CN209341663U - Cooling water recirculation system - Google Patents

Cooling water recirculation system Download PDF

Info

Publication number
CN209341663U
CN209341663U CN201821650426.1U CN201821650426U CN209341663U CN 209341663 U CN209341663 U CN 209341663U CN 201821650426 U CN201821650426 U CN 201821650426U CN 209341663 U CN209341663 U CN 209341663U
Authority
CN
China
Prior art keywords
water
solenoid valve
water tank
pipeline
cooling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821650426.1U
Other languages
Chinese (zh)
Inventor
陈金道
陈炳添
杨松坡
万捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Miasole Equipment Integration Fujian Co Ltd
Original Assignee
Miasole Equipment Integration Fujian Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Miasole Equipment Integration Fujian Co Ltd filed Critical Miasole Equipment Integration Fujian Co Ltd
Priority to CN201821650426.1U priority Critical patent/CN209341663U/en
Application granted granted Critical
Publication of CN209341663U publication Critical patent/CN209341663U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

本申请提供一种冷却水循环系统。所述冷却水循环系统包括通过管道依次连接的第一水箱、第二水箱和第一循环水泵。所述第一水箱与所述第二水箱连接的管道上设有第一电磁阀。所述第一水箱上设有第一温度检测装置,用于检测所述第一水箱中循环水的第一温度值。当所述第一温度值小于或等于第一预设温度值时,可以通过打开所述第一电磁阀,使所述第一水箱中的循环水不经过冷却塔和冷水机组直接回到用水设备中。所述第一电磁阀和所述第一温度检测装置配合使用减轻了所述冷却塔和所述冷水机组的工作负荷。

The application provides a cooling water circulation system. The cooling water circulation system includes a first water tank, a second water tank and a first circulating water pump connected in sequence through pipelines. The pipeline connecting the first water tank and the second water tank is provided with a first electromagnetic valve. The first water tank is provided with a first temperature detection device for detecting the first temperature value of the circulating water in the first water tank. When the first temperature value is less than or equal to the first preset temperature value, the circulating water in the first water tank can be directly returned to the water use equipment without passing through the cooling tower and the water chiller by opening the first electromagnetic valve middle. The cooperative use of the first electromagnetic valve and the first temperature detection device reduces the workload of the cooling tower and the chiller.

Description

冷却水循环系统cooling water circulation system

技术领域technical field

本申请涉及冷却循环技术领域,特别是涉及一种冷却水循环系统。The present application relates to the technical field of cooling circulation, in particular to a cooling water circulation system.

背景技术Background technique

在半导体工厂、数据机房等工业厂房中,工艺设备在生产运行过程中经常发热,导致生产设备中的水温持续上升。为了保障生产设备中的水全年达到生产所需环境,需要一套冷却降温的系统。In industrial plants such as semiconductor factories and data centers, process equipment often heats up during production and operation, resulting in a continuous rise in water temperature in production equipment. In order to ensure that the water in the production equipment reaches the environment required for production throughout the year, a cooling system is required.

现有的冷却降温系统无论生产设备中的水温是否达到生产所需环境,须将生产设备中出来的水导入冷却塔中进行一次降温后,再导入冷水机组中进行二次降温。此种冷却降温系统没有综合考虑外界环境等因素的影响,没有充分利用室外自然冷源,增加了冷水机组的工作负荷。In the existing cooling system, regardless of whether the water temperature in the production equipment reaches the required environment for production, the water from the production equipment must be introduced into the cooling tower for primary cooling, and then imported into the chiller for secondary cooling. This kind of cooling and cooling system does not comprehensively consider the influence of external environment and other factors, and does not make full use of the outdoor natural cold source, which increases the workload of the chiller.

实用新型内容Utility model content

基于此,有必要针对现有技术中没有充分利用室外自然冷源的问题,提供一种冷却水循系统。Based on this, it is necessary to provide a cooling water circulation system for the problem that the outdoor natural cold source is not fully utilized in the prior art.

一种冷却水循环系统。所述冷却水循环系统包括通过管道依次连接的第一水箱和第一循环水泵。所述冷却水循环系统还包括:A cooling water circulation system. The cooling water circulation system includes a first water tank and a first circulating water pump connected in sequence through pipelines. The cooling water circulation system also includes:

第一电磁阀,设于所述第一水箱与所述第二水箱之间的管道;以及a first solenoid valve disposed in the pipeline between the first water tank and the second water tank; and

第一温度检测装置,设于所述第一水箱,用于检测所述第一水箱中循环水的第一温度值是否小于或等于第一预设温度值。The first temperature detecting device is arranged in the first water tank, and is used for detecting whether the first temperature value of the circulating water in the first water tank is less than or equal to the first preset temperature value.

在其中一个实施例中,所述冷却水循环系统还包括:In one of the embodiments, the cooling water circulation system also includes:

控制器,与所述第一电磁阀电连接,用于控制所述第一电磁阀的开合状态;以及a controller, electrically connected to the first solenoid valve, for controlling the opening and closing state of the first solenoid valve; and

第二水箱,设置于所述第一水箱与所述第一循环水泵之间,所述第一水箱与所述第二水箱之间的管道设有所述第一电磁阀。The second water tank is arranged between the first water tank and the first circulating water pump, and the pipeline between the first water tank and the second water tank is provided with the first electromagnetic valve.

在其中一个实施例中,所述冷却水循环系统还包括:In one of the embodiments, the cooling water circulation system also includes:

第七电磁阀,设于所述第一水箱的补水管道,当所述第七电磁阀开启后,开始向所述第一水箱中补水;The seventh solenoid valve is located in the water replenishment pipeline of the first water tank, and when the seventh solenoid valve is opened, it starts to replenish water into the first water tank;

第八电磁阀,设于所述第二水箱的排水管道,当所述第八电磁阀开启后,所述第二水箱开始排水;以及The eighth solenoid valve is arranged in the drainage pipe of the second water tank, and when the eighth solenoid valve is opened, the second water tank starts to drain water; and

电导率检测装置,设于所述第二水箱,用于检测所述工艺水循环系统的电导率。The conductivity detection device is arranged in the second water tank and is used to detect the conductivity of the process water circulation system.

在其中一个实施例中,所述冷却水循环系统还包括:In one of the embodiments, the cooling water circulation system also includes:

废水回收装置,与所述第一循环水泵通过管道连接。The waste water recycling device is connected with the first circulating water pump through a pipeline.

在其中一个实施例中,所述冷却水循环系统还包括:In one of the embodiments, the cooling water circulation system also includes:

第九电磁阀,设于所述废水回收装置与所述第一循环水泵之间的管道,所述第九电磁阀开启后,所述第二水箱排出的循环水流入所述废水回收装置。The ninth solenoid valve is arranged in the pipeline between the waste water recovery device and the first circulating water pump. After the ninth solenoid valve is opened, the circulating water discharged from the second water tank flows into the waste water recovery device.

在其中一个实施例中,所述冷却水循环系统还包括:In one of the embodiments, the cooling water circulation system also includes:

一级循环系统,与所述第一水箱通过管道连接,用于冷却进入所述一级循环系统中的循环水;以及A primary circulation system, connected to the first water tank through a pipeline, for cooling the circulating water entering the primary circulation system; and

二级循环系统,分别与所述一级循环系统和所述第二水箱通过管道连接。The secondary circulation system is respectively connected with the primary circulation system and the second water tank through pipelines.

在其中一个实施例中,所述冷却水循环系统还包括:In one of the embodiments, the cooling water circulation system also includes:

第二电磁阀,设于所述一级循环系统与所述第一水箱之间的管道;The second solenoid valve is located in the pipeline between the primary circulation system and the first water tank;

第三电磁阀,设于所述一级循环系统与所述二级循环系统之间的管道;以及The third solenoid valve is located in the pipeline between the primary circulation system and the secondary circulation system; and

第四电磁阀,设于所述二级循环系统与所述第二水箱之间的管道。The fourth solenoid valve is arranged in the pipeline between the secondary circulation system and the second water tank.

在其中一个实施例中,所述一级循环系统包括:In one of the embodiments, the primary circulation system includes:

第二循环水泵,与所述第一水箱通过管道连接,所述第二电磁阀设于所述第二循环水泵与所述第一水箱之间的管道;以及The second circulating water pump is connected to the first water tank through a pipeline, and the second electromagnetic valve is arranged in the pipeline between the second circulating water pump and the first water tank; and

冷却塔,具有第一进水口和第一出水口,所述第一进水口与所述第二循环水泵通过管道连接,所述第一出水口与所述二级循环系统通过管道连接,所述第三电磁阀设于所述第一出水口与所述二级循环系统之间的管道。The cooling tower has a first water inlet and a first water outlet, the first water inlet is connected to the second circulating water pump through a pipeline, the first water outlet is connected to the secondary circulation system through a pipeline, and the The third electromagnetic valve is arranged in the pipeline between the first water outlet and the secondary circulation system.

在其中一个实施例中,所述二级循环系统包括:In one of the embodiments, the secondary circulation system includes:

换热器,与所述第一出水口通过管道连接,所述第三电磁阀设于所述换热器与所述第一出水口之间的管道;A heat exchanger is connected to the first water outlet through a pipeline, and the third electromagnetic valve is arranged in the pipeline between the heat exchanger and the first water outlet;

第三循环水泵,通过管道与所述换热器连接;以及The third circulating water pump is connected to the heat exchanger through a pipeline; and

冷水机组,分别与所述换热器和所述第三循环水泵通过管道连接。The chiller is connected to the heat exchanger and the third circulating water pump through pipelines respectively.

在其中一个实施例中,所述冷却水循环系统还包括:In one of the embodiments, the cooling water circulation system also includes:

第五电磁阀,设于所述第三循环水泵与所述换热器之间的管道;以及The fifth solenoid valve is arranged in the pipeline between the third circulating water pump and the heat exchanger; and

第六电磁阀,设于所述冷水机组与所述换热器之间的管道。The sixth electromagnetic valve is arranged in the pipeline between the chiller and the heat exchanger.

本申请提供一种冷却水循环系统。所述冷却水循环系统包括通过管道依次连接的第一水箱、第二水箱和第一循环水泵。所述第一水箱与所述第二水箱连接的管道上设有第一电磁阀。所述第一水箱上设有第一温度检测装置,用于检测所述第一水箱中循环水的第一温度值是否小于或等于第一预设温度值。当所述第一温度值小于或等于第一预设温度值时,可以通过打开所述第一电磁阀,使所述第一水箱中的循环水不经过冷却塔和冷水机组直接回到用水设备中。所述第一电磁阀和所述第一温度检测装置配合使用减轻了所述冷却塔和所述冷水机组的工作负荷。The application provides a cooling water circulation system. The cooling water circulation system includes a first water tank, a second water tank and a first circulating water pump connected in sequence through pipelines. The pipeline connecting the first water tank and the second water tank is provided with a first electromagnetic valve. The first water tank is provided with a first temperature detection device for detecting whether the first temperature value of the circulating water in the first water tank is less than or equal to the first preset temperature value. When the first temperature value is less than or equal to the first preset temperature value, the circulating water in the first water tank can be directly returned to the water use equipment without passing through the cooling tower and the water chiller by opening the first electromagnetic valve middle. The cooperative use of the first electromagnetic valve and the first temperature detection device reduces the workload of the cooling tower and the chiller.

附图说明Description of drawings

图1为本申请一个实施例中提供的冷却水循环控制方法流程图;Fig. 1 is a flow chart of the cooling water circulation control method provided in one embodiment of the present application;

图2为本申请另一个实施例中提供的冷却水循环控制方法流程图;FIG. 2 is a flowchart of a cooling water circulation control method provided in another embodiment of the present application;

图3为本申请再一个实施例中提供的冷却水循环控制方法流程图;3 is a flow chart of a cooling water circulation control method provided in another embodiment of the present application;

图4为本申请一个实施例中提供的冷却水循环系统结构示意图;FIG. 4 is a schematic structural diagram of a cooling water circulation system provided in an embodiment of the present application;

图5为本申请另一个实施例中提供的冷却水循环系统结构示意图。主要元件附图标号说明Fig. 5 is a schematic structural diagram of a cooling water circulation system provided in another embodiment of the present application. Explanation of main components with reference numerals

工艺水循环系统100Process water circulation system 100

控制器10controller 10

第一电磁阀21First solenoid valve 21

第二电磁阀22Second solenoid valve 22

第三电磁阀23The third solenoid valve 23

第四电磁阀24Fourth solenoid valve 24

第五电磁阀25Fifth solenoid valve 25

第六电磁阀26Sixth solenoid valve 26

第七电磁阀27Seventh solenoid valve 27

第八电磁阀28Eighth solenoid valve 28

第九电磁阀29Ninth solenoid valve 29

第一温度检测装置31The first temperature detection device 31

第二温度检测装置32Second temperature detection device 32

第三温度检测装置33The third temperature detection device 33

第四温度检测装置34Fourth temperature detection device 34

电导率检测装置40Conductivity detection device 40

废水回收装置50Wastewater recovery device 50

用水设备60Water equipment 60

第一水箱210First water tank 210

第二水箱220Second water tank 220

第一循环水泵230The first circulating water pump 230

一级循环系统300Primary circulation system 300

第二循环水泵310Second circulating water pump 310

冷却塔320Cooling tower 320

第一进水口321The first water inlet 321

第一出水口322The first water outlet 322

二级循环系统400Secondary circulation system 400

换热器410Heat exchanger 410

第三循环水泵420The third circulating water pump 420

冷水机组430Chiller 430

具体实施方式Detailed ways

为了使本申请的目的、技术方案及优点更加清楚明白,以下通过实施例,并结合附图,对本申请的冷却水循环系统进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本申请,并不用于限定本申请。In order to make the purpose, technical solution and advantages of the present application clearer, the cooling water circulation system of the present application will be further described in detail through the following examples and in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are only used to explain the present application, not to limit the present application.

请参见图1,本申请一个实施例中提供一种冷却水循环控制方法。所述冷却水循环控制方法包括:Referring to FIG. 1 , an embodiment of the present application provides a cooling water circulation control method. The cooling water circulation control method includes:

S100,检测并判断第一水箱210中循环水的第一温度值是否小于或等于第一预设温度值,所述第一预设温度值为适合用水设备60工作的温度值。S100, detecting and judging whether the first temperature value of the circulating water in the first water tank 210 is less than or equal to a first preset temperature value, and the first preset temperature value is a temperature value suitable for the water equipment 60 to work.

步骤S100中,由于用水设备60中的水流向所述第一水箱210过程中,利用循环水的运动会自然降温。由第一温度检测装置31检测所述第一水箱210中的循环水的第一温度值。并由单片机、微处理器等控制器10判断所述第一温度值是否小于所述第一预设温度值。所述第一预设温度值可以由本领域技术人员任意设定。比如所述第一预设温度值可以为22℃。In step S100, since the water in the water-using device 60 flows to the first water tank 210, the temperature will be naturally lowered by the movement of circulating water. The first temperature value of the circulating water in the first water tank 210 is detected by the first temperature detection device 31 . And the controller 10 such as a single-chip microcomputer or a microprocessor judges whether the first temperature value is lower than the first preset temperature value. The first preset temperature value can be set arbitrarily by those skilled in the art. For example, the first preset temperature value may be 22°C.

S200,当检测并判断到所述第一温度值小于或等于所述第一预设温度值时,控制第一电磁阀21打开,所述第一水箱210中的循环水经第一循环水泵230回到所述用水设备60中。S200, when it is detected and judged that the first temperature value is less than or equal to the first preset temperature value, control the first electromagnetic valve 21 to open, and the circulating water in the first water tank 210 passes through the first circulating water pump 230 Get back in the described water equipment 60.

步骤S200中,可以由控制器10控制所述第一电磁阀的开合状态。比如,所述第一预设温度值为22℃,所述第一温度检测装置31检测到的所述第一温度值为20摄氏度时。单片机可以控制所述第一电磁阀打开。此时,所述第一水箱210和所述第一循环水泵230之间的通路打开,所述第一水箱210中的循环水经所述第一循环水泵230回到所述用水设备60中。当然所述第一水箱210中的循环水也可以流入所述第二水箱220中。再通过与所述第二水箱220连接的第一循环水泵230回到所述用水设备60中,继续供用水设备60使用。In step S200, the controller 10 may control the opening and closing state of the first electromagnetic valve. For example, the first preset temperature value is 22°C, and the first temperature value detected by the first temperature detection device 31 is 20°C. The single-chip microcomputer can control the opening of the first electromagnetic valve. At this time, the passage between the first water tank 210 and the first circulating water pump 230 is opened, and the circulating water in the first water tank 210 returns to the water-using equipment 60 through the first circulating water pump 230 . Of course, the circulating water in the first water tank 210 may also flow into the second water tank 220 . Then return to the water equipment 60 through the first circulating water pump 230 connected to the second water tank 220 , and continue to be used by the water equipment 60 .

本实施例中,所述控制器10依据判断结果控制所述第一电磁阀21的开合状态。当所述第一温度值小于或等于所述第一预设温度值时,所述控制器10控制第一电磁阀21打开。此时,所述第一水箱210和所述第一循环水泵230之间的通路打开。所述第一水箱210中的循环水可以不经一级循环系统300和二级循环系统400的降温,经所述第一循环水泵230流回所述用水设备60。所述冷却水循环控制方法通过控制所述第一电磁阀21的开合状态,减轻了所述一级循环系统300和所述二级循环系统400的工作负荷。In this embodiment, the controller 10 controls the opening and closing state of the first solenoid valve 21 according to the judgment result. When the first temperature value is less than or equal to the first preset temperature value, the controller 10 controls the first solenoid valve 21 to open. At this time, the passage between the first water tank 210 and the first circulating water pump 230 is opened. The circulating water in the first water tank 210 may not be cooled by the primary circulating system 300 and the secondary circulating system 400 , and flow back to the water-using equipment 60 through the first circulating water pump 230 . The cooling water circulation control method reduces the workload of the primary circulation system 300 and the secondary circulation system 400 by controlling the opening and closing state of the first solenoid valve 21 .

请参见图2,在其中一个实施例中,还包括:Please refer to Figure 2, in one of the embodiments, it also includes:

S300,当检测并判断到所述第一温度值大于所述第一预设温度值时,检测并判断室外湿球温度值是否小于或等于第二预设温度值,所述第二预设温度值为利用一级循环系统300即可完成降温的室外温度值。S300, when detecting and judging that the first temperature value is greater than the first preset temperature value, detecting and judging whether the outdoor wet bulb temperature value is less than or equal to a second preset temperature value, the second preset temperature The value is the outdoor temperature value at which cooling can be completed by using the primary circulation system 300 .

步骤S300中,当所述控制器10判断所述第一温度值大于所述第一预设温度值。即通过循环水的运动自然降温方式,不能使所述第一水箱210中的循环水温降到适合所述用水设备60工作的温度值。此时,可以利用第二温度检测装置32检测室外的湿球温度值。所述第二温度检测装置32可以为设置在室外的温度传感器。所述控制器10判断所述湿球温度值是否小于或等于第二预设温度值。所述湿球温度代表在某一地点某一时间,循环水通过蒸发所能达到的最低温度。对于本申请来说,所述湿球温度代表循环水在所述一级降温系统300中可能被冷却到的最低温度。因此所述湿球温度值越低,用于降温的自然冷源越好。所述第二预设温度值可以依据所述用水设备60工作需要的循环水温进行设定。所述第二预设温度值需要适当比所述用水设备60工作需要的水温低一些。比如,所述用水设备60工作需要的循环水温为22℃,所述第二预设温度值可以设定为20℃。In step S300, when the controller 10 determines that the first temperature value is greater than the first preset temperature value. That is, the temperature of the circulating water in the first water tank 210 cannot be lowered to a temperature suitable for the operation of the water-using equipment 60 by means of natural cooling through the movement of the circulating water. At this time, the outdoor wet bulb temperature can be detected by the second temperature detection device 32 . The second temperature detection device 32 may be a temperature sensor installed outdoors. The controller 10 judges whether the wet bulb temperature value is less than or equal to a second preset temperature value. The wet bulb temperature represents the lowest temperature that the circulating water can reach through evaporation at a certain time at a certain place. For this application, the wet bulb temperature represents the lowest temperature to which circulating water may be cooled in the primary cooling system 300 . Therefore, the lower the wet bulb temperature value, the better the natural cooling source for cooling. The second preset temperature value can be set according to the circulating water temperature required by the water equipment 60 to work. The second preset temperature value needs to be properly lower than the water temperature required by the water equipment 60 to work. For example, the temperature of the circulating water required for the water equipment 60 to work is 22°C, and the second preset temperature value can be set to 20°C.

S400,当所述室外湿球温度值小于或等于所述第二预设温度值时,控制所述第一电磁阀21关闭,第二电磁阀22开启。以将所述第一水箱210中的循环水引入一级循环系统300中。对所述用水设备中的循环水进行一级降温处理后,控制第三电磁阀23和第四电磁阀24打开。所述一级循环系统300中的循环水经所述第一循环水泵230回到所述用水设备60中。S400, when the outdoor wet bulb temperature value is less than or equal to the second preset temperature value, control the first solenoid valve 21 to close and the second solenoid valve 22 to open. In order to introduce the circulating water in the first water tank 210 into the primary circulation system 300 . After the circulating water in the water equipment is subjected to primary cooling treatment, the third solenoid valve 23 and the fourth solenoid valve 24 are controlled to open. The circulating water in the primary circulating system 300 is returned to the water-using equipment 60 through the first circulating water pump 230 .

步骤S400中,当所述室外湿球温度值小于或等于所述第二预设温度值。即可以说明通过所述一级循环系统300利用自然冷源即可降到所述用水设备60工作需要的循环水温。所述一级循环系统300中可以设置第三温度检测装置33,用于检测所述一级循环系统300运行一段时间后循环水的第三温度值。当所述第三温度值小于或等于所述第一预设温度值时,则所述控制器10控制第三电磁阀23和第四电磁阀24打开,所述一级循环系统300中的循环水经所述第一循环水泵230回到所述用水设备60中。当所述第三温度值大于所述第一预设温度值时,所述一级循环系统300继续利用自然冷源对所述用水设备60中的循环水进行降温。直到所述控制器10判断得到到第三温度值小于或等于所述第一预设温度值。所述控制器10控制第三电磁阀23和第四电磁阀24打开,所述一级循环系统300中的循环水经所述第一循环水泵230回到所述用水设备60中。In step S400, when the outdoor wet bulb temperature value is less than or equal to the second preset temperature value. That is to say, it can be explained that the temperature of the circulating water required by the water-using equipment 60 can be lowered by using the natural cooling source through the primary circulation system 300 . A third temperature detection device 33 may be provided in the primary circulation system 300 to detect a third temperature value of circulating water after the primary circulation system 300 has been running for a period of time. When the third temperature value is less than or equal to the first preset temperature value, the controller 10 controls the third solenoid valve 23 and the fourth solenoid valve 24 to open, and the circulation in the primary circulation system 300 The water returns to the water equipment 60 through the first circulating water pump 230 . When the third temperature value is greater than the first preset temperature value, the primary circulation system 300 continues to use a natural cooling source to cool down the circulating water in the water use equipment 60 . Until the controller 10 determines that the third temperature value is less than or equal to the first preset temperature value. The controller 10 controls the opening of the third electromagnetic valve 23 and the fourth electromagnetic valve 24 , and the circulating water in the primary circulation system 300 returns to the water-using equipment 60 through the first circulating water pump 230 .

本实施例中,所述控制器10判断室外的所述湿球温度值是否小于或等于所述第二预设温度值。所述控制器10依据判断结果控制所述第一电磁阀21和所述第二电磁阀22的开合状态。当所述湿球温度值小于或等于所述第二预设温度值,所述控制器10控制所述第一电磁阀21关闭,并控制所述第二电磁阀22开启。以实现利用所述一级循环系统300利用自然冷源对所述用水设备60出来的循环水进行一级降温的目的。所述冷却水循环控制方法通过控制第一电磁阀21和第二电磁阀22的开合状态,充分利用自然冷源对所述用水设备60出来的循环水进行降温,减轻了所述二级循环系统400的工作负荷,提高了所述二级循环系统400的能效。In this embodiment, the controller 10 judges whether the outdoor wet bulb temperature value is less than or equal to the second preset temperature value. The controller 10 controls the opening and closing states of the first solenoid valve 21 and the second solenoid valve 22 according to the judgment result. When the wet bulb temperature value is less than or equal to the second preset temperature value, the controller 10 controls the first solenoid valve 21 to close and controls the second solenoid valve 22 to open. In order to achieve the purpose of using the primary circulation system 300 to use a natural cold source to perform primary cooling of the circulating water from the water use equipment 60 . The cooling water circulation control method controls the opening and closing states of the first electromagnetic valve 21 and the second electromagnetic valve 22, and makes full use of the natural cold source to cool the circulating water from the water equipment 60, thereby reducing the temperature of the secondary circulation system. 400, the energy efficiency of the secondary circulation system 400 is improved.

在其中一个实施例中,还包括:In one of the embodiments, it also includes:

S500,当所述室外湿球温度值大于所述第二预设温度值时,控制所述第一电磁阀21关闭,所述第二电磁阀22开启。以将所述第一水箱210中的循环水引入一级循环系统300中。对所述用水设备60中的循环水进行一级降温处理后,控制所述第四电磁阀24关闭,所述第三电磁阀23、第五电磁阀25和第六电磁阀26开启。以将所述一级循环系统300中的循环水引入二级循环系统400。对从所述一级循环系统300中流出的循环水进行二级降温处理后,控制所述第四电磁阀24打开,所述二级循环系统400中的循环水经所述第一循环水泵230回到所述用水设备60中。S500. When the outdoor wet bulb temperature value is greater than the second preset temperature value, control the first solenoid valve 21 to close and the second solenoid valve 22 to open. In order to introduce the circulating water in the first water tank 210 into the primary circulation system 300 . After the circulating water in the water equipment 60 is subjected to primary cooling treatment, the fourth solenoid valve 24 is controlled to be closed, and the third solenoid valve 23 , fifth solenoid valve 25 and sixth solenoid valve 26 are opened. To introduce the circulating water in the primary circulation system 300 into the secondary circulation system 400 . After the circulating water flowing out from the primary circulation system 300 is subjected to secondary cooling treatment, the fourth electromagnetic valve 24 is controlled to open, and the circulating water in the secondary circulation system 400 passes through the first circulating water pump 230 Get back in the described water equipment 60.

所述室外湿球温度值大于所述第二预设温度值。即可以说明只通过一级降温不能将所述用水设备60流出的循环水降到适合所述用水设备60继续工作的温度。比如,适合所述用水设备60继续工作的温度值22℃,从所述用水设备60中流出的循环水温度值为35℃,经一级循环系统300降温后,将从所述用水设备60中流出的循环水温降为30℃。此时,所述控制器10控制所述第四电磁阀24关闭,所述第三电磁阀23、第五电磁阀25和第六电磁阀26开启。将所述一级循环系统300中的循环水引入二级循环系统400中,采用所述二级循环系统400形成的逆卡诺循环的方式对进入所述二级循环系统400中的循环水进行二级降温。所述二级循环系统400中可以设置第四温度检测装置34。所述第四温度检测装置检测所述二级循环系统400运行一段时间后循环水的第四温度值。当所述第四温度值小于或等于第一预设温度值时,所述控制器10控制所述第四电磁阀24打开。所述二级循环系统400中的循环水经所述第一循环水泵230回到所述用水设备60中。The outdoor wet bulb temperature value is greater than the second preset temperature value. That is to say, it can be explained that the circulating water flowing out of the water use equipment 60 cannot be lowered to a temperature suitable for the water use equipment 60 to continue to work only through one-stage cooling. For example, the temperature value suitable for the continuous operation of the water equipment 60 is 22°C, and the temperature value of the circulating water flowing out from the water equipment 60 is 35°C. The temperature of the outgoing circulating water drops to 30°C. At this time, the controller 10 controls the fourth solenoid valve 24 to close, and the third solenoid valve 23 , the fifth solenoid valve 25 and the sixth solenoid valve 26 to open. The circulating water in the primary circulation system 300 is introduced into the secondary circulation system 400, and the circulating water entering the secondary circulation system 400 is processed by the reverse Carnot cycle formed by the secondary circulation system 400. Secondary cooling. A fourth temperature detection device 34 may be provided in the secondary circulation system 400 . The fourth temperature detection device detects the fourth temperature value of the circulating water after the secondary circulation system 400 has been running for a period of time. When the fourth temperature value is less than or equal to the first preset temperature value, the controller 10 controls the fourth solenoid valve 24 to open. The circulating water in the secondary circulating system 400 is returned to the water equipment 60 through the first circulating water pump 230 .

本实施例中,当所述湿球温度值大于所述第二预设温度值时,自然能源的降温的效果降低。所述一级循环系统300经一级降温处理后,将从所述用水设备60中流出的循环水降低到一定温度值后,再利用所述二级循环系统400进行二级降温。相对于所述二级循环系统400的制冷方式来说,所述一级循环系统300利用自然冷源制冷。所述一级循环系统300的功耗很低,分担了所述二级循环系统400的工作负荷,降低了所述二级循环系统400的功耗,从而降低了制冷设备的运行成本。In this embodiment, when the wet bulb temperature value is greater than the second preset temperature value, the cooling effect of natural energy is reduced. After the primary circulation system 300 has undergone primary cooling treatment, the circulating water flowing out of the water equipment 60 is reduced to a certain temperature value, and then the secondary circulation system 400 is used for secondary cooling. Compared with the refrigeration method of the secondary circulation system 400, the primary circulation system 300 uses a natural cooling source for refrigeration. The power consumption of the primary circulation system 300 is very low, which shares the workload of the secondary circulation system 400 and reduces the power consumption of the secondary circulation system 400, thereby reducing the operating cost of the refrigeration equipment.

请参见图3,在其中一个实施例中,还包括:Please refer to Figure 3, in one of the embodiments, it also includes:

S600,检测所述第二水箱220中的循环水的电导率值是否大于预设电导率值。S600, detecting whether the conductivity value of the circulating water in the second water tank 220 is greater than a preset conductivity value.

由于冷却水循环系统100中电导率值过大,可能造成管道或设备的阻垢、腐蚀等。因此,所述第二水箱上可以设置电导率检测装置40。所述电导率检测装置40检测所述第二水箱220中的循环水的电导率值。所述控制器10判断所述电导率值是否大于预设电导率值。所述预设电导率值可以由本领域技术人员任意设定。Since the conductivity value in the cooling water circulation system 100 is too large, it may cause scale inhibition and corrosion of pipelines or equipment. Therefore, a conductivity detection device 40 may be provided on the second water tank. The conductivity detection device 40 detects the conductivity value of the circulating water in the second water tank 220 . The controller 10 judges whether the conductivity value is greater than a preset conductivity value. The preset conductivity value can be set arbitrarily by those skilled in the art.

S700,当所述第二水箱220中的循环水的电导率值是否大于预设电导率值时,控制第七电磁阀27和第八电磁阀28打开,对所述第一水箱210补水,并对所述第二水箱220排水。S700, when whether the conductivity value of the circulating water in the second water tank 220 is greater than the preset conductivity value, control the opening of the seventh solenoid valve 27 and the eighth solenoid valve 28, replenish water to the first water tank 210, and Drain the second water tank 220 .

步骤S700中,所述第七电磁阀27是设置于所述第一水箱210的补水管道上的补水阀。所述第八电磁阀28是设置于所述第二水箱220排水管道上的排水阀。当所述电导率值大于所述预设电导率值时,所述控制器10控制所述第七电磁阀27打开,所述第一水箱210开始补水,且所述第二水箱220开始排水。In step S700 , the seventh solenoid valve 27 is a water replenishment valve provided on the water replenishment pipeline of the first water tank 210 . The eighth solenoid valve 28 is a drain valve arranged on the drain pipe of the second water tank 220 . When the conductivity value is greater than the preset conductivity value, the controller 10 controls the seventh solenoid valve 27 to open, the first water tank 210 starts to replenish water, and the second water tank 220 starts to drain water.

本实施例中,所述控制器10可以依据判断结果控制所述第七电磁阀27和所述第八电磁阀28的开合状态。从而保证所述冷却水循环系统100中循环水的电导率值在安全范围内。所述冷却水循环控制方法通过控制所述第一水箱210补水并控制所述第二水箱220排水避免所述冷却水循环系统100的管道或设备冷却装备阻垢、腐蚀等,提高设备换热效率,延长使用寿命,降低运维成本。In this embodiment, the controller 10 can control the opening and closing states of the seventh solenoid valve 27 and the eighth solenoid valve 28 according to the judgment result. Therefore, it is ensured that the conductivity value of the circulating water in the cooling water circulation system 100 is within a safe range. The cooling water circulation control method controls the first water tank 210 to replenish water and controls the second water tank 220 to drain water to avoid scaling and corrosion of the pipes or equipment cooling equipment in the cooling water circulation system 100, improve the heat exchange efficiency of the equipment, and prolong the life of the equipment. Long service life and reduce operation and maintenance costs.

在其中一个实施例中,还包括:In one of the embodiments, it also includes:

S800,控制第九电磁阀29打开,将所述第二水箱220中排出的循环水引入废水回收装置50中,以对所述第二水箱220中排出的循环水进行回收再利用。S800, control the opening of the ninth electromagnetic valve 29, and introduce the circulating water discharged from the second water tank 220 into the waste water recovery device 50, so as to recycle the circulating water discharged from the second water tank 220.

所述废水回收装置50与所述第一循环水泵230通过管道连接。所述第九电磁阀29设置于所述废水回收装置50与所述第一循环水泵230之间的管道上。当所述控制器10控制所述第七电磁阀27和所述第九电磁阀29打开,所述第二水箱220开始排水后,排出的循环水经所述第一循环水泵230流入所述废水回收装置50。所述废水回收装置50可与绿化管道或卫生间的冲水管道相连,用于绿化植被或卫生间用水。The wastewater recycling device 50 is connected to the first circulating water pump 230 through a pipeline. The ninth solenoid valve 29 is disposed on the pipeline between the waste water recycling device 50 and the first circulating water pump 230 . When the controller 10 controls the opening of the seventh solenoid valve 27 and the ninth solenoid valve 29 and the second water tank 220 starts to drain water, the discharged circulating water flows into the waste water through the first circulating water pump 230 Recovery device 50. The waste water recovery device 50 can be connected with the greening pipeline or the flushing pipeline of the toilet, and is used for greening vegetation or water for the toilet.

本实施例中,所述冷却水循环控制方法控制所述第二水箱220排出的循环水流入所述废水回收装置50。所述废水回收装置50可与绿化管道或卫生间的冲水管道相连,用于绿化植被或卫生间用水。所述冷却水循环控制方法减少了水资源的浪费,也减少了企业的成本支出。In this embodiment, the cooling water circulation control method controls the circulating water discharged from the second water tank 220 to flow into the waste water recycling device 50 . The waste water recovery device 50 can be connected with the greening pipeline or the flushing pipeline of the toilet, and is used for greening vegetation or water for the toilet. The cooling water circulation control method reduces the waste of water resources and also reduces the cost of enterprises.

请参见图4,本申请一个实施例中提供一种冷却水循环系统100。所述冷却水循环系统100包括通过管道依次连接的第一水箱210和第一循环水泵230。所述冷却水循环系统100还包括第一电磁阀21和第一温度检测装置31。Referring to FIG. 4 , an embodiment of the present application provides a cooling water circulation system 100 . The cooling water circulation system 100 includes a first water tank 210 and a first circulating water pump 230 connected in sequence through pipelines. The cooling water circulation system 100 also includes a first solenoid valve 21 and a first temperature detection device 31 .

所述第一水箱210的进水口与所述用水设备60的出水口通过管道相连。The water inlet of the first water tank 210 is connected to the water outlet of the water-using device 60 through a pipe.

所述第一电磁阀21设于所述第一水箱210出水口与所述第一循环水泵230之间的管道。当所述第一电磁阀21打开时,所述第一水箱210中的循环水可以经第一循环水泵230回到所述用水设备60中。The first electromagnetic valve 21 is arranged in the pipeline between the water outlet of the first water tank 210 and the first circulating water pump 230 . When the first solenoid valve 21 is opened, the circulating water in the first water tank 210 can return to the water-using equipment 60 through the first circulating water pump 230 .

所述第一温度检测装置31设于所述第一水箱210,用于检测所述第一水箱210中循环水的第一温度值。所述第一温度检测装置31可以为温度传感器。比如,所述第一预设值为25℃,即所述用水设备60正常工作需要的循环水温度值为25℃。当所述第一温度检测装置31检测到的所述第一温度值为23℃,所述第一电磁阀21可以被手动打开或由单片机控制打开。此时,所述第一水箱210中的循环水可以直接经所述第一循环水泵230回到所述用水设备60中。反之,当所述第一温度检测装置31检测到的所述第一温度值为26℃时,所述第一电磁阀处于关闭状态。此时,所述第一水箱210中的循环水不能经所述第一循环水泵230回到所述用水设备60中。The first temperature detecting device 31 is arranged in the first water tank 210 and is used for detecting a first temperature value of the circulating water in the first water tank 210 . The first temperature detection device 31 may be a temperature sensor. For example, the first preset value is 25°C, that is, the circulating water temperature value required for the normal operation of the water-using equipment 60 is 25°C. When the first temperature value detected by the first temperature detection device 31 is 23° C., the first electromagnetic valve 21 can be opened manually or controlled by a single-chip microcomputer. At this time, the circulating water in the first water tank 210 can be directly returned to the water-using equipment 60 through the first circulating water pump 230 . Conversely, when the first temperature value detected by the first temperature detection device 31 is 26° C., the first solenoid valve is in a closed state. At this time, the circulating water in the first water tank 210 cannot return to the water-using equipment 60 through the first circulating water pump 230 .

本实施例中,所述冷却水循环系统100包括通过管道依次连接的第一水箱210和第一循环水泵230。所述第一水箱210与所述第一循环水泵230连接的管道上设有第一电磁阀21。所述第一水箱210上设有第一温度检测装置31,用于检测所述第一水箱210中循环水的第一温度值。当所述第一温度值小于或等于第一预设温度值时,可以通过打开所述第一电磁阀21,使所述第一水箱210中的循环水不经过冷却塔320和冷水机组430直接回到所述用水设备60中。所述第一电磁阀21和所述第一温度检测装置31配合使用减轻了所述冷却塔320和所述冷水机组430的工作负荷。In this embodiment, the cooling water circulation system 100 includes a first water tank 210 and a first circulating water pump 230 connected in sequence through pipelines. A first electromagnetic valve 21 is provided on the pipeline connecting the first water tank 210 and the first circulating water pump 230 . The first water tank 210 is provided with a first temperature detection device 31 for detecting a first temperature value of the circulating water in the first water tank 210 . When the first temperature value is less than or equal to the first preset temperature value, by opening the first electromagnetic valve 21, the circulating water in the first water tank 210 can be directly Get back in the described water equipment 60. The cooperative use of the first electromagnetic valve 21 and the first temperature detection device 31 reduces the workload of the cooling tower 320 and the chiller 430 .

请参见图5,在其中一个实施例中,所述冷却水循环系统100还包括控制器10和第二水箱220。所述控制器10与所述第一电磁阀21电连接,用于控制所述第一电磁阀21的开合状态。所述第二水箱220设置于所述第一水箱210与所述第一循环水泵230之间,所述第一水箱210与所述第二水箱220之间的管道设有所述第一电磁阀21。Please refer to FIG. 5 , in one embodiment, the cooling water circulation system 100 further includes a controller 10 and a second water tank 220 . The controller 10 is electrically connected with the first solenoid valve 21 and used for controlling the opening and closing state of the first solenoid valve 21 . The second water tank 220 is arranged between the first water tank 210 and the first circulating water pump 230, and the pipeline between the first water tank 210 and the second water tank 220 is provided with the first solenoid valve twenty one.

所述控制器10可以为单片机、微处理器。所述控制器10与所述第一温度检测装置31通信连接,用于获取所述第一温度检测装置31检测到的所述第一温度值。此外,所述控制器10还可以与远端的触摸屏通信连接。当前工作人员可以通过所述触摸屏任意设定所述第一预设温度值和所述第二预设温度值。所述控制器10可以获取所述第一预设温度值并与所述第一温度值比较。比如,当前工作人员可以在所述触摸屏上设定所述第一预设温度值为25℃。所述所述第一温度检测装置31检测到的所述第一温度值为23℃。此时所述控制器10通过判断所述第一预设温度值大于所述第一温度值,此时所述控制器10可以立即控制所述第一电磁阀21打开。The controller 10 can be a single-chip microcomputer or a microprocessor. The controller 10 is connected in communication with the first temperature detection device 31 for obtaining the first temperature value detected by the first temperature detection device 31 . In addition, the controller 10 can also communicate with a remote touch screen. The current staff can arbitrarily set the first preset temperature value and the second preset temperature value through the touch screen. The controller 10 can acquire the first preset temperature value and compare it with the first temperature value. For example, the current staff can set the first preset temperature value to 25° C. on the touch screen. The first temperature value detected by the first temperature detection device 31 is 23°C. At this time, the controller 10 can immediately control the opening of the first solenoid valve 21 by judging that the first preset temperature value is greater than the first temperature value.

本实施例中,所述冷却水循环系统100通过设置控制器10自动控制所述第一电磁阀21的开合状态,进而实现控制所述用水设备60中的循环水通过何种降温模式进行降温。由于远端加入触摸屏的设置,可以随着环境变化或用水设备的需要任意设定所述第一预设温度值,操作更加灵活。In this embodiment, the cooling water circulation system 100 sets the controller 10 to automatically control the opening and closing state of the first electromagnetic valve 21 , and then realizes controlling which cooling mode the circulating water in the water-using equipment 60 uses to cool down. Since the setting of the touch screen is added at the remote end, the first preset temperature value can be set arbitrarily according to the environmental changes or the needs of the water equipment, and the operation is more flexible.

在其中一个实施例中,所述所述冷却水循环系统100还包括第七电磁阀27、第八电磁阀28和电导率检测装置40.In one of the embodiments, the cooling water circulation system 100 further includes a seventh solenoid valve 27, an eighth solenoid valve 28 and a conductivity detection device 40.

所述第七电磁阀27设于所述第一水箱210的补水管道,当所述第七电磁阀27开启后,开始向所述第一水箱210中补水。所述第七电磁阀27与所述控制器10电连接。The seventh solenoid valve 27 is installed in the water replenishment pipeline of the first water tank 210 , and when the seventh solenoid valve 27 is turned on, it starts to replenish water into the first water tank 210 . The seventh solenoid valve 27 is electrically connected to the controller 10 .

所述第八电磁阀28设于所述第二水箱220的排水管道,当所述第八电磁阀28开启后,所述第二水箱220开始排水。所述第八电磁阀28与所述控制器10电连接。The eighth solenoid valve 28 is disposed in the drain pipe of the second water tank 220 , and when the eighth solenoid valve 28 is turned on, the second water tank 220 starts to drain water. The eighth solenoid valve 28 is electrically connected to the controller 10 .

所述电导率检测装置40设于所述第二水箱220,用于检测所述冷却水循环系统100中循环水的电导率。所述电导率检测装置40与所述控制器10通信连接。The conductivity detection device 40 is installed in the second water tank 220 for detecting the conductivity of the circulating water in the cooling water circulation system 100 . The conductivity detection device 40 is in communication connection with the controller 10 .

当前工作人员可以根据所述冷却水循环系统100的需要在所述触摸屏上设定预设电导率值。所述电导率检测装置40可以实时检测所述第二水箱220中循环水的电导率值。当所述控制器10判断所述第二水箱220中循环水的电导率值大于所述预设电导率值时,所述控制器10控制所述第七电磁阀27和所述第八电磁阀打开。所述第一水箱210开始补水且同时所述第二水箱220开始排水。所述第一水箱210和所述第二水箱220中可以设置液位仪。所述液位仪可以为超声波液位计。所述液位仪可实时检测所述第一水箱210和所述第二水箱220中循环水的状态,防止循环水溢出等情况发生。Current staff can set a preset conductivity value on the touch screen according to the needs of the cooling water circulation system 100 . The conductivity detection device 40 can detect the conductivity value of the circulating water in the second water tank 220 in real time. When the controller 10 judges that the conductivity value of the circulating water in the second water tank 220 is greater than the preset conductivity value, the controller 10 controls the seventh solenoid valve 27 and the eighth solenoid valve Open. The first water tank 210 starts to replenish water and at the same time the second water tank 220 starts to drain water. Liquid level gauges may be installed in the first water tank 210 and the second water tank 220 . The liquid level gauge can be an ultrasonic liquid level gauge. The liquid level gauge can detect the status of the circulating water in the first water tank 210 and the second water tank 220 in real time, so as to prevent the circulating water from overflowing.

本实施例中,所述控制器10可以依据判断结果控制所述第七电磁阀27和所述第八电磁阀28的开合状态。从而保证所述冷却水循环系统100中循环水的电导率值在安全范围内。所述冷却水循环控制方法通过控制所述第一水箱210补水并控制所述第二水箱220排水避免所述冷却水循环系统100的管道或设备冷却装备阻垢、腐蚀等,提高设备换热效率,延长使用寿命,降低运维成本。In this embodiment, the controller 10 can control the opening and closing states of the seventh solenoid valve 27 and the eighth solenoid valve 28 according to the judgment result. Therefore, it is ensured that the conductivity value of the circulating water in the cooling water circulation system 100 is within a safe range. The cooling water circulation control method controls the first water tank 210 to replenish water and controls the second water tank 220 to drain water to avoid scaling and corrosion of the pipes or equipment cooling equipment in the cooling water circulation system 100, improve the heat exchange efficiency of the equipment, and prolong the life of the equipment. Long service life and reduce operation and maintenance costs.

在其中一个实施例中,所述冷却水循环系统100还包括第九电磁阀29和废水回收装置50。所述废水回收装置50与所述第一循环水泵230通过管道连接。所述第九电磁阀29设置于所述废水回收装置50与所述第一循环水泵230之间的管道上。当所述控制器10控制所述第七电磁阀27和所述第九电磁阀29打开,所述第二水箱220开始排水后,排出的循环水经所述第一循环水泵230流入所述废水回收装置50。所述废水回收装置50可与绿化管道或卫生间的冲水管道相连,用于绿化植被或卫生间用水。In one of the embodiments, the cooling water circulation system 100 further includes a ninth solenoid valve 29 and a waste water recycling device 50 . The wastewater recycling device 50 is connected to the first circulating water pump 230 through a pipeline. The ninth solenoid valve 29 is disposed on the pipeline between the waste water recycling device 50 and the first circulating water pump 230 . When the controller 10 controls the opening of the seventh solenoid valve 27 and the ninth solenoid valve 29 and the second water tank 220 starts to drain water, the discharged circulating water flows into the waste water through the first circulating water pump 230 Recovery device 50. The waste water recovery device 50 can be connected with the greening pipeline or the flushing pipeline of the toilet, and is used for greening vegetation or water for the toilet.

本实施例中,所述控制器10控制所述第二水箱220排出的循环水流入所述废水回收装置50。所述废水回收装置50可与绿化管道或卫生间的冲水管道相连,用于绿化植被或卫生间用水。所述冷却水循环控制方法减少了水资源的浪费,也减少了企业的成本支出。In this embodiment, the controller 10 controls the circulating water discharged from the second water tank 220 to flow into the waste water recycling device 50 . The waste water recovery device 50 can be connected with the greening pipeline or the flushing pipeline of the toilet, and is used for greening vegetation or water for the toilet. The cooling water circulation control method reduces the waste of water resources and also reduces the cost of enterprises.

在其中一个实施例中,所述冷却水循环系统100还包括一级循环系统300和二级循环系统400。In one embodiment, the cooling water circulation system 100 further includes a primary circulation system 300 and a secondary circulation system 400 .

所述一级循环系统300包括第二循环水泵310和冷却塔320。所述第二循环水泵310与所述第一水箱210通过管道连接。所述第二电磁阀22设于所述第二循环水泵310与所述第一水箱210之间的管道。所述第二电磁阀22与所述控制器10电连接。所述冷却塔320具有第一进水口321和第一出水口322。所述第一进水口321与所述第二循环水泵310通过管道连接,所述第一出水口322与所述二级循环系统400通过管道连接。所述第三电磁阀23设于所述第一出水口322与所述二级循环系统400之间的管道。所述第三电磁阀23与所述控制器10电连接。所述冷却塔320上还可以设有第三温度检测装置33。所述第三温度检测装置33用于检测所述一级循环系统300运行一段时间后所述冷却塔320中的第三温度值。The primary circulation system 300 includes a second circulating water pump 310 and a cooling tower 320 . The second circulating water pump 310 is connected to the first water tank 210 through a pipeline. The second solenoid valve 22 is disposed in the pipeline between the second circulating water pump 310 and the first water tank 210 . The second solenoid valve 22 is electrically connected to the controller 10 . The cooling tower 320 has a first water inlet 321 and a first water outlet 322 . The first water inlet 321 is connected to the second circulating water pump 310 through pipelines, and the first water outlet 322 is connected to the secondary circulation system 400 through pipelines. The third solenoid valve 23 is disposed in the pipeline between the first water outlet 322 and the secondary circulation system 400 . The third solenoid valve 23 is electrically connected to the controller 10 . The cooling tower 320 may also be provided with a third temperature detection device 33 . The third temperature detection device 33 is used to detect the third temperature value in the cooling tower 320 after the primary circulation system 300 has been running for a period of time.

所述冷却塔320包括多组喷淋泵和多组风机。当所述控制器10控制所述第二电磁阀打开后,所述第二循环水泵310提供动力,将所述第一水箱210中的循环水引入所述冷却塔320的管路中。所述喷淋泵向装有需要制冷的循环水的管路上喷冷水。且所述风机向装有需要制冷的循环水的管路上吹风。所述喷淋泵和所述风机配合使用,利用自然冷源达到物理降温的目的。所述第三温度检测装置33实时检测所述冷却塔的第三温度值。当前工作人员还可以在所述触摸屏上设置第三预设温度值。所述第三预设温度值为可以进入所述二级循环系统400中的温度值。只有当所述第三温度值小于或等于第一预设温度值时,所述喷淋泵和所述风机才停止工作。当所述湿球温度值小于或等于所述第二预设温度值时。此时所述二级循环系统400停止工作。此时,所述冷却塔320中的循环水经所述第一循环水泵230回到用水设备。当所述湿球温度值大于所述第二预设温度值时。且当所述第三温度值小于或等于第三预设温度值时,所述喷淋泵和所述风机才停止工作。此时,冷却塔320中的循环水进入所述二级循环系统400,进行二级降温处理。The cooling tower 320 includes multiple sets of spray pumps and multiple sets of fans. When the controller 10 controls the opening of the second solenoid valve, the second circulating water pump 310 provides power to introduce the circulating water in the first water tank 210 into the pipeline of the cooling tower 320 . The spray pump sprays cold water on the pipeline containing the circulating water that needs to be refrigerated. And the fan blows air to the pipeline containing the circulating water that needs to be refrigerated. The spray pump is used in conjunction with the fan to achieve the purpose of physical cooling by using a natural cooling source. The third temperature detection device 33 detects the third temperature value of the cooling tower in real time. The current staff can also set a third preset temperature value on the touch screen. The third preset temperature value is a temperature value that can enter the secondary circulation system 400 . Only when the third temperature value is less than or equal to the first preset temperature value, the spray pump and the fan stop working. When the wet bulb temperature value is less than or equal to the second preset temperature value. At this time, the secondary circulation system 400 stops working. At this time, the circulating water in the cooling tower 320 is returned to the water equipment through the first circulating water pump 230 . When the wet bulb temperature value is greater than the second preset temperature value. And when the third temperature value is less than or equal to the third preset temperature value, the spray pump and the fan stop working. At this time, the circulating water in the cooling tower 320 enters the secondary circulation system 400 for secondary cooling treatment.

所述二级循环系统400包括换热器410、第三循环水泵420和冷水机组430。The secondary circulation system 400 includes a heat exchanger 410 , a third circulating water pump 420 and a chiller 430 .

所述换热器410与所述第一出水口322通过管道连接。所述换热器410与所述第一出水口322之间的管道上设有所述第三电磁阀23。所述第三电磁阀23与所述控制10电连接。所述换热器410与所述第二水箱220通过管道连接。所述换热器410与所述第二水箱220之间的管道上设有所述第四电磁阀24。所述第四电磁阀24与所述控制器10电连接。The heat exchanger 410 is connected to the first water outlet 322 through a pipe. The third solenoid valve 23 is provided on the pipeline between the heat exchanger 410 and the first water outlet 322 . The third solenoid valve 23 is electrically connected with the controller 10 . The heat exchanger 410 is connected to the second water tank 220 through pipelines. The fourth solenoid valve 24 is provided on the pipeline between the heat exchanger 410 and the second water tank 220 . The fourth solenoid valve 24 is electrically connected to the controller 10 .

所述第三循环水泵420通过管道与所述换热器410连接。所述第三循环水泵420与所述换热器410之间的管道上设有所述第五电磁阀25。所述第五电磁阀25与所述控制器10电连接。The third circulating water pump 420 is connected to the heat exchanger 410 through a pipeline. The fifth electromagnetic valve 25 is provided on the pipeline between the third circulating water pump 420 and the heat exchanger 410 . The fifth solenoid valve 25 is electrically connected to the controller 10 .

所述冷水机组430分别与所述换热器410和所述第三循环水泵420通过管道连接。所述冷水机组430与所述换热器410之间的管道上设有所述第六电磁阀26。所述第六电磁阀26与所述控制器10电连接。所述冷水机组430上还可以设置第四温度检测装置34。所述第四温度检测装置34用于实时检测所述冷水机组430中的第四温度值。所述第四温度检测装置34与所述控制器10通信连接。The chiller unit 430 is connected to the heat exchanger 410 and the third circulating water pump 420 through pipelines respectively. The sixth solenoid valve 26 is provided on the pipeline between the chiller 430 and the heat exchanger 410 . The sixth solenoid valve 26 is electrically connected to the controller 10 . A fourth temperature detection device 34 may also be provided on the chiller 430 . The fourth temperature detection device 34 is used to detect the fourth temperature value in the chiller 430 in real time. The fourth temperature detection device 34 is in communication connection with the controller 10 .

当所述控制器10控制所述第二电磁阀22打开时,所述一级循环系统300可以利用自然冷源对进入所述一级循环系统300中的循环水进行一级降温处理。当所述控制器10控制所述第三电磁阀23和所述第四电磁阀24打开时,所述冷却塔320中的循环水经所述换热器410进入所述第二水箱220。再经所述第一循环水泵230回到所述用水设备60中。当所述控制器10控制所述第四电磁阀24关闭,所述第三电磁阀23、所述第五电磁阀25和所述第六电磁阀26打开。所述一级循环系统300中的循环水流入所述二级降温系统400中。所述二级降温系统400利用逆卡诺循环对进入所述二级循环系统400中的循环水进行二级降温。当所述第四温度值小于或等于所述第一预设值时,所述二级循环系统400停止工作。所述控制器10控制所述第四电磁阀24打开,所述二级循环系统400中的循环水进入所述第二水箱220,经所述第一循环水泵230回到所述用水设备中。反之,所述二级循环系统400继续工作,直到所述控制器10判断得到所述第四温度值小于或等于所述第一预设值。When the controller 10 controls the second electromagnetic valve 22 to open, the primary circulation system 300 can use a natural cold source to perform primary cooling treatment on the circulating water entering the primary circulation system 300 . When the controller 10 controls the opening of the third solenoid valve 23 and the fourth solenoid valve 24 , the circulating water in the cooling tower 320 enters the second water tank 220 through the heat exchanger 410 . Then return to the water equipment 60 through the first circulating water pump 230 . When the controller 10 controls the fourth solenoid valve 24 to close, the third solenoid valve 23 , the fifth solenoid valve 25 and the sixth solenoid valve 26 are opened. The circulating water in the primary circulation system 300 flows into the secondary cooling system 400 . The secondary cooling system 400 uses reverse Carnot cycle to perform secondary cooling on the circulating water entering the secondary circulating system 400 . When the fourth temperature value is less than or equal to the first preset value, the secondary circulation system 400 stops working. The controller 10 controls the fourth electromagnetic valve 24 to open, and the circulating water in the secondary circulation system 400 enters the second water tank 220 and returns to the water-using equipment through the first circulating water pump 230 . On the contrary, the secondary circulation system 400 continues to work until the controller 10 determines that the fourth temperature value is less than or equal to the first preset value.

本实施中,所述冷却水循环系统100利用所述一级循环系统300和所述二级循环系统400配合使用。所述冷却水循环系统100充分利用自然冷源对所述用水设备60出来的循环水进行降温,减轻了所述二级循环系统400的工作负荷,提高了所述二级循环系统400的能效。In this implementation, the cooling water circulation system 100 is used in cooperation with the primary circulation system 300 and the secondary circulation system 400 . The cooling water circulation system 100 makes full use of the natural cooling source to cool down the circulating water from the water equipment 60 , which reduces the workload of the secondary circulation system 400 and improves the energy efficiency of the secondary circulation system 400 .

以上所述实施例的各技术特征可以进行任意的组合,为使描述简洁,未对上述实施例中的各个技术特征所有可能的组合都进行描述,然而,只要这些技术特征的组合不存在矛盾,都应当认为是本说明书记载的范围。The various technical features of the above-mentioned embodiments can be combined arbitrarily. To make the description concise, all possible combinations of the various technical features in the above-mentioned embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, should be considered as within the scope of this specification.

以上所述实施例仅表达了本申请的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对申请专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本申请构思的前提下,还可以做出若干变形和改进,这些都属于本申请的保护范围。因此,本申请专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only express several implementation modes of the present application, and the description thereof is relatively specific and detailed, but should not be construed as limiting the scope of the patent application. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the scope of protection of the patent application should be based on the appended claims.

Claims (10)

1. a kind of cooling water recirculation system (100), including pass through sequentially connected first water tank (210) of pipeline and first circulation Water pump (230), which is characterized in that the cooling water recirculation system (100) further include:
First solenoid valve (21), the pipeline being set between first water tank (210) and the first circulation water pump (230);With And
First temperature-detecting device (31) is set to first water tank (210), follows for detecting in first water tank (210) First temperature value of ring water.
2. cooling water recirculation system (100) according to claim 1, which is characterized in that further include:
Controller (10) is electrically connected with first solenoid valve (21), for controlling the folding shape of first solenoid valve (21) State;And
Second water tank (220) is set between first water tank (210) and the first circulation water pump (230), described first Pipeline between water tank (210) and second water tank (220) is equipped with first solenoid valve (21).
3. cooling water recirculation system (100) according to claim 2, which is characterized in that further include:
7th solenoid valve (27) is set to the moisturizing pipeline of first water tank (210), when the 7th solenoid valve (27) is opened Afterwards, start the moisturizing into first water tank (210);
8th solenoid valve (28) is set to the drainage pipeline of second water tank (220), when the 8th solenoid valve (28) is opened Afterwards, second water tank (220) starts to drain;And
Conductivity detector (40) is set to second water tank (220), for detecting the cooling water recirculation system (100) The conductivity of middle recirculated water.
4. cooling water recirculation system (100) according to claim 3, which is characterized in that further include:
Waste water reclaiming device (50) is connect with the first circulation water pump (230) by pipeline.
5. cooling water recirculation system (100) according to claim 4, which is characterized in that further include:
9th solenoid valve (29), the pipe being set between the waste water reclaiming device (50) and the first circulation water pump (230) Road, after the 9th solenoid valve (29) is opened, the recirculated water of the second water tank (220) discharge flows into the waste water reclaiming device (50)。
6. cooling water recirculation system (100) according to claim 2, which is characterized in that further include:
Primary cycle system (300) is connect with first water tank (210) by pipeline, is followed for cooling into the level-one Recirculated water in loop system (300);And
Secondary cycle system (400) passes through pipeline with the primary cycle system (300) and second water tank (220) respectively Connection.
7. cooling water recirculation system (100) according to claim 6, which is characterized in that further include:
Second solenoid valve (22), the pipeline being set between the primary cycle system (300) and first water tank (210);
Third solenoid valve (23), the pipe being set between the primary cycle system (300) and the secondary cycle system (400) Road;And
4th solenoid valve (24), the pipeline being set between the secondary cycle system (400) and second water tank (220).
8. cooling water recirculation system (100) according to claim 7, which is characterized in that the primary cycle system (300) Include:
Second circulation water pump (310) is connect with first water tank (210) by pipeline, and the second solenoid valve (22) is set to Pipeline between the second circulation water pump (310) and first water tank (210);And
Cooling tower (320) has the first water inlet (321) and the first water outlet (322), first water inlet (321) and institute It states second circulation water pump (310) to connect by pipeline, first water outlet (322) and the secondary cycle system (400) are logical Piping connection, the third solenoid valve (23) be set to first water outlet (322) and the secondary cycle system (400) it Between pipeline.
9. cooling water recirculation system (100) according to claim 8, which is characterized in that the secondary cycle system (400) Include:
Heat exchanger (410) is connect with first water outlet (322) by pipeline, and the third solenoid valve (23) is set to described Pipeline between heat exchanger (410) and first water outlet (322);
Third water circulating pump (420) is connect by pipeline with the heat exchanger (410);And
Water cooler (430) is connect with the heat exchanger (410) and the third water circulating pump (420) by pipeline respectively.
10. cooling water recirculation system (100) according to claim 9, which is characterized in that further include:
5th solenoid valve (25), the pipeline being set between the third water circulating pump (420) and the heat exchanger (410);And
6th solenoid valve (26), the pipeline being set between the water cooler (430) and the heat exchanger (410).
CN201821650426.1U 2018-10-11 2018-10-11 Cooling water recirculation system Expired - Fee Related CN209341663U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821650426.1U CN209341663U (en) 2018-10-11 2018-10-11 Cooling water recirculation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821650426.1U CN209341663U (en) 2018-10-11 2018-10-11 Cooling water recirculation system

Publications (1)

Publication Number Publication Date
CN209341663U true CN209341663U (en) 2019-09-03

Family

ID=67745519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821650426.1U Expired - Fee Related CN209341663U (en) 2018-10-11 2018-10-11 Cooling water recirculation system

Country Status (1)

Country Link
CN (1) CN209341663U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111043818A (en) * 2018-10-11 2020-04-21 领凡新能源科技(北京)有限公司 Cooling water circulation control method and system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111043818A (en) * 2018-10-11 2020-04-21 领凡新能源科技(北京)有限公司 Cooling water circulation control method and system

Similar Documents

Publication Publication Date Title
CN104676993B (en) A kind of standby antifreeze control method
CN105004067B (en) A kind of solar energy and air-source and heating system
CN107687707B (en) A hot water system using air source and its control method
CN103911588B (en) For the water temperature controlled circulation cooling system of diffusion pump of vacuum coater
CN108954626A (en) A kind of building cooling supply heating system and its control method
CN109654887B (en) Circulating water cooling system and automatic control method thereof
CN202501759U (en) Carbon calciner waste heat heating system
CN103900247A (en) Instant water heater
CN106931799B (en) Cooling tower device with water replenishing and scale preventing functions and control method
CN203478468U (en) Chilled water storage air conditioning system
CN105605830A (en) Waste hot water recycling heat pump system and heat pump system control method
CN209341663U (en) Cooling water recirculation system
CN104613667A (en) Combined air-conditioning system as well as control method thereof
CN209326142U (en) air conditioner
CN113587448B (en) Circulating water pump control method of multi-energy heat supply waterway multi-circulating system
CN106288094B (en) Heat exchange cooling water system and control method
CN102967081B (en) Heat pump heat exchanger and control method thereof
CN206160340U (en) Heat exchange cooling water system
CN202835740U (en) Energy saving apparatus for air-conditioning condenser
CN111076420A (en) Energy-saving and water-saving construction site hot water system based on air energy heat pump and its construction method
CN206916835U (en) A kind of laboratory cooling water recirculation system
CN106288074B (en) A kind of water source heat pump air-conditioner recycling-guard device
CN103940125A (en) Intelligent cycle solar energy anti-freezing control system and control method thereof
CN115597397A (en) An automatic control method for steam condensate recovery
CN210178546U (en) Air compressor machine heat energy recycle circulation system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20200817

Granted publication date: 20190903

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20230817

Granted publication date: 20190903

PD01 Discharge of preservation of patent
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190903

CF01 Termination of patent right due to non-payment of annual fee