CN209353295U - A kind of discharge channel structure convenient for later period reconstruction - Google Patents
A kind of discharge channel structure convenient for later period reconstruction Download PDFInfo
- Publication number
- CN209353295U CN209353295U CN201822189667.7U CN201822189667U CN209353295U CN 209353295 U CN209353295 U CN 209353295U CN 201822189667 U CN201822189667 U CN 201822189667U CN 209353295 U CN209353295 U CN 209353295U
- Authority
- CN
- China
- Prior art keywords
- discharge channel
- period
- later period
- early period
- reconstruction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model relates to a kind of discharge channel structures for being convenient for later period reconstruction for municipal water environment engineering.The utility model is before discharge channel overcurrent early period, and heap builds clay straw bag early period cofferdam at reconstruction joint section, is used for water blocking when discharge channel early period overcurrent.During discharge channel overcurrent early period, completes later period discharge channel tract and build.Later period discharge channel tract is complete build after, i.e., dismountable clay early period straw bag cofferdam, early period discharge channel tract upstream side heap build the later period block clay straw bag cofferdam water retaining, at this time water flow pass through later period discharge channel overcurrent.Under the protection that the later period blocks clay straw bag cofferdam, the occluding body for later period water blocking is built.The utility model by building reconstruction joint section in advance, by clay straw bag cofferdam water retaining early period, may be implemented not having to cutout, building for later period discharge channel can be completed.
Description
Technical field
The utility model relates to a kind of discharge channel structures for being convenient for later period reconstruction for municipal water environment engineering, belong to city
Political affairs, water environment and hydraulic and hydroelectric engineering field.
Background technique
In municipal administration, hydraulic and hydroelectric engineering, for investment reduction, discharge structure is frequently with using the side for facing combination forever
Formula, i.e. construction time discharge structure, by being used as permanent discharge structure after reconstruction.During reconstruction, need to stop water
Other channels are led to, guarantee dry work during reconstruction.In small-sized municipal administration, water environment and hydraulic and hydroelectric engineering, due to
Construction time usually only arranges a drainage gallery, if desired reconstructs construction time interim discharge structure, then separately needs to arrange other
Drainage gallery, this undoubtedly will increase certain project cost, while will increase the difficulty of construction and influencing construction speed.
Utility model content
The technical issues of the utility model solves is: providing a kind of letting out convenient for later period reconstruction for municipal water environment engineering
Water channel structure may make in the case where not influencing normal aerial drainage, needs to reconstruct when early period, discharge channel was as later period discharge channel, change
It builds in work progress and does not stop.
The technical scheme adopted by the utility model to solve the technical problem is as follows: early period discharge channel with later period discharge channel phase
A reconstruction joint section is first built at the position of friendship, and in reconstruction joint section, discharge channel early period downstream be respectively arranged with it is detachable
Clay straw bag cofferdam controls water flow, reaches in the case where not influencing normal aerial drainage, completes discharge channel structure reconstruction work.
The overcurrent of the structure utilizes two stages of later period discharge channel overcurrent including the use of discharge channel overcurrent early period and after reconstructing.
In discharge channel overcurrent early period, discharge channel specific structure are as follows: including discharge channel early period, early period discharge channel medial side
Wall is connected with reconstruction joint section, reconstructs in joint section and is provided with detachable clay early period straw bag cofferdam.
It reconstructs joint section and discharge channel early period is divided into discharge channel Upstream section early period, discharge channel tract early period, the later period lets out
Water channel Upstream section and discharge channel early period Upstream section are common sections, when the later period reconstructs, discharge channel specific structure are as follows: under later period discharge channel
Trip section is connected to the downstream of reconstruction joint section;In early period, the upstream side of discharge channel tract is provided with detachable later period closure
Clay straw bag cofferdam, early period discharge channel tract the later period block clay straw bag cofferdam downstream side be provided with occluding body.
Preferably, there is bend, reconstruction joint section is connected to corner and is connected to bend inner wall in the middle part of discharge channel early period
For the side of spill.
For the construction method of above-mentioned discharge channel structure reconstruction, Specific construction step are as follows:
One, discharge channel early period and reconstruction joint section are built, reconstruction joint section is connected to the middle part of sliding channel of discharge channel early period, preceding
Before phase discharge channel overcurrent, heap has built clay straw bag cofferdam water retaining early period in reconstruction joint section, and water flow is from discharge channel overcurrent early period;
Two, during discharge channel early period overcurrent, later period discharge channel tract is built, and is coupled under reconstruction joint section
You Duan;Remove clay early period straw bag cofferdam, and early period discharge channel tract upstream side heap build the later period block clay straw bag enclose
Weir, water flow is by later period discharge channel overcurrent, in the case where the later period blocks the protection of clay straw bag cofferdam water retaining, blocks clay straw bag in the later period
Occluding body is built in the downstream side in cofferdam;Occluding body is complete build after, remove the later period block clay straw bag cofferdam, formed collection sand basin, build
It completes.
The beneficial effects of the utility model are: later period discharge channel tract is complete build after, i.e., dismountable clay early period straw bag encloses
Weir, in early period, the upstream side heap of discharge channel tract builds later period closure clay straw bag cofferdam water retaining, and water flow is let out by the later period at this time
Water channel overcurrent.Under the protection that the later period blocks clay straw bag cofferdam, the occluding body for later period water blocking is built.
Use early period clay straw bag cofferdam and the later period block clay straw bag cofferdam and have and be easy to heap and build, be suitable for water blocking and anti-
The characteristics of infiltration, while facilitating later period mechanical removal.
Occluding body is complete build after, remove the later period block clay straw bag cofferdam, later period discharge channel reconstruction complete.Joint section is reconstructed to connect
It is connected to corner and is connected to the side that bend inner wall is spill, can use Solution of Flow in Curved Channel feature as later period discharge channel
Collect sand basin, it is big using bend inner wall concave side flow velocity, bed load in water flow is shifted onto collection by transverse direction secondary circulations clockwise on bend
Inside sand basin, reduces bed load and mill is rushed to discharge channel.
Detailed description of the invention
Fig. 1 is one structural schematic diagram of process of the utility model;
Fig. 2 is two structural schematic diagram of process of the utility model;
Fig. 3 is three structural schematic diagram of process of the utility model;
Fig. 4 is four structural schematic diagram of process of the utility model;
Fig. 5 is the A-A cross-section diagram of Fig. 2;
Fig. 6 is the B-B cross-section diagram of Fig. 2;
Fig. 7 is the C-C cross-section diagram of Fig. 3.
In the figure, it is marked as 1- discharge channel early period, 11- discharge channel early period Upstream section, 12- discharge channel early period tract, 2- change
Build joint section, 3- clay early period straw bag cofferdam, 4- later period discharge channel Upstream section, 5- later period discharge channel tract, the 6- later period blocks
Clay straw bag cofferdam, 7- occluding body, 8- collection sand basin.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and embodiments, and direction shown in arrow is water flow side in figure
To.
The overcurrent of discharge channel structure is let out with after reconstruction using the later period including the use of discharge channel overcurrent early period in the utility model
Two stages of water channel overcurrent.
As shown in Figure 1, in 1 overcurrent of discharge channel early period, discharge channel specific structure are as follows: including discharge channel early period 1, early period is let out
The middle part of sliding channel of water channel 1 is connected with reconstruction joint section 2, reconstructs in joint section 2 and is provided with detachable clay early period straw bag cofferdam
3。
When building the early period of discharge channel 1, while the reconstruction joint section 2 of certain length is built, reconstruction joint section 2
Length with can arrange clay straw bag early period cofferdam 3 for principle, and retain suitable length conveniently build later period discharge channel tract 5 with
Reconstruction joint section 2 connects.
As shown in Figures 2 to 7, discharge channel early period 1 is divided into discharge channel Upstream section early period 11, early period by reconstruction joint section 2
Discharge channel tract 12, later period discharge channel Upstream section 4 and discharge channel early period Upstream section 11 are common sections, after later period reconstruction, the later period
Discharge channel tract 5 is connected to the downstream of reconstruction joint section 2;Early period discharge channel tract 12 upstream side be provided with it is removable
Later period for removing blocks clay straw bag cofferdam 6, and early period, discharge channel tract 12 was set in the downstream side that the later period blocks clay straw bag cofferdam 6
It is equipped with occluding body 7.
Preferably, there is bend, reconstruction joint section 2 is connected to corner and is connected in bend in the middle part of discharge channel early period 1
Wall is the side of spill.It can use collection sand basin 8 of the Solution of Flow in Curved Channel feature as later period discharge channel in this way, it is recessed using bend inner wall
Effluent is fast greatly, transverse direction secondary circulations are shifted bed load in water flow inside collection sand basin 8 onto clockwise on bend, reduction bed load pair
Discharge channel rushes mill.
For the construction method of above-mentioned discharge channel structure reconstruction, Specific construction step are as follows:
One, as shown in Figure 1, building discharge channel early period 1 and reconstruction joint section 2, reconstruction joint section 2 is connected to discharge channel early period
1 middle part of sliding channel, early period discharge channel 1 before overcurrent, heap has built 3 water blocking of clay straw bag early period cofferdam, water flow in reconstruction joint section 2
From 1 overcurrent of discharge channel early period;
Two, as shown in Fig. 2, during 1 overcurrent of discharge channel early period, later period discharge channel tract 5 is built, and be coupled with changing
Build the downstream of joint section 2;As shown in figure 3, remove clay early period straw bag cofferdam 3, and early period discharge channel tract 12 it is upper
Trip side heap builds later period closure clay straw bag cofferdam 6, and water flow blocks clay straw bag cofferdam 6 by later period discharge channel overcurrent, in the later period
Under water blocking protection, occluding body 7 is built in the downstream side that the later period blocks clay straw bag cofferdam 6;It is built as shown in figure 4, occluding body 7 is complete
Afterwards, later period closure clay straw bag cofferdam 6 is removed, collection sand basin 8 is formed, builds completion.
Claims (3)
1. a kind of discharge channel structure convenient for later period reconstruction, including discharge channel early period (1), it is characterised in that: discharge channel early period (1)
Middle part of sliding channel be connected with reconstruction joint section (2), reconstruction joint section (2) in is provided with detachable clay early period straw bag cofferdam
(3)。
2. a kind of discharge channel structure convenient for later period reconstruction as described in claim 1, it is characterised in that: reconstruction joint section (2)
Discharge channel early period (1) is divided into discharge channel Upstream section early period (11), discharge channel tract early period (12), later period discharge channel upstream
Section (4) and discharge channel early period Upstream section (11) are common sections, and later period discharge channel tract (5) is connected to reconstruction joint section (2)
Downstream;The upstream side of discharge channel tract early period (12) is provided with detachable later period closure clay straw bag cofferdam (6), it is preceding
Phase discharge channel tract (12) is provided with occluding body (7) in the downstream side that the later period blocks clay straw bag cofferdam (6).
3. a kind of discharge channel structure convenient for later period reconstruction as claimed in claim 1 or 2, it is characterised in that: early period discharge channel
(1) middle part has bend, and reconstruction joint section (2) is connected to corner and is connected to the side that bend inner wall is spill.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822189667.7U CN209353295U (en) | 2018-12-25 | 2018-12-25 | A kind of discharge channel structure convenient for later period reconstruction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822189667.7U CN209353295U (en) | 2018-12-25 | 2018-12-25 | A kind of discharge channel structure convenient for later period reconstruction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209353295U true CN209353295U (en) | 2019-09-06 |
Family
ID=67799790
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822189667.7U Withdrawn - After Issue CN209353295U (en) | 2018-12-25 | 2018-12-25 | A kind of discharge channel structure convenient for later period reconstruction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209353295U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109371914A (en) * | 2018-12-25 | 2019-02-22 | 中国电建集团成都勘测设计研究院有限公司 | A kind of discharge channel structure convenient for later period reconstruction |
-
2018
- 2018-12-25 CN CN201822189667.7U patent/CN209353295U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109371914A (en) * | 2018-12-25 | 2019-02-22 | 中国电建集团成都勘测设计研究院有限公司 | A kind of discharge channel structure convenient for later period reconstruction |
CN109371914B (en) * | 2018-12-25 | 2023-09-26 | 中国电建集团成都勘测设计研究院有限公司 | Drain channel structure convenient to later stage rebuild |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209353295U (en) | A kind of discharge channel structure convenient for later period reconstruction | |
CN106049390B (en) | A kind of sand setting suitable for river controlling projects blocks dirty integrated apparatus | |
CN205205793U (en) | Water delivery that utilizes diversion tunnel reconstruction hole makeup of imports of emptyying simultaneously | |
CN109371914A (en) | A kind of discharge channel structure convenient for later period reconstruction | |
CN108411865A (en) | A kind of construction method of water conservancy diversion discharge structure | |
CN205875194U (en) | Pouring jacket cofferdam bearing platform structure | |
CN106638486B (en) | High-tech zones cut-pff wall and gallery stage construction method | |
CN213572255U (en) | Municipal works drainage open channel construction fixing device | |
CN201342273Y (en) | Head for subpressure filtration and automatic back-washing in water intake project of arenose surface water source | |
CN204163057U (en) | A kind of for the blocking dam in mud-rock flow | |
CN107858990A (en) | The arrangement of Canyon Area high dam ditch engineering of water treatment | |
CN210341843U (en) | Special drainage pipeline of water conservancy water and electricity | |
CN205934883U (en) | Sand setting blocks dirty integrated device suitable for river regulation engineering | |
CN207453067U (en) | A kind of creek black and odorous water Vatch basin device | |
CN208105453U (en) | A kind of drainage manhole cover of adjustable displacement | |
CN206173879U (en) | Gravity dam construction diversion structure | |
CN201627258U (en) | Device for discharging water from storehouse surface during large-scale concrete construction | |
CN207452820U (en) | A kind of erosion control water conservancy dykes and dams | |
CN108677892A (en) | Diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole | |
CN207597336U (en) | The arrangement of Canyon Area high dam ditch engineering of water treatment | |
CN203096696U (en) | High and low composite backwater weir | |
CN206157858U (en) | Deodorant type integration vatch basin device | |
CN110500116B (en) | Actively-draining anti-floating duct piece and lining structure | |
CN207376576U (en) | A kind of water conservancy chute | |
CN102704451B (en) | Double-wing wedge-shaped cover plate of novel chute flood drainage system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20190906 Effective date of abandoning: 20230926 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20190906 Effective date of abandoning: 20230926 |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |