main frame 11, scaffold board 13 with build
Sealing plate 14 is additionally provided between wall 9, sealing plate 14 includes the subplate 141 affixed with scaffold board 13, and subplate 141 is close to building
9 side of wall is hinged with lapping plate 142, and lapping plate 142 includes the inclined plate 1421 hinged with subplate 141 and is overlapped on construction wall
The outstanding attachment strap 1422 of 9 upper ends hangs attachment strap 1422 and 1421 integrally connected of inclined plate.The setting of sealing plate 14 can prevent from constructing
Gap of the Cheng Zhongyou article between scaffold board and construction wall 9 is fallen, to reduce a possibility that casualties occurs, subplate
141 and inclined plate 1421 hingedly can will be connected between scaffold board and construction wall 9, and needing to rise frame body 1
During, inclined plate 1421 can turn on subplate 141, to will not influence the process of the rising of frame body 1.
Embodiment 2
A kind of attachment type raise scaffold, as shown in figure 8, its difference from Example 1 is, in construction,
Building a building usually can also be provided with balcony, therefore also prominent a part is equipped with prefabricated balcony 7 outside building wall, pre- for convenience
Wall-attached supporting seat 21 and prefabricated balcony 7 are passed through detachable member close to scaffold side in the present embodiment by the construction at balcony 7 processed
4 are detachably connected.When needing hoisting scaffold when wall-attached supporting seat 21 is connect with prefabricated balcony 7, electric block 24 with mention
242 length of cucurbit chain risen between bottom beam 3 is constant, between the wall-attached supporting seat 21 connecting with prefabricated balcony 7 and promotion bottom beam 3
242 length of cucurbit chain reduces, and frame body 1 is driven to rise.
In the process, because of the power downward by cucurbit chain 242 of prefabricated balcony 7, and prefabricated balcony 7 and construction wall 9
Between connecting node it is weaker, therefore the stiffener assembly of adjustable in length is provided between prefabricated balcony 7 and upper one layer of construction wall 9
8, in conjunction with Fig. 9, stiffener assembly 8 includes the first hanging ring 81 connecting respectively with construction wall 9 and the side close to each other of prefabricated balcony 7
With the second hanging ring 82, the adjustable drawbar 83 of adjustable in length, adjustable drawbar are connected between the first hanging ring 81 and the second hanging ring 82
83 include the first connection being connect respectively by the first hook 831 and the second hook 832 with the first hanging ring 81 and the second hanging ring 82
Bar 833 and the second connecting rod 834, positive/negative thread is connected with telescopic rod 835 between first connecting rod 833 and the second connecting rod 834,
835 both ends of the telescopic rod one end internal screw thread close to each other with first connecting rod 833 and the second connecting rod 834 is connect.Stiffener assembly 8
Setting the construction wall 9 for paying balcony and upper layer in advance of lower layer can be connected, prevent prefabricated balcony 7 subject to downward force so that
It cracks at prefabricated balcony 7 and 9 connecting node of construction wall.The setting of adjustable drawbar 83 so that prefabricated balcony 7 and construction wall 9 it
Between stiffener assembly 8 be tensioned, to reinforce its connection.
Further, Fig. 8 is reviewed, reinforcing rod 15, the building wall on upper layer are additionally provided between main frame 11 and support rod 12
Also adjustable drawbar 83 is connected between body 9 and the reinforcing rod on upper layer 15, between adjustable drawbar 83 and construction wall 9 and reinforcing rod 15
It is connected by screw to, frame body 1 can be connect ground more closely by such setting with construction wall 9, and two adjustable drawbars 83
And triangle is formed between scaffold, structure is more stable, also weaken hoisting scaffold when for prefabricated balcony 7 power.
A kind of hanging method of attachment type raise scaffold, comprising the following steps:
S1, one end of adjustable drawbar 83 is hung on the first hanging ring 81 by the first hook 831, the other end is hung by second
Hook 832 is hung on the second hanging ring 82;
Wall-attached supporting seat 21 is removably connected on corresponding each layer of the prefabricated balcony 7 of guide rail 121;
S2,24 one end of electric block is hooked on pendant 22, after the other end passes through guidance set 32 and wall-attached supporting seat 21
It is hung on wall-attached supporting seat 21 after bypassing guidance set 32 again;
S3, the adjustable drawbar 83 on the prefabricated balcony 7 for the 21 place layer of wall-attached supporting seat for being linked with cucurbit chain 242 is adjusted
Length is allowed to be tensioned, and starts electric block 24, moves up frame body 1 integrally, moves to appointed place on frame body 1, construct;
After S4, current layer number construction, when needing to continue to move up by frame body 1, connect by cucurbit chain 242 and therewith
The wall-attached supporting seat 21 connect separates, and then dismantles the wall-attached supporting seat 21 from prefabricated balcony 7, by cucurbit chain 242 far from pendant
22 sides are hooked on the wall-attached supporting seat 21 on one layer of prefabricated balcony 7;
The construction of the prefabricated balcony 7 of whole building tower can be completed in S5, circulation step S3 and step S4.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this
The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical
Within novel protection scope.
Claims (8)
1. a kind of detachable member being connect for scaffold with construction wall, it is characterized in that: scaffold includes that a pair first connects
Fitting (211), the detachable member (4) include the passive clip assembly (41) that is embedded in construction wall (9) and with it is described
The active clip assembly (42) of first connector (211) sliding connection, the active clip assembly (42) include across described the
A connection piece (211) and the clamping bar (421) for sliding connection therewith, clamping bar (421) outer wall is close to sleeve (411) side
A pair of of strip (422) are connected with along its axisymmetrical;
The passive clip assembly (41) include the sleeve (411) that is embedded in construction wall (9) and in the sleeve (411)
The ring segment (412) of wall connection, the ring segment (412) offers inserts for what clamping bar (421) and strip (422) passed through
It is described after slot (413), the clamping bar (421) and the strip (422) pass through the slot (413) and rotate in a circumferential direction along it
Strip (422) is abutted with the ring segment (412) far from the first connector (211) side.
2. a kind of detachable member being connect for scaffold with construction wall according to claim 1, it is characterised in that:
The clamping bar (421) is also connected with pushing block (423) far from the sleeve (411) side, is also socketed on the clamping bar (421)
Have spring (424), the spring (424) is between first connector (211) and the pushing block (423), the spring
(424) affixed with the pushing block (423).
3. a kind of detachable member being connect for scaffold with construction wall according to claim 1, it is characterised in that:
The internal diameter of slot (413) is gradually increased along close to the first connector (211) direction on the ring segment (412).
4. a kind of detachable member being connect for scaffold with construction wall according to claim 1, it is characterised in that:
The ring segment (412) is connected with locating piece (4122) far from the first connector (211) side, the locating piece (4122)
The cell wall of one end and slot (413) part passed through for strip (422) is in the same plane.
5. a kind of detachable member being connect for scaffold with construction wall according to claim 4, it is characterised in that:
The ring segment (412) offers the accommodation groove placed for the strip (422) far from the first connector (211) side
(4121), the accommodation groove (4121) is between the slot (413) and the locating piece (4122).
6. a kind of detachable member being connect for scaffold with construction wall according to claim 1, it is characterised in that:
First connector (211) is the opposite detachable channel steel of notch, which further includes in the detachable channel steel
Interior reinforcement block (425), the reinforcement block (425) fit closely with the detachable channel steel inner wall, and the reinforcement block (425) is sliding
Shifting is set on the clamping bar (421).
7. a kind of detachable member being connect for scaffold with construction wall according to claim 5, it is characterised in that:
The cell wall of the accommodation groove (4121) is obliquely installed in the horizontal direction, and is higher than far from the first connector (211) side
The other side.
8. a kind of detachable member being connect for scaffold with construction wall according to claim 7, it is characterised in that:
The cell wall of the accommodation groove (4121) is in 150~165 degree and is obliquely installed in the horizontal direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822089965.9U CN209353669U (en) | 2018-12-12 | 2018-12-12 | A kind of detachable member being connect for scaffold with construction wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822089965.9U CN209353669U (en) | 2018-12-12 | 2018-12-12 | A kind of detachable member being connect for scaffold with construction wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209353669U true CN209353669U (en) | 2019-09-06 |
Family
ID=67799058
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822089965.9U Active CN209353669U (en) | 2018-12-12 | 2018-12-12 | A kind of detachable member being connect for scaffold with construction wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209353669U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111502235A (en) * | 2020-05-13 | 2020-08-07 | 中建二局第一建筑工程有限公司 | Scaffold mounting device |
-
2018
- 2018-12-12 CN CN201822089965.9U patent/CN209353669U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111502235A (en) * | 2020-05-13 | 2020-08-07 | 中建二局第一建筑工程有限公司 | Scaffold mounting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109537866A (en) | A kind of attachment type raise scaffold and its hanging method | |
CN209339575U (en) | A kind of attachment type raise scaffold for construction | |
CN205777600U (en) | Batter post installs auxiliary support apparatus | |
CN209353669U (en) | A kind of detachable member being connect for scaffold with construction wall | |
CN207347032U (en) | A kind of movable hanging for building is unloaded | |
CN209353670U (en) | A kind of attachment type raise scaffold for construction | |
CN108756199A (en) | Attached lifting scaffold lifting gear | |
CN209339577U (en) | A kind of attachment type raise scaffold | |
CN209397452U (en) | A kind of track toter in shield construction tunnel | |
CN108128720A (en) | A kind of auxiliary mould for being used to install outdoor machine of air-conditioner | |
CN208856718U (en) | A kind of saddle climbing type workbench | |
CN205077842U (en) | Multi -use architecture support | |
CN206646836U (en) | A kind of exterior wall, inner partition plate movement lifting frame | |
CN209567730U (en) | A kind of small-sized lattice dead man steel construction | |
CN209839329U (en) | Support frame is used in water supply pipe installation | |
CN213792387U (en) | Chimney paint spraying traveling device | |
CN205802807U (en) | A kind of household building elevator | |
CN113235460A (en) | Prefabricated segment swinging method for bridge cantilever assembly | |
CN107814318A (en) | Loop wheel machine | |
CN109019314B (en) | A kind of tubular pole safty hoisting method | |
CN208964230U (en) | A high position puts line apparatus and high-order storing line component | |
CN207347124U (en) | A kind of loop wheel machine lever | |
CN217438708U (en) | Bridge side construction operation trolley capable of being operated by one person | |
CN207498986U (en) | Pipe gallery Quick Release formwork erecting structure | |
CN110950252A (en) | Vertical hydraulic turbine upper frame hoisting accessory |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |